NATIONALSTANDARD

OFTHEPEOPLESREPUBLICOFCHINA

CodeforInstallationofCokingandChemical

MechanicalEquipment

GB50967-2014

ChiefDevelopmentDepartment:ChinaMetallurgicalConstructionAssociation

ApprovalDepartment:MinistryofHousingandUrban-RuralDevelopment

ofthePeoplesRepublicofChina

ImplementationDate:August1,2014專用

人人文庫

ChinaPlanningPress

Beijing2016

圖書在版編目(CIP)數(shù)據(jù)

焦化機械設備安裝規(guī)范英文中華人民共和國住房和城鄉(xiāng)

GB50967-2014:/

建設部組織編譯北京中國計劃出版社

.—:,2016.1

ISBN978-7-5182-0323-9

中煤焦化機械設備設備安裝技術規(guī)范中

Ⅰ.①G…Ⅱ.①…Ⅲ.①-----

國英文

-Ⅳ.①TQ523.6-65

中國版本圖書館數(shù)據(jù)核字第號

CIP(2015)281876

ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2014

EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2016

byChinaPlanningPress

rd專用

3Floor,CTower,GuohongBuilding

No.A11,Muxidi-Beili,XichengDistrict

Beijing,100038

PrintedinChinabyBeijingJinghuaHucaisPrintingCO.,LTD

?2014byMinistryofHousingandUrban-RuralDevelopmentof

thePeoplesRepublicofChina

Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor

byanymeans人人文庫,graphic,electronic,ormechanical,includingphotocopying,recording,

oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.

Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,

resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof

blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition

includingthisconditionbeingimposedonthesubsequentpurchaser.

ISBN978-7-5182-0323-9

AnnouncementoftheMinistryofHousingandUrban-Rural

DevelopmentofthePeoplesRepublicofChina

No.293

Announcementonpublishingthenationalstandardof

CodeforInstallationofCokingandChemicalMechanicalEquipment

CodeforInstallationofCokingandChemicalMechanicalEquipment

hasbeenapprovedasa

nationalstandardwithaserialnumberofGB50967-2014,andwillbeimplementedonAugust1,

2014.Article20.1.3isacompulsoryprovisionandmustbeenforcedstrictly.

AuthorizedbyStandardRatingResearchInstitutionofourdepartment,thiscodeispublished

anddistributedbyChinaPlanningPress.專用

MinistryofHousingandUrban-RuralDevelopmentofthePeoplesRepublicofChina

January9,2014

人人文庫

Foreword

AccordingtotherequirementsofDocumentJianBiao[2006]No.136issuedbytheformer

MinistryofConstruction(MOC)-NoticeonPrintingtheDevelopmentandRevisionPlan(second

batch)ofNationalWorkConstructionStandardsin2006,thiscodeisdrawnupbyChinaMCC5

GroupCo.,Ltd.togetherwithrelatedunits.

Intheprocessofdrawingupthiscode,thedrawing-upteammakesadeepnvestigation,

seriouslysummarizestheinstallationexperiencesofcokingchemicalandmechanicalequipmentover

theyears,andextensivelysolicitstheopinioninrelatedaspectstocompleteapprovaldraft.Finally,

andthedraftisfinalizedafterexamination.

Thiscodeisdividedinto20chapters,themaintechnicalcontentscomprisegeneral

requirements,basicprovisions,equipmentfoundation,anchorboltsandshimplates,equipment

andmaterial,materialstackerandreclaimer,protectiveironpartsandoperatingplatformof

cokeoven,heatingandexchangedeviceundercokeoven,ovenroofequipmentofcokeoven,

auxiliaryequipmentofcokeoven,cokepusher,cokeguide,coalchar專用ger,cokecar,electric

locomotive,coketankcar,processsteelstructureandrailsofcokedryquench,quenching

channelofCDQ,mechanicalequipmentforcharginganddischargingsystemofCDQ,

mechanicalequipmentofgascirculatingsystemofCDQ,auxiliaryequipmentofCDQ,

equipmentgaspurificationandchemicalrecovery,test-runofequipmentofcoking&chemical

andthermal-stateoperationofcokeoven.

Theprovision(s)printedinboldtypeis(are)compulsoryone(ones)andmustbeenforced

strictly.

HousingandUrban-RuralDevelopmentofthePeoplesRepublicofChinaisinchargeofthe

administrationofthiscodeandtheexplanationofthecompulsoryprovisions,ChinaMetallurgical

ConstructionAssociationisresponsiblefortheexplanationofroutinemanagement,andChina

MCC5GroupCo.,Ltdisresponsiblefortheexplanationofspecifictechnicalcontents.

Allrelevantorganizationsarekindlyrequestedtosumupandaccumulateyourexperiencesin

actualpracticesduringtheprocessofimplementingthiscode.Therelevantopinionsandadvice,

whenevernecessary,canbepostedorpassedontoChinaMCC5GroupCo.,Ltd(address:Tieli

RoadNo.2501,BaoshanDistrict人人文庫,ShanghaiCityPostalCode:201900,Fax/telephone:021-

36211205,E-mail:shwyjszx@163.com)forreferenceduringrevisioninfuture.

ChiefDevelopmentOrganization,ParticipatingDevelopmentOrganization,ChiefDraftingStaff

andChiefExaminants:

ChiefDevelomentOranization

pg:

ChinaMCC5GroupCo.,Ltd

ParticiatinDevelomentOranization

pgpg:

MCCTianGongGroupCorporationLimited

ChiefDraftinStaff

g:

YanJueWangYongchuanChenHepingGuoKuixiangZhongMing

·1·

ShangXiuminZhouQing

ChiefExaminants

:

LiMingzhuZhengYonghengLiChangliangYuHuachunYuWei

TangYanZhaoCongZhengYajieMengFanshengLiaoLibao

專用

人人文庫

·2·

Contents

……………

1GeneralProvisions(1)

………………

2BasicRegulation(2)

……

3EquipmentFoundation,AnchorBoltsandShimPlates(3)

…………

3.1EquipmentFoundation(3)

………

3.2DatumLineandDatumMarkforInstallationofEquipment(3)

…………………

3.3AnchorBolts(3)

……………………

3.4ShimPlates(4)

………………………

4EquipmentandMaterial(5)

……………………

4.1Equipment(5)

………………………

4.2Material(5)

………………

5MaterialStackerandReclaimer(7)

…………

5.1GeneralRequirement(7)

………………

5.2InstallationofWalkingStructure(7)

…………………

5.3InstallationofReversibleDevice專用

(8)

……………………

5.4InstallationofCableDrum(8)

…………………

5.5InstallationofBeltConveyor,BalanceWeight,AnchorageLocker(9)

……………

6ProtectiveIronPartsandOperatingPlatformofCokeOven(11)

…………

6.1GeneralRequirement(11)

………………………

6.2InstallationofBuckstays(11)

…………………

6.3InstallationofSmallBuckstays(12)

…………………

6.4InstallationofProtectivePlates(12)

…………………

6.5InstallationofOvenPortFramesandNogPlates(13)

………………………

6.6InstallationofOvenPorts(15)

…………………

6.7InstallationofLongitudinalandLateralBracings(15)

……………

6.8InstallationofPlatformsontheCokePusherSideandCokeGuideSide(16)

………

7HeatingandExchangeDeviceundertheCokeOven(17)

………………

7.1InstallationofGasMainPipelines,BranchPipelineandDownspouts(17)

………………

7.2InstallationofRe人人文庫gulatingCock,ExchangeCockandOrificePlateBox(17)

………

7.3InstallationofWasteGasExchangeShutter(18)

…………………

7.4InstallationofGasExchanger(18)

………

7.5InstallationofExchangeDrivingStructure(19)

…………………

7.6InstallationofStackGateValve(19)

………

8EquipmentontheTopofCokeOven(20)

……………

8.1InstallationofGasHeadersandLiquidAmmoniaPipes(20)

………

8.2InstallationofRisersandCrossoverMains(20)

……………

8.3InstallationofGuidePipesforCokeGuideandCoalChargingDedusting(21)

…………

9AuxiliaryEquipmentofCokeOven(22)

·1·

9.1InstallationofTestEquipmentforOvenPortRepairStation,

………

CokePushingRamandCoalLevelingBar(22)

…………

9.2InstallationofCollectingPlatesofWetQuenchingTower(22)

…………………

9.3InstallationofCoalFeedingDeviceofCoalTower(22)

………………

9.4InstallationofScaleforCoalChargerofCoalTower(23)

……

9.5InstallationofRailsofCokePusher,CoalChargerandCokeCar(23)

………………

9.6InstallationofRailsofCokeGuide(23)

…………………

10CokePusher(25)

…………

10.1GeneralRequirement(25)

………………

10.2InstallationofWalkingStructure(25)

…………………

10.3InstallationofSteelStructure(26)

……………

10.4InstallationofCokePushingDevice(26)

…………

10.5InstallationofPortExtractingDevice(27)

……………

10.6InstallationofCleaningDeviceofOvenPortFrames(28)

……………………

10.7InstallationofCleaningDeviceofOvenPorts(29)

……………

10.8InstallationofCoalLevelingDevice(29)

………………

10.9InstallationofCleaningDeviceofSmallOvenPorts(30)

…………………

11CokeGuide(31)

…………

11.1GeneralRequirement專用()

31

………………

11.2InstallationofWalkingStructure(31)

…………………

11.3InstallationofSteelStructure(32)

………………

11.4InstallationofCokeGuideGrill(32)

…………

11.5InstallationofPortExtractingDevice(33)

……………

11.6InstallationofCleaningDeviceofOvenPortFrames(33)

……………………

11.7InstallationofCleaningDeviceofOvenPorts(34)

……………………

11.8InstallationofCokeGuideDedustingDevice(35)

…………………

12CoalCharger(36)

…………

12.1GeneralRequirement(36)

…………………

12.2InstallationofWalkingDevice(36)

…………………

12.3InstallationofSteelStructure(37)

……………………

12.4InstallationofCoalHopper(37)

……………

12.5InstallationofCoalFeedingDevice(38)

…………

12.6InstallationofCoverExtractin人人文庫gDevice(38)

…………

12.7InstallationofShuttersofCoversofLiquidAmmoniaExchangeandRisers(39)

…………………

12.8InstallationofDedustingDeviceofCoalCharger(39)

………

13CokeCar,ElectricLocomotiveandCokeTankCar(40)

………………………

13.1InstallationofCokeCar(40)

……………

13.2InstallationofElectricLocomotive(40)

…………………

13.3InstallationofCokeTankCar(40)

…………………

14ProcessSteelStructureandRailsofCokeDryQuench(41)

…………

14.1GeneralRequirement(41)

………………

14.2InstallationofQuenchingChannelSteelStructure(41)

·2·

……………

14.3InstallationofRailsofLiftingDevice(43)

…………………

14.4InstallationofGuideRailsofLiftingHeadframe(44)

……………………

14.5InstallationofRailsofMaintenanceCranes(44)

………………

14.6InstallationofCableGuideFrameofLiftingDevice(44)

……………………

15QuenchingTankofCDQ(46)

……………………

15.1InstallationofShellBodyofQuenchingTank(46)

………………

15.2InstallationofAirSupplyDevice(47)

16MechanicalEquipmentforChargingandDischargingSystemofCDQ(49)

………

16.1InstallationofTransverseTractingDevice(49)

…………………

16.2InstallationofLiftingDevice(50)

…………………

16.3InstallationofChargingDevice(51)

………………

16.4InstallationofDischargingDevice(52)

…………………

16.5InstallationofAutomaticPara-positionDevice(53)

………………

17MechanicalEquipmentofGasCirculatingSystemofCDQ(54)

…………

17.1GeneralRequirement(54)

………………

17.2InstallationofPrimaryDeduster(54)

……………

17.3InstallationofSecondaryDeduster(55)

………

17.4InstallationofWaterFeedingPre-heater(56)

………………專用

18AuxiliaryEquipmentofCDQ(57)

…………

18.1GeneralRequirement(57)

…………………

18.2InstallationofElevatorShaft(57)

………

18.3InstallationofDemineralizedWaterTank(57)

…………………

19EquipmentofGasPurificationandChemicalRecovery(59)

…………

19.1GeneralRequirement(59)

………………

19.2AssemblyofTowerEquipment(59)

……………

19.3SiteWeldingofTowerEquipment(61)

………………

19.4InstallationofTowerEquipment(62)

………

19.5InstallationofPartsofTowerEquipment(64)

………………

19.6AssemblyofVesselEquipment(66)

……………

19.7SiteWeldingofVesselEquipment(67)

………………

19.8InstallationofVesselEquipment(68)

………………

19.9InstallationofTankEquipment(69)

…………………

19.10WeldingofTankE人人文庫quipment(71)

………

19.11InstallationofHeat-exchangeEquipment(72)

…………………

19.12InstallationofMechanicalSedimentationTank(73)

…………

19.13InstallationofCentrifugalSeparator(73)

……………………

19.14InstallationofGasPrimaryandFinalCooler(74)

…………

19.15InstallationofElectricalTarSkimmer(74)

………………………

19.16InstallationofSaturator(75)

………

19.17InstallationofPipe-typeHeatingFurnace(75)

………

19.18InstallationofRotaryDrumCrystallizer(77)

……………

19.19InstallationofNaphthaleneRefiner(77)

·3·

………………

19.20InstallationofMaterialCharger(78)

………

19.21InstallationofQuantitativeBarrelFiller(78)

………………………

19.22InstallationofPelleter(78)

20Test-runofMechanicalEquipmentofCoking&ChemicalandThermal-state

……………………

OperationofCokeOven(80)

…………

20.1GeneralRequirement(80)

……………………

20.2Test-runofMaterialStackerandReclaimer(81)

…………………

20.3Test-runofMechanialEquipmentofCokeOven(81)

……………………

20.4Test-runofMovingMechanicalEquipment(82)

………………

20.5Test-runofDryQuenchingUnit(85)

…………

20.6Test-runofGasPurificationandChemicalRecoveryUnit(87)

…………

20.7Thermal-stateOperationofCokeOven(87)

…………

ExplanationofWorkinginThisCode(89)

…………

ListofQuotedStandards(90)

……………

Addition:ExplanationofProvisions(91)

專用

人人文庫

·4·

1GeneralProvisions

1.0.1

Thiscodeisformulatedwithviewtonormalizingtheinstallationandconstructionofcoking

chemicalandmechanicalequipment,promotingtechnicalprogressandensuringWorkquality.

1.0.2

ThiscodeisapplicabletotheWorkinstallationofmetallurgicalcokingcoalprocessing

equipmentandthemechanicalequipmentofthecokeovensystem,thedryquenchingsystemand

thegaspurifyingandchemicalproductrecyclingsystem.

1.0.3

NotonlytherequirementsstipulatedinthiscodeontheWorkinstallationofcoking

chemicalandmechanicalequipment,butalsothoseinthecurrentrelevantonesofthenationshall

becompliedwith.

專用

人人文庫

·1·

2BasicRegulation

2.0.1

Theinstallationofequipmentmustbeperformedbyusingmeasuringinstrumentssubjected

tometrologicalverificationandqualifiedcalibration,andtheaccuracygradesshallmeetthe

requirementsofqualitystandard.

2.0.2

Beforetheinstallationofequipment,thefollowingconstructionworksshallbeprepared:

1

Theself-examinationandjointcheckupofdrawingsshallbeperformed,andrecordsshall

bekept;

2

Constructionsiteshallhavethecorrespondingconstructiontechnicalstandardandtechnical

documentsofconstructionorganizationdesign,constructionscheme,etc.,whichareexaminedand

approved;

3

Technicaldisclosureshallbeperformedtorelatedpersonnelinaccordancewithtechnical

documentsofdesigndocuments,contractagreement,constructiontechnicalstandard,construction

organizationdesign,constructionscheme,etc;

4

Temporaryfacilitiesofequipmentfoundation,plants,roadsfortransportation,water

,,,,專用

sourcepowersupplylightingfirecontroletc.shallmeettherequirementsofequipment

installation;

5

Mainmaterial,constructionmachineryandtoolsandinstrumentsshallmeetthe

requirementsofinstallation.

2.0.3

Beforetheinstallationofequipment,rust,dirtandgreaseonthesurfaceofequipmentand

paintonthebottomsurfaceofequipmentbaseshallberemoved,andtherustremovalandcleaning

CodeforConstructionandAcceptanceof

methodsforequipmentshallmeettherequirementsof

MechanicalEquipmentInstallationWork

GB50231asnationalstandard.

2.0.4

Theinstallationofequipmentshallbeperformedinaccordancewiththespecifiedworking

procedures,andeachworkingprocedureshallbecheckedafterfinishingtoformrecords.Thenext

workingprocedureshallnotbeperformedincaseofnoapprovedexaminationoftheprevious

workingprocedure.

2.0.5

Concealedworksintheinstallationofequipmentshallbeconcealedafterpassingexamination,and

recordsshallbekept.

2.0.6

Equipment人人文庫protectivemeasuresshallbeensuredintheprocessesofequipmentinstallation

andhoistingtoavoiddamagetoequipment.Afterbeinginstalled,equipmentshallbeprotected

well.

2.0.7

Theinstallationofdryquenchingwasteheatboilershallmeettherequirementsofdesign

TechnicalSupervisionRegulationforSafetyofBoilerTechnical

documentsandTSGG0001and

SpecificationforElectricPowerConstructionPartBoilerUnit

2DL5190.2ascurrentnational

standard.

·2·

3EquipmentFoundation,AnchorBoltsandShimPlates

3.1EquipmentFoundation

3.1.1

Beforebeinginstalled,equipmentfoundationshallbesubjectedtohandoveracceptance,and

onenotsubjectedtohandoveracceptanceshallnotbeinstalled.

3.1.2

Thehandoveracceptanceofequipmentfoundationshallbeincompliancewiththefollowing

requirements:

1

Basicacceptancematerialshallbecomplete;

2

Thestrengthgradesoffoundationconcreteshallmeettherequirementsofdesign

documents,andacceptancematerialandrecordsshallbereserved;

3CodeforConstruction

Thepositionandsizeoffoundationshallmeettherequirementsof

andAcceptanceofMechanicalEquipmentInstallationWork

GB50231asnationalstandard;

4

Formworkonthesurfaceoffoundation,anchorboltfixingframe,etc.shallberemoved,and

laitance,oilstain,brokenstone,mud,accumulatedwater,etc.onthesurfaceoffoundationandin

anchorboltholesshallberemoved;

5專用

Built-inanchorboltsshallhavenodamage,threadsshallbecleanedandcoatedwithgrease

andhavetheprotectivemeasures.

3.1.3

Designdocumentsandrelevantspecificationsandprovisionsshallincludeequipmentfoundation

subjectedtosettlementobservation,settlementobservationrecordsandsettlementobservationpointsshall

behandedover,andsettlementobservationshallbeproceededtoperformintheprocessofequipment

installation.

3.2DatumLineandDatumMarkforInstallationofEquipment

3.2.1

Beforetheinstallationofequipment,thedatumlineanddatummarkofinstallationshallbe

set,whichshallbeincompliancewiththefollowingrequirements:

1

Drawthearrangementdiagramsofdatumlineanddatummarkinaccordancewithdesign

documents;

2

Setcentraltargetanddatummarkinaccordancewithbasichandovermaterialandthe

arrangementdiagramsofdatumlineanddatummark;

3

Surveydatumlineanddatummarkinaccordancewithsitesurve人人文庫yingcontrolnetwork;

4

Mainbodyequipmentshallbeembeddedwiththecentraltargetandtheperpetualdatum

mark;

5

Aftersurveying,themeasuringresultreportshallbesubmitted.

3.2.2

AftertheequipmentinstallationWorkisfinished,theperpetualcentraltarget,the

perpetualdatummarkandarrangementdiagramsthereofshallbehandedoverconstructionunits.

3.3AnchorBolts

3.3.1

Theinstallationofanchorboltswithpreformedholesshallbeincompliancewiththe

followingrequirements:

·3·

1

Beforeinstallation,oilstainandoxidescalesonanchorboltsshallberemoved,andthreads

shallbecoatedwithgrease;

2

Anchorboltsshallbeverticalinperformedholes,thedistanceofanyonepartfromhole

wallsshallbelargerthan15mm,andanyonepartshallnotcontactholebottoms;

3

Groutingofreservedanchorboltholesshallmeettherequirementsofdesigndocuments

CodeforConstructionandAcceptanceofMechanicalEquipmentInstallationWork

andGB50231

asthecurrentnationalstandard;

4

Theanchorboltscanbefastenedonlyafterthestrengthofgroutingconcreteinperformed

holesshallreach75%ofdesignstrength,andthefasteningforceofeachboltshallbeuniform;

5

Contactbetweennutsandgasketsandbetweengasketsandequipmentshallbetight.

3.3.2

Theinstallationofbuilt-inanchorboltsshallbeincompliancewiththefollowingrequirements:

1

Beforetheinstallationofequipment,thepositionsandsizesofbuilt-inanchorbolts

shallbecheckedinaccordancewiththeactualpositionsandsizesofboltholesofequipment

base;

2

Partsofanchorbolts,exposedoutofthefoundationshallbevertical,equipmentbaseshall

haveadjustmentmarginwhensleevedintheanchorbolts,andeachanchorboltshallnotbe

jammed.

3.3.3

TheinstallationofanchorboltswithT-shapedheadsshallbeincompliancewiththe

:專用

followingrequirements

1

AnchorboltswithT-shapedheadsandanchorplateshallbematchedinaccordancewith

designdocuments.

2

Beforeequipmentisinposition,trialfittingofanchorboltswithT-shapedheadsshallbe

performed,andthedirectionsofT-shapedheadsshallbemarked.Duringinstallation,T-shaped

headsshallbecorrectlyembeddedintotherectangulargrooveoftheanchorplate.

3

Partsofanchorbolts,whichdonothavethreadsandtheanchorplateshallbecoatedin

accordancewithdesigndocuments.Whendesigndoesnothaverequirements,rust-proofpaintshall

becoated.

4

Sealedfillersshallbepackedintheperformedholesorprotectivepipeinaccordancewith

designdocumentsbeforesecondarygrouting.

3.3.4

Thefasteningofanchorboltswithrequirementsonfasteningforceshallmeettherequirementsof

designdocuments,andafterbeingfastened,boltsshallexposenutsorshallbelevelwithnuts.

3.4ShimPlates

人人文庫

3.4.1

Thearrangementofshimplatesshallmeettherequirementsofdesigndocuments.When

thedesigndoesnothaverequirements,bed-mortarmethod,installationmethodwithoutshim

plates,etc.canbeadopted.

3.4.2CodeforConstructionand

Theinstallationofshimplatesshallmeettherequirementsof

AcceptanceofMechanicalEquipmentInstallationWork

GB50231asnationalstandard.

3.4.3

Beforeequipmentbaseisinposition,thesize,groupnumberandplacingpositionofshim

platesshallbedeterminedinaccordancewiththeshapeandsizeofbase,thediametersofanchor

bolts,thecompressivestrengthoffoundationandequipmentweight.

·4·

4EquipmentandMaterial

4.1Equipment

4.1.1

Equipmentapproachplanshallbeformulatedinaccordancewithequipmentdeliveryscheduleand

constructionschedulefororganization.

4.1.2

Theopen-boxinspectionofequipmentshallkeeprecordsandshallbeincompliancewith

thefollowingrequirements:

1

Checkboxnumber,boxnumberandpackagingcondition,andpackageappearanceshallnot

haveobviousdamage;

2

Equipmentname,modelandspecificationshallmeettherequirementsofdesigndocuments;

3

Checkthenumberofappearancequalityofequipmentandparts,lossanddamagetoparts

shallbeavoided,anddamage,rustanddeformationonsurfaceshallalsobeavoided;

4

Randomtechnicaldocuments,specialtoolsandsparepartsforequipmentboxingshallbe

complete;

5

Equipmentshallincludeconformitycertificates,andimportede專用quipmentshallinclude

commercialinspectionconformitycertificates.

4.1.3

Afterequipmentboxisopened,equipmentandpartsandspecialtoolsshallbekept

properly,anddeformation,damage,rustorlossshallbeavoided.

4.1.4

Duringequipmentconveying,thehoistingpointshallbepositionedatthemarkingposition

ordesignhoistingpointofequipmentandpackagingbox,andduringconveying,protectivemeasures

shallbeprovidedtoavoidequipmentdamage.

4.2Material

4.2.1

Materialapproachplanshallbeformulatedinaccordancewithequipmentdeliveryschedule

andconstructionschedulefororganization.

4.2.2

Rawmaterial,standardparts,steelmembersandsemi-finishedproductsshallbe

subjectedtoacceptanceduringapproachandshallbeincompliancewiththefollowing

requirements:

1

Allqualityconformitycertificatesshallbechecked,andmodels,specifications,textures,

quality,quantityand人人文庫performanceofmaterialshallmeettherequirementsofdesigndocumentsand

currentnationalproductstandard.

2

Materialshallbereinspectedincaseofre-inspectionrequirementsindesigndocumentsand

currentnationalstandard,andthere-inspectionresultshallmeettherequirementsofdesign

documentsandcurrentnationalproductstandard.

3

Thequalityofmaterialobjectsshallbesubjectedtospotcheckinproportion,eachkindis

subjectedtospotcheckby1%andshallnotbelessthan5pieces,anditsappearancequalityand

sizedeviationshallmeettherequirementsofcurrentnationalstandard.

4.2.3

Materialshallbeclassifiedwithmarkinginaccordancewithvarieties,specificationsand

batchnumberforstackingandproperkeeping,damageanddeformationshallbeavoided.

·5·

4.2.4

Themodelsandspecificationsofweldingmaterialshallmeettherequirementsofdesign

documentsandweldingtechnologicaldocument,andthekeeping,drying,cleaning,supply,useand

recyclingofweldingmaterialshallmeettherequirementsofcurrentnationalstandard,product

specificationandtechnicaldocuments.

專用

人人文庫

·6·

5MaterialStackerandReclaimer

5.1GeneralRequirement

5.1.1CodeforConstructionandAcceptanceof

Theinstallationofrailshallmeettherequirementsof

CraneInstallationWork

GB50278ascurrentnationalstandard.

5.1.2CodeforConstructionand

Theinstallationofbeltconveyorshallmeettherequirementsof

AcceptanceofConveyingEquipmentInstallationWork

GB50270ascurrentnationalstandard.

5.1.3

Theconstructionofhigh-strengthboltsshallmeettherequirementsofdesigndocuments

TechnicalSpecificationforHighStrengthBoltConnectionsofSteelStructures

andJGJ82as

currentprofessionalstandard.

5.2InstallationofWalkingStructure

5.2.1

Thewalkingstructureshallbeinstalledaftertheacceptanceofdatumrail.

5.2.2

Theinstallationofdatumrailshallbeincompliancewiththefollowingrequirements:

1

Adjustspacebetweencentersoftwosteelrailsandthecenterlineofrail,withallowable

;專用

deviationof±4.0mm

2

Adjusttheelevationofrailtopsurface,withallowabledeviationof±1.0mm.

5.2.3

Duringtheassemblyofbogieframe,temporarysupportforoverturningshallbearranged.

5.2.4

Theinstallationoftravelingwheelshallbeincompliancewiththefollowingrequirements

(Figure5.2.4):

1

Pointsfallonthecentrallinesoftwosteelrailsthroughthedesignsizesofthecenter

distanceofendwheelsoftworowsoftravelingwheelstoformarectangle,anddifferencebetween

diagonallinesoftherectangleshallnotbelargerthan4.0mm;

2

Thelateraldeviationofwheelsisadjusted,wheelsaredetectedatpointsofX1toX4andY1

toY4,allowabledeviationshallbe1/1000ofwheeldiameter,andthewheeldeviationdirectionsof

wheelsonthesameaxisshallbeopposite;

3

Thehomotopicdifferenceofwheelsatthesameendisadjusted,wheelsaredetectedat

pointsofX5,X6,Y5andY6,andallowabledeviationshallbe2.0mm;

4

Theperpendicularityofendfaceisadjusted,allowabledeviationshallbe1/1000ofwheel

diameter,andupperwheelflan人人文庫geshallinclineoutwards.

Figure5.2.4Detectionfigureoftravelingwheels

1-Travelingwheel;2-Measuringauxiliaryline

·7·

5.2.5

Theinstallationoftravellingbalancershallbeincompliancewiththefollowingrequirements:

1

Longitudinalandlateralintervalsareadjusted,andallowabledeviationshallbe±2.0mm;

2

Differenceofdiagonallinesofuppersurfaceisadjusted,andallowabledeviationshallbe

2.0mm;

3

Thelevelnessofuppersurfaceinlongitudinalandlateraldirectionsisadjusted,and

allowabledeviationshallbe1/1000ofsidelength;

4

Theelevationofuppersurfaceisadjusted,andallowabledeviationshallbe±1.0mm.

5.3InstallationofReversibleDevice

5.3.1

Portframesshouldbeinstalledafterbeingassembledontheground.

5.3.2

Theweldingofportframebeamandlandinglegshallbeperformedaftertheacceptanceof

theelevationoflandinglegtopsurface.

5.3.3

Theinstallationofreversibledeviceshallbeperformedafterthequalifiedinstallationof

portframes.

5.3.4

Duringtheinstallationofreversibledevice,pointofintersectionofthecenterlineoffront

andbackwheelrailsofwalkingstructureandthecenterlineofrailgaugeisusedascenterof

rotation,andcentermarkisindicatedontheportframes.

5.3.5

Beforetheinstallationofreversibledevice,thelargebearingsealingcapshallbe

disassembledtocheckwhetherrust,moistureanddirtexistinsidethereversibledeviceornot專用,and

insufficientlubricatinggreaseisaddedinaccordancewithgradesspecifiedbydesigndocuments.

5.3.6

Theweldingofrotationrailshallmeettherequirementsofdesigndocuments.After

welding,weldsshallbepolishedsmoothly,andsurfaceinspectionshallbeperformeduntilitis

qualified.

5.3.7

Theinstallationofrotationrailshallbecheckedbyextractingmorethan8equaldiversion

pointsonthecircumference,andshallbeincompliancewiththefollowingrequirements:

1

Railradiusisadjusted,andallowabledeviationshallbe±4.0mm;

2

Theelevationofeachpointonthetopsurfaceofrailisadjusted,andallowabledeviation

shallbe±5.0mm;

3

Theradiusofcenteringsupportingrollrailisadjusted,andallowabledeviationshallbe

±4.0mm;

4

Theradiusofrotationpingearisadjusted,andallowabledeviationshallbe±3.0mm;

5

Gapbetweentherollerofcenteringrollandrailisadjusted,andallowabledeviationshallbe

±1.0mm.

5.3.8

人人文庫:

Theinstallationofrotationbalancersshallbeincompliancewiththefollowingrequirements

1

Thelevelnessofuppersurfaceinlongitudinalandlateraldirectionsisadjusted,and

allowabledeviationshallbe1/1000ofsidelength;

2

Sidelengthsofasquareformedbythefourrotationbalancers,andallowabledeviationshall

be±2.0mm;

3

Diagonaldifferenceofthesquareformedbythefourrotationbalancers,andallowable

deviationshallbe4.0mm.

5.4InstallationofCableDrum

5.4.1

Theinstallationofcabledrumshallbeincompliancewiththefollowingrequirements

·8·

(Figure5.4.1):

1

Thelevelnessofthedrumisadjusted,andallowabledeviationshallbe1/1000ofthelength

ofdrum;

2

Thelateraldeviationofthedrumonthedatumlineoftherailisadjustedandisdetectedat

W1andW2,andallowabledeviationshallbe1.0mm.

Figure5.4.1Detectionfigureofcabledrum

1-Levelgauge;2-Drum;3-Travelingrail;4-Plumbbob

5.4.2

Theinstallationofreelshallbeincompliancewiththefollowingrequirements:

1

Thelateraldeviationofthereelandthelongitudinaldatumlineofdrumisadjusted,and

allowabledeviationshallbe5.0mm.

2

Theperpendicularityofthereelisadjusted,andallowabledeviationshallbe2.0mm.專用

5.5InstallationofBeltConveyor,BalanceWeight,AnchorageLocker

5.5.1

Cantileversupportsshouldbeinstalledafterbeingassembledontheground.

5.5.2

Cantileversupportsshallbesupportedbyusingthetemporarysupport,andthetemporary

supportshallhavesufficientbearingcapacityandcanbeheight-adjustable.

5.5.3

Duringassembly,thecantileversupportsshallbepositionedbyusingtheordinarybolts,

andaftertherelativepositionsandstraightnessoftwosectionsofcantileversupportsareadjusted

tomeetrequirements,thecantileversupportsareconnectedbyusinghigh-strengthbolts.

5.5.4

Bucketwheelbodyshouldbeassembledontheground,andthen,hoistedintegrally.

5.5.5

Thetailcarbeltconveyorframeshouldbeassembledontheground,andthen,subjectedto

segmentalhoisting.

5.5.6

Theinstallationofbalanceweightandbalanceexperimentsshallmeettherequirementsof

designandequipmenttechnicaldocuments.

5.5.7

Theassemblyofcantileverbeltconveyorframeshallbeincompliancewiththefollowing

requirements:人人文庫

1

Thecenterlineisadjusted,andallowabledeviationshallbe3.0mm;

2

Altitudedifferenceoflowersurfaceattheconnectionpointisadjusted,andallowable

deviationshallbe5.0mm.

5.5.8

Theinstallationofcantileverbeltconveyorframeshallbeincompliancewiththefollowing

requirements:

1

Thecenterlineisadjusted,andallowabledeviationshallbe10.0mm;

2

Theelevationisadjusted,andallowabledeviationshallbe±10.0mm.

5.5.9

Theassemblyoftailcarbeltconveyorframeshallbeincompliancewiththefollowing

requirements:

·9·

1

Thecenterlineisadjusted,andallowabledeviationshallbe3.0mm;

2

Altitudedifferenceoflowersurfaceattheconnectionpointisadjusted,andallowable

deviationshallbe3.0mm.

5.5.10

Theinstallationoftailcarbeltconveyorframeshallbeincompliancewiththefollowing

requirements:

1

Thecenterlineisadjusted,andallowabledeviationshallbe5.0mm;

2

Theperpendicularityofthesupportinthemiddleisadjusted,andallowabledeviationshall

be1/1000oftheheightofthesupport.

5.5.11

Theinstallationofanchoringlockershallbebasedontherailcenterline,andshallbein

compliancewiththefollowingrequirements:

1

Parallelismisadjusted,andallowabledeviationshallbe3.0mm;

2

Perpendicularityisadjusted,andallowabledeviationshallbe3.0mm.

專用

人人文庫

·01·

6ProtectiveIronPartsandOperatingPlatformofCokeOven

6.1GeneralRequirement

6.1.1

Fortheinstallationofcokeovenbodyequipment,twoconstructiontechnologiesofbuilding

beforeinstallationofbuckstays(hearafterreferredtoasClassA)andinstallingbuckstaysbefore

building(hearafterreferredtoasClassB)maybeadopted.

6.1.2

Beforetheinstallationofequipment,themeasuringresultofthepreviousworking

procedureissubjectedtothecheckofactualmeasurement,simultaneously,thelongitidinaland

lateralcenterlinesofcokeovenbank,thecenterlineofthesidecokingchamber,theinstallation

datumlinesoffrontlinesonmachineandcokesidesandthecenterlineofflueshallbeset,andthe

perpetualcentraltargetanddatummarkshallbeembedded(Figure6.1.2).

專用

Figure6.1.2Datumlineofcokeoven

1-Centerlineofflue;2-Controllineofovenlength;3-Longitidinalcenterlineofcokeoven;

4-Centerlineofsidecokingchamber;5-Lateralcenterlineofcokeoven

6.2InstallationofBuckstays

6.2.1

Buckstaysshallbesubjectedtocheckandacceptancebeforeinstallation,andshallbein

compliancewiththefollowingrequirements:

1

Theoversizeanddeflectionvectorheightofthebuckstays,andtheallowabledeviationof

thedeflectionvectorheightshallbe5.0mm;

2

Sizesandpositionsofbuckstaysboltholesshallmeettherequirementsofdesigndocuments;

3

Lubricatin人人文庫reaseshallbecoatedatthebottomsofbuckstasandbetweenthebuckstas

ggyy

andtheshimplatestofacilitatesliding.

6.2.2

Thedeformationofthebuckstaysshallbeavoidedduringthetransportationandhoisting,

andduringstacking,thebuckstaysshallbeleveledupwithbearingpointsnotlessthan3.

6.2.3

Beforeinstallation,theconcreteofovenhearthshallbesubjectedtocheckandacceptance,

andshallbeincompliancewiththefollowingrequirements:

1

Theedgeofconcreteedgeofovenhearthshallnotbugleoutofthemasonryofthecoke

oven;

2

Thesizeoftheconcretebracketofovenhearthshallmeettherequirementsofdesign

documents;

·11·

3

Gapbetweenthelowerpartofbuckstaysandtheconcretebracketofovenhearthshall

meettherequirementsofdesigndocuments,andshallcontainimpurities.

6.2.4

Thecontactofthesmallprotectiveplateandthemasonryshallbeclose,gapshallbeless

than1.0mm,andcontinuouslengthshallnotbelargerthan100.0mm.

6.2.5

WhentheClassAconstructiontechnologyisadopted,theinstallationofbuckstaysshallbe

incompliancewiththefollowingrequirements(Figure6.2.5):

1

Theelevationofshimplatesofbuckstaysisadjusted,andallowabledeviationshallbe

±5.0mm;

2

Spacebetweenbuckstaysisadjusted,andallowabledeviationshallbe±3.0mm.

6.2.6

WhentheClassBconstructiontechnologyisadopted,theinstallationofbuckstaysshallbe

incompliancewiththefollowingrequirements(Figure6.2.5):

Figure6.2.5Detectionfigureofbuckstaysinstallationofcokeoven專用

1-Buckstays;2-Braceonlowerpart;3-Braceonupperpart

1

Theelevationofshimplatesofbuckstaysisadjusted,andallowabledeviationshallbe

±1.0mm.

2

Spacebetweenbuckstaysintheovenlengthshallbecheckedandadjustedtwice,forthe

firsttime,spaceischeckedandadjustedduringtheinstallationofbuckstaysbeforethepouringof

ovenhearthandthebuildingofovenbottom,andforthesecondtime,spaceischeckedandadjusted

beforetheovenbodyisbuilttothebottomofthecokingchamberandtheprotectiveplateis

+5.0

installed.Theallowabledeviationoftheovenbottomis0mm,theallowabledeviationofthe

+7.0+16.0

bottomofthecokingchamberis0mm,andtheallowabledeviationofovenroofis-12.0mm.

3

Gapsofbuckstaysintheovenbankdirectionshallbecheckedandadjustedtwice,the

allowabledeviationoftheovenbottomis±3.0mm,theallowabledeviationofthebottomofthe

cokingchamberis±5.0mm,thefirstallowabledeviationofovenroofis±7.0mm,andthesecond

allowabledeviationofovenroofis±3.0mm.

6.3InstallationofSmallBuckstays

人人文庫

6.3.1

Smallbuckstaysshallbeclosetothesinglewallsurfaceofregenerativechamber.

6.3.2

Theallowabledeviationofthecenterlineofthesmallbuckstaysandthecenterlineofthe

singlewallshallbe±2.0mm.

6.3.3

Thelengthofcompressedspringduringinstallationshallmeettherequirementsofdesign

documents.Whenthedesigndoesnotrequirements,allowabledeviationshallbe±2.0mm.

6.4InstallationofProtectivePlates

6.4.1

Buckstaysshallbesubjectedtocheckandacceptancebeforeinstallation,andshallbein

compliancewiththefollowingrequirements:

·21·

1

Cornersaroundtheprotectiveplateshallbesmoothandtransitional,andshallnothave

flangesandacuteangles;

2

Thecastingsurfaceoftheprotectiveplateshallbeflatandsmooth,andshallnothavedefectsof

sandholes,honeycombs,pores,flash,bumps,etc;

3

Themeasuredvalueofthegeometricalsizeoftheprotectiveplateshallmeettherequirementsof

designdocuments;

4

Theconstructionofthethermalinsulationmaterialoftheprotectiveplateliningshallmeet

therequirementsofdesigndocuments.

6.4.2

Beforetheinstallationoftheprotectiveplate,theelevationoftheovenshoulderatthe

bottomofthecokingchamberhandedoverduringovenbuildingshallbecheckedandshallmeetthe

requirementsofdesigndocuments.

6.4.3

Themodel,specificationandignitionlossofsealingfillershallmeettherequirementsof

designdocuments.

6.4.4

Sealingfillerbetweentheprotectiveplateandthemasonryshallbetight,theamountof

compressionofthesealingfillershallmeettherequirementsofdesigndocuments,andwhenthe

1mmfeelergaugeisinserted,thelengthofcontinuousinsertionshallnotbelargerthan100.0mm.

6.4.5

Theoverlappinglengthofsealingfillerbetweentheprotectiveplateandthemasonryshall

notlessthan90.0mm.

6.4.6專用

Theinstallationoftheprotectiveplateshallbeincompliancewiththefollowingrequirements:

1

Theprotectiveplateshallbeverticallyhoistedtobeinstalledfromtheupperend;

2

Thesideoftheprotectiveplatemustnotbebulgedoutofthewallofthecokingchamber;

3

Distancebetweentheadjacentprotectiveplatesandtheovenwallofthecokingchamber

shallbeadjusteduniformly.

6.4.7

WhentheClassAconstructiontechnologyisadopted,theinstallationoftheprotective

plateshallbeincompliancewiththefollowingrequirements:

1

Thecenterofovenbankisadjusted,andallowabledeviationshallbe3.0mm;

2

Elevationisadjusted,andallowabledeviationshallbe±2.0mm;

3

Aftertheprotectiveplateisfastenedunderthepressure,theallowabledeviationofgap

+2.0

betweentheadjacentprotectiveplateshallbe0mm,andtheprotectiveplatesshallbeonthesame

verticalplane,andallowabledeviationshallbe5.0mm.

6.4.8

WhentheClassBconstructiontechnologyisadopted,theinstallationoftheprotectiveplate

shallbeincompliancewiththefollowingrequirements:

1

Theinstallationaccurac人人文庫yofbuckstaysshallbere-inspectedbeforetheinstallationofthe

protectiveplate,andshallmeettherequirementsofarticle6.2.6ofthiscode;

2

Thegapoftheprotectiveplatesintheovenlengthdirectionisadjusted,andallowable

+2.0

deviationshallbe0mm;

3

Thegapoftheprotectiveplatesintheovenbankdirectionisadjusted,andallowable

deviationshallbe±2.0mm;

4

Theelevationoftheprotectiveplateisadjusted,andallowabledeviationshallbe±2.0mm.

6.5InstallationofOvenPortFramesandNogPlates

6.5.1

Theovenportframesshallbesubjectedtocheckandacceptancebeforeinstallation,and

·31·

shallbeincompliancewiththefollowingrequirements:

1

Thesizeandallowabledeviationofovenportframesshallmeettherequirementsofdesign

documents;

2

Cornersaroundtheovenportframesshallbesmoothandtransitional,andshallnothave

flangesandacuteangles;

3

Thecontactsurfaceoftheovenportframesandtheovenportknifeedgeshallbeflatand

smooth,andshallnothavedefectsofsandholes,honeycombs,pores,flash,bumps,etc.

6.5.2

Theinstallationofthesealingfilleroftheovenportframesshallbeincompliancewiththe

followingrequirements:

1

Themodel,specificationandignitionlossofsealingfillershallmeettherequirementsof

designdocuments,andprotectivemeasuresareadoptedforthesealingfillerwithgoodpaste;

2

Thejointofeachlayerofsealingfillerbetweentheovenportframesandtheprotective

plateshallbestaggered,theoverlappinglengthshallbelargerthan90.0mm,andthesealingfiller

shallbetightenedandcompacted;

3

Theamountofcompressionofthesealingfilleroftheovenportframesshallmeetthe

requirementsofdesigndocuments.

6.5.3

Thegeometricsizesoftheovenportframesandprotectiveplatepositioningpinshallbe

checkedbeforetheinstallationoftheovenportframesandshallmeetthere專用quirementsofdesign

documents.

6.5.4

Theinneredgeoftheovenportframesshallnotprotrudeoutoftheouteredgeofthe

protectiveplateaftertheinstallationoftheovenportframes.

6.5.5

Thenogplatesoftheovenportframesshallbefixed,andtheelevationofthetopsurfaceof

thenogplatesshallbelowerthanthebottomsurfaceofthecokingchamber.

6.5.6

WhentheClassAconstructiontechnologyisadopted,thedeformationoftheovenport

framesdoesnotoccurunderthepressure.

6.5.7

WhentheClassAconstructiontechnologyisadopted,theinstallationoftheovenport

framesshallbeincompliancewiththefollowingrequirements:

1

Gapoftheovenportframesintheovenbankdirectionisadjusted,andallowabledeviation

shallbe±2.0mm;

2

Thelevelnessofthenogplatesurfaceisadjusted,andallowabledeviationshallbe1/500of

thesidelengthofthenogplate;

3

Theelevationofrollbracketisadjusted,allowabledeviationshallbe±1.0mm,andthe

differenceofleftandri人人文庫ghtelevationsofrollbracketis±0.5mm;

4

Thestampmarkofthebottomelevationofthecokingchamberontheovenportframesand

thebottomelevationofthecokingchamberareadjusted,andallowabledeviationshallbe±1mm.

6.5.8

WhentheClassBconstructiontechnologyisadopted,theinstallationoftheovenport

framesshallbeincompliancewiththefollowingrequirements:

1

Gapoftheovenportframesintheovenbankdirectionisadjusted,andallowabledeviation

shallbe±2.0mm;

2

Theperpendicularityoftheovenportframesisadjusted,andallowabledeviationshallbe

4.0mm;

3

Theelevationofrollbracketisadjusted,allowabledeviationshallbe±0.5mm,andthe

·41·

differenceofleftandrightelevationsofrollbracketis±0.5mm;

4

Thestampmarkofthebottomelevationofthecokingchamberontheovenportframesand

thebottomelevationofthecokingchamberareadjusted,andallowabledeviationshallbe±1mm.

6.6InstallationofOvenPorts

6.6.1

Ovenportsshallbesubjectedtocheckandacceptancebeforeinstallation,andshallbein

compliancewiththefollowingrequirements:

1

Themachiningsurfaceofovenportandknifeedgeshallbeflatandsmooth,andshallnot

havedefectsofsandholes,honeycombs,pores,flash,bumps,etc;

2

Smallovenportshallbeopenedandclosedflexibly,andshallnotbejammed;

3

Theconstructionofthermalinsulationmaterialoftheovenportliningshallmeetthe

requirementsofdesigndocuments.

6.6.2

Beforetheinstallationofovenport,ovenportknifeedgeandthespringofovenportbolt

shallbeintheloosenedstate,andtheovenportknifeedgeshallhaveprotectivemeasuresduring

installationtoavoiddamagetoknifeedge.

6.6.3

Coincidenceshallberealizedbetweenovenridingwheelandportframecarrierrollerbase

andbetweenupperandlowerportlatchesandhooks.

6.6.4

Thecontactoftheovenportknifeedgeandtheovenportframesshallbeti專用ght,gapshallbe

lessthan0.1mm,andthecontinuouslengthofthegapshallbelessthan100.0mm.

6.6.5

Spacebetweenadjustingnutsofupperandlowerportlatchesofovenportandportlatches

shallmeettherequirementsofdesigndocuments.

6.6.6

Ovenportlatchesandvariousboltsshallbeadjustedrespectivelyintheearlierandlater

stagesofovendry-off.

6.7InstallationofLongitudinalandLateralBracings

6.7.1

Longitudinalandlateralbracingsshallbesubjectedtocheckandacceptancebeforeinstallation,

andshallbeincompliancewiththefollowingrequirement:

1

Thefull-lengthflexivityoflateralbraceshallnotbelargerthan10.0mm;

2+40.0

Theallowabledeviationofthetotallengthoflateralbraceshallbe-20.0mm,andthe

+20.0

allowabledeviationofthreadlengthshallbe-10.0mm;

3

Longitudinalbracingsmustnothavepermanentdeformation.

6.7.2

Springsoflongitudinalandlateralbracingsshallcontainfactorcompressionvaluereport,

andtheallowabledeviationofthecom人人文庫pressedspringsduringinstallationshallbe±2.0mm.

6.7.3

Afterlongitudinalandlateralbracingsareinstalledandadjusted,theyshallnotcontact

witheachother.

6.7.4

Theinstallationoflateralbracingsshallbeincompliancewiththefollowingrequirements:

1

Afterbeinginstalled,lateralbracingsontheupperpartshallbekeptstraight,andthe

allowabledeviationofelevationandcentershallbe±5.0mm;

2

Lateralbracingsontheupperpartshallbeprovidedwiththeprotectivedeviceaccordingto

therequirementsofdesigndocuments,whichcanmovefreelyintheprotectivesleeve.

6.7.5

Theinstallationoflongitudinalbracingsshallbeincompliancewiththefollowingrequirements:

1

Longitudinalbracingsshallbeweldedonsiteontheovenroof,andthepositionsofwelds

·51·

shallbestaggeredwiththetopofcombustionchamber;

2

Thequalityoftheweldsoflongitudinalbracingsshallmeettherequirementsofdesign

documents.

6.8InstallationofPlatformsontheCokePusherSideandCokeGuideSide

6.8.1

Mainmembersofsteelcolumn,beams,etc.shallbere-inspected,andmainsizesshallmeet

CodeforAcceptanceofConstructionQualityofSteel

therequirementsofdesigndocumentsand

StructureWork

GB50205.

6.8.2

Theallowabledeviationofthesurfaceelevationofcastironplatepavedontheplatformson

thecokepushersideandcokeguidesideshallbe±5.0mm.

6.8.3

Thegradientofcastironplatebetweencokeguiderailsshallmeettherequirementsof

designdocuments.

6.8.4

Theinstallationofplatformsonthecokepushersideandcokeguidesideshallbein

compliancewiththefollowingrequirements:

10

Theelevationofcolumntopisadjusted,andallowabledeviationshallbe-0.5mm;

2

Distanceofcolumncenterisadjusted,andallowabledeviationshallbe±5.0mm;

3

Perpendicularityofcolumnisadjusted,andallowabledeviationshallbe1/1000ofcolumn

height;

4專用

Theelevationsofplatformsonthecokepushersideandcokeguidesideareadjustedand

aredetectedontheuppersurfaceofsteelbeam,allowabledeviationonthecokesideshallbe

±3.0mm,andallowabledeviationonthepushersideshallbe±5.0mm;

5

Spacebetweenthetopofsteelbeamandbuckstaysisadjusted,andallowabledeviation

+5.0

shallbe0mm;

6

Theelevationsofbracketsofplatformsareadjusted,andallowabledeviationshallbe

0

-5.0mm.

人人文庫

·61·

7HeatingandExchangeDeviceundertheCokeOven

7.1InstallationofGasMainPipelines,BranchPipelineandDownspouts

7.1.1

Thedatumlineofpipeinstallationshallbesetonthefoundationaccordingtothedatum

lineofcokeoven.

7.1.2

Themodelsandspecificationsofvariousvalvesshallmeettherequirementsofdesign

documents,andvariousvalvesshallbeinstalledafterair-tighttestisqualified.

7.1.3

Theassemblyandweldingofgaspipelineshallmeettherequirementsofdesigndocuments

CodeforConstructionandAcceptanceofIndustrialMetallicPiping

andGB50235ascurrent

nationalstandard.

7.1.4

Whenthebranchpipeisconnectedtothemainpipe,theopenporediameterofthemain

pipeislargerthantheouterdiameterofthebranchpipe,butshouldnotexceed5.0mm,andthe

insertingdepthofthebranchpipeshouldnotexceed3.0mm.

7.1.5

Theinstallationofthefixingbracketandslidingbracketofthemainpipeshallmeetthe

requirementsofdesigndocuments.

7.1.6專用

Thepipelineshallinclineinthewaterflowdirection,andthegradientshallmeetthe

requirementsofdesigndocuments.

7.1.7

Afterbeinginstalled,thegaspipelineshallbesubjectedtotheair-tighttestofthesystem

CodeforConstructionandAcceptanceof

andshallmeettherequirementsofdesigndocumentsand

IndustrialMetallicPiping

GB50235ascurrentnationalstandard.

7.1.8

Installationofgasmainpipelines,branchpipelineanddownspoutsshallbeincompliance

withthefollowingrequirements:

1

Centersofmixedgasmainpipesonthecokepushersideandcokeguidesideandcokeoven

gasmainpipeareadjusted,andallowabledeviationshallbe5.0mm;

2

Elevationsofmixedgasmainpipesonthecokepushersideandcokeguidesideandcoke

ovengasmainpipeareadjusted,andallowabledeviationshallbe±5.0mm;

3

Thecenterofdistributionstandpipeisadjusted,andallowabledeviationshallbe3.0mm;

4

Thelevelnessofdistributionstandpipeflangeisadjusted,andallowabledeviationshallbe

1/500ofouterdiameterofflange;

5

Theelevationofdistributionstand人人文庫pipeflangeisadjusted,andallowabledeviationshallbe

±5.0mm;

6

Theperpendicularityofthedownspoutsisadjusted,andallowabledeviationshallbe

3.0mm.

7.2InstallationofRegulatingCock,ExchangeCockandOrificePlateBox

7.2.1

Theregulatingcock,exchangecockandorificeplateboxshallmeettherequirementsof

designdocuments,andareinstalledafterpressuretestisqualified.

7.2.2

Theoddandevennumberandon/offstateoftheexchangecockandtheindicationofthe

engraveddirectionshallmeettherequirementsofdesigndocuments.

·71·

7.2.3

Gapsofupperandlowerpositionsbetweenexchangecockwrenchandcocksquarehead

shallnotbelargerthan0.3mm,andgapsshallnotoccuronleftandlowersides.

7.2.4

Thecenteroftheexchangecockshallbeonthestraightline,andallowabledeviationshall

be3.0mm.

7.2.5

Theinstallationofflangesofregulatingcock,orificeplateboxandexchangecockshall

CodeforConstructionandAcceptanceofIndustrialMetallicPiping

meettherequirementsofGB

50235ascurrentnationalstandard.

7.3InstallationofWasteGasExchangeShutter

7.3.1

Wastegasexchangeshuttershallbesubjectedtocheckandacceptancebeforeinstallation,

andshallbeincompliancewiththefollowingrequirement:

1

Theleaktestofgasthalliumandwastegasthalliumshallbeperformedaccordingtothe

requirementsofdesigndocuments;

2

Wastegasthalliumrodorgasthalliumrodshallnotbebent,andshallnotbejammed

duringliftingorfreedropping;

3

Theturningplateinthevalvebodyshallbeflexiblyrotated,andtheturningplateshallnot

bejammedintheoffposition;

4

Theon/offdirectionofairportregulationturningplateinthewaste專用gasvalveshallbe

consistent,andon/offpositionanddirectionindicationshallbemarkedontheindexdial.

7.3.2

Gapofwastegasexchangeshutterandgaparoundsmallfluefaucetandsocketshallbe

uniform,andtheallowabledeviationofthelongitudinalcenterlineofthewastegasexchange

shuttershallbe3.0mm.

7.3.3

Theallowabledeviationofthecenterelevationoftheelevationofbifurcatedpipeflangeof

thewastegasexchangeshuttershallbe±5.0mm,andtheperpendicularityofflangesurfaceshall

notbelargerthan1/500offlangediameter.

7.3.4

Theaircapisinthefullclosingstate,andthegapofthecontactsurfaceshallsmallerthan

0.05mm.

7.3.5

Thestrokeofthewastegasthalliumrodandthegasthalliumrodarecheckedwithinthe

allowabledeviationscopeofthestrokeoftheexchangeoilcylinder,andtheallowabledeviationof

theliftingheightshallbe±5.0mm.

7.4InstallationofGasExchanger

7.4.1

Theallowabledeviationofthecenterlinesofexchan人人文庫geoilcylinderandfrontandrearchain

wheelsshallbe3.0mm.

7.4.2

Theallowabledeviationofthestrokeofexchangeoilcylindershallbe±10.0mm.

7.4.3

Theinstallationofexchangeoilcylindershallbeincompliancewiththefollowing

requirements:

1

Thecenterlineofexchangeoilcylinderisadjusted,andallowabledeviationshallbe

2.0mm;

2

Thelevelnessofexchangeoilcylinderisadjusted,andallowabledeviationshallbe1/500;

ofthelengthofoilcylinder;

3

Theelevationofexchangeoilcylinderisadjusted,andallowabledeviationshallbe±2.0mm.

·81·

7.5InstallationofExchangeDrivingStructure

7.5.1

Theexchangedrivingstructureshallbeinstalledaftertheinstallationoftheheatinggas

pipelineandtheexchangeshutterisqualified.

7.5.2

Theexchangedrivingstructureispositionedonthewheelstandattheresistancewall,the

installationelevationshallbedeterminedaccordingtothecenterelevationsofthechainwheels,and

thecentersofthewheelstandchainwheelsofthesamesystemshallbeconsistent.

7.5.3

Beforetheinstallationoftheexchangewrench,theon/offpositionoftheexchangecock

shallbecheckedbycontrastingtotheheatingsystemdiagram,andtheallowabledeviationofthe

wrenchturningonandturningofftheexchangecockatthefullturning-onandfullturning-off

positionshallbe±2.0mm.

7.5.4

Thebearingpulleyofthethalliumrodbraceofthewastegasvalveshallsupportthebrace,

theallowabledeviationofthecenterlineofthepulleyshallbe3.0mm;andtheallowabledeviation

oftheelevationofthepulleyshallbe±5.0mm.

7.5.5

Beforetheinstallationofthewrenchturningofandturningoffthewastegasvalve,the

directionofwrenchandthetransmissionstateoffan-shapedwheelandairdampertransmission

levershallbecheckedbycontrastingtotheheatingsystemdiagramandtheactiondiagramofthe

exchangeshutter,andtheallowabledeviationofthewrenchatthefullturnin專用g-onandfullturning-

offpositionshallbe±3.0mm.

7.5.6

Theallowabledeviationofthestrokeoftheexchangetransmissionbraceshallbe

±10.0mm.

7.5.7

Theinstallationoftheexchangedrivingstructureshallbeincompliancewiththefollowing

requirements:

1

Thecenterofthechainwheelbaseisadjusted,andallowabledeviationshallbe3.0mm;

2

Theelevationofthechainwheelbaseisadjusted,andallowabledeviationshallbe

±5.0mm;

3

Thecenterofthebracesupportisadjusted,andallowabledeviationshallbe3.0mm;

4

Theelevationofthebracesupportisadjusted,andallowabledeviationshallbe±5.0mm.

7.6InstallationofStackGateValve

7.6.1

Flueshuttershallbeinstalledcompletelybeforeovendry-off.

7.6.2

Flueshuttershallbepreassembledbeforeinstallation,andtheallowabledeviationofgap

betweenturningplateandflueshallbe±5.0mm.人人文庫

7.6.3

Duringinstallation,flueshuttershallkeepverticalandflexiblerotation,sealingcoverplate

shallbetight,theon/offpositionandon/offdirectionofindexdialshallmeettherequirementsof

designdocuments.

7.6.4

Theinstallationofthestackgatevalveshallbeincompliancewiththefollowing

requirements:

1

Thecenterofthestackgatevalveisadjusted,andallowabledeviationshallbe10.0mm;

2

Theelevationthestackgatevalveisadjusted,andallowabledeviationshallbe±10.0mm;

3

Thelevelnessofbeamonthetopofthestackgatevalveisadjusted,andallowabledeviation

shallbe1/1000ofbeamlength.

·91·

8EquipmentontheTopofCokeOven

8.1InstallationofGasHeadersandLiquidAmmoniaPipes

8.1.1

Thegasheadersshouldbemadeinsections,andmaybeinstalledafterpassingexamination

CodeforConstructionandAcceptanceof

accordingtotherequirementsofdesigndocumentsand

FieldequipmentIndustrialPipeWeldingWork

,GB50683ascurrentnationalstandard.

8.1.2

Twopipesectionsofthegasheadersshallbeconnectedbyusingtheexternally-lapped

connectingplate,andtheweldofthegasheadersshallbesubjectedtonondestructiveexamination

accordingtotherequirementsofdesigndocuments.

8.1.3

Fortheinstallationoftheammoniawaterbranchpipe,theconnectorpositionshallbe

checkedaccordingtodesigndocuments,andthepipelinerunissetaccordingtotheactualsite.

8.1.4

Theliquidammoniapipeslineshallbesubjectedtowaterpressuretestaccordingtothe

requirementsofdesigndocuments.Whenthedesigndoesnothaverequirements,testpressureshall

be1.5timesofworkingpressure,andtheliquidammoniapipeslineisqualifiedwithoutleakage

after30minutes.

8.1.5專用

Afterthepressuretestoftheliquidammoniapipeslineisqualified,theliquidammonia

pipeslineshallbesubjectedtowaterwashingandairpurge.

8.1.6

Beforeclosing,thegasheadersmaybeclosedafterbeingcleaned.

8.1.7

Thegasheadersshouldbeinstalledinthecoldstateandshallbeincompliancewiththe

followingrequirements:

1

Thecenterofthegasheadersisadjusted,andallowabledeviationshallbe3.0mm;

2

Theelevationofthegasheadersisadjusted,andallowabledeviationshallbe±5.0mm;

3

Thelongitudinalandlateralcentersofthegasheadersandthewatersealvalveconnecting

flangeisadjusted,andallowabledeviationshallbe3.0mm;

4

Theelevationofthewatersealvalveflangeofthegasheadersisadjusted,andallowable

deviationshallbe±3.0mm.

8.2InstallationofRisersandCrossoverMains

8.2.1

Beforetheinstallationoftherisers,thecenterlinesofbasesoftherisersshallbechecked,

andtheallowabledeviationofthebasesofan人人文庫ytworisersshallbe3.0mm.

8.2.2

Therisersandcrossovermainsshouldbeinpositioninthecoldstateandadjustedinthe

thermalstate.Therisersandcrossovermainsshallbeconnectedtemporarilybeforeoven

temperaturereaches650℃oventemperaturereaches650℃therisersshallbefixedafterthegaps

aroundthebirdmouthsoftherisersandthewatersealvalveareadjustedtobeuniformand

jammingdoesnotexist.

8.2.3

Afterthewatersealcoversofrisersareinstalled,andthecheckofwatersealheightand

leakagetestareperformedaccordingtotherequirementsofdesigndocuments,andtheallowable

deviationofwatersealheightshallbe±5mm.

8.2.4

Afterthewatersealcoversofrisersareinstalled,counterweightshallbeadjusted,sothat

·02·

itcannotbeclosedautomaticallyafterbeingopened.

8.2.5

Therotationofhighandlow-pressureliquidammoniaconversionmechanismshallbe

flexible,theopeningandclosingstateshallbecorrect,andliquidammoniashallhavegoodspraying

andshallbepreventedfrombeingsprayedinthecokingchamber.

8.2.6

Afterrisers,crossovermainsandwatersealvalves,etc.areinstalledandadjusted,damaged

paintedpositionsshallbecoatedagain.

8.2.7

Theinstallationofrisersshallbeincompliancewiththefollowingrequirements:

1

Thecentersofriserbodiesareadjusted,andtheallowabledeviationofthecentersofany

tworisersshallbe3.0mm;

2

Theelevationsoftopcoversofrisersareadjusted,andallowabledeviationshallbe

±5.0mm;

3

Theperpendicularityofriserbodiesareadjusted,andallowabledeviationshallbe1/500of

heightsofriserbodies.

8.3InstallationofGuidePipesforCokeGuideandCoalChargingDedusting

8.3.1

Connectorforfixingthededustingguidepipeandthecokeguideandthededustingdevice

ofthecoalchargingcarshallbeadjustedinthethermalstatetobefixed.

8.3.2

Theelevation,longitudinalandlateralcenterlines,perpendicularit專用yandoverallsizeofeach

connectionflangeofconcentrateddedustingfixingpipeshallmeettherequirementsofdesign

documents.

8.3.3

Anti-explosionvalveshallhavenojamming.

8.3.4

Pipelineflangeshallbefastened,sealshallhavenodamage,andsupportsandhangersshall

befirmandreliable.

8.3.5

Theallowabledeviationofdistancebetweentheflangeendfaceofeachfixedconnectorof

thededustingguidepipeandcenterlinesofrailsofcokeguideandcoalchargingcarshallbe

±20.0mm.

8.3.6

Theallowabledeviationofthecenterofeachfixedconnectorofthededustingguidepipe

andthecenterlineofeachcokingchambershallbe40.0mm.

人人文庫

·12·

9AuxiliaryEquipmentofCokeOven

9.1InstallationofTestEquipmentforOvenPortRepairStation,

CokePushingRamandCoalLevelingBar

9.1.1

Installationofequipmentforovenportrepairstationshallbeincompliancewiththe

followingrequirements:

1

Thecenterofwinchisadjusted,andallowabledeviationshallbe5.00;

2

Theelevationofwinchisadjusted,andallowabledeviationshallbe±5.0mm;

3

Thecenteroffixingframeisadjusted,andallowabledeviationshallbe5.00;

4

Theelevationoffixingframeisadjusted,andallowabledeviationshallbe±5.0mm;

5

Theperpendicularityoffixingframeisadjusted,andallowabledeviationshallbe1/1000of

frameheight;

6

Therailgaugeoflandinggearisadjusted,andallowabledeviationshallbe±3.0mm;

7

Theelevationofguiderailoflandinggearisadjusted,andallowabledeviationshallbe

±2.0mm.

9.1.2

Theinstallationoftestequipmentforcokepushingramandcoallevelin專用gbarshallbein

compliancewiththefollowingrequirements:

1

Thelongitudinalcenteroftestridingwheelgroupofcoallevelingbarisadjusted,and

allowabledeviationshallbe5.0mm;

2

Theelevationoftestridingwheelgroupofcoallevelingbarisadjusted,andallowable

0

deviationshallbe-5.0mm,andrelativeheightdifferenceshallnotbelargerthan2.0mm;

3

Thelongitudinalcenteroftestplatformofcokepushingramisadjusted,andallowable

deviationshallbe5.0mm;

4

Theelevationoftestplatformofcokepushingramisadjusted,andallowabledeviation

0

shallbe-5.0mm.

9.2InstallationofCollectingPlatesofWetQuenchingTower

9.2.1

Theinstallationofcollectingplatesshallbeincompliancewiththefollowingrequirements:

1

Thespacebetweencollectingplatesisadjusted,andallowabledeviationshallbe±5.0mm;

2

Theelevationofcollectin人人文庫gplatesisadjusted,andallowabledeviationshallbe±10.0mm;

3

Thecenterofcollectingplatesisadjusted,andallowabledeviationshallbe10.0mm.

9.3InstallationofCoalFeedingDeviceofCoalTower

9.3.1

Theinstallationofdischargespoutofcoaltowershallincompliancewiththefollowing

requirements:

1

Thecenterofdischargespoutisadjusted,andallowabledeviationshallbe5.0mm;

2

Theelevationofdischargespoutisadjusted,andallowabledeviationshallbe±5.0mm.

9.3.2

Theinstallationofbeltconveyorofcoaltowershallincompliancewiththefollowing

requirements:

·22·

1

Thecenterofbeltconveyorisadjusted,andallowabledeviationshallbe5.0mm;

2

Theelevationofbeltconveyorisadjusted,andallowabledeviationshallbe±5.0mm.

9.4InstallationofScaleforCoalChargerofCoalTower

9.4.1

Theelevationoftopsurfaceatrailjointoftherailsectionofweighingmachineshallbe0to

1.0mmlowerthanelevationsoftopsurfacesofrailattwoends.

9.4.2

Theinstallationofscaleforcoalchargershallbeincompliancewiththefollowingrequirements:

1

Thecenterofsensorisadjusted,andallowabledeviationshallbe1.0mm;

2

Theelevationofsensorisadjusted,andallowabledeviationshallbe±1.0mm;

3

Thelevelnessofsensorbaseisadjusted,andallowabledeviationshallbe1/1000ofside

lengthofbase;

4

Theelevationsofrailsareadjusted,andallowabledeviationshallbe±2.0mm;

5

Thecentersofrailsareadjusted,andallowabledeviationshallbe2.0mm.

9.5InstallationofRailsofCokePusher,CoalChargerandCokeCar

9.5.1

Railsshallbesubjectedtocheckandacceptancebeforeinstallation,andshallbein

compliancewiththefollowingrequirement:

1

Railsshallhavenotorsionaldeformation;

2專用

Steelrailendfacesshallbeperpendiculartolongitudinalaxesofsteelrails;

3

Steelrailsshallnothaveseriousrustingandotherobvioussurfacedefects.

9.5.2

Fortheinstallationofrails,thelongitudinalcenterlineofovenbankofcokeovenisusedas

thedatum,andtheperpetualcentertargetisprovided.

9.5.3

Thepositionsofjointsoftwoparallelrailsshallbestaggered,andthestaggeringdistance

shallnotbeequaltobasedistanceoffrontandrearwheels.

9.5.4

Carbumpersandbuffersontwosidesatthesameendshallcontactsimultaneously.

9.5.5

Theelevationsofcoalchargerrailsshallbeperformedinthelaterstageofovendry-off,and

railsarefixedaftertheelevationsareadjustedaccordingtotheactualelevationofovenroofofcoke

oven.

9.5.6

Theinstallationofrailsofcokepusher,coalchargercarandcokecarshallbeincompliance

withthefollowingrequirements:

1

Thecentersofrailsareadjusted,andallowabledeviationshallbe2.0mm;

2

Theelevationsofrailplanesareadjusted,andallowabledeviationshallbe±5.0mm;

3+1.0

Gapsofrail人人文庫jointsareadjusted,andallowabledeviationshallbe0mm;

4

Staggeringofrailjointsisadjusted,andallowabledeviationshallbe1.0mm;

5

Spanofrailsisadjusted,andallowabledeviationshallbe±2.0mm.

9.6InstallationofRailsofCokeGuide

9.6.1

Railsshallbesubjectedtocheckandacceptancebeforeinstallation,andshallbeincompliance

withthefollowingrequirement:

1

Steelrailsshallhavenotorsionaldeformation;

2

Steelrailendfacesshallbeperpendiculartolongitudinalaxesofsteelrails;

3

Steelrailsshallnothaveseriousrustingandotherobvioussurfacedefects.

·32·

9.6.2

Fortheinstallationofsteelrails,thelongitudinalcenterlineofovenbankofcokeovenis

usedasthedatum,andtheperpetualcentertargetisprovided.

9.6.3

Thepositionsofjointsoftwoparallelrailsshallbestaggered,andthestaggeringdistance

shallnotbeequaltobasedistanceoffrontandrearwheels.

9.6.4

Carbumpersandbuffersontwosidesatthesameendshallcontactsimultaneously.

9.6.5

Railsofcokeguideontheplatformoncokeguidesideontheoverbodysectionofcokeoven

shallbeadjustedandfixedafterovendry-offtemperaturereaches650℃.

9.6.6

Theinstallationofcokeguideshallbeincompliancewiththefollowingrequirements:

1

Thecentersofrailsareadjusted,andallowabledeviationshallbe2.0mm;

2+1.0

Gapsofrailjointsareadjusted,andallowabledeviationshallbe0mm;

3

Staggeringofrailjointsisadjusted,andallowabledeviationshallbe1.0mm;

4

Spanofrailsisadjusted,andallowabledeviationshallbe±2.0mm;

5

Cokeguideisprovidedwithtworails,thetworailsareontheplatformoncokeguideside,

theallowabledeviationoftheelevationoftherailontheovensideshallbe±2.0mm,andthe

+3.0

allowabledeviationoftheelevationoftherailonthereverseovensideshallbe0mm;

6

Cokeguideisprovidedwithtworails,oneisontheplatformoncokeguideside,andwhen

theotheroneisonthecodeguidededustingsupport,theallowabledeviationofelevationsofthe

railsonovensideandreverseovensideshallbe±2.0mm;

7

,專用,

Cokeguideisprovidedwiththreerailstworailsareontheplatformoncokeguideside

andwhentheotheroneisonthecodeguidededustingsupport,theallowabledeviationofelevations

oftherailsonovensideandreverseovensideshallbe±2.0mm.

人人文庫

·42·

10CokePusher

10.1GeneralRequirement

10.1.1

Beforetheinstallationofcokepusher,walkingrailshallbesubjectedtoacceptancecheck,

andrailswhichdonotpassacceptancemustnotbeusedfortheinstallationofequipment.

10.1.2

Fortheinstallationofcokepusher,thecenterlineofwalkingrailofcokepusherandcoke

pushingcenterlineshallbeusedasdatumlineandshallbeperpendiculartoeachother,andthe

allowabledeviationoforthogonaldegreeshallbe0.1/1000.

10.1.3

Theinstallationpositionofcokepushershouldbeattheendplatformofcokeovenand

shallbestaggeredwiththeinstallationpositionofcoalchargercar.

10.1.4

Thecokepusherisinstalledonthebasisofsettlement,railsshallbesubjectedto

settlementobservationperiodicallyintheinstallationprocess,thecontactpointofeachwheeland

railshallbeonthesamehorizontalplane,andheightdifferenceshallnotbelargerthan2.0mm.

10.1.5

Theinstallationofhydraulic,pneumaticandlubricatingequipmentandpipelinesshall

CodeforConstructionandAcceptanceofConveyerEquipment

meettherequirementsof

InstallationWork專用

GB50270ascurrentnationalstandard.

10.1.7

Theinstallationofventilatingandair-conditioningequipmentshallmeettherequirements

CodeforConstructionandAcceptanceofVentilationandAirConditioningWork

ofGB50243as

currentnationalstandard.

10.1.8CodeforConstruction

Theinstallationofsteelstructureshallmeettherequirementsof

andAcceptanceofSteelStructureWork

GB50205ascurrentnationalstandard.

10.2InstallationofWalkingStructure

10.2.1

Datumanddatummarkshallbesetonthewalkingrailwithdatumsection,wheeltrackline,

spanlineandcokepushingcenterlinearesetbytakingthecenterlineofwalkingrailontheovensideas

datum,andthecokepushingcenterlineshallbeperpendiculartothecenterlineofcokeoven.

10.2.2

Theinstallationcenterofwalkingstructureshallbeadjustedbytakingthefactorymark

onthewalkingbeamasdatum.

10.2.3

Fortheinstallationofthewalkingstructure,wheelpartsshallbeputonthesteelrailsand

supportedbyusing人人文庫thetemporarysupport,andwalkingbeamisinstalledafterthelevelingofwheel

parts.

10.2.4

Adjustingshimplatebetweenthebaseofeachtransmissionmechanismandequipment

shallbecushionedcompactly,andtheconnectingboltsshallbeconsistentinrun-throughdirection

andshallbefastenedintime.

10.2.5

Theinstallationofwalkingstructureshallbeincompliancewiththefollowingrequirements:

1

Thewheeltrackoffrontandrearwalkingwheelsisadjusted,andallowabledeviationshall

be±2.0mm;

2

Thespanofwalkinggirdersisadjusted,andallowabledeviationshallbe±2.0mm;

3

Thediagonaldifferenceofwalkinggirdersisadjusted,andallowabledeviationshallbe

·52·

3.0mm;

4

Thedeflectionofwheelsontwosidesinhorizontaldirectionisadjusted,andallowable

deviationshallbe1/1000ofpointdistanceontwosides;

5

Thehomolateraldifferenceofwheelonsamesideisadjusted,andallowabledeviationshall

be2.0mm;

6

Theperpendicularityofwheelendfaceisadjusted,theupperrimofwheelshallincline

towardstheoutsideofrails,andallowabledeviationshallbe1/500ofwheeldiameter;

7

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論