




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
Ref.
編號(hào)
Item
項(xiàng)目
Quantity
數(shù)量
Unit
單位
Rate
單價(jià)
Total
總額
SUBSTRUCTURE
Notes:
ThisSubstructureBillincludesalltheworksuptoandincludinggroundfloorslabs.
ScreenWallsaremeasuredinSuperstructureofthisBill.
)
)
)
)
EARTHWORKS
1
Takeup,setasideandrelocateexistingpavingblocktodesignatedareawithinLammaPowerStationanditsExtensionandsubsequentlyreinstallincludingmakinggoodallworksdisturbed,allasdirectedbytheEngineer.
740
Sup.
2
Excavateforallelementsnotexceeding1.50mdeep.
1840
Cube
3
Excavateforallelements1.50-3.00mdeep.
1840
Cube
4
Excavateforallelements3.00-4.50mdeep.
1440
Cube
5
Backfillselectedexcavatedmaterialaroundallelementsinlayersandconsolidate.
3200
Cube
6
Load,wheel,deposit,spreadandlevelselectedsuitablesurplusexcavatedmaterialtodesignatedareawithintheareaoradjacenttotheareaofLammaPowerStationanditsExtensioninlayersandconsolidatedtomakeuplevels,allasdirectedbytheEngineer.
960
Cube
7
Loadandremovesurplusexcavatedmaterialfromsite.
960
Cube
-
Ref.
編號(hào)
Item
項(xiàng)目
Quantity
數(shù)量
Unit
單位
Rate
單價(jià)
Total
總額
TEMPORARYSHORING,STRUTTING
ANDRETAININGSHEETPILEAS
DRAWINGNO.552/03/034/2202AND
552/03/034/2205
8
Design,supplyandinstallationofsheetpiling
1
Item
worksandassociatedlateralsupportincluding
dewatering,protectionofadjacentexisting
structuresandutitilies,allnecessary
predrillingforremovalofunderground
obstruction,temporaryworksandsubsequent
removaluponcompletionofwork,submission
torelevantgovernmentauthoritiesfor
obtainingapprovalandconsent,makinggood
allworkdisturbedandremovealldebrisfrom
theSite.
PILEHEADTREATMENT
9
Cutoffpileheadof2180mmboredpile,
11
No.
includingremovalofsteelliner,breakup
reinforcedconcretedowntorequiredlevel,
trimtocorrectlevel,straighten,clean,bend
andcutofprojectingreinforcementbarsas
necessaryandremovedebrisfromSite.
CONCRETE
10
Grade20D/20PFAconcreteinallelements.
90
Cube
11
Grade30D/20PFAconcreteinallelements.
30
Cube
12
ReinforcedGrade45D/20PFAconcreteinall
1920
Cube
elements.
FORMWORK
13
FormworkClassF2toverticalsidesofall
2100
Sup.
elementsincludingvoidformers.
-
Ref.
編號(hào)
Item
項(xiàng)目
Quantity
數(shù)量
Unit
單位
Rate
單價(jià)
Total
總額
14
FormworkClassF4toverticalsidesofall
130
Sup.
elementsincludingvoidformers.
REINFORCEMENT
15
Deformedhighyieldsteelbars10mmand
630000
kg
overingeneralreinforcementincludingbars
benttocurveandover12.00minlength.
16
Ditto,butinlinks,stirrupsandbindersand
70000
kg
helicalreinforcement.
17
WeldedsteelfabricreinforcementtoB.S.
1350
Sup.
4483Ref.No.A252weighting3.95kg/m2
laidwith450mm(min.)lapsinconcreteslab
(measurednett-noallowanceforlaps).
FINISHES
18
ClassU2finishasdescribedtoconcrete
1350
Sup.
surfaces.
19
Twocoatsbitumenpaintonburiedconcrete
2100
Sup.
surface;allasdirectedbytheEngineer.
LIFTPIT
20
Waterproofcementandsand(1:3)rendering
12
Sup.
againstupstandbrickworkwith20mminner
layer,20mmouterlayer,20mmtopand
bottomlayerand145mmwideoveralland
includingextrarenderingin25x25mmdeep
groove,allasDrawingNo.552/03/034/1617.
21
Brickworkinwaterproofcementmortar(1:3)
12
Sup.
in105mmwall.
-
Ref.
編號(hào)
Item
項(xiàng)目
Quantity
數(shù)量
Unit
單位
Rate
單價(jià)
Total
總額
22
Approved200mmwidetwicebentangle
10
Run
waterproofingmembranereinforcingstrip.
23
20mmCementandsand(1:3)screedsonslab
5
Sup.
toreceivewaterproofingmembrane.
24
50x50mmTriangularfilletincementand
10
Run
sand(1:3)screed.
"SOPREMA"orapprovedequal
waterproofingmembraneasapprovedbythe
Engineerandappliedinstrictaccordancewith
themanufacturer'sinstructionsbyanapproval
specialistatContractor'sownexpense
25
Waterproofingmembranewith3mmthick
5
Sup.
protectionboardlaidonscreed(screed
measuredseparately).
26
Ditto,butfixtowall.
12
Sup.
TUNNELOFCABLESEALINGEND
CHAMBER
27
Waterproofcementandsand(1:3)rendering
155
Sup.
againstupstandbrickworkwith20mminner
layer,20mmouterlayer,20mmtopand
bottomlayerand145mmwideoveralland
includingextrarenderingin25x25mmdeep
groove,allasDrawingNo.552/03/034/1639.
28
Brickworkinwaterproofcementmortar(1:3)
155
Sup.
in105mmwall.
29
Approved200mmwidetwicebentangle
65
Run
waterproofingmembranereinforcingstrip.
-
Ref.
編號(hào)
Item
項(xiàng)目
Quantity
數(shù)量
Unit
單位
Rate
單價(jià)
Total
總額
30
20mmCementandsand(1:3)screedsonslab
135
Sup.
toreceivewaterproofingmembrane.
31
50x50mmTriangularfilletincementand
65
Run
sand(1:3)screed.
"SOPREMA"orapprovedequal
waterproofingmembraneasapprovedbythe
Engineerandappliedinstrictaccordancewith
themanufacturer'sinstructionsbyanapproval
specialistatContractor'sownexpense
32
Waterproofingmembranewith3mmthick
135
Sup.
protectionboardlaidonscreed(screed
measuredseparately).
33
Ditto,butfixtowall.
155
Sup.
JOINTS
34
25mmApprovedfibrousjointfillerset
250
Sup.
betweenconcrete
溫馨提示
- 1. 本站所有資源如無(wú)特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 中獸醫(yī)基礎(chǔ)理論知到課后答案智慧樹章節(jié)測(cè)試答案2025年春河北農(nóng)業(yè)大學(xué)
- 阜陽(yáng)幼兒師范高等??茖W(xué)?!禨cratch與創(chuàng)意設(shè)計(jì)》2023-2024學(xué)年第二學(xué)期期末試卷
- 云南省玉溪市元江縣第一中學(xué)2025屆高三第二學(xué)期學(xué)生月考測(cè)試卷(2.22)化學(xué)試題試卷含附加題含解析
- 溫州職業(yè)技術(shù)學(xué)院《現(xiàn)代漢語(yǔ)A3》2023-2024學(xué)年第一學(xué)期期末試卷
- 宿州學(xué)院《金融工程學(xué)》2023-2024學(xué)年第二學(xué)期期末試卷
- 湖北省武漢市武漢小學(xué)瑞景小學(xué)2024-2025學(xué)年五年級(jí)數(shù)學(xué)第二學(xué)期期末教學(xué)質(zhì)量檢測(cè)試題含答案
- 天津生物工程職業(yè)技術(shù)學(xué)院《化工熱力學(xué)》2023-2024學(xué)年第二學(xué)期期末試卷
- 公司車間衛(wèi)生流動(dòng)紅旗評(píng)比方案
- 酸罐區(qū)土建施工方案
- 2025年中考語(yǔ)文寫作素材積累:《人民日?qǐng)?bào)》作文素材之人文情懷
- 統(tǒng)編版(2024)道德與法治七年級(jí)下冊(cè)第一單元 珍惜青春時(shí)光 單元測(cè)試卷(含答案)
- 蘇教版數(shù)學(xué)一年級(jí)下冊(cè)(2024)第七單元觀察物體(一)綜合素養(yǎng)測(cè)評(píng) A 卷(含答案)
- 2025年甘肅省張掖市民樂縣招聘專業(yè)技術(shù)人員9人(第二期)歷年高頻重點(diǎn)模擬試卷提升(共500題附帶答案詳解)
- 2025年湖北武漢理工大學(xué)學(xué)生輔導(dǎo)員招聘18人歷年高頻重點(diǎn)模擬試卷提升(共500題附帶答案詳解)
- 2025年烏蘭察布醫(yī)學(xué)高等??茖W(xué)校高職單招職業(yè)技能測(cè)試近5年??及鎱⒖碱}庫(kù)含答案解析
- 2024入團(tuán)知識(shí)題庫(kù)(含答案)
- 義務(wù)教育英語(yǔ)課程標(biāo)準(zhǔn)(2022年版)
- JT∕T 1431.3-2022 公路機(jī)電設(shè)施用電設(shè)備能效等級(jí)及評(píng)定方法 第3部分:公路隧道照明系統(tǒng)
- 總包單位向各分包移交建筑一米線交接單
- DB37∕T 5197-2021 公共建筑節(jié)能監(jiān)測(cè)系統(tǒng)技術(shù)標(biāo)準(zhǔn)
- 門診特定病種待遇認(rèn)定申請(qǐng)表
評(píng)論
0/150
提交評(píng)論