地塊項目
塔吊基礎施工方案
(格式最終版)
編制:
審核:
批準:
中建x局科技建設有限公司
CHINACONSTRUCTIONEIGHTHENGINEERINGBUREAUTECHNOLOGYCONSTRUCTIONCORP.LTD
地塊項目塔吊基礎施工方案
目錄
第1章編制依據(jù).............................................................................................................1
第2章工程概況.............................................................................................................3
2.1工程建設概況一覽表................................................................................................3
2.2設計概況....................................................................................................................3
2.2.1設計依據(jù).........................................................................................................3
2.3地質(zhì)水文條件..........................................................................................................10
2.3.1地質(zhì)條件.......................................................................................................10
2.3.2塔吊樁基土質(zhì)情況.......................................................................................11
2.3.3水文條件.......................................................................................................13
2.3.4不良地質(zhì)條件...............................................................................................13
2.4周邊環(huán)境條件..........................................................................................................14
2.4.1周邊環(huán)境概況...............................................................................................14
2.4.2周邊建構(gòu)筑物情況.......................................................................................16
2.4.3地下管線情況...............................................................................................17
2.5現(xiàn)場施工條件..........................................................................................................18
第3章塔吊基礎設計...................................................................................................19
3.1塔吊概況..................................................................................................................19
3.2塔吊基礎計算參數(shù)..................................................................................................19
3.3塔吊基礎詳細參數(shù)..................................................................................................20
3.3.1承臺設計參數(shù)...............................................................................................20
3.3.2樁基設計.......................................................................................................24
3.4塔吊定位..................................................................................................................26
3.5塔吊防雷接地設計..................................................................................................26
第4章施工安排...........................................................................................................28
4.1項目管理組織..........................................................................................................28
4.2項目管理目標..........................................................................................................28
4.3各項資源供應方式..................................................................................................29
4.3.1勞務資源安排一覽表...................................................................................29
4.3.2工程用大宗物資供應安排一覽表...............................................................29
4.3.3大型機械設備采購供應安排一覽表...........................................................29
4.3.4施工周轉(zhuǎn)工具采購供應安排一覽表...........................................................29
4.4施工流水段的劃分及施工工藝流程......................................................................29
4.4.1施工流水段的劃分.......................................................................................29
地塊項目塔吊基礎施工方案
4.4.2施工工藝流程...............................................................................................30
4.5工程施工重點和難點分析及應對措施..................................................................30
第5章施工進度計劃...................................................................................................31
第6章施工準備與資源配置計劃...............................................................................32
6.1施工準備計劃..........................................................................................................32
6.1.1技術準備.......................................................................................................32
6.1.2現(xiàn)場準備.......................................................................................................34
6.2資源配置計劃..........................................................................................................35
6.2.1勞動力配置計劃...........................................................................................35
6.2.2生產(chǎn)工藝設備需要量計劃...........................................................................35
6.2.3施工機具配置計劃.......................................................................................35
6.2.4測量設備配置計劃.......................................................................................36
第7章施工方法及工藝要求.......................................................................................37
7.1樁基參數(shù)..................................................................................................................37
7.2灌注樁施工工藝流程..............................................................................................37
7.3施工要點..................................................................................................................38
7.3.1測量放線.......................................................................................................38
7.3.2護筒埋設.......................................................................................................38
7.3.3鉆機就位.......................................................................................................39
7.3.4鉆進成孔.......................................................................................................39
7.3.5鋼筋籠施工方法...........................................................................................40
7.3.6混凝土施工...................................................................................................41
7.3.1泥漿排放.......................................................................................................42
7.4立柱樁施工方法......................................................................................................43
7.4.1施工工藝.......................................................................................................43
7.4.2主要控制標準...............................................................................................43
7.5基礎承臺施工方法..................................................................................................44
7.5.1基礎承臺施工流程.......................................................................................44
7.5.2基礎承臺施工方法.......................................................................................44
7.6驗收標準..................................................................................................................45
7.7驗收程序..................................................................................................................46
7.8驗收內(nèi)容和驗收人員..............................................................................................47
第8章各項管理計劃...................................................................................................49
地塊項目塔吊基礎施工方案
8.1綠色施工管理計劃..................................................................................................49
8.2進度管理計劃..........................................................................................................49
8.3質(zhì)量管理計劃..........................................................................................................50
8.3.1工程施工質(zhì)量分解目標...............................................................................50
8.3.2項目質(zhì)量管理的組織機構(gòu)并明確職責.......................................................50
8.3.3確定質(zhì)量控制點...........................................................................................51
8.3.4現(xiàn)場質(zhì)量管理制度.......................................................................................51
8.3.5質(zhì)量保證措施...............................................................................................52
8.4安全管理計劃..........................................................................................................53
8.4.1職業(yè)健康安全管理目標...............................................................................53
8.4.2現(xiàn)場職業(yè)健康安全管理組織機構(gòu)和職責分工...........................................54
8.4.3職業(yè)健康安全重大危險源...........................................................................55
8.4.4職業(yè)健康安全資源配置計劃.......................................................................55
8.4.5專項施工安全方案編制計劃.......................................................................56
8.4.6施工現(xiàn)場安全生產(chǎn)管理制度.......................................................................57
8.4.7職業(yè)健康安全保證措施...............................................................................57
第9章應急預案...........................................................................................................60
9.1應急指揮機構(gòu)及職責..............................................................................................60
9.2事故風險分析..........................................................................................................60
9.3應急救援程序..........................................................................................................61
9.4應急處置措施..........................................................................................................61
9.4.1高處墜落的預防措施...................................................................................61
9.4.2物體打擊的預防措施...................................................................................62
9.4.3機械傷害的預防措施...................................................................................62
9.4.4觸電事故的預防措施...................................................................................63
9.4.5中毒事故的預防措施...................................................................................64
9.4.6火災的預防措施...........................................................................................64
9.5應急物資準備..........................................................................................................65
9.6應急演練..................................................................................................................65
第10章計算書和相關圖紙.........................................................................................68
10.1計算書....................................................................................................................68
10.2塔吊平面布置圖....................................................................................................68
10.3塔吊基礎設計圖紙................................................................................................68
地塊項目塔吊基礎施工方案
第1章編制依據(jù)
表1.1-1編制依據(jù)
序號類別文件名稱編號
1《建筑地基基礎設計規(guī)范》GB50007-2011
2《混凝土結(jié)構(gòu)設計規(guī)范》GB50010-2010
3《鋼結(jié)構(gòu)設計規(guī)范》GB50017-2017
4《混凝土質(zhì)量控制標準》GB50164-2011
5《塔式起重機安全規(guī)程》GB5144-2006
6《建筑結(jié)構(gòu)荷載規(guī)范》GB50009-2012
7國家標準《塔式起重機設計規(guī)范》GBT13752-2017
8《工程測量規(guī)范》GB50026-2007
9《建筑地基基礎工程施工質(zhì)量驗收標準》GB50202-2018
10《鋼結(jié)構(gòu)工程施工質(zhì)量驗收標準》GB50205-2020
11《混凝土強度檢驗評定標準》GB/T50107-2010
12《建設工程施工現(xiàn)場供用電安全規(guī)范》GB50194-2014
13《高聳結(jié)構(gòu)設計規(guī)范》GB50135-2006
15《建筑機械使用安全技術規(guī)程》JGJ33-2012
16《建筑施工安全檢查標準》JGJ59-2011
17國家行業(yè)《建筑樁基技術規(guī)范》JGJ94-2008
18規(guī)范《塔式起重機混凝土基礎工程技術規(guī)程》JGJ/T187-2019
19《建筑施工高處作業(yè)安全技術規(guī)范》JGJ80-2016
20《施工現(xiàn)場臨時用電安全技術規(guī)范》JGJ46-2005
21《建筑起重機械安全檢驗與評估規(guī)程》DG/TJ08-208-2010
22《地基基礎設計規(guī)范》DGJ08-11-2010
地方規(guī)范
23《鉆孔灌注樁施工規(guī)程》DG/TJ08-202-2007
標準
24《施工現(xiàn)場安全質(zhì)量保證體系》DG/TJ08-1201-2005
25《地基處理技術規(guī)范》DG/TJ08-40-2010
關于印發(fā)《上海市建設工程危險性較大的分滬住建規(guī)范[2019]6
26
部分項工程安全管理實施細則》的通知號
住房和城鄉(xiāng)建設部令
27危險性較大的分部分項工程安全管理規(guī)定
2018年第37號
關于加強塔式起重機鋼結(jié)構(gòu)組合式基礎平臺滬建質(zhì)安(2017)
28
安全管理要求的通知1066號
29合同本項目總承包施工合同
30本工程施工圖紙
設計文件
31《巖土工程勘察報告》
32企業(yè)管理《質(zhì)量管理手冊》CSCEC8SH-ZL-2021
33文件《科技技術管理手冊》CSCEC8SH-ST-2021
34物探檢測報告
其他場地周邊建筑、市政道路、地下管線等有關
35
資料
1
地塊項目塔吊基礎施工方案
36STT553使用說明書
37STT383使用說明書
38STT200使用說明書
2
地塊項目塔吊基礎施工方案
第2章工程概況
2.1工程建設概況一覽表
工程建設概況
工程名稱工程業(yè)態(tài)研發(fā)、辦公
本項目位于上海市浦東
新區(qū)南匯新城鎮(zhèn),擬建
地塊東北側(cè)為水蕓南
本建設項目1~4#樓為10~12層研
工程規(guī)模工程地址路,西北側(cè)為規(guī)劃科洲
發(fā)樓;地下車庫為2層。
路,西南側(cè)為云鵑南
路,東南側(cè)為規(guī)劃創(chuàng)洋
路。
總建筑面積108604.08
㎡,地上建筑面積
總占地面積21802㎡總建筑面積
77107㎡,地下建筑面
積31497.08㎡。
結(jié)構(gòu)形式裝配整體式框架、框筒結(jié)構(gòu)基礎形式樁筏基礎
屋面形式種植屋面、(不)上人屋面外墻形式玻璃幕墻
建設單位項目承包范圍總承包
樁基、一結(jié)構(gòu)、二結(jié)構(gòu)、
設計單位主要分包工程裝飾裝修、幕墻、機電、
鋼結(jié)構(gòu)、PC、塔吊工程
浦東新區(qū)優(yōu)質(zhì)工程、白
勘察單位合質(zhì)量玉蘭、中建杯、一次性
同驗收合格
監(jiān)理單位要工期總工期889天
總承包單位求安全上海市文明工地
分包單位/科技新技術應用示范工程
工程主要功
研發(fā)、研發(fā)配套、地下車庫、人防工程
能或用途
2.2設計概況
2.2.1設計依據(jù)
2.2.1.1建筑高度
考慮建筑主塔樓的高度及對應的群塔高差關系、坑內(nèi)塔吊承臺與首層底板地
面的關系、坑外塔吊承臺與地面高差關系以及鋼結(jié)構(gòu)連廊位置關系,塔吊基礎計
算高度取最大獨立高度狀態(tài)計算。
3
地塊項目塔吊基礎施工方案
1#研發(fā)樓2#研發(fā)樓3#研發(fā)樓4#研發(fā)樓
樓層層高本層樓層層高本層樓層層高本層樓層層本層
標高標高標高高標高
//////RF2/59.4RF2/59.4
//////RF14.554.9RF14.554.9
RF2/50.4RF2/50.412F4.550.412F4.550.4
RF14.545.9RF14.545.911F4.545.911F4.545.9
10F4.541.410F4.541.410F4.541.410F4.541.4
9F4.536.99F4.536.99F4.536.99F4.536.9
8F4.532.48F4.532.48F4.532.48F4.532.4
7F4.527.97F4.527.97F4.527.97F4.527.9
6F4.523.46F4.523.46F4.523.46F4.523.4
5F4.518.95F4.518.95F4.518.95F4.518.9
4F4.514.44F4.514.44F4.514.44F4.514.4
3F4.59.93F4.59.93F4.59.93F4.59.9
2F4.55.42F4.55.42F4.55.42F4.55.4
1F5.40.01F5.40.01F5.40.01F5.40.0
B1F6.0-6.0B1F6.0-6.0B1F6.0-6.0B1F6.0-6.0
B2F3.7-9.7B2F3.7-9.7B2F3.7-9.7B2F3.7-9.7
2.2.1.2建筑定位
地下部分考慮塔吊坑內(nèi)立柱樁與工程樁的間距≥500mm、與支撐的錯位以及
與主體框架梁錯開的位置;并考慮基坑階段塔吊的覆蓋面積、主體階段各個樓層
的PC梁、柱最大重量、材料堆場、道路位置、剪力墻位置等布置塔吊型號位置。
根據(jù)上述情況,地下階段施工配備1#塔吊為STT293臂端吊重4.8t,作業(yè)半徑
50m,最大吊重18t;2#塔吊為STT293臂端吊重4.8t,作業(yè)半徑50m,最大吊重
18t;9#塔吊為R7525臂端吊重3.1t,作業(yè)半徑70m,最大吊重18t;10#塔吊為R7525
臂端吊重6.2t,作業(yè)半徑50m,最大吊重18t。具體定位詳見附圖地下階段塔吊平
面布置圖。
2.2.1.3PC吊重分析
1#樓2#樓3#樓4#樓
構(gòu)
最大最遠最遠最大最遠最遠最大最遠最遠最大最遠最遠
件
重量距離重量重量距離重量重量距離重量重量距離重量
柱9.00t38m8.50t10.2t55m8.50t5.84t56m5.60t8.75t48m5.84t
梁7.46t33m6.61t5.68t56m5.65t6.62t51m3.19t7.12t42m5.64t
板1.30t35m1.17t1.30t60m0.91t1.42t56m1.26t1.53t47m1.00t
4
地塊項目塔吊基礎施工方案
圖2.2-11#科研樓吊裝不利工況示意圖
圖2.2-22#科研樓吊裝不利工況示意圖
5
地塊項目塔吊基礎施工方案
圖2.2-33#科研樓吊裝不利工況示意圖
圖2.2-44#科研樓吊裝不利工況示意圖
6
地塊項目塔吊基礎施工方案
根據(jù)PC重量情況,地上施工階段塔吊配備8臺塔吊,選型分別為確定1#樓
配備兩臺塔吊分別為1#塔吊(STT293臂端吊重7.5t,作業(yè)半徑40m,最大吊重
18t)和5#塔吊為STT383(臂端吊重9t,作業(yè)半徑40m,最大吊重18t);2#樓配
備兩臺塔吊分別為2#塔吊(STT293臂端吊重7.5t,作業(yè)半徑40m,最大吊重18t)
和6#塔吊為STT383(臂端吊重9t,作業(yè)半徑40m,最大吊重18t);3#樓配備兩臺
塔吊分別為7#塔吊(STT383臂端吊重5.37t,作業(yè)半徑60m,最大吊重18t)和3#
塔吊為R7525(臂端吊重9t,作業(yè)半徑40m,最大吊重18t);4#樓配備兩臺塔吊
分別為8#塔吊(STT383臂端吊重6.12t,作業(yè)半徑50m,最大吊重18t)和4#塔吊
為R7525(臂端吊重9t,作業(yè)半徑40m,最大吊重18t)。具體定位詳見附圖地上
階段塔吊平面布置圖。
2.2.1.4塔吊參數(shù)
圖2.2-1STT293塔吊示意圖
7
地塊項目塔吊基礎施工方案
表2.2-1STT293塔吊性能表
8
地塊項目塔吊基礎施工方案
圖2.2-2STT383塔吊示意圖
表2.2-2STT383塔吊性能表
圖2.2-3STT200塔吊示意圖
9
地塊項目塔吊基礎施工方案
表2.2-3STT200塔吊性能表
2.3地質(zhì)水文條件
2.3.1地質(zhì)條件
本場地位于古河道沉積區(qū)。場地地表由于人工活動的影響分布有厚度約1.20~
3.00m左右的第①1層吹填土,相對來說整個場地吹填土厚度較厚;局部地段其下
分布有新近沉積的第①2層淤泥質(zhì)粉質(zhì)粘土;場地淺部填土以下沉積為第②3層土
(細分為②3-1層灰色粘質(zhì)粉土、②3-2層灰色砂質(zhì)粉土兩個次亞層);其下為軟弱土
層第④層灰色淤泥質(zhì)粘土以及第⑤1層灰色粘土、第⑤3層灰色粉質(zhì)粘土、第⑤4層
灰綠色粉質(zhì)粘土;場地內(nèi)第⑦層粉性土和砂性土分布較穩(wěn)定,可細分為⑦1、⑦2-1、
⑦2-2層三子個亞層。擬建場地內(nèi)地基土的分布及主要特征如下:
各土層特征和具體分布情況見表2.3-1地層特性表。
表2.3-1地層特性表
土層層厚層頂標
土層名稱土層描述
層號m高m
10
地塊項目塔吊基礎施工方案
以粉性土為主,含有機質(zhì),局部上部夾碎石、磚
①吹填土2.25.56
1塊,土質(zhì)不均。
含云母、有機質(zhì),土質(zhì)不均,局部區(qū)域為淤泥,夾
淤泥質(zhì)粉
①0.943.93有3~20mm厚薄層粉砂,分布零散,不具有規(guī)律
2質(zhì)黏土
性。
含云母,夾5-20mm厚薄層淤泥質(zhì)粉質(zhì)黏土,土質(zhì)
②粘質(zhì)粉土3.753.12
3-1不均。
含云母,夾30-50mm厚薄層淤泥質(zhì)粉質(zhì)黏土,土質(zhì)
②砂質(zhì)粉土11.03-0.77
3-2不均。
淤泥質(zhì)黏含云母,有機質(zhì),局部夾10-20mm厚薄層粉砂,土
④2.58-11.8
土質(zhì)較均勻。
含云母,有機質(zhì),夾鈣質(zhì)結(jié)核,土性自上而下逐漸
⑤黏土5.13-14.38
1變好,土質(zhì)較均勻。
⑤3粉質(zhì)黏土5.08-19.48含云母,有機質(zhì),土質(zhì)較均勻。
含氧化鐵斑點,偶夾鈣質(zhì)結(jié)核,下部局部夾有
⑤4粉質(zhì)黏土3.28-24.43
2~3mm后薄層粉性土,土質(zhì)較均勻。
含云母,局部夾20-30mm厚薄層粘性土,土質(zhì)不
⑦砂質(zhì)粉土3.63-27.59
1均。
由長石、石英、云母等礦物顆粒組成,土質(zhì)較均
⑦2-1粉砂13.31-31.22
勻、致密,局部夾有20-30cm厚粘性土。
未鉆由長石、石英、云母等礦物顆粒組織,土質(zhì)較均
⑦粉砂-44.53
2-2穿勻、致密。
2.3.2塔吊樁基土質(zhì)情況
根據(jù)《臨港新片區(qū)PDC1-0401單元K05-01地塊項目巖土工程勘察報告》、塔
吊樁基設計圖紙得知塔吊樁基灌入土層關系如下表所示:
表2.3-2塔吊基礎土層情況
1#塔(勘察Z5孔)6#塔(勘察J5孔)7#塔(勘察J14孔)4#塔(勘察Z9孔)
厚厚厚厚
層頂標高度層頂標高度層頂標高度層頂標高度
序號(m)(m)(m)(m)
(m)(m)(m)(m)
絕對相對絕對相對絕對相對相對絕對
①15.890.792.35.230.132.25.180.081.86.211.112
①2//////3.38-1.720.64.21-0.890.5
②3-13.59-1.513.72.53-2.574.62.78-2.324.13.71-1.393.5
11.10.10.11.
②3-2-0.11-5.21-2.07-7.17-1.32-6.420.21-4.89
4155
21.7------
④16.612.43.132.5
112.1717.2711.8216.9211.2916.39
-
--------
⑤113.95.25.455
19.0115.2720.3714.8219.9213.7918.89
1
11
地塊項目塔吊基礎施工方案
-
------
⑤319.14.4-2.674.84.25.2
24.2125.7719.8224.9218.7923.89
1
-
-------
⑤423.5343.22.8
28.6125.4730.5724.0229.1223.9929.09
1
-
-------
⑦126.54.62.14.24
31.6129.4734.5727.2232.3226.7931.89
1
-
---13.--13.--
⑦2-131.11313
36.2131.5736.67731.4236.52430.7935.89
1
⑦2-2
2#塔(Z6孔)5#塔(J4孔)8#塔(J15孔)3#塔(Z8孔)
厚厚厚厚
層頂標高度層頂標高度層頂標高度層頂標高度
序號(m)(m)(m)(m)
(m)(m)(m)(m)
絕對相對絕對相對絕對相對相對絕對
2.0
①10.665.762.10.085.182.60.665.7630.956.05
3
0.6
①2-1.084.02
7
②3-1-1.443.663.9-2.522.583.6-2.342.762.7-1.753.353.6
11.12.11.
②3-2-5.34-0.24-6.12-1.0211-5.040.06-5.35-0.25
5
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 電力行業(yè)輸電線路安全檢測
- 百貨行業(yè)安全生產(chǎn)工作總結(jié)
- 主管如何引導團隊討論計劃
- 2024年稅務師題庫(考點梳理)
- 2023年公開考調(diào)工作人員報名表
- 2024年電力安全管理制度
- 制氧機租賃合同(2篇)
- 創(chuàng)業(yè)培訓服務協(xié)議書(2篇)
- 2024年甘肅省反洗錢知識競賽考試題庫(含答案)
- 【人教版九上歷史】21天打卡計劃(填空版)
- 做賬實操-科學研究和技術服務業(yè)的賬務處理示例
- 2025年人教版歷史八上期末復習-全冊重難點知識
- 山東省濱州市2023-2024學年高一上學期1月期末考試 政治 含答案
- 儀控技術手冊-自控專業(yè)工程設計用典型條件表
- 《慶澳門回歸盼祖國統(tǒng)一》主題班會教案
- 洗衣房工作人員崗位職責培訓
- 廣東省深圳市光明區(qū)2022-2023學年五年級上學期數(shù)學期末試卷(含答案)
- XX小區(qū)春節(jié)燈光布置方案
- 《華為銷售人員培訓》課件
- 《廣西壯族自治區(qū)房屋建筑和市政工程施工招標文件范本(2023年版)》
- 2024年化學螺栓錨固劑項目可行性研究報告
評論
0/150
提交評論