




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
《HighVoltageEquipmentTesting》InsulationResistanceTest主講人:何發(fā)武(副教授)OperatingWorksheet:OperatingWorksheet:TableofContents01Followme02Workshop03Training01FollowmeⅠ.OverviewofinsulationresistanceMeasuringtheinsulationresistance,particularlytheabsorptionratioandpolarizationindexofthetransformer,ishighlysensitiveinassessingtheoverallinsulationcondition.Thismethodeffectivelyidentifiesissueslikemoisture,surfacecontamination,andthrough-holedefectsinthetransformerinsulation.Itcanalsodetectproblemssuchasshortcircuits,grounding,orcracksintheporcelaininsulation.Insulatingmaterialswithinthetransformer,includingtheinternalironcore,clamps,andthrough-bolts,playacrucialroleinensuringinsulation.Theinsulationinthewindingsectionscanwithstandhighvoltagelevels.Ⅰ.OverviewofinsulationresistanceWhentheinsulationofthetransformeriscompromisedduetopiercing,damagetotheceramicinsulation,connectionoftheleadwiretothecasing,ortheoccurrenceofmetalshort-circuitfaults,therewillbeanoticeablechangeintheinsulationresistance.Moreover,thechangeininsulationresistancebeforeandafterequipmentdryingissignificantlylargerthanthechangeinthedissipationfactorofthedielectric.Ⅰ.OverviewofinsulationresistanceForinstance,inthe7,500
kVAtransformer,thedissipationfactormaychangeby2.5timesbeforeandafterdrying,whiletheinsulationresistancemaychangebymorethan40times.Thischangeisquiteremarkable.Therefore,evaluatingtheinsulationresistanceofcomponentsliketheironcorecaneffectivelydetectoverallmoistureinthetransformerinsulation,surfacecontaminationofcomponents,andconcentratedthrough-holedefects.Ⅰ.OverviewofinsulationresistanceTheabsorptionratioKreferstotheratiooftheinsulationresistancevalueat60secondstotheinsulationresistancevalueat15seconds.ThepolarizationindexPIreferstotheratiooftheinsulationresistancevalueat10minutestotheinsulationresistancevalueat1minuteduringtesting.K=R60/R15 (2-1)PI=R600/R60 (2-2)Ⅰ.OverviewofinsulationresistanceThepolarizationindexisanimportantparameterforassessingwhetherlargepowerequipmentisaffectedbymoisture.Forthelargetransformer,generator,powercable,andparallelcapacitor,duetotheirlargesamplecapacitanceandcompositeinsulationmaterials,theabsorptioncurrentdecaysslowly,andthepolarizationprocessoftencannotbecompletedwithin1minute.Therefore,itisnecessarytomeasurefor10minutes,andcomparedtofactorytests,theinsulationconditionisjudgedusingthepolarizationindex(PI).Ⅰ.OverviewofinsulationresistanceTaketransformersasanexample,duetotheimprovementindryingprocesses,theinsulationresistanceoftransformersisincreasingandcangenerallyreachseveraltensofthousandsofmegaohms,causingthepolarizationprocessofthetransformertobecomelonger.Therefore,thepolarizationindexshouldbemeasured,andtheabsorptionratiotestresultsshouldnotbeusedtodetermineifthetransformerisqualified.Ⅰ.OverviewofinsulationresistanceWhentheinsulationresistanceofthetransformerexceeds10,000M,thereisnoneedtoconsidertheabsorptionratioorpolarizationindex.Therefore,whenconductinginsulationresistance,absorptionratio,orpolarizationindextesting,theresultsshouldbeanalyzedandjudgedincombinationwithspecificelectricalequipment.Inthe“Regulations”,itisstipulatedthattheabsorptionratioandpolarizationindexarenotconvertedbytemperature.Ⅱ.TestStandardsAccordingtothe“RegulationsonPreventiveTestingofPowerEquipment”,itisstipulatedthattheabsorptionratioshouldnotbelessthan1.3orthepolarizationindexshouldnotbelessthan1.5asthecompliancestandard.AsshowninTable2-1,2-2.Aftermeasuringinsulationresistance,itshouldbeuniformlyconvertedto20Candcomparedwiththefactoryvalueorthevaluefromthepreviousmeasurementcycle.StatusPolarizationIndex(PI)HazardousLessthan1.0Poor1.0–1.1suspicious1.1–1.25fair1.25–2.0goodGreaterthan2.0Table2-1
Referencestandardsforassessinginsulationconditionbasedonthepolarizationindex.Ⅱ.TestStandardsTable2-2QualifiedstandardforinsulationresistancetestⅡ.TestStandardsTable2-2QualifiedstandardforinsulationresistancetestⅡ.TestStandardsTable2-2Qualifiedstandardforinsulationresistancetest02WorkshopⅠ.MeasurementmethodsDuringthemeasurement,recordtheambienttemperatureandhumidity.Measuretheinsulationresistanceandabsorptionratiosequentiallyforeachwindingwithrespecttogroundandbetweenotherwindings.Short-circuitallleadsofthewindingbeingtested,andshort-circuitandgroundallleadsofthenon-testedwindings.Thisallowsformeasuringtheinsulationconditionbetweenthetestedwindingandground,aswellasbetweenthetestedwindingandthenon-testedwindings,whileavoidingtheinfluenceofresidualchargesinthenon-testedwindingsonthemeasurement.Ⅰ.MeasurementmethodsDuringthemeasurement,recordtheambienttemperatureandhumidity.Measuretheinsulationresistanceandabsorptionratiosequentiallyforeachwindingwithrespecttogroundandbetweenotherwindings.Short-circuitallleadsofthewindingbeingtested,andshort-circuitandgroundallleadsofthenon-testedwindings.Thisallowsformeasuringtheinsulationconditionbetweenthetestedwindingandground,aswellasbetweenthetestedwindingandthenon-testedwindings,whileavoidingtheinfluenceofresidualchargesinthenon-testedwindingsonthemeasurement.Ⅰ.MeasurementmethodsFigure2-1showsthefunctionaldiagramoftheinsulationresistancetester,Figure2-2showsthewiringdiagramformeasuringtheinsulationresistanceofthehigh-voltagewindingofthehigh-voltagegenerator.Figure2-1
InsulationresistancetesterfunctiondiagramFigure2-2Wiringdiagramforinsulationresistancemeasurementofthree-Phasetransformerhigh-voltagewindingⅠ.MeasurementmethodsWhenmeasuringtheinsulationresistanceofwindingsratedat1
kVandbelow,useamegohmmeterwitharangenotexceeding0.5
kV.Forwindingswithvoltagesof2.5
kVandabove,amegohmmeterwithavoltageof1
kVor2.5
kVcanbeused.Forwindingsratedat10
kVandabove,usea5
kVinsulationresistancetesterandrecordthetopoiltemperature.Ⅰ.MeasurementmethodsAnalysisofinsulationresistancemeasurementresultsisconductedusingacomparativemethod,primarilyrelyingoncomparingtheresultswithprevioustestresultsofthistransformer.Generally,theswitchingtestvalueshouldnotbelowerthan70%ofthefactorytestvalue.Whenconvertinginsulationresistancetotheinsulationresistanceat20C,transformersupto220
kVshouldhaveavaluenotlessthan800
M,andthetransformerof500
kVshouldhaveavaluenotlessthan2,000
M.Theabsorptionratioshouldnotbelowerthan1.3.Ⅰ.MeasurementmethodsWhenmeasuringtheinsulationresistanceofwindingsratedat1
kVandbelow,useamegohmmeterwitharangenotexceeding0.5
kV.Forwindingswithvoltagesof2.5
kVandabove,amegohmmeterwithavoltageof1
kVor2.5
kVcanbeused.Forwindingsratedat10
kVandabove,usea5
kVinsulationresistancetesterandrecordthetopoiltemperature.WhenmeasuringtheabsorptionratioKofthetransformer,theironcoremustbegrounded.Iftheironcoreisnotgrounded,insulationmaterialssuchascardboardbetweenthetransformerwindingsandthecasingareintroducedinseries,causinganincreaseinthemeasuredinsulationvalueR15,resultinginadecreaseintheabsorptionratio,whichcaneasilyleadtoanunqualifiedresult.Ⅰ.WorkspecificationWhenconductinghigh-voltagetestsonelectricalequipment,afencemustbesetuparoundtheworkarea,withasignhangingonthefencewith“NoEntry,HighVoltageDanger!”Guardsshouldbestationedthere.Onlyoneworkgroupisallowedtoperformhigh-voltagetestsononepieceofequipmentwithinaspecificelectricalconnection.Agroundingwireshouldbeinstalledonthemaintenancesideofthedisconnectionpoint,andasignwith“NoEntry,HighVoltageDanger!”shouldbehungonthehigh-voltagetestside,facingthemaintenanceworkarea.Ⅱ.TechnicalstandardsForthelargepowertransformerof35
kVandbelow,theabsorptionratioshouldnotbelowerthan1.3.Forthelargepowertransformerswithvoltagesequaltoorhigherthan60
kV,theabsorptionratioshouldbecontrollednotlowerthan1.5.Inthecommissioningtestofthepowerindustry,thecorrespondingrequirementfortheabsorptionratioisnotlowerthan1.2and1.3,respectively.Ⅲ.JudgmentandAnalysisInsulationresistancecanpartiallyreflecttheinsulationconditionofwindings.However,itisgreatlyinfluencedbyfactorssuchasinsulationstructure,operationmode,environment,equipmenttemperature,insulationoilquality,andmeasurementerrors.Therefore,duringinstallation,theinsulationresistancevalueR60sshouldnotbelowerthan70%ofthemeasuredinsulationresistancevalueduringthefactorytest.Duringpreventivetests,theinsulationresistancevalueR60sshouldnotbelowerthan50%ofthemeasuredvalueafterinstallation,majorrepairs,andpriortobeingputintooperation.Forthe500
kVtransformer,underthesametemperatureconditions,itsinsulationresistanceshouldnotbelowerthan70%ofthefactoryvalue,andtheminimumresistancevalueat20Cshouldnotbelessthan2,000
M.Ⅳ.SpecialNoticesDuetothedesignedshieldingloopinthemegohmmeter’sinternalcircuitrytoensuremeasurementaccuracy,itisimportanttocorrectlyconnectthecircuit.TheL-terminalofthelineshouldbeconnectedtotheconductivepartofthetestspecimeninsulatedfromtheground,whiletheE-terminalshouldbeconnectedtothegroundingendofthetestspecimen.Interchangingtheseconnectionsisnotallowedasitmayresultinmeasurementerrors.Ⅳ.SpecialNoticesSelectingamegohmmeterwithameasuringvoltagethatmatchestheratedvoltageofthespecimeniscrucial.Thebreakdownvoltageoftheinsulationmaterialisrelatedtotheappliedvoltage,andthemeasurementaccuracyofinsulationcharacteristicsalsodependsontheappliedvoltage.Ifthemeasuringvoltageistoolow,itwillnotaccuratelymeasuretheinsulationcondition,andifitistoohigh,itmaydamagetheinsulationofthespecimen.Ⅳ.SpecialNoticesTemperatureandhumidityshouldberecordedduringthemeasurement.Theabsorptionratioistemperature-dependent.Forverygoodinsulation,theabsorptionratioincreaseswithtemperature.Forpoorinsulationsuchasoilorpaperinsulation,theabsorptionratiodecreaseswithtemperature.Inequipmentwithseveremoisture,theinsulationresistancevariessignificantlywithtemperature.Iftheequipmenttransitionsfromoperationtoshutdown,itshouldbemeasuredaftertheinternalinsulationhascooleddowncompletely,andtheinsulationresistanceshouldbeconvertedtotheinsulationresistanceat20C.Ⅳ.SpecialNoticesForneworRepairedoil-immersedtransformers,Itwilltakedozensofhourstowaitfortheoilcirculationandbubbleescapebeforemeasuringtheinsulationresistance.Forthetransformerwithacapacityof8,000
kVAorabove,theyshouldbeleftstandingforatleast20hours,whileotherlower-capacitytransformersrequireastandingtimeofatleast5hours.Thequalityofoilinthetransformerdirectlyaffectstheinsulationresistancevalue.Thebettertheoilquality,thehighertheinsulationresistanceandthehighertheabsorptionratio.
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 曲靖市花椒加工項(xiàng)目可行性研究報(bào)告
- 【可行性報(bào)告】2025年彩妝化妝品項(xiàng)目可行性研究分析報(bào)告
- 2025年度個(gè)人租賃合同范本:租賃合同中的租金支付方式
- 2024-2030年中國導(dǎo)熱硅脂行業(yè)市場發(fā)展趨勢與前景展望戰(zhàn)略分析報(bào)告
- 三維固土網(wǎng)墊項(xiàng)目投資可行性研究分析報(bào)告(2024-2030版)
- 設(shè)備轉(zhuǎn)售合同范本
- 2025年度高端醫(yī)療器械銷售代理合同范本-@-1
- 2025年六氟環(huán)氧丙烷合作協(xié)議書
- 2025年電動(dòng)汽車銷售市場調(diào)研與分析合同
- 操場項(xiàng)目效益評估報(bào)告
- 醫(yī)院感染與醫(yī)療器械消毒
- 投行競爭格局-洞察分析
- 2024年公務(wù)員考試青岡縣《行政職業(yè)能力測驗(yàn)》深度預(yù)測試卷含解析
- 冠脈介入治療術(shù)后護(hù)理常規(guī)
- 物業(yè)管家客服培訓(xùn)課件
- 涵洞工程專項(xiàng)施工方案
- 校園食品安全與膳食經(jīng)費(fèi)管理工作實(shí)施方案3篇
- 鄉(xiāng)村生態(tài)旅游研學(xué)基地建設(shè)方案
- 戰(zhàn)救課件教學(xué)課件
- 2024年社區(qū)警務(wù)工作規(guī)范考試題庫
- 小學(xué)2024-2025?學(xué)年課程設(shè)置方案
評論
0/150
提交評論