![本科畢業(yè)土木工程專業(yè)英語翻譯翻譯_第1頁](http://file1.renrendoc.com/fileroot_temp2/2020-7/22/23a005df-2cb2-4120-9d27-eeb547e473b8/23a005df-2cb2-4120-9d27-eeb547e473b81.gif)
![本科畢業(yè)土木工程專業(yè)英語翻譯翻譯_第2頁](http://file1.renrendoc.com/fileroot_temp2/2020-7/22/23a005df-2cb2-4120-9d27-eeb547e473b8/23a005df-2cb2-4120-9d27-eeb547e473b82.gif)
![本科畢業(yè)土木工程專業(yè)英語翻譯翻譯_第3頁](http://file1.renrendoc.com/fileroot_temp2/2020-7/22/23a005df-2cb2-4120-9d27-eeb547e473b8/23a005df-2cb2-4120-9d27-eeb547e473b83.gif)
![本科畢業(yè)土木工程專業(yè)英語翻譯翻譯_第4頁](http://file1.renrendoc.com/fileroot_temp2/2020-7/22/23a005df-2cb2-4120-9d27-eeb547e473b8/23a005df-2cb2-4120-9d27-eeb547e473b84.gif)
![本科畢業(yè)土木工程專業(yè)英語翻譯翻譯_第5頁](http://file1.renrendoc.com/fileroot_temp2/2020-7/22/23a005df-2cb2-4120-9d27-eeb547e473b8/23a005df-2cb2-4120-9d27-eeb547e473b85.gif)
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、外 文 翻 譯學(xué) 院:城市建設(shè)學(xué)院專 業(yè):土木工程學(xué) 號:6 姓 名:郭占勇 指導(dǎo)教師:陳 偉 武漢科技大學(xué) 2012年 月 日Discuss the construction temperature and crack of the concrete lightly By G. K. Kululanga, W. Kuotcha, R. McCaffer, Member, ASCE, and F. Edum-Fotwe ,The American Society of Civil EngineersThe summary Through observation live for many ye
2、ars, through consulting the monograph about stress within the concrete, explain to concrete temperature reason , on-the-spot concrete control and measure , prevention of crack of temperature that crack produce. Key word; Concrete; Temperature stress; Crack; Control 1. The concrete occupies the impor
3、tant position in modern engineering construction. But today, the crack of the concrete is comparatively general, the cracks are nearly omnipresent in the science of bridge building. Though we take various kinds of measures in constructing, careful, but the crack still occurs now and then. Tracing it
4、 to its cause, it is one of them incompletely that our change to concrete temperature stress pays attention to. In the large volume concrete, temperature stress and temperature control are significant. This is mainly because of the reason of two respects. First of all, concrete often appear the temp
5、erature crack in not constructing, influence the globality and durability of the structure. Secondly, in the course of operating, the temperature change has remarkable influence that cant be ignored on the stress state of the structure. We meet to construct temperature crack in mainly, so only to or
6、igin cause of formation and treatment measure, concrete of crack make a discussion in constructing this text. Reason of a crack Have many kinds of reasons to produce the crack in the concrete, it is mainly the changes of temperature and humidity, fragility and disparity of the concrete, and the stru
7、cture is unreasonable, the raw materials is not up to standard (if the alkali aggregate react), the template is out of shape, the foundation does not subside etc. evenly . The cement emits a large amount of heat of hydration when the concrete is hardenned, inside temperature is rising constantly, ca
8、use the stress of drawing on the surface. In the course of lowering the temperature , is it congeal foundation pay restrain to mix always later stage, will present the stress of drawing within the concrete . Reducing of temperature can surface cause heavy stress of drawing very in concrete too. When
9、 these draw the stress and go beyond resisting the ability of splitting of concrete , namely will present the crack . A lot of inside humidity of concrete change very light or change relatively slow, surface humidity might change heavy the violent change takes placing. Such as maintaining thoroughly
10、, when getting wetter when not doing,contract surface there arent deformation doing, often cause the crack too. The concrete is a kind of fragility material , tensile strength is about 1/10 of the compression strength, is it carry on ones shoulder or back limit when draw out of shape to have *104 on
11、ly , is it carry on ones shoulder or back limit location when stretch out of shape to there is *104 to add for a long time to add a short time. Because raw materials even, water dust than unstable, transport and build phenomenon of emanating of course, its tensile strength is not even in the same co
12、ncrete, a lot of resist the ability of drawing very low, it is apt to present the weak position of the crack. Among armored concrete , draw stress to undertake by reinforcing bar mainly , concrete bear stress of keeping just. Or reinforcing bar mix if edge position gone to to congeal present the str
13、ess of drawing in the structure in plain concrete, must rely on the concrete oneself to bear . Require to avoid the stress of drawing or only very small stress of drawing appears of the the general design. But the concrete is cooled from maximum temperature to the steady temperature of operating per
14、iod in constructing, often cause sizable to draw the stress within the concrete. The temperature stress can exceed other outsides and load the stresses caused sometimes, know change law , temperature of stress for carry on reasonable structural design and construct extremely important. Analysis of 2
15、 temperature stresses Can be divided into following three stages according to the forming process of the temperature stress: (1)It is early: Build concrete is it is it over basically to send out heat to cement to begin , generally one one day by oneself. Two characteristics at this stage, first, the
16、 cement emits a large amount of heat of hydration, second , mix and congeal the changing sharply of elastic model quantity. Because of the change of elastic model quantity , form the remaining stress in the concrete in this period. (2)Middle period: Up till the concrete is cooled until stability tem
17、perature from cement send out heat function basically when expiring, in this period, the temperature stress is mainly because the cooling of the concrete and external temperature change cause, these stresses and remnants stresses that is formed in early days are superposed , mix and congeal the elas
18、tic mould amount that goes to and does not change much during this period. (3)Later period: Operation period after the complete cooling of concrete. Temperature stress whether external temperature change cause mainly, these stresses and first two kinds of remnants stresseses are changed and added .
19、Can be divided into two kinds according to the reason why the temperature stress causes: (1)Spontaneous stress: There are not any restraint or totally static structure at the border, if inside temperature is non-linear distribution, temperature stress appearing because structure restrains from each
20、other. For example, the body of mound of the bridge, the physical dimension is relatively large, surface temperature is low when the concrete is cooled, inside temperature is high, present the stress of drawing on the surface, present the stress of pressing in the middle. (2)Restrain the stress: All
21、 of the structure ones or it restrain external one some border,cant out of shape and stress not cause not free. Such as case roof beam roof concrete and guardrail concrete. This two kinds of temperature stresses draw back stresses caused to act on with the doing of concrete together frequently. It i
22、s a more complicated job to want to analyse the distribution , size of the temperature stress accurately according to known temperature. In case of great majority , need to rely on the model test or the number value to calculate. To is it make temperature stress have sizable limp to creep concrete,
23、at the stress accounting temperature, must consider the influence that creep , calculate concretly that no longer states thinly here. Control and preventing the measure of the crack of 3 temperature For prevent crack , lighten temperature stress can from control temperature and is it is it set about
24、 to restrain terms from two to improve. The measure of controlling temperature is as follows: (1)Is it improve aggregate grade mix , is it do rigid concrete to spend , mix mixture to adopt, is it guide angry pharmaceutical or plastification pharmaceutical ,etc. measure in order to reduce cement cons
25、umption of concrete to add; (2)Add water or the water to cool the broken stone in order to reduce the temperature of building of the concrete while mixing and shutting the concrete; (3)Reduce the thickness of building while building the concrete on hot day, utilize and build the aspect to dispel the
26、 heat; (4)Bury the water pipe underground in the concrete, enter the cold water to lower the temperature openly; (5)Stipulate rational form removal time, the temperature keeps warm the surface while lowering suddenly, in case that the rapid temperature gradient takes place in the concrete surface; (
27、6)The concrete with medium and long-term and exposed construction builds a piece of surface or thin wall structure, take the measure of keeping warm in cold season; The measure of improving condition of restraining is: (1)Divide and sew and divide one rationally ; (2)Prevent the foundation from risi
28、ng and falling too big; (3)Rational arrangement construction process, prevent the too big discrepancy in elevation and side from exposing for a long time; In addition, improve the performance of the concrete and improve and resist the ability of splitting, strengthen maintenance , prevent the surfac
29、e from being done and contracted , especially guarantee the quality of the concrete is very important to preventing the crack, should pay special attention to avoiding producing and running through the crack , the globality resumed its structure after appearing is very difficult, so should rely main
30、ly on preventing the emergence of the running through crack while constructing. In construction of concrete , for raise turnover rate of template , demand concrete form removal as soon as possible that build newly often. Should consider form removal time properly when concrete temperature is higher
31、than the temperature, so as not to cause the superficial early crack of concrete. Building the early form removal newly, cause very large stress of drawing on the surface, the phenomenon that temperature is assaulted appears. Build initial stage in concrete, because heat of hydration is sent out, th
32、e surface causes sizable to draw the stress, surface temperature is also higher than temperature at this moment, remove the template at this moment , surface temperature is lowered suddenly, must cause temperature gradient , thus add and draw the stress on the surface , change and add with the heat
33、of hydration stress, in addition, the concrete dries and contracts , the superficial stress of drawing reaches very great number value, have danger of causing the crack, but cover a light-duty heat insulator with on the surface in time after removing the template , for instance foam sponge ,etc., fo
34、r prevent concrete surface from produce the too big stress of drawing, have remarkable results. Add muscle influence to large volume temperature stress of concrete very light , because large volume concrete include muscle to be rate very much low. Just have influence on the general armored concrete.
35、 On terms that temperature is not very high and the stress is less than limit of surrendering, every performance of the steel is steady, and have nothing to do with stress state , time and temperature. Line bloated coefficient of steel and concrete line bloated coefficient difference very light, tak
36、e place little internal stress very only between the two while changing in temperature. Because elastic mould amount of steel concrete elastic mould 715 of quantity, reach as interior concrete stress tensile strength and when fracturing, the stress of the reinforcing bar will not exceed 10000kg/cm2.
37、 . So is it is it prevent tiny appearance difficulty very much of crack from to make use of reinforcing bar to want among concrete. But the crack in the structure generally becomes numerous, the interval is little, the width and depth are smaller after adding the muscle. And if diameter of reinforci
38、ng bar detailed and when interval dense, to improve concrete resist result of person who split better. Concrete and surface , armored concrete of structure can take place detailed and shallow crack often, among them the great majority belong to and do and draw back the crack. Though this kind of cra
39、ck is generally all relatively light, it stills have certain influence on the intensity and durability of the structure. In order to guarantee concrete project quality , prevent fracturing , improve the durability of the concrete, use the admixture to reduce one of the measures that fractures correc
40、tly. Whether is it reduce water is it split pharmaceutical to defend , I summarize his main function in practice to use. (1)There is pore Dao of a large number of mao in the concrete , produce capillary tension in the capillary after water is evaporated, make concrete is it contract out of shape to
41、do. Increasing the thin aperture of hair can reduce the capillary surface tension , but will make the intensity of concrete reduce . This surface tension theory has already been confirmed in the world as far back as the sixties. (2)Water dust than influence important factor that concrete shrink, is
42、it reduce water is it split pharmaceutical can make concrete water consumption reduce by 25% to defend to use. (3)Cement consumption important factor, concrete of person who shrink too, is it add and subtract water is it split concrete reducible 15% of the cement consumption on terms that keep the i
43、ntensity of concrete of pharmaceutical to defend to mix, its volume is supplemented by increasing aggregate consumption. (4)Reduce water is it split pharmaceutical can improve consistency of grout , reduce concrete secrete ink to defend, reduce and sink and draw back deforming. (5)Improve glueing th
44、e strength of forming of the grout and aggregate, the concrete improved resists the performance of splitting. (6)Concrete is it produce stress of drawing to restrain from while shrinking, crack when drawing the stress and is greater than concrete tensile strength can produce. Reduce water is it spli
45、t pharmaceutical effective concrete tensile strength of improvement very to defend , improve resisting the performance of splitting of concrete by a wide margin. (7)It can make the concrete density good to add the admixture to mix , can improve resisting carbonization of concrete effectively , reduc
46、e carbonization to shrink. (8)Is it reduce water is it split slow coagulation time proper concrete under pharmaceutical to defend , on the basis of preventing the fast water of cement from sending out heat effectively to mix, prevent the plasticity shrink that brings because the cement is not congea
47、led for a long time from increasing. (9)Mix admixture concrete and getting easy and kind , surface easy to feel flat , form little membrane, reduce the moisture to evaporate, reduce drily and shrink. A lot of admixture all have the functions of slow coagulation , increasing and apt , improvement pla
48、sticity, the experiment that we should carry on in this respect more in the project practice is compared with and studied, than lean against not improving terms more simple,may getting simple and more direct, economy. Early maintenance of 4 concrete Practice has proved , the common crack of concrete
49、 , most is the surface crack of different depth, main reason its whether temperature gradient cause cold temperature of area lower too easy to form crack suddenly. So say the warm - keeping of the concrete is especially important to preventing the early crack of surface. From the viewpoint of temper
50、ature stress, should reach and require to keep warm followingly: 1)Prevent concrete internal and external temperature poor and concrete surface gradient from , prevent the surface crack. 2)Prevent concrete from to be ultra and cold , should is it is it make the minimum temperature is not lower than
51、the steady temperature of concrete service time construction time in concrete to try to try ones best. 3)Prevent the old concrete subcooling , in order to reduce the restraint among the old and new concrete. The early maintenance of the concrete, the main purpose lies in keeping the suitable warm an
52、d humid condition , in order to get the result of two respects, on the other hand make the concrete avoid the invasion and attack of the unfavorable and warm , humidity out of shape, the ones that prevent from harmfully are cold to contract and do to contract. On one hand make cement water function
53、go on smoothly , is in the hope of reaching the intensity designed and resisting the ability of splitting. The suitable warm damp condition is interrelated. Mix warm - keeping measure paid to congeal often protect wet results too. Analyse , water concrete include moisture can meet demand , cement of
54、 water have enough and to spare newly theoretically. But because the reason of evaporating etc. often causes losses of the moisture, thus postpone or hinder water of the cement from, the surface concrete receives this kind of adverse effect easiestly and directly. Key period when maintained in initi
55、al a few days after so the concrete is built, should pay attention to conscientiously in constructing. Conclusions Construction temperature and relation of crack in concrete the above carry on preliminary discussion of theory and practice, though the academia has different theories to origin cause o
56、f formation and computing technology of the concrete crack, but to concrete prevention and improving the measure suggestion to relatively unify , application in practice result fine too at the same time, concrete to is it observe , compare more more by us to want in constructing, analyse more , summ
57、arize more after going wrong , combine many kinds of prevention and deal with the measure, the crack of the concrete can be avoided. 2.Quality control of waterproof concrete constructionCombined with experience, from formwork design, fabrication and installation, assembing reinforoement, pouring and
58、 curing of concrete and other aspects construction technology of fair-faced concrete is introduced as well as quality control measures and standards in order to reduce engineering cost to acquire satisfied economic and social benefits. The factors of influening waterproof- concrete quality are very
59、many Any links does not pay attention to the water-proof concrete of field loss hinders the water function without exception jointly with degree.Engineering construction in the basement adopts secondary form board fabrication and installation, reinforced bar fabrication and bind, concrete stirring and mixing system and transport, concrete concrete covibration bea
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度模具研發(fā)合作與成果轉(zhuǎn)化協(xié)議
- 二零二五年度生態(tài)農(nóng)業(yè)用地流轉(zhuǎn)合同模板
- 二零二五年度噴漆車間房租及環(huán)保設(shè)施升級協(xié)議4篇
- 二零二五年度離婚協(xié)議模板松紈婚姻終結(jié)方案
- 水磨石勞務(wù)施工合同(2篇)
- 民非組織合同(2篇)
- 二零二五年度資源共享型合作協(xié)議轉(zhuǎn)讓股權(quán)方案
- 2025至2030年中國毛絨鞋墊數(shù)據(jù)監(jiān)測研究報告
- 2025至2030年彎柄項目投資價值分析報告
- 2025至2030年中國千斤頂型舉升機(jī)數(shù)據(jù)監(jiān)測研究報告
- 江蘇省蘇州市2024-2025學(xué)年高三上學(xué)期1月期末生物試題(有答案)
- 銷售與銷售目標(biāo)管理制度
- 特殊教育學(xué)校2024-2025學(xué)年度第二學(xué)期教學(xué)工作計劃
- 2025年第一次工地開工會議主要議程開工大吉模板
- 第16課抗日戰(zhàn)爭課件-人教版高中歷史必修一
- 對口升學(xué)語文模擬試卷(9)-江西省(解析版)
- 糖尿病高滲昏迷指南
- 【公開課】同一直線上二力的合成+課件+2024-2025學(xué)年+人教版(2024)初中物理八年級下冊+
- 南京信息工程大學(xué)《教師領(lǐng)導(dǎo)力》2021-2022學(xué)年第一學(xué)期期末試卷
- 信息科技大單元教學(xué)設(shè)計之七年級第三單元便捷的互聯(lián)網(wǎng)服務(wù)
- 壁壘加筑未來可期:2024年短保面包行業(yè)白皮書
評論
0/150
提交評論