1、目錄 Contents一、編制說(shuō)明Explanation to the Compilation1二、工程概況Project Profile5三、施工準(zhǔn)備Preparations for the Commencement8四、項(xiàng)目組織管理機(jī)構(gòu)The Project Administration Organization12五、土建部分主要施工方法The Main Construction Method for the Civil Work19六、 裝飾裝修工程主要施工方法The Main Construction Method forFinishing Work41七、安裝部分主要施工方法Mai

2、n working plan for installation47八、季節(jié)性施工措施Working plan for seasonality58九、質(zhì)量保證措施Quality guarantee measurement61十、工期保證措施The steps for time limitation guarantee66十一、安全生產(chǎn)措施Security Production Measurement69十二、現(xiàn)場(chǎng)文明施工措施Field civilization working measures78十四、工程資料的整理及歸檔project material settling and filing8

3、1十五、工程回訪維修制度Project revisit repair system82十六、施工總平面布置圖The layout of the jobsite83十七、形象進(jìn)度計(jì)劃表Schedule Chart85附圖:施工現(xiàn)場(chǎng)平面布置圖附表:總的施工進(jìn)度計(jì)劃表一、 編制說(shuō)明 Explanation to the Compilation1.1 綜合說(shuō)明 Comprehensive Explanations首先,我們誠(chéng)懇地表示:我們將全心全意為業(yè)主服務(wù),服從業(yè)主、監(jiān)理的管理,和設(shè)計(jì)單位、各分包單位一起共同完成本項(xiàng)目的建設(shè)任務(wù)。我們通過(guò)認(rèn)真學(xué)習(xí)和研究招標(biāo)文件及有關(guān)圖紙資料,并踏勘施工現(xiàn)場(chǎng),在分析了

4、各種外部環(huán)境和內(nèi)部條件,以及工程施工的特點(diǎn)以后,我們有充分的信心保證高質(zhì)量、如期、全面完成本工程招標(biāo)文件規(guī)定的工程范圍的任務(wù)。First of all, we would honestly express: we will serve the Client whole-heartedly and obeythe administration by the Client and the Supervisor, execute the project with the design unitand the various sub-contractors. Having seriously stud

5、ied the tender documents and all therelevant drawings and data, physically visited the project site, fully analyzed the factors ofthe surroundingenvironmentsand our internal conditions and the characteristicsof theproject, we are fully confident to guarantee the timely completion of all the work wit

6、h highqualities stated in the tender documents.一旦我們中標(biāo),我們一定會(huì)全力以赴,做好施工前期準(zhǔn)備工作,并做好各項(xiàng)施工方案的審定工作。我們一定發(fā)揮我公司的管理優(yōu)勢(shì)、技術(shù)優(yōu)勢(shì)、隊(duì)伍優(yōu)勢(shì)、材料設(shè)備等資源優(yōu)勢(shì),科學(xué)組織施工,配置足夠的管理力量、技術(shù)力量和勞動(dòng)力,強(qiáng)化計(jì)劃管理、質(zhì)量管理,在規(guī)定的合同工期內(nèi)高質(zhì)高速完成本工程,具體措施如下:Wewill go all outtomakepre-constructionpreparationsand the examinationsofall theschemesfor theprojectexecution

7、if wewin the bid. We are sure to exertouradvantages inadministrations,technologies, workforces, materials and equipments, organize the execution scientifically;deploy ourselves with adequate administrative personnel, engineers and technicians, andlabor forces; stress the administration in the well-p

8、lanned execution and the quality controlso as to timelycomplete theproject with high qualities set by the contract. Thedetailedmeasures are as follows:1.1.1 把本項(xiàng)目列為我公司的重點(diǎn)項(xiàng)目, 委派具有豐富現(xiàn)場(chǎng)管理經(jīng)驗(yàn)和施工實(shí)踐經(jīng)驗(yàn)的項(xiàng)目經(jīng)理?yè)?dān)任項(xiàng)目部經(jīng)理,配備施工經(jīng)驗(yàn)豐富、技術(shù)素質(zhì)高的管理人員組成項(xiàng)目管理班子,進(jìn)駐現(xiàn)場(chǎng)施工; We will view the project as the major one of our companyand

9、 accredit aproject managerwith full site managementand constructionexperiencesas the ProjectManager;deploythe Site ProjectManagementwith a strongteam of engineersandadministrativestaffwhoare withrich constructionexperiencesandgoodat projectmanagement.1.1.2 施工中采用四新技術(shù), 以科技進(jìn)步保證項(xiàng)目目標(biāo)的實(shí)現(xiàn);Four new techniqu

10、es willbe applied to guarantee the successful completion of the Project;1.1.3 為保證工程質(zhì)量、 節(jié)省粉刷材料的人工費(fèi)用, 本工程擬采用新型模板體系:結(jié)構(gòu)施工采用木膠合板模板體系(清水模板) ;We plan to apply the new mould system in order toguarantee the work quality and save the labor cost for the plastering work; we will apply theplywood-mould system fo

11、r the structure work with fair face.1.1.4 鋼筋一般情況下水平方向縱向受力鋼筋的接頭主要采用閃光對(duì)焊連接,部分采用冷綁扎搭接; Reinforcement steel bar are generally connected by welding for those subject tohorizontal extension, and other than these, by seam binding.1.1.5 地面及屋面工程采用美國(guó)MBW 公司生產(chǎn)的 F36-4B 內(nèi)燃汽油磨光機(jī)原漿壓光機(jī)施工工藝,即節(jié)省了大量的人工和材料費(fèi)用, 又提高了樓地面的質(zhì)量

12、, 提前了工期; Flooring androofing work will be executed with the technique of the press-smooth-surface by F36-4Bgrinders (generated with petrol engine) manufacturedby MBW Co. Ltd in USA so as tosave the labor and material cost, to improve the quality of the floor surface and to shortenthe completion time

13、.1.1.6 強(qiáng)化質(zhì)量管理,嚴(yán)格按照建設(shè)部頒發(fā)的有關(guān)文明施工標(biāo)準(zhǔn)以及上海市建委關(guān)于施工現(xiàn)場(chǎng)標(biāo)準(zhǔn)化管理的具體規(guī)定組織好現(xiàn)場(chǎng)文明施工,確保達(dá)標(biāo),實(shí)現(xiàn)文明工地; Strengthen thequality control and strictly carry out the civilized-construction standards promulgated by theMinistryofConstructionandthedetailedstipulationsregardingstandardizedsitemanagement issued by Shanghai Bureau to o

14、rganize the site civilized production.1.1.7 工程施工采用信息化管理:施工過(guò)程中,按階段采集施工信息, 對(duì)施工操作過(guò)程進(jìn)行攝像記錄。項(xiàng)目施工的全過(guò)程采用計(jì)算機(jī)管理工程的工期、質(zhì)量、技術(shù)、資源、文件檔案。加強(qiáng)工程進(jìn)度管理,提前規(guī)劃,并在施工過(guò)程中采用先進(jìn)的進(jìn)度管理軟件(Win Project)實(shí)行實(shí)時(shí)跟蹤,及時(shí)調(diào)整作業(yè)計(jì)劃,實(shí)現(xiàn)總體控制,確保在215 個(gè)日歷天完成所有施工任務(wù);Information administration will be applied during the project execution: in the course of

15、theproject execution, all the information will be collected in different stages and video film forthe same will be shot. Computer program management will be applied in the whole processfor the work period, quality, techniques, resources and files. Project progress managementis to be strengthened wit

16、h everything planned in advance and follow-up is to be made simultaneously. The advanced software (Win Project) for progress management is to beused for the whole execution. Timely adjustments will be made in order to control the wholeproject execution so as to guarantee the completion of the projec

17、t in 215 calendar days.1.1.8 加強(qiáng)總承包管理措施,主動(dòng)熱情地組織好、配合好、協(xié)調(diào)好業(yè)主指定的其他分包單位施工,使本工程成為高品質(zhì)的產(chǎn)品; Measures for the main Contractor management willbe strengthened. We will do a good and active job in organizing, cooperating, coordinatingthe work made by the sub-contractors who are appointed by the Client so as to m

18、ake theProject as a project of superior quality.1.1.9 以一流的服務(wù)、一流的干勁、一流的質(zhì)量、一流的速度、一流的文明向業(yè)主獻(xiàn)禮,為工程早日建成投入使用,早日發(fā)揮其社會(huì)效益和經(jīng)濟(jì)效益做出我們應(yīng)有的貢獻(xiàn);We willoffer our best service, best quality, best civilization with top drive and speed and make ourcontribution for the earlier completion and operation of the project so as

19、 to make it a goodproject of social and economic effects.1.2 編制原則 The Principles of the Compilation考慮到目前是招標(biāo)投標(biāo)階段,本施工組織設(shè)計(jì)只是根據(jù)招標(biāo)文件中對(duì)技術(shù)標(biāo)的有關(guān)要求進(jìn)行編制的,著重于施工方案、技術(shù)措施、施工管理措施、施工形象進(jìn)度計(jì)劃、現(xiàn)場(chǎng)平面布置、機(jī)械設(shè)備及人員組織機(jī)構(gòu)配置、施工中的重點(diǎn)難點(diǎn)技術(shù)措施的編制。本施工組織設(shè)計(jì)只是針對(duì)本工程施工圖紙和招標(biāo)文件所規(guī)定的內(nèi)容而編制的規(guī)劃性的文件。待工程中標(biāo)后,我公司再根據(jù)本工程的施工特點(diǎn)、圖紙?jiān)O(shè)計(jì)要求編制一份完整的詳細(xì)的施工組織設(shè)計(jì)。Thepre

20、sent proposal,with a view to the bidding stage, is madeand based on the technicalspecificationsstated in the tender documents.It is concentratedin the executionplan,technicalandmanagementmeasures,progressscheme,sitelayout,machinesandequipments, labor forces, site management organization and measures

21、 to be taken for themain and difficult work execution.It is only a proposal made to comply with the projectdrawings and the details stated in the bidding documents. This company will compile onecomplete and detailed execution schedule based on the Project characteristics and designdemands1.3 編制依據(jù) Gi

22、st for the Compilation1.3.1 克魯勃潤(rùn)滑產(chǎn)品(上海)有限公司新建辦公樓工程施工圖(含土建、安裝工程)及投標(biāo)須知; Project Drawings for Kluber LubricationIndustries(Shanghai)Co.,LTD NewBuilding Project (including the civil work, installation work) and bidding instruction.二、工程概況Project Profile本工程位于上海市青浦工業(yè)園區(qū),西近勝利路, 與王子包裝 (上海)有限公司一墻之隔,東接園區(qū)綠苑內(nèi)的苗圃,

23、南為建設(shè)中的拓青路,北臨北青公路,建筑面積約3117 m2 ,由克魯勃潤(rùn)滑產(chǎn)品(上海)有限公司投資興建,由化學(xué)工業(yè)第二設(shè)計(jì)院寧波工程有限公司設(shè)計(jì),本次擬建工程為行政辦公樓。 總工期為 215 天。This project lies in Qingpu Industrial Zone ofShanghai City, near Shengli Road in the west, next to Prince Package(Shanghai)Co.,Ltd,and being connected to nursery of landscape in the east, in the south

24、is the Tuoqing Roadin development, in the north nest to Beiqing Road, and the floor area is about3117 m2. It isinvested by Kluber Lubrication Industries(Shanghai) Co.,Ltd, designed by NO.2 ChemistryIndustry Designing Institute Ningbo Construction Co., Ltd. This planning project will be theAdmin Buil

25、ding, and the total construction time will be 215 days.2.1 、辦公樓工程Office Building2.1.1 辦公樓的平面尺寸為: 64.6m*13.2m ;鋼筋混凝土框架結(jié)構(gòu),檐口高度為13.4m ,室內(nèi)外高差為 0.45 m 。The plan size of the building is 64.6m*13.2m ,and the constructureform is steel concrete frame. Cornice height: 13.4m. The indoor and outdoor difference

26、is 0.45M.2.1.2 基礎(chǔ)工程:C40 鋼筋砼樁承臺(tái)、 C30 基礎(chǔ)梁。磚基礎(chǔ)采用 MU10 蒸壓灰砂磚, M7.5水泥砂漿砌筑。 The foundation work: C40 reinforcement concrete pilecaps, C30 foundation beam. The MU10 steam pressure sand-lime bricks is applied for the brick foundation laid with M7.5 mortar.2.1.3 主體工程 : C40 鋼筋砼框架柱 ,C30 梁、板;框架填充墻采用強(qiáng)度等級(jí)為MU10 砼小

27、型空心砌塊,凡砌體內(nèi)墻190 厚,外墻 240 厚,標(biāo)高 -0.060 以上用 M5 混合砂漿砌筑,標(biāo)高 -0.060 以下用 MU10 蒸壓灰砂磚, M7.5 水泥砂漿砌筑,并用1 :2 防水砂漿抹 20 厚。墻身水平防潮層用1:2 水泥砂漿(摻 5% 水泥重量的防水劑),鋪厚 20,設(shè)于標(biāo)高 -0.060 處。The superstructure: C40 reinforcement concrete frame columns, and C30 beam and floor.Concrete small cavity blocks with strength grade of MU10

28、are to be adopted for the framefiller wall. Thickness of the interior masonry wall shall be 190mm, M5 mixed mortar shall beused for the brickworkwith elevationshigher than -0.060,MU10 autoclavedlime-sandbricks and M7.5 cement mortar bricks shall beused for brickwork with elevationslowerthan -0.060.

29、Besides, waterproof mortar with blending propotion of 1:2 shall be plasteredwiththicknessof20mm.1:2cementmortar(blendedwithwater-proofingadditivesequivalent to 5% of the cement weight) shall be plastered to the elevation of -0.060 withthickness of 20mm for the wall body horizontal damp-proof coating

30、.2.1.4 屋面工程 :現(xiàn)澆板上做 1:10 水泥珍珠巖找坡最薄處30mm 、空鋪 APP 聚酯胎改性瀝青防水卷材 4mm 厚、擠塑泡沫板140mm厚、 20 厚 1:2.5 水泥砂漿找平、 PVC 防水卷材 1.5 厚、保濕毯 /保護(hù)層、蓄排水盤、土工布保護(hù)墊、120 厚輕質(zhì)人工合成土、植被。Roofwork: on the cast-in-situs slab,the sequential layer as follows: 1:10 cement perlite slopingleveling minimum THK.30mm; Spread the APP bitumen water

31、proof book of the APP.4mm;Squeezethe mold foam the plank, 140mm; 1:2.5 cement mortar leveling THK. 20mm;Waterproof book of PVC, 1.5mm; Moisture retention / protection mat; Drainage board; Soilworktheclothprotectthemat;Light-weighttheartificialsynthesizesoil.120mm;Vegetation.2.1.5 裝飾裝修工程:外墻裝飾,1:2.5 水

32、泥砂漿 20 厚抹平,干掛 30 厚毛面花崗巖;內(nèi)裝修,天棚吊頂龍骨表面熱鍍鋅層,可以徒手拆卸龍骨,便于天花板上方空調(diào)、線路等機(jī)電設(shè)備維修。內(nèi)墻隔墻:采用鋼龍骨雙層石膏板隔墻,龍骨采用75 系列熱鍍鋅板,厚度為1.0MM 、 1.5MM 。 FinishingandDecorationWork:Outerwall decoration,thewallissmoothedby 1:2.5 cementmortarwith thicknessin 20mm, and 30 thickeddull-finishgranite; Inside decoration: Hot galvanized co

33、ating is painted on the surface of the keel ofthe supendedceiling,the keel can be dismantledby hand for the maintenanceof theair-conditionersand electromechanicalequipmentsof power lines; Light-weightpartitionwall: Adopt steel keel bi-layer fire proofing gypsum plate partition wall. The keel adpots

34、hotgalvanized zinc plate of Series 75 with thickness of 1.0mm and 1.5mm.2.1.6 樓地面裝飾工程:(1)辦公室及會(huì)議室:鋪3mm 厚地毯;(2)大廳、茶水間、儲(chǔ)藏間:打臘火燒板黑色花崗巖600*600*20 ;(3)餐廳、走廊: 3.5mm 橡膠地板;(4)實(shí)驗(yàn)室及其辦公室和IT 辦公室: 5mm 厚橡膠地板;(5)機(jī)房:自流平環(huán)氧膠泥面層;(6)洗碗間、備餐間、衛(wèi)生間等:防滑地磚150*150*10 水泥膠粘貼 5mm 厚。Flooring Work: (1)Meeting room office: carpet th

35、ickness is 3mm;(2)Hall, tea room, storage room: waxingfire plate black granite 600*600*20cement adhersive5 thick;(3)Canteen,corridor:3.5mm thick rubber floor;(4)Testing rooms and office, IT offices: 5mm thick rubber floor;(5)Main computer room: 1mm of gravity flow epoxy daub layer;cleaning room, tea

36、 house: anti-slipping floor 5mm.(6)Sanitary room,2.1.7 門窗工程 :鋁合金外窗采用中空鍍膜低輻射玻璃,窗框采用斷橋鋁合金節(jié)能窗框,鋼門料框應(yīng)熱鍍鋅防腐處理, 鋁合金窗表面陽(yáng)極氧化附合表膜, 厚度大于等于 7m.Doors andwindowswork: Externalall alloy windowadoptshollow glass with coatingfilm an lowradiation, and the frame adopts the bridge-cutting energy saving. Steel frame sh

37、ould gethotgalvanizingandanticorrosiontreatmentandthealloywindowis treatedwithanodizated compoundd film, thickness 7.5 m.2.2 門衛(wèi)配電房工程Substation & Gate house2.2.1 門衛(wèi)配電房的建筑面積為:316.38 平方米 , 一層框架結(jié)構(gòu) ; The building area forSubstation & Gate house is 316.38m2, and the structure form is one floor reinforceme

38、ntconcrete frame.2.2.2門衛(wèi)配電房基礎(chǔ)采用獨(dú)立柱基礎(chǔ),承臺(tái)及基礎(chǔ)梁為C25 鋼筋混凝土;Thefoundation is independent column base, the pilecap and foundation beam is C25 concrete.三、施工準(zhǔn)備Preparations for the Commencement3.1 現(xiàn)場(chǎng)準(zhǔn)備Site Preparation3.1.1 按施工現(xiàn)場(chǎng)平面布置圖搭建生產(chǎn)和生活臨時(shí)設(shè)施,做好現(xiàn)場(chǎng)臨時(shí)施工道路、施工用水電的布置、現(xiàn)場(chǎng)污水、雨水排放明溝,現(xiàn)場(chǎng)安全防護(hù)設(shè)施搭建等工作。 Set up the tempora

39、ryfacilitiesfor site productionand life as per the site layout. Prepare well the temporaryaccess, water and power, sewage disposal, rain water discharge and the safety protectionfacilities and etc. for the commencement.3.1.2 布置好現(xiàn)場(chǎng)的工程概況牌、 安全生產(chǎn)標(biāo)志牌、勞動(dòng)紀(jì)律牌等“二圖六牌”。Set up at thesitethetwochartsandsix board

40、s:the projectplate,safeproductionmarks,workdisciplines board and etc.3.1.3 組織施工人員進(jìn)場(chǎng) ,并做好各項(xiàng)教育工作。 Organize the work force, move into thesite and do well educational work and others.3.2 施工技術(shù)準(zhǔn)備 Preparations for execution techniques施工技術(shù)準(zhǔn)備的主要內(nèi)容,可以歸納為以下四個(gè)方面:一是組織圖紙會(huì)審;二是編制開工前的各項(xiàng)方案、措施;三是進(jìn)行工程定位,開展施工測(cè)量;四是完成技術(shù)、檢

41、驗(yàn)機(jī)制的建立。其具體內(nèi)容是: The main thing in this regard are the following four parts: study and examinethe drawings; work out the schedules for the commencement; start the project location andsurveyingwork;establishthe mechanismof the techniqueidentificationandqualityinspection. The details are:3.2.1 及時(shí)組織技術(shù)人員,

42、 預(yù)算員認(rèn)真熟悉施工圖紙,參與圖紙會(huì)審和技術(shù)交底; Timelyorganize the technicians and quantity surveyors to get familiar with all the drawings. Theyshall participatein the drawingsstudyingand examining,and explain all the technicaldetails.3.2.2 編制施工圖預(yù)算和月旬作業(yè)計(jì)劃,提供材料的需要量計(jì)劃; Work out the projectbudget and the schedulesfor month

43、ly and 10-day s site work, and also the materialssupply plan.3.2.3 商請(qǐng)建設(shè)單位組織移交、 規(guī)劃紅線、座標(biāo)、標(biāo)高等;Consult with the Client to handover the site, plot lines, bench marks and levels, etc.3.2.4組織專業(yè)技術(shù)人員進(jìn)行模板和鋼筋的翻樣工作; Organizetheprofessionaltechnicians to work out shop drawings for all the moulding board and stee

44、l work.3.2.5 做好各種進(jìn)場(chǎng)材料的質(zhì)量檢驗(yàn)及砼配合比的試配等準(zhǔn)備工作。Do a good job inchecking all those materials to be brought into the site and concrete mix preparations.3.2.6 根據(jù)工程施工需要 ,結(jié)合外圍電網(wǎng)的情況和市政供水管網(wǎng)的情況,進(jìn)行施工用電用水設(shè)計(jì)。 Work out the consumption schedule for the water and power needed for the projectas per the requirements of th

45、e project execution and the status of electricity grid and citywater supply.3.3主要機(jī)械設(shè)備、周轉(zhuǎn)材料及勞動(dòng)力資源配備Preparations of Majormechanicalequipments, cycling materials and work forces根據(jù)本工程的施工規(guī)模及結(jié)構(gòu)形式,為了順利快速地完成本工程,交付給業(yè)主早日投產(chǎn)使用,擬投入的機(jī)械設(shè)備及勞動(dòng)力詳下表。As per the project scale and structural formationand in order to smoo

46、thly complete the execution so as to hand over to the client for theearly operation, it is proposed to allocate of the following equipments and labor forces asthe form listed below:主要施工機(jī)械和材料一覽表Major Machines and Materials for the Project用電量 /臺(tái)進(jìn)場(chǎng)安排序號(hào)名稱型號(hào)數(shù)量單位(KW) PowerDate to bringS.NoDescriptionsMode

47、lQtyUnitConsumptionin挖掘機(jī)輛按1Excavator4Unit2.8實(shí)砼攪拌機(jī)臺(tái)際2JZC35025.5Concrete MixerUnit開砂漿拌和機(jī)臺(tái)工3Mortar MixerUJ2002Unit2.2日塔吊4QTZ60T.M Tower Crane鋼筋切筋機(jī)5GJ5-40 Cutting M/C鋼筋彎曲機(jī)6Bending M/C電焊機(jī)7BX-300-2 Welding M/C8平刨機(jī) planerMB106圓盤鋸9MJ106 Disc Saw插入式振搗器10HZ6X-50 Vibrators平板振動(dòng)器 Plate11PZ-501 Compactor鏑燈 Dyspro

48、sium12lamp13水準(zhǔn)儀 LevelS3經(jīng)緯儀14J2 Theodolite臺(tái)期1Unit陸臺(tái)續(xù)27Unit進(jìn)臺(tái)場(chǎng)22.8UnitEnter the臺(tái)site as per223.4Unitthe臺(tái)requirements27.5Uniton site臺(tái)25.5Unit臺(tái)101.5Unit臺(tái)60.5Unit盞2Unit臺(tái)1Unit臺(tái)1Unit高壓水泵 High臺(tái)1530m 揚(yáng)程27Pressure PumpUnit3.4 勞動(dòng)力資源配備Labor Forces勞動(dòng)力安排一覽表Labor Forces List序號(hào)工種名稱數(shù)量單位S.No.TradeNumberunit1瓦技工 Mason

49、80人 person2木工 Carpenter100人 person鋼筋工360人 personRebar man4架子工 Scaffolder20人 person5機(jī)電工 Electrician10人 person6塔吊司機(jī) Crane2人 personOperator壯工 Unskilled7Labor50人 person8后勤保衛(wèi) Guard4人 person備注Remarks按實(shí)際開工日期陸續(xù)進(jìn)場(chǎng)Enterthe siteaspertherequirementson site四、項(xiàng)目組織管理機(jī)構(gòu)The Project Administration Organization4.1項(xiàng)目管理

50、組織機(jī)構(gòu)的組建(具體人員名單附后)The set-up of the ProjectAdministration Organization(The detailed name list as attached)為了提高工程質(zhì)量,加速施工進(jìn)度及加強(qiáng)施工現(xiàn)場(chǎng)的管理,并能科學(xué)地安排施工進(jìn)度,組織和保證各類物資及時(shí)供應(yīng),做好各種協(xié)調(diào)工作,我公司高度重視本工程,委派具有豐富現(xiàn)場(chǎng)管理經(jīng)驗(yàn)的負(fù)責(zé)人組建成項(xiàng)目經(jīng)理部,項(xiàng)目經(jīng)理部建立崗位責(zé)任制,明確分工職責(zé) ,落實(shí)施工責(zé)任 ,各崗位各行其職。 In order to improve the project quality, speed up the projectprogress,strengthenthe site management,scientificallyarrangethe siteproduction,organizeand guaranteetimely supple of the variousmaterialsand do a good job incoordination work, this company extremely stresses the Project and

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論