




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、Computer Modelling Group, Inc.2006 TutorialBuilding, Running and Analyzing a“ STARS Water flood ” Reservoir Simulation ModelusingBuilder & STARS2006.102006.10CMG軟件培訓(xùn)講義(二)Table of ContentsCreating a “ Black oil ” model using BU2LDE6R0 .3Starting CMG Launcher3Opening BUILDER3Creating the Simulatio
2、n Grid3Assigning Porosity & Permeability to the Model6Creating PVT Data7Creating Relative Permeability Data8Creating Initial Conditions9Creating Trajectory and Loading Perforation file9Adding Historical Production Data 12Creating Monthly Production/Injection recurrent welldata12Creating Field Pr
3、oduction history (*.fhf) for History Match 13Well Definition and Constraints13Write out Restart information to a Restart File 15Running the STARS Dataset. .15Reviewing the Simulation results using Results Graph .16Using the Historical D ata restart File in a Prediction Run .171Creating a “ Black oil
4、 " model using BU20D6R0Create a working directory somewhere on your disk and put the map files that accompany this tutorial in this directory.Start the CMG Launcher (icon on desktop or START/PROGRAMS/CMG/Launcher)? Select menu itemProjects, then Add Project? Browse for the directory where you s
5、tored the map files? Call the project Tutorial? Click OK to exit back to the Launcher? You should now have this directory displayedOpen BUILDER 2006.10 (double click on the icon)? Choose:STARS Simulator, SI Units, Single PorosityStarting date 1991-01-01? Click OK twiceCreate the Simulation Grid (str
6、uctural data)? Click on File (on the menu bar, top left), thenOpen Map File? Choose Map Type - Atlas Boundary format and m for Units for x/y coordinates? Select the Top-of-Structure map file called To10flt.bna by clicking on the Browse button and locating the file? Click OKCMG軟件培訓(xùn)講義(二)25LrH. siet i|
7、f 0崎也!B6cfrlHl LnlM4il reftditHME |u4r l4iJI 由 小小心 山 IjkJC tlr-Ji.* 巾S三I Q n” 1*1!4i-"JiMnMJi_ lLhIIR-fen b¥ Ft哼牙ii>“SMt40F33"d feR*xnaZ 下為由IF”、11岫嗎F*Zi旨已Csn>Fara>Hi.IT./ W GcEE IhM 6司(3 NinfiMlGhik 珀 都“皿J -ik. i31配5 gULDEF? DATASETMaximise the screensfor a better view by cli
8、cking on the window maximise button (the square in the top right of the windows)Click Reservoir (on the menu bar)Select Orthogonal Corner Point and specify a 25 (I-direction) x 35 (J-direction) x 4 (K-direction) grid.Enter 25*110 in the I direction box (meaning all 25 columns in the I-directionwill
9、be 110 meters in length)Enter 35*125 in the J-direction box (meaning all 35 rows in the J-direction will be 125 meters in length)Click OKHold down Shift key and hold down left mouse button to move (pan) gridHold down Ctrl key and hold down left mouse button to rotate gridAlign the grid with the faul
10、t so that a grid block boundary lies along it, and the grid covers the whole map area.toolbar buttonChange display control to Probe mode by clicking on this on left hand sideClick on the Specify Property button (top middle of screen) to open the General Property Specification spreadsheet as shown be
11、lowSelect the box for layer 1 under the property column labelled Grid Top. Right click in this box and select the Geological Map option as the data source.Click the Values in filel button, then Browse for and select the top-of-structure map file called To10flt.bna (it should already be selected from
12、 previous actions)Click OK to return to the spreadsheet type windowRepeat this action for Grid Thickness in layer1 box but this time select Thickflt.bna in the Values in file1 box. Also, enter 0.25 in the times box (still on the property specification menu) in order to allocate 25% of the total thic
13、kness map to each of the 4 layers in the grid. Finally, copy the layer1,Grid Thickness cell contents and paste it into the layer2, layer3 and layer4 Grid Thickness cells to complete the specification of Grid Thickness source data for each of the 4 layers in the grid you can use Cntrl-C and Cntrl-V k
14、eys to copy specifications for the first layer to the other 3 just as in a regular spreadsheet), Click OKClick the Calculate Property button and click on OK to populate the grid with top-of-structure and grid thickness data (this operation is performed by BUILDER using the specified map data to inte
15、rpolate grid cell values).Change the view from IJ-2D Areal to 3-D View (in the upper left corner!)? Click on the rotate 3D view button =_l (from the toolbar) to rotate the display by holding down the left mouse button and using the cursor to move the model. Hold down the Cntrl key left mouse button
16、and move the mouse toward the top of the screento zoom in or move the mouse to the bottom of the screen to zoom out.? To remove the contour map from the display, click the right mouse button while the cursor is anyway in the display area. SelecProperties from the displayed menu (bottom of list), Map
17、s from the tree view; and (finally) uncheck the Show Map Contours Lines and Fault boxes.Assigning Porosity & Permeability to the Model?Repeat this for Porosity, but select the map porosflt.dig. Use the same map for each layer. Note that the input map values are in % and the simulator uses fracti
18、ons (need to multiply each map by 0.01 數(shù)據(jù)圖里是數(shù)據(jù) %,而軟件是讀 入小數(shù),所以要乘以0.01?Select Permeability I from the list on the panel?Enter the following:Layer 150Layer 2250Layer 3500Layer 4100?Select Permeability J in the Whole Grid and right click?Click on the box and selectEQUALSI then OK?Do the same with Permea
19、bility K?Click on the box and selectEQUALSI?In the first box select* and then Value0.1 (This applies a Kv/Kh ratio of 0.1)<enter> thenOK?Leave the General Property Specification section and then doalculate Property ? If the above is done correctly, the Reservoir Tab should be checked.Assigning
20、 Other Reservoir Properties?Select Other Reservoir Properties, a new window will show up as follows:- button. Select Rock? Select New Thermal Rock Type by clicking on the Compressibility tab? Set the rock compressibility to 2E-5 1/kPa at a reference pressure of 20000kPa Units will be applied automat
21、ically.?Exit back to the main panel? This would be a good point to save the data set you are working on. Click File then Save Dataset as. Save file as Tutorial.dat .Creating component propery data? Go to Component Selection, Add/Edit Component , Choose “H2。from the library and define it as aqueous c
22、omponent and also will exist as gas phase based on K-value partitioned (Steam).? (do not worry about the warning messages about densities!)? Add another component and named it as “ Dead Oil ” , which is defined as Oleic component and no K-value partitioned. (No solution gas within this oil),? Input
23、Molecular weight 0.6 (equivalent to 600 gm/g-mole), Pc, Tc equal zero,? Apply & OK.? Go to Densities tab, change to Mass Densities and enter the following:Water1000 Kg/m3Dead Oil980 Kg/m3Leave Liquid compressibilities and thermal expansion coefficients empty (Use defaultvalues instead!)? Go to L
24、iquid Viscosity Section and choose “ Use viscosity table “ option, input the following table for oil Viscosity, input zero for water viscosity (this will trigger the program to use default value for Water!)(Hint: Use Ctrl I to insert rows for data entry!)TemperatureViscosity25578040138065.518793.347
25、121.117.4148.98.5176.75.2260.02.5426.72.5? Now click Apply and all the values should turn to Green!Creating Relative Permeability Data? Click the Rock Fluid section.? Double click the Rock Fluid Type in the tree menu, a menu will show up.Select New Rock Type by clicking on the button. SelectNew Rock
26、 Type ? Choose Tools and Generate Table using correlation ? Enter the following parameters for the Analytical relative permeability curves generation.Swcon 0.2Swcrit 0.2Soirw 0.4Sorw 0.4Soirg 0.2 Sorg 0.2 Sgcon 0.05 Sgcrit 0.05 Krocw 0.8 Krwro 0.3 Krgcl 0.3 Krogcg 0.8 (optional, no input)All Exponen
27、ts should be 2.0? Then Apply, OK and a table containing the relative permeability curves will appear.? The Rock Fluid section should turn to green check mark. Save the file at this time<! H4g I .Jr IailJJLBkE 加06 日Wrt dal ATuliiE *:0 111 * 口+"Kr " 嗅(T*fW3I f £-*1*1 414 RilrFli"
28、;4 Xr(l- !iaJ |-i-'l!-ii| 1 h4rl R i p 1:'' h | 卜-Ui ' F71膽 I 1 4mt-viaw ?a:11Mli 二 g工T*IjD Cs-iKi“嗚/匚木*皿二,Ma<4>|>tL-ie. Dpf.1- AJ|4VV4L-'»* Crwi.-.i*E"k,口; 4 Tj?qiCm*Pr=p電H中.制MmlX* (£!:,"4! ! Uikl : Creating Initial ConditionsClick the Initial tab on
29、 the tree menu oBUILDER.Double click on Initial ConditionsSelect Water-Oil-Gas as the initial fluid in the reservoir to perform a Gravity-Capillary Equilibrium CalculationType:27600 (kpa implied) in the Reference pressure window3050 (m implied) in the Depth of reference pressure window3080 (m implie
30、d) in the Water-oil contact window1980 (m implied) in the Gas-oil contact windowLeave the other boxes blankClick on Apply ; then OKYou should now be back in the main menu of BUILDER with all tabs in green check except for the Recurrent Data box.At this point it is advisable to save the data again by
31、 selectingFile from the top menu andSave DatasetCreating Trajectories and PerforationsOnce we have created the static model, we will now incorporate the trajectories and perforations information into the model.? Click on Wells and Recurrent Tab? Go to the menuWell Trajectories?Select Create New Traj
32、ectories from completions (PERF) using the button, the following window should pop up;Create vwll 怔e" from location 日M drectian # BKcting nwdel viel cpnpletign I g tolawirg concfcions tc salettedl 網(wǎng)日orly rh白 1st 討 mcdd ell complctme PEEFJ wil to ueodOMctng tRicctonoo ill bo dolctolS rtprt iajpI
33、I Mrrwr二/石而1 gfi叵5et LB e45V3tiDn atoe datum:牖 Dnp ter 4 uwlk d mIndividual ycIucs.Caned?This screen will create a vertical trajectory for each well originate from the map; PressOK to create these vertical trajectories;? Now go back to menu Well Trajectories, Select Trajectory perforation Intervals
34、, the following window should pop up:?Click on Read File, select the file MODIFIED-PERFS.PeRF , select the file unit as SI, thenopen?If this is done correctly, the window will update to the following:?PressApply and OK;?This completes the trajectories and Perforation of the wells in the model.Adding
35、 Historical Production Data to the ModelThe last item we want to do is add historical rate data so as we can set up a history match run?Go to the top menu again and select Import Production/Injection data ( this is the wizard to create production/injection data into well & recurrent data for the
36、 simulator and also defines the status of each well!)?STEP 1: First step of this wizard is to provide the type and name of the production file. In our case, we will use General and choose a file in the tutorial directory namedProduction-history.prd?STEP 2: Follow the instructions and highlight the f
37、irst line containing the production data and well name, goto next Use the Next/Back buttons on the panels to move forward/backward between each Step?STEP 3: If the limiter looks good and separate the columns accordingly, go to STEP 4?STEP 4: Go to Column 3 to 5 and in the identifier row, choose Oil
38、Produced, Water Produced and Gas Produced for each column.?STEP 5: This is the place showing you which well ' production data has been picked up and which well is not. For example, the program could not find any production data from well 5, 7 and 9. Since wells 5, 7 and 9 have no production hist
39、ory, the easiest action is to delete them from the model. We will do this later. Other than that, click Finish .±KpO£l P E Li duct xon/ IlL | £:C t IOEl Dal Si5tW 2. Chv L-i-e lir I vPlcase Select (illh.1 iJht) the start line 口£ a.ctuaJ. deita having voJLid DatePate Oi 1 Hate U口.
40、tu 5?ate- Gai E?a teH *口.¥ mlSj- d-oyii3ii. 3-dWflE? 37E41E IE三EI8RT 於/3433Jzjggi 4.Z3DZJ931VEIL fWelL 1-"?白口白中耳豆>5"口1¥ El白67白 /2可 747113 ;30 HB673 Ml 9!>4 34 V237 Ib4459 90 25D5E d5IDBL Z4T21 9S. 73S513 5.H”g31L1H士氣尊b 、&X30Z1531 7x31.19y1 mh 小 gi5" 21143 102. S305
41、792” 2S2>7£14 0053 IDZZO 01721 + 5 T5BSJ ?bl8y . 81QU13蝦 MW012 283Highlight these linesne fl rsf ,已11 naueLZJl/jg?l 2-281991 : 丁 ”74/301彩1S-31 .-iggi>0&Z : J794JL6 154目 J.Q5L 0?42678 0:3593 152.2fcSE01 5 J8S78 632SM7 128113 230 866734 1IL9E4 3416237 16445g 90 2505s 45D&1 ?47217355
42、19 36.05-903 1 白 l 白看74&616x30x19917X31xjggi 亂,Jl/Jiyj上537 921H3J口工 510579Z'?7 . NH上已白了”4 flO53 1口?304 017?157G4BD BID I33b.644U12 bZbJ.74473nrr fjrmip nauuR: hltfs in rrwfrHet- View 口值同F(xiàn)ileCcriil I”里k11麗E JCreating Average Monthly Production / Injection recurrent well dataNext thing we want
43、 to do is to generate the well recurrent data for every month.Go to the top menu again and selecAverage Production/Injection DataNow, move your mouse to the y-axis and right click , a menu will show up to allow you to change the average interval from this point on to monthly, bi-annually, yearly, et
44、c.1 £.vex au e- I'rocLuclxtixi/ J.elj evliun. Data Ptope呷;jOIRMh sc: piadKlIvi-TJ 日哂ApMOartt t19W6,0l =EM制* 口曰.解1OCT WLE_o1.9237856一二一二iinterval tetrjFI聞與tt83rT機(jī),BtT*thV*fl'A.pTI J但 ear a W HE14*|»,4£1£.£, iv-S'4CiTi.C1 CFral t * ifttffirvftl t *41154& ftwith
45、s l:力interval toInteirw-fil ta? nLh-iMerwal? to d.f也1Mt ef *ry ,r*附廿*3/TT'dl1! ptwjf n»nthittralT in &f岑弓 tm! dir 5N 11-01-01 st iflBicri-crifrt ifl9i-ui-ai kt I99I-01-&1 Mt l9iH0il-0ii *t 191-01-01*0骷什費(fèi)匕 下匕“七口 . UMI|yyi-0H i 目 “1小"p" c* -Ji my* hirf t ,ditr ft*1LKt 199fl-
46、Dl-014 t'4Swt La xt'CLCid.也上上仁Thelflila*hg wek,)”命Hl -iMpure )酬普口出片K。什巾懺,產(chǎn)咿卜 產(chǎn)。m yf尸仁即戶口+產(chǎn)r-qirn 啟一,叫 41TL ?cu ext Uii d-iahij ALL /TIs ml k? 4r±gK wih Ihs spec Ind rJtervafcV/dTlJwdl ID,. Well 2,WdB 3. WdH4. WdllG. 'el ggK Cartel | HelpSelect monthly and OKplease Sslecl (Mi g;hl ig
47、hr) ihe lineDrtte Oil R迫也 ¥=it>sr 刊己* Gaa R*日 Y a 3zdayn3l/dkiy ii 5zdCreating Field Production History (*.fhf) for History MatchNext thing we want to do is to create a field history file so that we can make comparison between simulation run and actual field history file.Go to the top menu a
48、gain and select Create Field History file, then provide a filename (or you can just use the default)Well Definition and Constraints .For those wells that have no production history, we can either delete it or define it as producer or injector and shut-in the wells so that it will not affect the hist
49、ory match.In this tutorial, we will delete well 5, change well 7 & 9 as injectors.To do that, open the tree view and highlightWell 5 and right click, delete and yesGo to well 7, right click, Properties, a new menu will show up as follows:Click on ID & Type , check the Edit box for Type, and
50、select the well as Injector MobweightGo to Constraints tab, (say YES to apply changed if asked!), check theconstraint definition box.Under select new, input OPERATE, BOTTOM HOLE PRESSURE, MAX,25000 KPAGoto Injected Fluid and chooseWater as injection fluid.Go to Options, Check Status box, chooseShut-
51、in well at this time.Now, we will copy all the above specification to well 9 also. To do that, make sure you are in the well 7 and hightlight the INJECTOR, constraints, Injected fluid, SHUTIN (all of them!), Select Tools at the bottom of the screen, click Copy events using filter at the top of the m
52、enu, a new menu will pop up. Then select well 9, goto Date Selection tab, check the data 1991-01-01, therSearch and Add , the menu should look like this:Click OK and the same information on constraint created in well 7 will now copy to well 9.“YE6 ,If message pop up requesting to change the well sta
53、tus for well 9, sayIf everything is OK, you should have all the tabs turned intogreen check.Please save the file one more time!?We now have a fully defined reservoir model that we can submit to the simulator.The dataset, tutorial.dat, can now be dragged and dropped onto the STARS icon from the Launc
54、her window to run the dataset. We will analyse the output later.Note: To refresh the file display in the Launcher window you can just click on the directory folder in the left hand folder display window. Otherwise you can set an automatic refreshing interval by selecting Launcher menu option View; A
55、dvanced options . You can check the automatic refresh box and set the refresh interval. New files labelled .out containing ASCII text output; .irf; and .mrf containing graphical data, have been created.You can use the file filter in the top right of the Launcher to filter on standard or user defined
56、 file endings.Write out Restart information to a Restart File?Click on the I/O Control tab?Select theRestart?Click on Enable Restart Writing?On the + sign, click and select the first simulation date which is 1991-01-01.?Select the first option At every time .?Click OK back to main panel?Click File;
57、then Save Dataset as.Name this file tutorial_hm.dat?We now have a completed dataset so we can exit Builder and drag and drop the tutorial_hm.dat file onto the STARS icon to run it. You will be able to make prediction runs without having to rerun the historical data portion as a result of using the Restart Run feature.Running the STARS Dataset?If everything is OK, you should be able to run the dataset?First locate the file Tutorial-hm.dat
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 正規(guī)服裝合作合同范本
- 五金電器購(gòu)銷合同范本
- 米線店加盟合同范本
- 合同范本委托
- 醫(yī)療公司勞務(wù)合同范本
- 古玩字畫買賣合同范本
- 公司做飯阿姨勞務(wù)合同范本
- 公司委托租房合同范本
- 合肥 裝修 合同范本
- 廠房和設(shè)備采購(gòu)合同范本
- 2025年廣州市黃埔區(qū)東區(qū)街招考社區(qū)居委會(huì)專職工作人員高頻重點(diǎn)模擬試卷提升(共500題附帶答案詳解)
- 汽車制動(dòng)系統(tǒng)課件
- 2025年黑龍江省高職單招《職測(cè)》高頻必練考試題庫(kù)400題(含答案)
- 統(tǒng)編版七年級(jí)語(yǔ)文下冊(cè)《第16課有為有不為》教案
- GB 45184-2024眼視光產(chǎn)品元件安全技術(shù)規(guī)范
- 【上?!康谝淮卧驴季?1【20~21章】
- 2025年湖南科技職業(yè)學(xué)院高職單招數(shù)學(xué)歷年(2016-2024)頻考點(diǎn)試題含答案解析
- 2025年?yáng)|營(yíng)科技職業(yè)學(xué)院高職單招語(yǔ)文2018-2024歷年參考題庫(kù)頻考點(diǎn)含答案解析
- 《新媒體廣告》課件 第4章 從技術(shù)到場(chǎng)景:新媒體廣告的創(chuàng)新應(yīng)用
- 2025年煙臺(tái)工程職業(yè)技術(shù)學(xué)院高職單招數(shù)學(xué)歷年(2016-2024)頻考點(diǎn)試題含答案解析
- 2025年上半年中煤科工集團(tuán)商業(yè)保理限公司招聘易考易錯(cuò)模擬試題(共500題)試卷后附參考答案
評(píng)論
0/150
提交評(píng)論