陽(yáng)極氧化工藝流程翻譯_第1頁(yè)
陽(yáng)極氧化工藝流程翻譯_第2頁(yè)
陽(yáng)極氧化工藝流程翻譯_第3頁(yè)
陽(yáng)極氧化工藝流程翻譯_第4頁(yè)
陽(yáng)極氧化工藝流程翻譯_第5頁(yè)
已閱讀5頁(yè),還剩15頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、陽(yáng)極氧化工藝流程翻譯Process flow and raw materials of aluminum andaluminum alloy anodic oxidation tintingProcedure specification on aluminum and aluminum alloy anodic oxidation tinting 1. Procedure specification(line drawing)Substrate - Mounted hanging - Degreasing - Alkaline etching - Neutralization - Anodic

2、 oxidation - Electrolytic coloring - Sealing - Electrophoretic coating - Curing - Unloading packaging - WarehousingMounted hanging :preparations before mounted hanging.Check the conductive parts like conductive beams and bars. They should be regularly polished, cleaned or repaired.Get ready conducti

3、vity of aluminum and aluminum wire.Check the pneumatic tools and related equipment.Check whether or not requirements like length, count, color, thickness on the flow paper or production task list are consistent with the order drawing and actual materials.Depending on the specifications (size of circ

4、umscribed circle, external surface area, etc.) to determine the count and space. To control the pigment spacing about 1.2 times than the horizontal width of the material shaped, and the white material spacing about 1 time than the width.Choose the appropriate rack, and ensure that hook number of neg

5、ative and positive hangers is the same with the count of materials shaped.Mounted hanging:When hanging, fix the topside one first, and then the bottom one, and then arrange the remaining sections in the middle, and tighten the screws.Before hanging, placing one aluminum sheet between the material an

6、d aluminum screw p so that it can prevent poor conductivity impacting oxidation, coloring and electrophoresis.When hanging, it is not allowed to hang all the materials in the lower or upper rack.The hanged materials should recline more than 14 degrees in order to facilitate air exhausting in electro

7、phoresis or coloring, and reduce the air bubbles.When hanging, considering the facing of the decorative surface and groove to prevent the color shading, bubbles, pitting appearing in the decorative surface.Like some flexible and easily deformed materials, put one more rack or aluminum wire in the mi

8、ddle to prevent friction between the materials or touching tank plate, and that may abrade or burn the surface.When selecting vice-bar rack, the plug rod is preferred. When using aluminum banding, they must be evenly spaced, and the outcrops should be less than 25mm.Materials with great disparity of

9、 cross-section size and shape are prohibited to hang in the same row.When hanging and handling equipment, you must wear clean gloves, gently and well protecting the surface.When hanging or handling equipment, workers should strengthen self-examination and cross-examination, the failure materials are

10、 non-mounted, and take appropriate measures to deal with the surface stained with oil or aluminum burrsAfter eliminating unqualified ones, you must make them up in time by order.In hanging area, materials should not be stored for too long time, to prevent corrosion of the surface.Filling the hanging

11、 record and oxidation process card. Accurately calculating and fill in oxidation of each linked area, checking models, count and color by orders at any time.Do a good job in shift procedures and keep the work area clean.Preparation before oxidized production units:Checking the level of the liquid in

12、 the process tank. According to test report card, to adjust the concentration of the bath solution and ensure that bath solution is always in line with technical requirements. Workers should frequently sweep the dirt from the bath solution.Checking the vehicle, freezer, rectifiers, circulating acid

13、pump, water pump, transfer cars, furnace and other equipment, any exception should be immediately solved.Check PH (or conductivity) and cleanliness in the pure water washing tank and running water washing tank. If it does not meet the technical requirements, workers should change it and hydrating ov

14、erflow.Open the alkaline etching, hot pure water tank, sealing the steam or cooling water tank; open the oxidation tank, coloring tank and cooling system of electrophoresis tank to ensure the uniformity of bath solution and temperature complying with requirements.Check the Roots blowers, exhaust blo

15、wers and exhaust fans. Before the production, they should be opened.Carefully check the oxidation process card, specifically confirm the production requirements, and prepare the color palette.General requirements for oxidation sets operation:It is not allowed to hang t more than two hangings every t

16、ime. And keeping a certain distance between the two hangings to prevent collision between the materials.When materials hung into and hung out of the bath solution, they must be inclined to 30Materials falling into the tank must be removed promptly and hung up in rafts, the damage ones must be prompt

17、ly notified to group-to-order equipment to make them up.In addition to alkaline etching and coloring, the sections should be hung out after the bath solution drained away to reduce the flow of waste and pollution.When the hanging materials must cross other sections, the transferring ones must mainta

18、in the level of the degree to reduce theflow of liquid and pollute materials and conductive beam.Each process should be promptly fill in the oxidation process cards, and sign them.Degreasing:Process ParametersComposition of bath solution: acidic degreasing agent 2 to 3% Temperature: room temperature

19、 Degreasing time: 1 3minOperating requirements:productionthe sameor similarCheck process card, make requirements clear. Materials with color, same model and same orderproductionthe sameor similarspecification should be suspended into the degreasing tank simultaneously or preferentially, preventing t

20、he sand from the surface.so that it canfacilitate theoperation theso that it canfacilitate theoperation thepost-procedure.5.2.2 When thematerials shoulddegreasing is be hung outpost-procedure.5.2.2 When thematerials shoulddegreasing is be hung outfinished, the of the tank,After degreasing, the surfa

21、ce should be well-distributed and wet, and the materials should be washed by Level 2 water then turned into the alkaline etching process.Alkaline etching:Process parameters:Composition of bath solution: plain-surface alkaline etching, sand-surface alkaline etching NaOH: 40 50g / l 45 60g / lAdditive

22、s (NaOH): 1 /12 1 / 15 1 / 6 1 / 8 Temperature: 40 45 45 55 Alkaline etching time: 1 3min 10 30min 6.2 Operating requirements:When alkaline etching, the forced draught blowers and exhaust fans should be opened.When alkaline etching is finished, materials should be hung out as soon as possible, finis

23、hing shedding immediately and transferring to the tank washing, so that it can prevent straying marking from the surface.Strictly control alkaline etching process parameters, to ensure uniform quality of the surface after alkaline etching.Post-alkaline-etching materials must be washed by Level 2 ove

24、rflow. The remaining alkaline liquid should be fully cleared away, so that the raffinate can t pollute other tanks.Neutralization:Process parameters:Composition of bath solution: HNO3: 120 150g / lTank temperature: room temperature Neutralizing time: 2 5minOperating requirements:. When neutralizing,

25、 the materials should be moved up and down and anti-tilt, fully neutralizing exhaust liquor in the hole and remove appearing dust.Post- neutralizing materials must be washed by Level 2 overflow, and turn to the anodizing tank.The surface quality inspection should be strengthened to check the surface

26、 of the sand surface conditions, mottling, burrs, welding lines and other surface defects, for timely processing, reworking.Regularly check screws are loose or not, to ensure good electrical conductivity.Anodic oxidation:process parameters:Tank composition: H2SO4:150 180 g/l AL ion:5 to 15 g/lTank t

27、emperature: 20 1 o COxidation voltage: 14 and 18 VCurrent density: 130 150 A / m2The oxidized time: according to requirements film thickness calculation.Operating requirements:Anodic oxidation must be open before:Rectifier cooling water.Bath circulation cooling system (cooling unit).Send the exhaust

28、 fan.Anodic oxidation must be checked in advance: conductive copper conducting copper aluminum piece, hanging fixture and conductive beam in contact, and the situation of the conductive, should be often burnished.Anodic oxidation must be opened before a conductive copper cooling water, check and con

29、ductive beam bending, whether the conductive bending beam must be replaced, in case of burn out the conductive and impacts anodic oxidation.Before electricity oxidation, profile must be placed in middle of oxidation tank, ensure that with both side distances are the same.Before electricity oxidation

30、 link up, driving hook must be taken off conductive beam hook, when the power and oxidation end, driving hook can hang conductive beam hook, in order to avoid short circuit, damage the equipment.Anodic oxidation set the current density, oxidation method should accord to the oxidation area of profile

31、s multiplied with the current density. Shading materials for the current density of oxidation must be controlled in 130 A/ m2.When Anodic oxidation, should often visited the voltage, current, temperature, etc. Various kinds of instrument, any abnormal should be promptly eliminated.After Oxidation of

32、 profiles, should detect the film thickness, and make records, if film thickness can not reach the requirements, must be to prolong the oxidized time to film thickness to meet requirements.Electrolytic coloring:process parameters:Bronze is golden brown departmentBath composition: SnSO4: seven to 10

33、g/l GD: 35 to 45 g/lNiSO4 ? 6 H2O: 20 30 g/l SeO2:8 10 g/l Additives: Same amount with SnSO4 CuSO4:2 3.5 g/lH2SO4:15 20 g/l 12 to 17 g/lPH: 0.6 1.0 PH: 0.7 1.025 C temperature: 15 20 25 Voltage: 14 to 18 V 14 to 16 VShading time: 20 S 15 min 2 6 minOperating requirements:Maintain bigger slope when p

34、utting anodic oxidated profiles into color cell, and placed at the middle of poles, ensure equal polar distances.When shading, driving hook must be taken off conductive beam hook, and rest for 0.5 1 minutes to color.Shading voltage for the same kinds of color must be equal.When bronze cell shading o

35、ver, must be lifted immediately as soon as possible, flow bath, transfer to sink quickly, fully clean the acid water in the hole of profiles, use coloring board to compare, when color is too light, put it into coloring tank to electricity complementary color, when color is too deep, put it into colo

36、ring tank (no electricity) or acidic water behind of oxidation tank to fade (bronze series).Because golden not fade, and shading time should not be too long.The shaded profiles shall be washed adequately by level 2 water, then go on electrophoresis or hole sealing.Sealing:Process parameters:Bath com

37、position: Ni ion: 0.8 1.2 g/l, F ion: 0.35 0.6 g/l, PH: 5.6 6.5, pure dampening solution temperature: 20 30 Hole sealing time: oxidation film thickness (um) x 1.2 min around (subject to quality standards).Operating requirements:Profiles should be washed by pure water before sealing, in case the poll

38、ution of electrophoresis and sealing slots.When profiles enter into sealing slots, should prevent hole sealing water from splashing into electrophoresis recycling tank.Hole sealed profile after must be dried after being washed.Sealed profile should be strictly prohibited to contact with oil, electro

39、lyte and bare hands.After sealing, should sport check the hole sealing quality, timely adjust hole sealing time, ensure that hole sealing quality to achieve the requirements, and prevent the over-sealing powder.electrophoresisprocess parameters:Tank composition:Solids: 5 8%Solvent: 1 5%Conductivity:

40、 550 900 S S/cmPH: 7.6 8.0Electrophoresis Voltage: 90 120VTemperature: 23 3 CElectrophoresis time: 1 2minoperating requirements:Before electrophoresis, the ones must be gone through one pure water, two hot water, three cold water washing, fully washing the acidic water and dirt in the material surfa

41、ce, hole and film hole.Always check PH, conductivity and cleanliness in the three water, keeping PH 5.5 in the water tank, the first pure water conductivity 120 s S/cm,the second and the third water conductivity 60 s S cm, and often change the water.Temperature of hot pure water tank should be contr

42、olled between 60 80 .Articles in hot water tanks time between3 5min, after the hot water wash, should be fully dried and fully wiped to get conductive beam rid of oil and acid-base water. Keep special attention on cleaning and cooling of thick-walled tubular.Temperature of Cold pure water washing ta

43、nk should be maintained below 30 七.Articles that are washed in cold water should not be dried, preventing extra wave when electrophoresis.Maintain the largest tilt when profiles are in the electrophoresis tank to facilitate theexclusion of air.After put into the electrophoresis tank,articles should

44、be placed in the centralelectrode, and ensure equal distance on both sides of the plate, and stand for one minute before electrophoresis.When electrophoresis, circulating pump and electrophoresis recycling equipment must be turned on. The two pure water tanks should meet the following technical requ

45、irements:The first pure water, the second oneSolids: 1.0% 0.3%PH: 8.0 8.3 8.0 8.5Conductivity: 100 S S/cm 50 S S/cm 11.2.9 Electrophoresis solution should open refined purification system at fixed period as for the increase of PH and conductivity to ensure the electrophoresis bath meet process requi

46、rements.After electrophoresis, articles must be passed by two pure water.Post-electrophoresis articles should be placed in the pre-dried area.keep electrophoresis area clean, non-oil, no dust, no acid mist to pollute profiles and electrophoresis tank.Curing:process parameters:Curing temperature: 180

47、 200 Curing time:30 45minoperating requirements:Before curing, check oven and curing temperature measurement system, and regularly clean the curing oven.When finished curing and cooled to room temperature, workers check the quality of the electrophoresis film.unloading, packagingPreparation for disc

48、hargeCheck the storage rack, transport trolley, film machine, packaging machineCheck the model, length, count, color on the card are consistent with the material object or not. Make packaging requirements clear; prepare protective film, tape, wrapping paper and other packaging materials.Test oxidati

49、on thickness, composite thickness, sealing quality, the film hardness, film adhesion, color, color variation, appearance quality. All of them adhere to requirements, then they can be discharged, and fill oxidation product inspection records.unloading, packagingWater sealing material is not allowed to unload with water, electrophoresis materials must be cooled to room temperature before unloading.Profiles must be unloaded by teams, non-impacted, non-beat, and p

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論