![彈性支承塊式無(wú)作軌道部件第1部分混凝土支承塊LowVibrationTrackComponents-Part1:ConcreteBlock_第1頁(yè)](http://file4.renrendoc.com/view11/M03/2B/28/wKhkGWWdDHqAW8-jAADgkRX2gRw579.jpg)
![彈性支承塊式無(wú)作軌道部件第1部分混凝土支承塊LowVibrationTrackComponents-Part1:ConcreteBlock_第2頁(yè)](http://file4.renrendoc.com/view11/M03/2B/28/wKhkGWWdDHqAW8-jAADgkRX2gRw5792.jpg)
![彈性支承塊式無(wú)作軌道部件第1部分混凝土支承塊LowVibrationTrackComponents-Part1:ConcreteBlock_第3頁(yè)](http://file4.renrendoc.com/view11/M03/2B/28/wKhkGWWdDHqAW8-jAADgkRX2gRw5793.jpg)
![彈性支承塊式無(wú)作軌道部件第1部分混凝土支承塊LowVibrationTrackComponents-Part1:ConcreteBlock_第4頁(yè)](http://file4.renrendoc.com/view11/M03/2B/28/wKhkGWWdDHqAW8-jAADgkRX2gRw5794.jpg)
付費(fèi)閱讀全文
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
RAILWAYINDUSTRYSTANDARD
OFTHEPEOPLES'REPUBLICOFCHINA
LowVibrationTrackComonents—Part1ConcreteBlock
p:
TB/T3515.1-2018
'
IssuedbyNationalRailwayAdministrationofthePeoplesRepublicofChina
IssuedDate:July16,2018
ValidDate:February1,2019
ChinaRailwayPublishingHouseCo.,Ltd.
Beijing2022
圖書(shū)在版編目CIP數(shù)據(jù)
()
彈性支承塊式無(wú)砟軌道部件第部分
:TB/T3515.1-2018.1,
混凝土支承塊英文國(guó)家鐵路局組織編譯北京中國(guó)鐵道
:/.—:
出版社有限公司
,2022.3
ISBN978-7-113-28844-0
彈國(guó)彈性支承無(wú)砟軌道混凝土
Ⅰ.①…Ⅱ.①…Ⅲ.①--
支架零部件行業(yè)標(biāo)準(zhǔn)中國(guó)英文
----Ⅳ.①U213.2-65
中國(guó)版本圖書(shū)館數(shù)據(jù)核字第號(hào)
CIP(2022)024592
'
ChineseversionfirstpublishedinthePeoplesRepublicofChinain2018
'
EnglishversionfirstpublishedinthePeoplesRepublicofChinain2022
byChinaRailwayPublishingHouseCo.,Ltd.
'
No.8,YouanmenWestStreet,XichengDistrict
Beijing,100054
PrintedinChinabyBEIJINGCONGREATPRINTINGCO.,LTD.
'
?2018byNationalRailwayAdministrationofthePeoplesRepublicofChina
Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor
byanymeans,electronicormechanical,includingphotocopying,recording,orbyany
informationstorageandretrievalsystems,withoutthepriorwrittenconsentofthepublisher.
Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,
'
belent,resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsent
inanyformofbindingorcoverotherthanthatinwhichitispublishedandwithouta
similarconditionincludingthisconditionbeingimposedonthesubsequentpurchaser.
ISBN978-7-113-28844-0
IntroductiontotheEnglishVersion
TopromotetheexchangeandcooperationinrailwaytechnologybetweenChinaandtherestof
theworld,PlanningandStandardResearchInstituteofNationalRailwayAdministration,entrustedby
'
NationalRailwayAdministrationofthePeoplesRepublicofChina,organizedthetranslationand
preparationofChineserailwaytechnologyandproductstandards.
LowVibrationTrackComponentsPart1
ThisStandardistheofficialEnglishversionof—:
ConcreteBlock
(TB/T3515.1-2018).TheoriginalChineseversionofthisstandardwasissuedby
'
NationalRailwayAdministrationofthePeoplesRepublicofChinaandcameintoeffectonFebruary
1,2019.Incaseofdiscrepanciesbetweenthetwoversions,theChineseversionshallprevail.
'
NationalRailwayAdministrationofthePeoplesRepublicofChinaownsthecopyrightofthis
Englishversion.
Yourcommentsareinvitedfornextrevisionofthisstandardandshouldbeaddressedto
TechnologyandLegislationDepartmentofNationalRailwayAdministrationandPlanningand
StandardResearchInstituteofNationalRailwayAdministration.
Address:TechnologyandLegislationDepartmentofNationalRailwayAdministration,No.6,
FuxingRoad,Beijing,100891,P.R.China.
PlanningandStandardResearchInstituteofNationalRailwayAdministrationatBlockB,
JianGongBuilding,No.1,GuanglianRoad,XichengDistrict,Beijing,100055,P.R.China.
ThetranslationwasperformedbyJiangHankeandFangWenshan.
ThetranslationwasreviewedbyGuAijun,HanZhigang,WangYajun,WangLei,LiuHaozheng,
GuanXinwu,DongXuewu,XueJigangandZhaoLin.
1
NoticeofNationalRailwayAdministrationonIssuingtheEnglish
VersionofEightChineseRailwayTechnicalStandardsincluding
TechnicalSpecificationforLayingofHighSpeedTurnoutsforSlabTrack
DocumentGTKF〔2021〕No.33
TechnicalSpecificationforLayingofHigh
EightChineserailwaytechnicalstandardsincluding
SpeedTurnoutsforSlabTrack
(TB/T3302-2013)areissued.Incaseofdiscrepanciesbetweenthe
twoversions,theChineseversionshallprevail.
ChinaRailwayPublishingHouseCo.,Ltd.isauthorizedtopublishanddistributetheEnglish
versionofthesestandards.
AttachedhereisalistoftheEnglishversionofthesestandards.
S/NChinesetitleEnglishtitleStandardnumber
高速鐵路無(wú)砟軌道道岔鋪設(shè)技
TechnicalSpecificationforLayingofHighSpeedTurnouts
1術(shù)條件TB/T3302-2013
forSlabTrack
高速鐵路有砟軌道道岔鋪設(shè)技
TechnicalSpecificationforLayingofHighSpeedTurnouts
2術(shù)條件TB/T3306-2013
forBallastedTrack
客運(yùn)專線鋼軌伸縮調(diào)節(jié)器
3RailExpansionJointofPassengerDedicatedLineTB/T3401-2015
客貨共線鐵路鋼軌伸縮調(diào)節(jié)器RailExpansionJointofMixedPassengerandFreight
4TB/T3518-2018
Railway
彈性支承塊式無(wú)砟軌道部件
5第部分混凝土支承塊LowVibrationTrackComponents—Part1:ConcreteBlockTB/T3515.1-2018
1:
鐵路橋梁鋼支座
6SteelBearingsforRailwayBridgeTB/T1853-2018
鐵路數(shù)字移動(dòng)通信系統(tǒng)
(GSM-R)GlobalSystemforMobileCommunications-Railway(GSM-
7設(shè)備機(jī)車綜合無(wú)線通信設(shè)備TB/T3375-2018
R)—CabIntegratedRadioCommunicationEquipment
集中聯(lián)鎖結(jié)合電路一般原則GeneralPrinciplesforCombinedCircuitofCentralized
8TB/T2307-2017
Interlocking
'
NationalRailwayAdministrationofthePeoplesRepublicofChina
October28,2021
3
Contents
………………
ForewordⅢ
………………
1Scope1
………………
2NormativeReferences1
……………
3TechnicalRequirements1
…………………
4InspectionMethods4
……………………
5InspectionRules5
……………
6Marking6
………………………
7StorageandTransportation6
Ⅰ
Foreword
LowVibrationTrackComponents
TB/T3515iscomprisedoffourparts:
———Part1:ConcreteBlock;
———Part2:FasteningSystem;
———Part3:RubberBoot;
———Part4:BlockPad.
ThisisPart1ofTB/T3515.
ThisPartisdraftedinaccordancewiththerulesgiveninGB/T1.1-2009.
Attentionisdrawntothepossibilitythatsomeoftheelementsofthisdocumentmaybethe
subjectofpatents.Theissuerofthisdocumentshallnotbeheldresponsibleforidentifyingthese
patents.
ThisPartismanagedbyChinaRailwayEconomicandPlanningResearchInstituteCo.,Ltd.
ThisPartisdraftedbyChinaRailwayFirstSurveyandDesignInstituteGroupCo.,Ltd.,
ChinaRailwayEconomicandPlanningResearchInstitute,andRailwayEngineeringResearch
InstituteofChinaAcademyofRailwaySciencesCorporationLimited.
ThisPartismainlydraftedbyChangDeshi,LiuHua,GuanXinwu,YangQuanliang,WeiZhouchun,
YuPeng,ChangWeihua,ChuWeisong,KongFanbing,FanJia,XiaoJunhengandWangJijun.
Ⅲ
LowVibrationTrackComonents—Part1ConcreteBlock
p:
1Scope
ThisPartspecifiesthetechnicalrequirements,inspectionmethods,inspectionrules,marking,
storageandtransportationofconcreteblocksforlowvibrationtrack(hereinafterreferredtoasthe
blocks).
ThisPartisapplicabletotheblocksforlowvibrationtrackintunnelsofmixedtrafficrailways
withadesignspeedequaltoorlessthan160km/handanaxleloadequaltoorlessthan23t.
2NormativeReferences
Thefollowingreferenceddocumentsareindispensablefortheapplicationofthisdocument.For
datedreferences,onlytheeditioncitedapplies.Forundatedreferences,thelatesteditionofthe
referenceddocument(includinganyamendments)applies.
SteelfortheReinforcementofConcretePart1HotRolledPlainBars
GB1499.1—:
SteelfortheReinforcementofConcretePart2HotRolledRibbedBars
GB1499.2—:
StaticLoadCrackResistanceTestMethodforPrestressedConcreteSleepers
TB/T1879
ConcreteforRailwayConstruction
TB/T3275
TestMethodsforFasteningSystemsofHigh-speedRailwayPart7VerticalLoad
TB/T3396.7—:
TestforCast-inFasteningComponents
LowVibrationTrackComponentsPart2FasteningSystem
TB/T3515.2—:
InspectionSpecificationforStructureConcreteStrengthofRailwayEngineering
TB10425
3TechnicalRequirements
3.1GeneralRequirements
3.1.1
Theblocksshallbemanufacturedaccordingtothedesigndrawingsandthisstandard.
3.1.2
Theblocksshallbemanufacturedinthefactorywhichshallhavethenecessarytooling
equipmentandmatureproductionprocesses.
3.2Materials
3.2.1
PortlandcementorordinaryPortlandcementwithastrengthgradenotlowerthan42.5shall
beused,andearly-strengthcementshallnotbeused.TheAlkalicontentofcementshallnotbe
greaterthan0.60%,thesulfurtrioxidecontentshallnotbegreaterthan3.0%andothertechnical
requirementsshallcomplywithTB/T3275.
3.2.2
Thecontinuousgradedcrushedstonewithaparticlesizeof5mm-20mmshallbeusedas
coarseaggregate,andthecrushedcobbleshallnotbeused.Thesoilcontentshallnotbegreaterthan
0.5%bymassandothertechnicalrequirementsshallcomplywithTB/T3275.
Naturalmedium-coarsefluvialsandshallbeusedasfineaggregate.Thesoilcontentshallnotbe
greaterthan1.5%bymassandothertechnicalrequirementsshallcomplywithTB/T3275.
NeitherAlkali-carbonatereactiveaggregatenorAlkali-silicatereactiveaggregatewithamortar
barexpansionrate(acceleratingmethod)greaterthanorequalto0.20%shallbeused.Beforethe
blocksareputintoproduction,whentheaggregatesourcechangesortheaggregatehasbeenusedfor
·1·
oneyear,thecorrespondingqualifiedinspectioninstitutionshalltestandevaluatethealkalireactivity
oftheaggregateaccordingtothemethodspecifiedinTB/T3275.
3.2.3
ThewatershallcomplywithTB/T3275.
3.2.4
TheadditiveperformanceshallcomplywithTB/T3275.
3.2.5
TheadmixtureperformanceshallcomplywithTB/T3275.
3.2.6
ThehotrolledribbedbarswiththeperformancenotlowerthanHRB400shallbeusedasthe
mainreinforcementofblocks,andtheirperformanceshallcomplywithGB1499.2;theplainbarswith
theperformancenotlowerthanHPB300shallbeusedasthestirrupandtheirperformanceshall
complywithGB1499.1.
3.2.7
TheembeddedironbaseshallcomplywithTB/T3515.2.
3.3Manufacture
3.3.1
Thesteelbarprocessingshallcomplywiththefollowingrequirements:
a)Oilstain,paintdirt,cementpaste,rust,etc.,shallberemovedfromthesteelbarsurface.
b)Steelbarprocessingshallbeconductedatnormaltemperatureinsuchawaythatitsmaterial
isnotdamaged.Thesteelbarshallbebentandshapedbymachinesandtoolsinoneoperation.
c)Thetoleranceshallbe±5mmforsteelbarpositioning,and0mmto+5mmforconcrete
coverthickness.
3.3.2
Concretepreparationandpouringshallcomplywiththefollowingrequirements:
a)Theconcretemixingratioshallbedeterminedbytestsandthecontentofcementitiousmaterialshall
3
notexceed480kg/m.
b)Theforcedmixershallbeusedforconcretemixing.Themixingtimeandthematerialmeasurement
errorshallcomplywithTB/T3275.
c)Beforeconcretepouring,thepositionandspacingofsteelbarsandembeddedironbases,
concretecoverthicknessshallbeverified,andnecessarymeasuresshallbetakentoensure
thecorrectpositionofsteelbars.
d)Concreteshallbepouredcontinuouslyandconsolidatedthroughvibration.
e)Duringconcretepouring,themouldtemperatureshouldrangefrom5℃to35℃.
f)Thetemperatureofconcretemixtureuponpouringintothemouldshallrangefrom5℃to35℃.
g)Beforetrialproduction,theselectedcement,aggregate,admixture,additiveandotherraw
materialsshallbeusedtomakeasetoffreezingresistancespecimensandanothersetof
electricfluxspecimensfordurabilitytests.
h)Duringconcretepouring,theconcretestrengthspecimensandelasticitymodulusspecimens
shallbemadebyrandomsampling,andsuchspecimensshallbeconsolidatedthrough
vibrationandcuredunderthesameconditionsastheblocks.The28dstandardspecimens
shallbecuredunderstandardconditionsafterdemouldingandtheconcretespecimensshallbe
curedunderthesameconditionsastheblocks.
3.3.3
Naturalcuringorsteamcuringmaybeadoptedfortheconcreteandshallcomplywiththe
followingrequirements:
a)Naturalcuringshallbecarriedoutafterconcretepouringandamoisturefilmshallbecovered.The
differenceoftemperaturesatthecoreandatthesurfaceofblocksshallbelessthan15℃,
andtheambienttemperatureforcuringshallrangefrom5℃to35℃.
b)Steamcuringconsistsoffourstages:staticresting,heating,constanttemperaturekeeping
andcooling.Afterconcretepouring,heatingshallbeconductedafterrestingfor2hoursat
anambienttemperaturebetween5℃and35℃.Theheatingrateshallnotexceed15℃/h.
·2·
Thecoretemperatureoftheblocksshallnotbehigherthan55℃underconstanttemperature
andthecoolingrateshallnotexceed15℃/h.Attheendofsteamcuring,thedifference
betweenthesurfacetemperatureofblocksandtheambienttemperatureshallnotexceed
15℃.
c)Temperatureshallbemeasuredduringcuring.Whenthemanufacturerfindouttherelationship
betweenthecoretemperatureofblocksandtheambienttemperature,itcancontrolthecore
temperaturebyregulatingtheambienttemperaturethroughoutthecuringprocess.However,
thecoretemperatureoftheblocks,whichshallberepresentativeofthecorrespondingbatch,shall
bemeasuredonceamonth.
3.3.4
Beforedemoulding,theconcretestrengthofblocksshallnotbelessthan35MPa.After
demoulding,concreteshallbemoisturizedfornotlessthan7daysatanambienttemperaturenotlower
than5℃.
3.4QualityRequirements
3.4.1
TheoutlinedimensionsandappearancequalityofblocksshallcomplywithTable1.
Table1OutlineDimensionalToleranceandAppearanceQualityRequirementsofBlocks
Inspectionquantity
S/NInspectionitemClassRequirementsRoutinetest
Typetest
(eachbatch)
Outlinedimensions
1ToplengthofblockB1±1.0mm10blocks20blocks
2BottomlengthofblockB1±1.0mm10blocks20blocks
3TopwidthofblockB1±1.0mm10blocks20blocks
4BottomwidthofblockB1±1.0mm10blocks20blocks
5TheheightunderthecapB1±1.0mm10blocks20blocks
6TotalheightofblockB1±1.0mm10blocks20blocks
7WidthofrailseatB1±1.0mm10blocks20blocks
8RailcantofrailseatsurfaceB11∶35-1∶4510blocks20blocks
Flatnessofrailseatsurfaceandblock
9B11.0mm10blocks20blocks
bottom
Perpendicularityofembeddedironbase
10B1±1.0°10blocks20blocks
tolongaxisofblock
Perpendicularityofembeddedironbase
11B1±1.0°10blocks20blocks
torailbearingsurfaceofblock
12InnerspacingofembeddedironbaseB1-0.5mm-+1.0mm10blocks20blocks
13ExposedheightofembeddedironbaseB1±1.0mm10blocks20blocks
Appearancequality
Surfacedefects(bughole,peeling,Length:≤10mm
14B2All20blocks
honeycomb,etc.)ofrailseatpartsDepth:≤2mm
Surfacedefects(bughole,peeling,Length:≤30mm
15CAll20blocks
honeycomb,etc.)ofotherpartsDepth:≤5mm
·3·
Table1OutlineDimensionalToleranceandAppearanceQualityRequirementsofBlocks
(continued)
Inspectionquantity
S/NInspectionitemClassRequirementsRoutinetest
Typetest
(eachbatch)
Appearancequality
Cracksonrailseatsurfaceandother
16ANotallowedAll20blocks
surfaces
17MarkingASee3.1.1All20blocks
18MissingedgesorcornersofblockCLength:≤25mmAll20blocks
3.4.2
ThestrengthgradeofconcreteshallnotbelowerthanC50andtheelasticitymodulusof
4
concreteat28dshallnotbelessthan3.45×10MPa.
3.4.3
TheconcretefreezingresistanceindexshallnotbelowerthanF300.
3.4.4
Theelectricfluxofconcreteshallbelessthan1200C.
3.4.53
Thetotalalkalicontentinconcreteshallnotbegreaterthan3.0kg/m.Thetotalchlorideion
contentinconcreteshallnotexceed0.06%ofthetotalcontentofcementitiousmaterials.Thesulfur
trioxidecontentinconcreteshallnotbegreaterthan4.0%ofthetotalcontentofcementitious
D
materials.Fortheblocksusedinchlorideenvironment,thechloriondiffusioncoefficient(RCM)of
-122
concreteat56dshallnotbegreaterthan8×10m/s.
3.4.6
Thepullingresistanceoftheembeddedironbaseshallnotbelessthan60kN.Afterthepull-
outtest,thereshallbenovisiblecracksinthesurroundingconcreteandasmallamountofmortar
strippingisallowed.
3.4.7
Theblocksshallnotcrackwhentheyaretestedforcrackingresistanceunderstaticload.
4InspectionMethods
4.1
Theoutlinedimensionsofblocksshallbeinspectedwithbothspecialandgeneralmeasuring
tools,andtheappearancequalityshallbevisuallyinspectedandmeasuredwithtools.
4.2
Theperformancetestofcement,admixture,coarseandfineaggregate,waterandadditiveshall
becarriedoutaccordingtoTB/T3275.
4.3
TheperformanceofconcretemixtureshallbetestedaccordingtoTB/T3275.
4.4
Thecompressivestrengthofconcreteshallbetestedaccordingtothecubespecimentestmethod
specifiedinTB/T3275andshallbeevaluatedaccordingtoTB10425.Theelasticitymodulusof
concreteshallbetestedaccordingtotheprismspecimentestmethodspecifiedinTB/T3275.The
concretespecimensshallbeformedandcuredunderthesameconditionsastheblocks,andthe28d
standardspecimensforcompressivestrengthtestshallbecuredunderstandardconditionsafter
demoulding.
4.5
TheconcretefreezingresistanceshallbetestedaccordingtoTB/T3275.
4.6
TheelectricfluxofconcreteshallbetestedaccordingtoTB/T3275.
4.7D
Thechloriondiffusioncoefficient(RCM)ofconcreteat56dshallbetestedaccordingtoTB/T3275.
4.8
ThepullingresistanceoftheembeddedironbaseshallbetestedaccordingtoTB/T3396.7.
4.9
Thecrackingresistanceofsub-railcrosssectionofblocksunderstaticloadshallbetested
accordingtoTB/T1879.Thesupportspacingshallbe500mmandthetestvalueofcrackingresistanceunder
staticloadshallbe70kN.
·4·
5InspectionRules
5.1
Theinspectionsoftheblocksincluderoutinetestandtypetest.
5.2
Theroutinetestofblocksshallbeconductedinbatches.Every2000blocksmanufacturedbythe
sameshift,withthesamematerialsandthesameprocessesshallbetakenasabatch.Ifthequantityis
lessthan2000blocks,itshallalsobedeemedasabatch.
5.3
Typetestshallbecarriedoutwhenoneofthefollowingconditionsoccurs:
a)Theblocksareputintoproductionforthefirsttimeortransferredtoanotherplantforproduction;
b)Significantchangesinmaterialsorprocessesduringproduction,whichaffecttheproductperformance;
c)Productionlastsconsecutivelyfor2.5years;
d)Productionhasbeensuspendedformorethanoneyear.
5.4
TheinspectionshallcomplywithTable2.
Table2InspectionRulesforBlocks
S/NInspectionitemJudgmentcriteriaTypetestRoutinetest
1OutlinedimensionsThesamplingquantityandclassareshowninTable1.The√√
blocksshallbedeemedqualifiedifthepassrateof
individualitemofClassAis100%,individualitemof
2AppearancequalityClassB1isnolessthan95%,individualitemofClassB2√√
isnolessthan90%andtotalitemsofClassCisnotless
than90%
Deemedasqualifiedifcomplyingwiththerequirements
3Concretedemouldingstrength(Inroutinetest,asetofblocksshallbetestedforconcrete√√
demouldingstrengthforeachcuringkiln)
Deemedasqualifiedifcomplyingwiththerequirements
428dcompressivestrength(Inroutinetest,asetofblocksshallbetestedfor28d√√
compressivestrengthforeachbatch)
Deemedasqualifiedifcomplyingwiththerequirements
528delasticitymodulus(asetofblocksshallbetestedfor28delasticitymodulus√—
forevery10batches)
6Concretefreezingresistance√—
7Electricfluxofconcrete√—
Deemedasqualifiedifcomplyingwiththerequirements
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年商業(yè)流通倉(cāng)儲(chǔ)服務(wù)項(xiàng)目申請(qǐng)報(bào)告模稿
- 2025年公益贈(zèng)與合同范本協(xié)議書(shū)
- 2025年上海住宅銷售合同樣本
- 2025年企業(yè)資本注入?yún)f(xié)議書(shū)樣本
- 2025年供需平衡合同藍(lán)寶石
- 2025年公立幼兒園轉(zhuǎn)讓合同樣本
- 2025年式樣店面租賃合同協(xié)議
- 2025年企業(yè)市場(chǎng)拓展合作戰(zhàn)略協(xié)議文本
- 2025年二手房買(mǎi)賣(mài)雙方贈(zèng)送學(xué)位房補(bǔ)充協(xié)議
- 2025年企業(yè)促銷品量身定制合同
- 2023年上海市秋考語(yǔ)文真題試卷含答案(整理版)
- 2023年心理咨詢師之心理咨詢師基礎(chǔ)知識(shí)考試題庫(kù)附完整答案【有一套】
- 路緣石安裝一級(jí)安全交底
- 一級(jí)建造師繼續(xù)教育最全題庫(kù)及答案(新)
- LS/T 1226-2022糧庫(kù)智能通風(fēng)控制系統(tǒng)
- 直線加速器專項(xiàng)施工方案
- 聯(lián)苯二氯芐生產(chǎn)工藝及產(chǎn)排污分析
- 儲(chǔ)能設(shè)備項(xiàng)目采購(gòu)供應(yīng)質(zhì)量管理方案
- 美國(guó)房地產(chǎn)市場(chǎng)特征、框架與周期演變
- 光伏發(fā)電工程施工組織設(shè)計(jì)施工工程光伏發(fā)電工程光伏發(fā)電施工組織設(shè)計(jì)
- 民政局離婚協(xié)議書(shū)模板(4篇)
評(píng)論
0/150
提交評(píng)論