




免費(fèi)預(yù)覽已結(jié)束,剩余1頁可下載查看
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
附錄2外文資料ThestudywithregardtodeepfoundationpitduringgeotechnicalengineeringconstructionAt present of the rock engineering,the excavation of deep foundationand supporting structurerelate tothe engineering geology,engineeringstructure,building materials,construction technologyetc.Because supporting structureis composed ofseveralindependent functionsystem. Regardless of the overallfunctional structure designand construction organization. Itshouldstart to eachpart coordination to ensure safe, reliable,economical and reasonable.This essay mainly analyzes thedeep foundation supportingproblems andof geotechnical engineering construction.Keywords:Geotechnical engineering;Deep excavation; Supporting; BuildingconstructionThe foundation engineeringis a practicalandvery strong empiricallydiscipline. In the actual construction, we need facemore and moredeepfoundation trend. Especially theincreaseofenvironmental protection requirements on nowadays. We need morerigorous scientificattitudeto treat thedeep foundation support. The article will discuss deep foundationsupporting about the common problemsand the countermeasures in this context studying.The author hopes sum upandimprove the technical levelin the future engineering practiceconstantly, and makes contribution for thedevelopment of theory and practice ofdeep foundation pit engineering.There are problems in the construction of deep foundation pit support.1.sloping repairis not up to the standardof over breakand under breakphenomenoninconstruction of deep foundation pitin the actualrequirements. These areaffected by theconstruction managementis not in place andthe manipulatoroperation leveland other factors. Itmakes the slopesurfacemechanical excavationtheflatnessand straightnessof irregular,and the artificialrepairsanddue to the limitation ofnotfor the depth of excavation. Itoften appearsretaining paymentof over breakandunder break phenomenon.These are more commondeficiencyin the constructionof deep foundation pit support engineering.2.The differences between the construction process and constructiondesignofdeep foundation pitengineering construction. Deep mixingcementpileare often inadequate, this will affect cement-soil retaining Gongman change and then make thecement soilcracks. In addition,in the actual construction,shoddyphenomenonis not uncommon,the designof excavationdeep foundation pit excavationprogramoftenonrequestto reduce the deformation of bracing anddrawing. Butin actual construction,it oftenregardless ofthese patterns,rob progress,diagramoflocalbenefit.ThiscageengravedmasterwillcauseJerryphenomenon.Deepexcavation is a space problem.The traditional deep foundation pit supporting structure design istreated as planestrain problem.The problemofspacebefore the treatmentand required bytheplane stressmomentsectiondesignin failed. The structure of the supporting structureshould be adjusted to adapt to the requirements of thespaceeffect ofexcavation.This pointin the designand actual construction isbigger. It also need high value.3.The soil excavation and slope supporting do not form a complete set of earthwork excavation technology including leads,so the organization managementis easy.Whileretainingthehigh technical content,construction organizationandmanagement are morecomplex about earthwork excavation.So in the actual construction process, the large engineering is completed bya professional construction team usually. And the vast majority aretwo parallelcontract.So,in the construction of harmoniousmanagement are very difficult. Earthwork construction units tograb progress,drag period,open bidding andares sequenceis chaotic,especiallypropose anotherperiod ofconstruction,and even regardless of retainingconstructionwork required for thesurface,leaving afirstsupporting constructionsurfaceis almostunable to operate,timecan not be completed.Nursingwork,the underground constructionproject belongs to the geotechnical engineering,qualification does not limit strictly,foundation pit engineeringsub contractis more common, some construction unitsdo not have thetechnical conditions. In pursuit of profits and modify on engineering design,broadssafety degree.Siting managementconfusion, resulting in danger,notthe information constructionand dynamic management.This is one ofproblems in deep foundation pit supportconstruction.Implementation strategies of deep excavation in geotechnical engineering:Change the traditional deep excavation engineering design.In recent years,our country hasaccumulated a lot of experience really in deep excavation technology and worked out the laws of rock supporting changes in the actual hook stretched preliminarily. For building the sound new theories and methods of deep foundation pit supporting structure design to lay a good foundation. But forrock and soilof retaining structure of deep foundation pitdesignandconstruction method ofpractical trainingis stillin the process of learning and discussing. And at present there is no unifiedsupport structure design normsandsocksbetter.The distribution of earth pressure according toKulunor Rankinetheory to determine,retaining pilesare still using equivalent beam methodto calculate.These oldcalculation theory ofthe calculated results with thesupporting structure of deep foundation pit and the actual stressof large difference,neither safe nor economic.Therefore,the constructionof retaining structure of deep foundation pitdesignshould notusethe traditionalload structuremethod,but it shouldchange the traditional design idea completely, and establishinformation dynamic gradually to feedbackdesignsystem based on the construction monitoringoriented.2. Pay attention to observe deformationandremedy timely.Geotechnicalengineering ofdeep foundation pit supporting structureobservation of deformation includes:Viewing of the pit slope deformation.,observation ofdeformation,surrounding buildingsand underground pipelines.Over the monitoring data can be analyzed in a timelymanner and to keep abreast of earth excavation and support design in the practical application case. Analyzing the existence of deviation can understand deformed condition of the soil excavation and earthwork excavation as well as the impact of the settlement of the case, such as deformation of underground pipelines.The deviationin designing,correctingdesign of the trainingparameterstimelyinthelowerconstruction,theconstructionsitetotakeappropriateremedialandcontrolmeasures.Therefore,requireon-sitedeformationo bservationdatamustbe accurateand reliable.And In strict accordance with the requirements of the deformation observers carefully measuring predetermined design side, serious and responsible to ensure quality of the observation.If you find anomalies in the actual measurement, youneed to take immediate measures to prevent it and its evil once large deformation or sliding, immediately analyze the main reason to make reliable reinforcement design and construction programs that work quickly and reinforcement effectively prevent the deformation or sliding continue to develop. Norms as well as local and regional research and application engineering experience have been the excavation industry. For currently used by experts in the form of major domestic complicated excavation of the project to ensure safety. Reduce the cost effective and realistic approach.3.Construction quality of drawing excavation all the way.Geotechnical construction deep excavation lies process control. If control link of construction process has some problems,it will be difficult to correct and repair. So the penalty door must be strictly control the construction process management to insure the quality ofconstruction.附錄3中文翻譯巖土工程施工中關(guān)于深基坑支護(hù)的研究目前在巖土工程中,深基坑的開挖及支護(hù)結(jié)構(gòu)涉及工程地質(zhì)、工程結(jié)構(gòu)、建筑材料、施工工藝等諸多方面。因?yàn)橹ёo(hù)結(jié)構(gòu)是由若干具有獨(dú)立功能的體系組成的整體,所以不管是結(jié)構(gòu)設(shè)計(jì)還是施工組織都應(yīng)從整體功能出發(fā),要把各個(gè)組成部分協(xié)調(diào)好,才能確保它的安全可靠、經(jīng)濟(jì)合理。本文主要解析了巖土工程施工中深基坑支護(hù)出現(xiàn)的問題及處理。 關(guān)鍵詞:巖土工程;深基坑;支護(hù);建筑施工 當(dāng)前基坑工程專業(yè)是一門實(shí)用性及經(jīng)驗(yàn)性很強(qiáng)的學(xué)科,在實(shí)際施工中面臨著基坑越來越深的趨勢(shì),尤其是在環(huán)保要求逐漸提高的今天,我們需要以更加嚴(yán)謹(jǐn)?shù)目茖W(xué)態(tài)度來對(duì)待深基坑支護(hù)問題,文章正是在這樣的背景下探討了深基坑支護(hù)中常見的問題及其處理對(duì)策,作者以期在今后的工程實(shí)踐中不斷總結(jié)和提高技術(shù)水平,為發(fā)展深基坑工程的理論和實(shí)踐做出貢獻(xiàn)。 一、深基坑支護(hù)施工中存在的問題 1.邊坡修理達(dá)不到規(guī)范要求 實(shí)際的深基坑施工中常存在超挖和欠挖的現(xiàn)象,都是由于受到施工管理人員不到位以及機(jī)械操作手的操作水平等多種影響因素的影響,使得機(jī)械開挖后的邊坡表面的平整度和順直度不規(guī)則,而人工修理時(shí)又由于條件的限制不可能作深度挖掘,故經(jīng)常性的會(huì)出現(xiàn)擋土支付后出現(xiàn)超挖和欠挖現(xiàn)象。這是深基坑支護(hù)工程施工中較為常見的不足之處。2、施工過程與施工設(shè)計(jì)的差異大 深基坑支護(hù)工程施工中,深層攪拌樁的水泥摻量常常不足,這就會(huì)影響水泥土的支護(hù)弓曼變,進(jìn)而使得水泥土發(fā)生裂縫,另外,在實(shí)際施工中,偷工減料的現(xiàn)象也并不少見,深基坑挖土設(shè)計(jì)中常常對(duì)挖土程序有所要求來減少支護(hù)變形,并進(jìn)行圖紙交底,而實(shí)際施工中往往不管這些框框,搶進(jìn)度,圖局部效益,這籠刻主就會(huì)造成偷工減料現(xiàn)象的發(fā)生。深基坑開挖是一個(gè)空間問題。傳統(tǒng)的深基坑支護(hù)結(jié)構(gòu)的設(shè)計(jì)是按平面應(yīng)變問題處理的。在未能進(jìn)行空間問題處理前而需按平面應(yīng)刻段設(shè)設(shè)計(jì)時(shí),支護(hù)結(jié)構(gòu)的構(gòu)造要適當(dāng)調(diào)整,以適應(yīng)開挖空間效應(yīng)的要求。這點(diǎn)在設(shè)計(jì)與實(shí)際施工相差較大,也需要引起高度的重視。3.土層開挖和邊坡支護(hù)不配套土方開挖技術(shù)含引氏,組織管理容易。而擋土支護(hù)的技術(shù)含量高,施工組織和管理都較土方開挖復(fù)雜。所以在實(shí)際的施工過程中,大型的工程一.般都是由專業(yè)的施工隊(duì)伍來完成的,且絕大部分都是兩個(gè)平行的合同。這樣,在施工中協(xié)調(diào)管理的難度大,土方施工單位搶進(jìn)度,拖工期,開招頃序較亂,特另提雨期施工,甚至不顧擋土支護(hù)施工所需工作面,留給支護(hù)施工的鍘乍面幾乎是無法操作,時(shí)間上也無法完成支護(hù)工作
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 教育信息化基礎(chǔ)設(shè)施建設(shè)與教育信息化服務(wù)質(zhì)量研究報(bào)告001
- 關(guān)于假如我是一片云小學(xué)作文13篇
- 2025年環(huán)境監(jiān)測(cè)物聯(lián)網(wǎng)技術(shù)在環(huán)境監(jiān)測(cè)設(shè)備產(chǎn)業(yè)市場(chǎng)分析報(bào)告精準(zhǔn)度中的應(yīng)用報(bào)告
- 2025年成人教育終身學(xué)習(xí)體系構(gòu)建與平臺(tái)運(yùn)營(yíng)的教育公平與教育質(zhì)量提升報(bào)告
- 2025-2030中國蛋粉行業(yè)競(jìng)爭(zhēng)態(tài)勢(shì)與消費(fèi)趨勢(shì)預(yù)測(cè)報(bào)告
- 2025-2030中國自粘傷口敷料行業(yè)現(xiàn)狀規(guī)模應(yīng)用前景預(yù)測(cè)報(bào)告
- 2025-2030中國聚光式太陽灶市場(chǎng)營(yíng)銷策略與銷售趨勢(shì)預(yù)測(cè)報(bào)告
- 2025-2030中國硅碳棒行業(yè)產(chǎn)銷態(tài)勢(shì)與投資前景預(yù)測(cè)報(bào)告
- 樂器批發(fā)商品牌定位中的社會(huì)責(zé)任實(shí)踐研究考核試卷
- 紡織業(yè)數(shù)字化轉(zhuǎn)型政策與法規(guī)研究考核試卷
- GB/T 43868-2024電化學(xué)儲(chǔ)能電站啟動(dòng)驗(yàn)收規(guī)程
- 統(tǒng)計(jì)與數(shù)據(jù)分析基礎(chǔ)-形成性考核二(項(xiàng)目3-項(xiàng)目5階段性測(cè)試權(quán)重25%)-國開-參考資料
- 中醫(yī)藥健康管理服務(wù)流程
- 資本論在中國智慧樹知到期末考試答案2024年
- 國家職業(yè)技術(shù)技能標(biāo)準(zhǔn) 6-16-02-06 油氣水井測(cè)試工 人社廳發(fā)202226號(hào)
- 繼電保護(hù)配置及整定計(jì)算
- 初高中物理銜接課件
- 血管導(dǎo)管相關(guān)血流感染預(yù)防與控制
- 第四次教育革命:人工智能如何改變教育
- 汽車電氣工學(xué)一體化學(xué)生工作頁
- 中國人的規(guī)矩
評(píng)論
0/150
提交評(píng)論