![船舶承退租檢驗(yàn)業(yè)務(wù)操作流程_第1頁(yè)](http://file2.renrendoc.com/fileroot_temp3/2021-7/26/1a75e7e2-170c-4163-aab4-f394a9fa66ae/1a75e7e2-170c-4163-aab4-f394a9fa66ae1.gif)
![船舶承退租檢驗(yàn)業(yè)務(wù)操作流程_第2頁(yè)](http://file2.renrendoc.com/fileroot_temp3/2021-7/26/1a75e7e2-170c-4163-aab4-f394a9fa66ae/1a75e7e2-170c-4163-aab4-f394a9fa66ae2.gif)
![船舶承退租檢驗(yàn)業(yè)務(wù)操作流程_第3頁(yè)](http://file2.renrendoc.com/fileroot_temp3/2021-7/26/1a75e7e2-170c-4163-aab4-f394a9fa66ae/1a75e7e2-170c-4163-aab4-f394a9fa66ae3.gif)
![船舶承退租檢驗(yàn)業(yè)務(wù)操作流程_第4頁(yè)](http://file2.renrendoc.com/fileroot_temp3/2021-7/26/1a75e7e2-170c-4163-aab4-f394a9fa66ae/1a75e7e2-170c-4163-aab4-f394a9fa66ae4.gif)
![船舶承退租檢驗(yàn)業(yè)務(wù)操作流程_第5頁(yè)](http://file2.renrendoc.com/fileroot_temp3/2021-7/26/1a75e7e2-170c-4163-aab4-f394a9fa66ae/1a75e7e2-170c-4163-aab4-f394a9fa66ae5.gif)
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、1船舶承退租檢驗(yàn)業(yè)務(wù)操作流程煙臺(tái)中聯(lián)理貨有限公司煙臺(tái)中聯(lián)理貨有限公司 馬吉承馬吉承 電話電話 E-mail:majc_ 21. 租船合同或租船租約(1) 定程租船(2) 定期租船(3) 光船租船(一)船舶承退租鑒定的相關(guān)知識(shí)3 2. 交船(Delivery of the ship)和還船(Redelivery of the ship) 交船就是船東把船舶和它的船員交給租方使用。 還船就是在租期屆滿時(shí),租方將原船按交船時(shí)相似完好狀態(tài)交給船東。 交船時(shí)要符合下列條件: (1) 貨就緒,各貨艙均已清掃干凈。 (2) 船上存油量和船上設(shè)備符合租約規(guī)定。 (3) 船舶證件齊備,
2、有效。 (4) 申請(qǐng)有關(guān)檢驗(yàn)機(jī)構(gòu)對(duì)船舶進(jìn)行檢驗(yàn),做出檢驗(yàn)報(bào)告。 (5) 最后由船租雙方簽署交船證書(shū)。 換船是除上述(3)外,其他條件相同。(一)船舶承退租鑒定的相關(guān)知識(shí)4(一)船舶承退租鑒定的相關(guān)知識(shí) 3. 轉(zhuǎn)租(Sublet)5 (二) 船舶承退租鑒定的概念 船舶承退租鑒定,就是檢驗(yàn)鑒定機(jī)構(gòu)應(yīng)船舶所有人或租船人的委托,對(duì)交船或還船以及轉(zhuǎn)租時(shí)船舶外觀狀況和燃油存有量進(jìn)行鑒定,出據(jù)相應(yīng)報(bào)告的工作。 檢驗(yàn)鑒定機(jī)構(gòu)應(yīng)船舶所有人或租船人的委托,對(duì)交船時(shí)船舶外觀狀況和燃油存有量的鑒定,是承租鑒定(或稱起租鑒定) 檢驗(yàn)鑒定機(jī)構(gòu)應(yīng)船舶所有人或租船人的委托,對(duì)還船時(shí)船舶外觀狀況和燃油存有量的鑒定,是退租鑒定(
3、或稱還船鑒定)6 1. 船況鑒定(Ships Condition Survey) (1) 船殼部分(Hull) (2) )船玄部分(Bulwark/Railing) (3) 主甲板(Main Deck) (4) 貨艙及其附屬設(shè)施 (5) 艏樓部分(Forecastle) (6) 艉樓部分 (7) 駕駛室(Bridge) (8) 機(jī)艙及舵室(Engine room And Steering Gear Room)(三) 船舶承退租鑒定的工作內(nèi)容7 2. 燃油鑒定(Bunker Survey)燃油鑒定是通過(guò)對(duì)船舶燃油艙進(jìn)行測(cè)量,依據(jù)船方提供的油艙計(jì)量表并經(jīng)過(guò)相應(yīng)的校正后計(jì)算承退租是船舶燃油的存油量(
4、Bunker ROB) (1) 油艙的測(cè)量 測(cè)量時(shí)應(yīng)具備的條件(a) 該船應(yīng)具備經(jīng)有關(guān)檢定部門(mén)檢定合格的油艙艙容表。(b) 船舶有縱橫傾時(shí),應(yīng)有正規(guī)的縱橫傾艙容或液位高度修正表。(c) 燃油艙應(yīng)有測(cè)量孔或測(cè)量管的裝置,其測(cè)量基準(zhǔn)點(diǎn)的位置一般應(yīng)在艙容表上列明,并應(yīng)與實(shí)際相符。(d) 使用的計(jì)量工具,包括量油尺、溫度計(jì)等應(yīng)經(jīng)檢定合格并在使用有效期內(nèi)。(e) 如果該船正在加油,應(yīng)待加油結(jié)束后0.5小時(shí)至1小時(shí)后方可進(jìn)行測(cè)量。(三) 船舶承退租鑒定的工作內(nèi)容8 2. 燃油鑒定(Bunker Survey) 查看船舶的縱傾和橫傾 測(cè)量燃油艙液位或空距 測(cè)量燃油艙溫度 燃油密度的確定 (2)燃油重量的計(jì)算
5、 燃油體積的確定 燃油重量的計(jì)算 (3)承退租時(shí)刻燃油重量的推算 承退租時(shí)刻 燃油日消耗量(三) 船舶承退租鑒定的工作內(nèi)容9 3. 船況加燃油鑒定 船況加燃油鑒定包括船況鑒定與燃油鑒定倆部分業(yè)務(wù),需要對(duì)船況和燃油的存量分別進(jìn)行鑒定。(三) 船舶承退租鑒定的工作內(nèi)容10 1. 船況鑒定 2. 燃油鑒定(四) 船舶承退租鑒定證書(shū)11SURVEY REPORT ON M.V. “CONFIDENCE OCEAN”- On Hire Bunker & Condition Survey at Longyan Port on September 21, 2011 THIS IS TO CERTIFY th
6、at the undersigned surveyor did, at the request of Qingdao Huiquan Shipping Co., Ltd, and on behalf of the interests ofQingdao Huiquan Shipping Co., Ltd, CONFIDENCE OCEAN SHIPPING CO,.LTDattend onboard M.V. “CONFIDENCE OCEAN” on September 21, 2011, whilst she was berthed alongside No.2 wharf of Long
7、yan shipyard, port of Longyan, P. R. China, for the purpose of carrying out the on-hire bunker and condition survey. Our survey report was noted as follows:121. Ships Particulars Name of Vessel:CONFIDENCE OCEAN Registry Port:PANAMA IMO Number:9145944Call Sign : 3FQL6 Kind of Vessel:Bulk Carrier Keel
8、 Loaded:June 11, 1996Date of Delivery:November 16, 1996 Owners:CONFIDENCE SHIPPING CO,.LTD G / N Tonnage:16450.00 / 26586.00 LOA / Breadth / Depth:189.33M / 30.95M / 16.40M Output (M.C.O.):9480kw (12900PS)*127 min-1 Output (C.S.O.)(90%M.C.O.):8532kw (11600PS)*122.6 min-1132. Our Attendance & Intervi
9、ew On receiving the instruction, the undersigned surveyor got contact with the local agent, and learned M.V. “CONFIDENCE OCEAN” was lying at No.2 berth of Longyan shipyard, port of Longyan, P.R. China. Because the shortage of berth, MV.CONFIDENCE OCEAN made fast alongside a new ship named MV.POLA PA
10、OAL at the same berth. At about 1000hrs on September 1, 2011, M.V. “CONFIDENCE OCEAN” got berthed at No.2 wharf of Longyan shipyard for annual repair. At about 0930 hours on September 21,2011. The undersigned attended the foresaid vessel after the local immigration officers formal procedures. The Ma
11、ster Capt. Zhang Zhentian, the Chief Engineer Mr.Zhou Yaping were met in the ships office. It was told the vessel bund for Longyan for her annual repair. The vessel was reported being delivered from the owners Qingdao Huiquan Shipping Co,.Ltd. to the charterers DAMPSKIBSSELSKABET A/S NORDEN COPENHAG
12、EN, and got on hire at about 0925hrs on September 22, 2011. In company with the Chief Engineer, we did perform bunker survey at 1000 hours LMT on September 21, 2011. The undersigned did carry out hull / hold / and deck fitting condition survey and record properly. We did inspect the ships condition
13、on hatch arrangement, deck equipment, mooring equipment, ladders, hull and etc. 143. Ships Condition M.V. “CONFIDENCE OCEAN”, a bulk carrier, was built by OSHIMA Shipyard Corporation and delivered on November 16, 1996, registered at Panama, gross weight of 10136.0 tons, equipped with end folding typ
14、e of steel hatch covers / 5 cargo holds and 4 deck cranes. The navigating bridge, accommodation and engineer space located aft. Ships condition was inspected at site, which was noted as follows: 153.1 Weather Deck Main deckStructure in sound condition, well painted on surface, but oil polluted on so
15、mewhere.Forecastle deck Maintained well and structure in sound condition,but oil polluted on somewhere.Poop deckMaintained well and structure in sound condition,but oil polluted on somewhere.163.2 Deck fittings The hatch covers were about in the same horizontal line with the main deck when closed, a
16、nd general flat, painted well, structurally in sound condition. Windlass and winches on forecastle and poop deck maintained in sound condition; Air vents and air pipes, filling pipes, watertight doors were in sound condition; the gangways and bulwark were in sound condition. 173.3 Hull The hull plat
17、ing above water line noted structurally in order and well painted. 3.4Condition of holdsDuring our attendance, the annual repairing work was conducting. The relevant cargo holds and structures etc were inspected, the details noted as below: 18Hold No.1Item checked Structural condition TanktopStructu
18、re in sound condition, but the plate was rust stained mostly.Internal side platingStructure in sound condition, but the plate was rust stained scratched on somewhere.Fore bulkheadStructure in sound condition,but the plate was rust stained / scratched on somewhere. Aft bulkheadStructure in sound cond
19、ition,but the plate was rust stained / scratched on somewhere.Laddersstructurally sound condition Manhole coversStructure in sound conditionHatch cover top platingStructure in sound condition,well paintedHatch cover underside Structure in sound condition, but slightly scratched on somewhere.Cell gui
20、de Structure in sound condition 19Hold No.2Item checked Structural condition TanktopStructure in sound condition, but the plate was rust stained mostly.Internal side platingStructure in sound condition, but the plate was rust stained scratched on somewhere.Fore bulkheadStructure in sound condition,b
21、ut the plate was rust stained / scratched on somewhere. Aft bulkheadStructure in sound condition,but the plate was rust stained / scratched on somewhere.Laddersstructurally sound condition Manhole coversStructure in sound conditionHatch cover top platingStructure in sound condition,well paintedHatch
22、 cover underside Structure in sound condition, but slightly scratched on somewhere.Cell guide Structure in sound condition 20Hold No.2Item checked Structural condition TanktopStructure in sound condition, but the plate was rust stained mostly.Internal side platingStructure in sound condition, but th
23、e plate was rust stained scratched on somewhere.Fore bulkheadStructure in sound condition,but the plate was rust stained / scratched on somewhere. Aft bulkheadStructure in sound condition,but the plate was rust stained / scratched on somewhere.Laddersstructurally sound condition Manhole coversStruct
24、ure in sound conditionHatch cover top platingStructure in sound condition,well paintedHatch cover underside Structure in sound condition, but slightly scratched on somewhere.Cell guide Structure in sound condition 21Hold No.3Item checked Structural condition TanktopStructure in sound condition, but
25、the plate was rust stained mostly.Internal side platingStructure in sound condition, but the plate was rust stained scratched on somewhere.Fore bulkheadStructure in sound condition,but the plate was rust stained / scratched on somewhere. Aft bulkheadStructure in sound condition,but the plate was rus
26、t stained / scratched on somewhere.Laddersstructurally sound condition Manhole coversStructure in sound conditionHatch cover top platingStructure in sound condition,well paintedHatch cover underside Structure in sound condition, but slightly scratched on somewhere.Cell guide Structure in sound condi
27、tion 22Hold No.4Item checked Structural condition TanktopStructure in sound condition, but the plate was rust stained mostly.Internal side platingStructure in sound condition, but the plate was rust stained scratched on somewhere.Fore bulkheadStructure in sound condition,but the plate was rust stain
28、ed / scratched on somewhere. Aft bulkheadStructure in sound condition,but the plate was rust stained / scratched on somewhere.Laddersstructurally sound condition Manhole coversStructure in sound conditionHatch cover top platingStructure in sound condition,well paintedHatch cover underside Structure
29、in sound condition, but slightly scratched on somewhere.Cell guide Structure in sound condition 23Hold No.5Item checked Structural condition TanktopStructure in sound condition, but the plate was rust stained mostly.Internal side platingStructure in sound condition, but the plate was rust stained sc
30、ratched on somewhere.Fore bulkheadStructure in sound condition,but the plate was rust stained / scratched on somewhere. Aft bulkheadStructure in sound condition,but the plate was rust stained / scratched on somewhere.Laddersstructurally sound condition Manhole coversStructure in sound conditionHatch
31、 cover top platingStructure in sound condition,well paintedHatch cover underside Structure in sound condition, but slightly scratched on somewhere.Cell guide Structure in sound condition 244.Fuel Oil and Diesel Oil The Fuel Oil and Diesel Oil Tanks were sounded in the presence of the vessels Chief E
32、ngineer at 1000 hours LMT (0200 hours GMT) on September 21, 2011. The vessel was reported to have gone on-hire / delivery at 0925 hours LMT on September 22, 2011 (0125 hours GMT on September 22, 2011). The quantity of Fuel Oil and Diesel Oil on board which were sounded and calculated noted as follow
33、s: F.O.A)Intermediate Fuel Oil on board at 1000 hours LT on September 21 (0200hrs GMT on September 21) 2011.874.9577 tons B)Fuel Oil on board at 0925 hours LT on September 22 (0125 hours GMT on September 22), 2011 when the vessel went on-hire / delivery.873.96 tons D.O.C)Intermediate Marine diesel o
34、il on board at 1000 hours LT on September 21 (0200hrs GMT September 21), 201159.2236 tonsD)Marine diesel Oil on board at 0925 hours LT on September 22 (0125 hours GMT on September 22), 2011 when the vessel went on-hire / delivery.57.7 tons 255.Fuel Consumption A)Main engine type & numberMITSHUBISHI
35、6UEC50LSII/BHP-9900 PS110.0 RPMB)Output (M.C.O.)9480KW (12900 PS)*127 min-1Output (C.S.O.) (90% M.C.O.)8532KW (11600 PS)*122.6 min-1C)Fuel Oil25.5 tons / day at sea1.0 tons / day in port1.0 tons / day in anchorage D)Diesel Oil0.3 ton / day at sea1.5 ton / day in port1.5 ton / day in anchorage266.Shi
36、ps CertificatesCERTIFICATEISSUEDVALID UNTILDescription Issued Date Expiry DateCertificate of Registry 2010-12-02 2015-12-18Certificate of Class 2008-09-16 2011-11-15Certificate of Minimum Safe Manning 2006-12-11 permanenceInternational Tonnage Certificate 2006-09-15 permanenceInternational Load Line
37、 Certificate 2010-12-23 2011-11-15Cargo Ship Safety Radio Certificate 2008-09-16 2011-11-15Cargo Ship Safety Construction Certificate 2008-09-16 2011-11-15Cargo Ship Safety Equipment Certificate 2010-12-23 2011-11-15Document of Compliance 2010-11-29 2015-12-07Safety Management Certificate 2007-09-14
38、 permanenceI.S.S.C 2008-05-08 2013-04-04277.Photographs One set of photographs taken at the time of our survey is attached to this report.This report represents our finding at the time and place of inspection stated herein. Such inspection has been carried out and report issued to the best of our kn
39、owledge and ability without prejudice to interests of any parties concerned.Qingdao Port, June 19, 2011 Shanghai Yingxin Marine Service Co., Ltd. _(Dawn Chen)Staff Surveyor 28Attachmen 1. Copy of Ships Particulars(1 page) 2. Copy of Crew List(1 page) 3. Copy of Bunker Survey Report Onboard (1 Page)
40、4. Copy of Certificate of On- Hire Bunker Quantity (1 Page) 5. Photographs (a set) CERTIFICATE OF OFF HIRE BUNKER QUANTITY 29 2. 燃油鑒定302. FUEL ON BOARD at 1200 hrs. on December.10, 2011 SHIPSSOUNDING/G.O.V. Cu.M.API 60FTEMP.FACTORG.S.V. Cu.M.W.C.F.TONNES M/TTANKULLAGES M/FTAT TEMPDensity 15F- T-54B1
41、5T-561 HFO P1 HFO P0.183.8050.9894230.994643.7846 0.98833.7403 1 HFO S1 HFO S0.142.6650.9894230.994642.6507 0.98832.6197 2 HFO P2 HFO P894200.996650.8970 0.98830.8865 2 HFO S2 HFO S0.032.950.9894200.996652.9401 0.98832.9057 3 HFO P3 HFO P000.989400.0000 0.98830.0000 3 HFO S3 HFO S000.98940
42、0.0000 0.98830.0000 OVER FLOW OVER FLOW 1 1000.989400.0000 0.98830.0000 O V ER FLOW 2000.9894000.0000 0.98830.0000 O V ER FLOW 30.261.30.989441.007371.3096 0.98831.2943 SETT 1Gauge29.70.9894720.9618128.5658 0.988328.2315 SETT 2Gauge9.60.9894750.95989.2141 0.98839.1063 SERV. Gauge370.9894950.946435.0168 0.988334.6071 TOTAL0.0000 -0.00110.0000 Total:83.3914 313.D
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年受體激動(dòng)阻斷藥合作協(xié)議書(shū)
- 2025年主令電器防雷避雷產(chǎn)品合作協(xié)議書(shū)
- 2025年致密熔鑄合成云母陶瓷合作協(xié)議書(shū)
- 八年級(jí)美術(shù)-第三課-《書(shū)籍裝幀設(shè)計(jì)》教案
- 2025年二年級(jí)音樂(lè)年度總結(jié)參考(2篇)
- 2025年個(gè)人股權(quán)無(wú)償轉(zhuǎn)讓協(xié)議簡(jiǎn)單版(2篇)
- 2025年二手汽車(chē)轉(zhuǎn)讓協(xié)議格式范文(2篇)
- 山西省2024七年級(jí)道德與法治上冊(cè)第二單元成長(zhǎng)的時(shí)空第五課和諧的師生關(guān)系情境基礎(chǔ)小練新人教版
- 2025年五年級(jí)《紅樓夢(mèng)》讀書(shū)心得(2篇)
- 2025年個(gè)人房產(chǎn)轉(zhuǎn)讓合同簡(jiǎn)單版(2篇)
- 六安市葉集化工園區(qū)污水處理廠及配套管網(wǎng)一期工程環(huán)境影響報(bào)告書(shū)
- 運(yùn)動(dòng)技能學(xué)習(xí)與控制課件第一章運(yùn)動(dòng)技能學(xué)習(xí)與控制概述
- 固體廢棄物檢查記錄
- 工程設(shè)計(jì)費(fèi)取費(fèi)標(biāo)準(zhǔn)
- GB/T 5465.1-2009電氣設(shè)備用圖形符號(hào)第1部分:概述與分類
- 2023年遼寧鐵道職業(yè)技術(shù)學(xué)院高職單招(數(shù)學(xué))試題庫(kù)含答案解析
- CAPP教學(xué)講解課件
- 自然環(huán)境的服務(wù)功能課件 高中地理人教版(2019)選擇性必修3
- 小耳畸形課件
- 新人教版初中初三中考數(shù)學(xué)總復(fù)習(xí)課件
- 機(jī)械制造有限公司組織架構(gòu)圖模板
評(píng)論
0/150
提交評(píng)論