實習(xí)后報告(英文).doc_第1頁
實習(xí)后報告(英文).doc_第2頁
實習(xí)后報告(英文).doc_第3頁
實習(xí)后報告(英文).doc_第4頁
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

GraduationreportGraduationpractice isto complete the finalphase of theuniversityscourseto bethe most importantsection ofthePractice.Practiceis everyqualifiedstudentsmust havean experiencethat allows usto enhance professionalismin thepractice ofawarenessand practice ofawareness.Wepracticeduring the process oftrainingunits in theschool andsupport, moreguidance ofexperts, throughtrainingwelearned a lotin class,notsimplythe knowledge ofschoolfor ourfuturedesignand lay asolid foundation.At the same timeallowthemselvesto contactthe schoolfor the purpose ofinternshiptrainingof our ability, the five-weekinternshiptoincreasetheirability tohavea lot ofknowledge,greatly improved.GraduationpurposeInternshipis designed to improvethe ability ofstudents andsocial contactsandto understand and master,verifyand consolidatelearnedbasic coursecontent.Enable students tounderstand themodernhigh-rise buildingdesign andthe actual constructionof electricaleasy toignore the problem, studentsintegrate theory with practice, love theprofessional,enthusiastic,committed tothinking ofChinas modernization drive.GraduationcontentTo achieve the aboveobjectivepractice, practicethe main contentshould include:1.Understand theinternshipprocess andproduction organizationof productionmanagement.2.Understand theperformance ofsomeelectrical productsand features.3.Controllow-voltage distributionsystem design,weakpart of thedesign, lighting,part of thedesign, dynamicpart of the design,lightning protection and groundingpart of the design.4.Institute ofelectrical equipmentused inoperatingmethodsand the basicworking principle.Although thispracticeis only3 weekstime, butduring that time,the theoryfor somecommonthings, withperceptual awareness,feelbenefit.Here aresome ofmysummary ofthe internship period, andtheir feelings and experiences.To carry outtheirworkin the future, and thefuture workofgreat help tome.Visitthe West Campus,DongshengBuilding andCity Halland linearlow-voltagepower distribution room, andthe laying ofthe roofthere areweaknesses inthe design ofsome ofmine.Now I willexplainin detailthe buildingof thelightning protection and grounding1. Basic principles:Lightning protection design of technical measures should be the existing national standard lightning protection design of buildings for Lightning Protection, refer to Building Lightning Protection Design Standard corresponding requirements, the use of ball lightning rod protection method, the use of other potentialjoin the most important safety measures.2. Anti-cloud-to-measure, should meet the following requirements:(1) air terminals using the lightning rod, lightning protection zone (network), or a combination of both, it should be used as a metal roof building air terminals, but should be consistent with regulatory requirements.Containing radioactive material should not be used air terminals.The elimination of other forms of lightning, it should only be used with high pole tower roof was added to our building on.Protrusions on the roof, such as satellite and receiver antenna, holiday lights, aviation obstruction lights and air-cooled unit, the roof should be in the range of lightning protection devices, if not calculated by ball within the scope of protection should beseparate lightning rod, with protection, lightning protection device connected with the roof.(2) deflectors should give priority to the use of reinforced concrete building columns or shear walls in the main bar, but also should use the building on fire ladders, steel columns, metal chimneys, etc., as deflectors.When the use of steel in reinforced concrete columns, steel columns as a natural drop, and also used as a grounding device based steel with no disconnect card, but it should be located in a number of suitable locations outside the bar connected with the column connecting plate,for the measurement, an external artificial grounding and equipotential bonding for use.Brick buildings surrounded by a separate deflectors in the external walls and the installation of 1.8 meters from the ground disconnected card.The 1.7 meters to 0.3 meters underground for some protective measures should be taken.(3) The use of grounding devices should give priority to the building of reinforced concrete base.A reinforced concrete ground beam, should in the beam reinforced with a ring grounding device; not reinforced concrete ground beam, it can not in the building surrounding strip of reinforced concrete base closed, galvanized flat steel with a direct lay-40x4pit in the outer groove to form a circular grounding.When the transformer and the work of the diesel generator neutral grounding, electrical protective earth grounding system work and share weak grounding device, the grounding resistance should be less than 1 euro.Use common grounding, the weak systems should their equipment room, and building insulation grounding stud, with more than 25 mm2 copper cable or wire welded steel pipe made through a separate drop, the foundations of buildingsconnected with the ground plate.Weak system of general requirements for grounding resistance of less than 4 ohms, should be an independent ground system view often Boxu Chile to catch car owner thereupon low ash wood ho chant argon ? 0 meters.3. Sideswipe against mine measures should meet the following requirements:Height over 30 meters of reinforced concrete structures, steel structures, should take the following anti-swipe mine and equipotential bonding of the protective measures:(1) steel frame and reinforced concrete should be connected to each other;(2) should be used within the steel column or reinforced concrete columns reinforced as a lightning protection device deflectors;(3) should be 30 meters and over the railings on the external walls, doors, windows and other large metal objects and lightning protection device is connected;(4) vertical laying of metal pipes and metal top and low-end devices to be connected with the mine;(5) columns and ring beam without the buildings, walls should be laid at intervals of around three out of galvanized round steel 12 to do the grading rings, a combination of columns and ring beam, the use of steel for the ring beamgrading ring.All the building every three vertical metal pipe connected with a grading ring.Grading ring should be connected with the lightning protection device deflectors.4. Lightning induction of measures, should meet the following requirements:(1) The protection of metal objects within the building ground, is the main measure lightning induction.Therefore, the building housing the equipment, pipelines, and other major metal frame should be close to receiving the grounding or electrical equipment, lightning protection grounding device(2) parallel to the laying of pipes, cables metal jacket structure and a long metal object, the spacing is less than 100mm should be used jumper wire, cross-junction spacing should not exceed 30m; crossing clearance less than 100mm, theshould be across the intersection.5. Lightning invasion wave of measures, should meet the following requirements:(1) line of low voltage lines should be buried with the cable directly into the home end of the cable jacket or the protection of metal pipe on the device receiving the lightning protection and grounding; if connected to overhead lines should be changed into the household 50m cable, cable for connection atarrester should be installed, and with the cable metal sheath, steel and iron insulator feet, fittings, etc. together, the impulse grounding resistance should not exceed 10 ohms.If overhead wires are used, the arrester should be installed into office.(2) overhead and underground metal pipes, should be in and out of buildings and lightning protection grounding device connected at.Fixed on the building of holiday lights, aviation obstruction lights and other electrical equipment of the line, should be based on the importance of building the mine to take corresponding measures invasive radio waves:a. no metal or electrical equipment protec

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論