u環(huán)保監(jiān)理實(shí)施細(xì)則_第1頁(yè)
u環(huán)保監(jiān)理實(shí)施細(xì)則_第2頁(yè)
u環(huán)保監(jiān)理實(shí)施細(xì)則_第3頁(yè)
u環(huán)保監(jiān)理實(shí)施細(xì)則_第4頁(yè)
u環(huán)保監(jiān)理實(shí)施細(xì)則_第5頁(yè)
已閱讀5頁(yè),還剩11頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、relationship, established equivalent relationship 14, and subject: application problem (4)-scores and percentage application problem review content overview answers scores, and percentage application problem of key is: according to meaning, (1) determine standard volume (units 1) (2) find associate

2、volume rate corresponds to relationship, then in-line solution. category fraction multiplication word problem score division applications engineering problem problem xv, a subject: review of the measurement of the amount of capacity, measurement and units of measurement of common units of measuremen

3、t and their significance in rate 1, currency, length, area, volume, unit size, volume, weight and rate. (omitted) 2, commonly used time units and their relationships. (slightly) with a measurement units zhijian of of poly 1, and of method 2, and poly method 3, and of method and poly method of relati

4、onship measurement distance of method 1, and tool measurement 2, and estimates 16, and subject: geometry preliminary knowledge (1)-line and angle review content line, and segment, and ray, and vertical, and parallel, and angle angle of classification (slightly) 17, and subject: geometry preliminary

5、knowledge (2)-plane graphics review content triangle, and edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : preliminary knowledge (3)-review of solid content category 1-d shapes are divided into: cylinder and cone 2, column is divided in

6、to: cuboid, square 3, cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1, size 2, table .和質(zhì)量是我們的尊嚴(yán)和榮譽(yù)竭力為業(yè)主提供滿意的監(jiān)理和技術(shù)咨詢服務(wù)是我們的核心任務(wù)寶城26區(qū)(一期)a區(qū)安全環(huán)保監(jiān)理細(xì)則編 制: 審 核: 二一一年七月一、 工程概況與環(huán)境保護(hù)要求1.1寶城26區(qū)(一期)a區(qū)工程位于深圳市寶安區(qū)第26區(qū)宗

7、地號(hào)a009-1285地塊,四周環(huán)裕安二路、公園路。1、建設(shè)單位: 深圳市中洲寶城置業(yè)有限公司2、勘察單位:深圳市勘察設(shè)計(jì)研究院3、設(shè)計(jì)單位:中信建筑設(shè)計(jì)(深圳)研究院有限公司4、總包施工單位:江蘇省華建建設(shè)股份有限公司工程簡(jiǎn)介:本項(xiàng)目占地面積42034.19m2,總建筑面積約226315.73m2,建筑高度約100m,地面上33層,地下二層,塔樓主體為框筒結(jié)構(gòu)。場(chǎng)地西側(cè)和北側(cè)為三期用地,周邊無(wú)高層建筑,北側(cè)為城中村,東側(cè)為靈芝公園,四邊道路貫通,總體交通情況較為便利,深基坑對(duì)周邊影響較小。共計(jì)7棟住宅塔樓、1棟公寓塔樓,屬1類高層建筑,地下二層為停車庫(kù)(其中地下二層局部為人防地下室),一層為

8、架空層及商鋪,二層以上為住宅,建筑高度為99米,總建筑面積23萬(wàn)平米,地下室設(shè)有停車場(chǎng)和設(shè)備機(jī)房和消防中心等。1.2監(jiān)理工程師熟悉了解施工圖中專門列入的環(huán)境保護(hù)內(nèi)容。掌握設(shè)計(jì)中環(huán)境保護(hù)工程措施及要求。1.3在環(huán)境保護(hù)監(jiān)理規(guī)劃的指導(dǎo)下,一般按照工程進(jìn)展所涉及的環(huán)境保護(hù)問(wèn)題和使用要求,由環(huán)境監(jiān)理保護(hù)監(jiān)理工程師負(fù)責(zé)編制,并經(jīng)環(huán)境保護(hù)總監(jiān)理工程師批準(zhǔn)用于實(shí)施工程環(huán)境保護(hù)監(jiān)理業(yè)務(wù)操作性文件。1.4督促施工單位嚴(yán)格執(zhí)行環(huán)保局、水務(wù)部門對(duì)本項(xiàng)目環(huán)保報(bào)告書(shū)的審查意見(jiàn)以及地方性法規(guī)。2.編制依據(jù)2.1 環(huán)境保護(hù)有關(guān)的法律、法規(guī)、規(guī)章和標(biāo)準(zhǔn)。2.2 建設(shè)項(xiàng)目環(huán)境影響評(píng)價(jià)報(bào)告和環(huán)境保護(hù)設(shè)計(jì)文件等。2.3 施工區(qū)、生

9、活區(qū)等區(qū)域環(huán)境基本情況和環(huán)境保護(hù)要求。2.4 施工組織設(shè)計(jì)、施工措施計(jì)劃中有關(guān)水污染、大氣污染、固體廢棄物處置、水土流失、生態(tài)影響等的基本資料和經(jīng)批準(zhǔn)的環(huán)境保護(hù)措施。2.5環(huán)境保護(hù)監(jiān)理合同、環(huán)境保護(hù)監(jiān)理規(guī)劃、施工合同中有關(guān)環(huán)境保護(hù)條款。2.6施工設(shè)備、材料等的出廠技術(shù)資料中有關(guān)環(huán)境保護(hù)的文件和資料。3.監(jiān)理工作流程政府環(huán)保部門指示、通知項(xiàng)目法人環(huán)境保護(hù)部門環(huán)境保護(hù)監(jiān)理機(jī)構(gòu)環(huán)境監(jiān)測(cè)機(jī)構(gòu)環(huán)境監(jiān)測(cè)機(jī)構(gòu)環(huán)境報(bào)告反饋、指令信息通報(bào)通報(bào)、協(xié)商環(huán)境報(bào)告反饋、指令環(huán)境報(bào)告承包人圖1 環(huán)境保護(hù)監(jiān)理基本信息流程環(huán)境監(jiān)理工程師現(xiàn)場(chǎng)巡視檢查 重要問(wèn)題已 處 理存在環(huán)境問(wèn)題一般問(wèn)題現(xiàn)場(chǎng)直接指出存在的環(huán)境問(wèn)題,要求限期處

10、理拒絕與工程監(jiān)理工程師協(xié)商后簽發(fā)環(huán)境問(wèn)題通知跟蹤處理結(jié)果委托他人完成跟蹤處理結(jié)果與工程總監(jiān)理工程師協(xié)商后簽發(fā)環(huán)境行動(dòng)通知跟蹤處理結(jié)果拒不解決期滿未解決期滿未解決增加的費(fèi)用和損失處理 圖2 現(xiàn)場(chǎng)環(huán)境巡視檢查程序4.工作范圍及工作重點(diǎn)2.1 監(jiān)理工程師審查施工組織設(shè)計(jì)時(shí),應(yīng)對(duì)施工單位在工程施工中的環(huán)境保護(hù)措施、方案、實(shí)施辦法進(jìn)行審核。符合相關(guān)規(guī)定,由監(jiān)理工程師提出審核意見(jiàn),報(bào)總監(jiān)理工程師批準(zhǔn)。2.2 審查施工單位現(xiàn)場(chǎng)的環(huán)境保護(hù)組織機(jī)構(gòu)專職人員、環(huán)境保護(hù)措施及相關(guān)制度的建立,是否符合要求。2.3 督促施工單位與當(dāng)?shù)丨h(huán)保部門建立正常的工作聯(lián)系,了解當(dāng)?shù)氐沫h(huán)境保護(hù)要求和相關(guān)標(biāo)準(zhǔn),取得當(dāng)?shù)丨h(huán)保部門的支持。

11、2.4 施工過(guò)程中監(jiān)理工程師對(duì)施工單位環(huán)境保護(hù)措施進(jìn)行跟蹤檢查,對(duì)環(huán)境保護(hù)工程項(xiàng)目進(jìn)行檢查及驗(yàn)收。5.環(huán)境保護(hù)監(jiān)理實(shí)施細(xì)則5.1 環(huán)境保護(hù)監(jiān)理范圍內(nèi)污染源調(diào)查細(xì)則1.通過(guò)對(duì)施工區(qū)污染源分布情況調(diào)查,根據(jù)污染源分布的總體情況,有針對(duì)性的做好環(huán)境監(jiān)理工作。2.對(duì)原地形地貌的破壞,施工完成后必須予以恢復(fù)。臨時(shí)便道的修建,如對(duì)地表水系造成影響,施工中必須采取相應(yīng)的保護(hù)措施,施工結(jié)束后對(duì)原來(lái)的地表水系要予恢復(fù),防止地表水土流失或造成堵塞,排泄不暢。3.取土場(chǎng),棄土場(chǎng)的使用和恢復(fù)。施工棄碴不得棄入當(dāng)?shù)睾?、湖,不得影響現(xiàn)有地表水系,應(yīng)集中在指定棄碴場(chǎng)地。4.污水處理完要經(jīng)有關(guān)部門檢驗(yàn)達(dá)標(biāo)后再按設(shè)計(jì)要求處理。

12、施工污水不得直接排入地表,也不得直接排入附近河湖中,應(yīng)設(shè)污水沉淀池、氣浮池,施工中產(chǎn)生的廢碴、廢液應(yīng)按有關(guān)環(huán)保要求進(jìn)行處理,不得隨意棄置、排放;施工營(yíng)區(qū)的生活污水,必須建立適當(dāng)?shù)奈鬯幚泶胧?,不得直接排入附近河湖之中?.施工營(yíng)區(qū)的環(huán)境保護(hù)。施工營(yíng)地要進(jìn)行適當(dāng)綠化,以便與周圍環(huán)境相協(xié)調(diào)。生活垃圾,固體廢棄物必須集中放置運(yùn)至當(dāng)?shù)氐睦幚睃c(diǎn),不得隨意丟棄。施工營(yíng)區(qū)有專人進(jìn)行衛(wèi)生清掃,搞好環(huán)境衛(wèi)生。6.施工影響區(qū)的恢復(fù)。施工結(jié)束后,應(yīng)按照原地貌特點(diǎn),進(jìn)行土地復(fù)耕,地貌恢復(fù)并進(jìn)行綠化,清除一切施工垃圾;硬化的地面、地表臨時(shí)建筑予以鑿除。7混凝土拌和站的保護(hù)。施工中的污水,設(shè)備清洗污水要經(jīng)處理才可排放

13、,并應(yīng)建立排水系統(tǒng);原材料堆放,要符合設(shè)計(jì)要求;混凝土攪拌機(jī)要適當(dāng)封閉,防止揚(yáng)塵污染。8隧道內(nèi)施工環(huán)境。隧道內(nèi)施工要建立良好的通風(fēng)系統(tǒng);定期對(duì)有害氣體排放及污水進(jìn)行檢測(cè);棄碴運(yùn)輸盡量采取減少污染環(huán)境的手段;現(xiàn)場(chǎng)作業(yè)人員勞動(dòng)保護(hù)應(yīng)符合有關(guān)規(guī)定。5.2 環(huán)境保護(hù)措施審核細(xì)則1. 熟悉環(huán)境保護(hù)工程設(shè)計(jì)文件內(nèi)容,檢查設(shè)計(jì)文件(包括:設(shè)計(jì)說(shuō)明、施工圖紙、施工措施、技術(shù)要求、操作規(guī)程、設(shè)計(jì)修改通知等)是否符合現(xiàn)場(chǎng)的實(shí)際情況。2. 審查環(huán)境保護(hù)工程設(shè)計(jì)文件和各項(xiàng)設(shè)計(jì)變更,提出意見(jiàn)與優(yōu)化建議。3. 及時(shí)向工程施工承包人簽發(fā)環(huán)境保護(hù)工程設(shè)計(jì)文件,發(fā)現(xiàn)問(wèn)題及時(shí)與設(shè)計(jì)單位聯(lián)系,重大問(wèn)題應(yīng)及時(shí)向業(yè)主報(bào)告。4. 組織設(shè)

14、計(jì)單位進(jìn)行環(huán)境保護(hù)工程現(xiàn)場(chǎng)設(shè)計(jì)交底。5. 協(xié)助業(yè)主會(huì)同設(shè)計(jì)單位對(duì)環(huán)境保護(hù)工程中重大技術(shù)問(wèn)題和優(yōu)化設(shè)計(jì)進(jìn)行專題討論并參加設(shè)計(jì)聯(lián)絡(luò)會(huì)。6. 審查承包人對(duì)設(shè)計(jì)文件的意見(jiàn)和建議,協(xié)助業(yè)主與設(shè)計(jì)單位進(jìn)行研究,并督促設(shè)計(jì)單位盡快給予答復(fù)。7審批環(huán)境保護(hù)工程施工承包人提交的施工組織設(shè)計(jì)、施工進(jìn)度計(jì)劃、施工技術(shù)措施計(jì)劃、作業(yè)規(guī)程、工藝試驗(yàn)成果、臨建工程設(shè)計(jì)、施工詳圖、使用的原材料及試驗(yàn)成果等;簽發(fā)補(bǔ)充的設(shè)計(jì)文件、技術(shù)規(guī)范等;答復(fù)施工承包人提出的建議和意見(jiàn)。8督促業(yè)主按施工合同的規(guī)定,落實(shí)必須提供的施工條件;檢查施工承包人開(kāi)工準(zhǔn)備工作,并在檢查與審查合格后簽發(fā)環(huán)境保護(hù)工程項(xiàng)目開(kāi)工令。9主持召開(kāi)環(huán)境保護(hù)專項(xiàng)工程周

15、例會(huì)。檢查承包人上周工程計(jì)劃實(shí)施情況,落實(shí)下周的工作計(jì)劃,協(xié)調(diào)解決存在的有關(guān)問(wèn)題。10定期檢查環(huán)境保護(hù)工程及設(shè)施的運(yùn)行狀況,如生產(chǎn)廢水、生活污水處理系統(tǒng)的處理量、處理效果、運(yùn)行成本、污泥處置等,對(duì)環(huán)保設(shè)施運(yùn)行是否達(dá)到環(huán)境保護(hù)相關(guān)標(biāo)準(zhǔn)進(jìn)行監(jiān)督。5.3 環(huán)境保護(hù)監(jiān)理現(xiàn)場(chǎng)巡視檢查細(xì)則1.對(duì)監(jiān)理范圍內(nèi)(包括施工區(qū)、生活區(qū)和移民區(qū))的環(huán)境和環(huán)境保護(hù)工作進(jìn)行定期和不定期的日常監(jiān)督、檢查。2.檢查承包人落實(shí)項(xiàng)目有關(guān)環(huán)境保護(hù)措施的情況。3.對(duì)監(jiān)理范圍內(nèi)的環(huán)境狀況進(jìn)行日常巡查,對(duì)存在重大環(huán)境問(wèn)題的施工區(qū)或生活區(qū)的環(huán)境情況和環(huán)境保護(hù)措施的實(shí)施進(jìn)行跟蹤檢查。4.對(duì)存在的環(huán)境問(wèn)題,可直接要求承包人處理。5.對(duì)重要的環(huán)

16、境問(wèn)題,或要求承包人處理而未處理的環(huán)境問(wèn)題,現(xiàn)場(chǎng)環(huán)境保護(hù)監(jiān)理工程在與現(xiàn)場(chǎng)工程監(jiān)理工程師協(xié)商后簽發(fā)環(huán)境問(wèn)題通知,要求承包人限期解決。承包人應(yīng)按通知的要求,采取一切有效措施,按照解決存在的問(wèn)題,并向現(xiàn)場(chǎng)環(huán)境保護(hù)監(jiān)理工程報(bào)告。6.對(duì)環(huán)境問(wèn)題通知中要求解決的環(huán)境問(wèn)題,若承包人拒不解決或期滿后仍未解決,現(xiàn)場(chǎng)環(huán)境保護(hù)監(jiān)理工程應(yīng)向環(huán)境總監(jiān)理工程師匯報(bào),必要時(shí),環(huán)境保護(hù)總監(jiān)理工程師在與工程總監(jiān)理工程師協(xié)商后,向承包人發(fā)出整改指示或環(huán)境行動(dòng)通知。7在通知發(fā)出后14天后(特殊情況下7天后),承包人仍未采取有效措施處理存在的環(huán)境問(wèn)題,則發(fā)包人或其聘請(qǐng)的合格人員可以進(jìn)駐現(xiàn)場(chǎng)對(duì)有關(guān)環(huán)境問(wèn)題進(jìn)行處理。8由此引起的費(fèi)用增加

17、或損失均由承包人承擔(dān),通過(guò)工程監(jiān)理機(jī)構(gòu)從下月給承包人的付款中扣除。9在環(huán)境保護(hù)整改期間,應(yīng)暫停對(duì)承包人的付款。10檢查負(fù)責(zé)范圍內(nèi)的環(huán)境影響情況,并做好現(xiàn)場(chǎng)監(jiān)理記錄。核實(shí)承包人環(huán)境保護(hù)相關(guān)原始記錄。5.4 環(huán)境保護(hù)旁站監(jiān)理細(xì)則1.對(duì)一些重要環(huán)境問(wèn)題采取連續(xù)性的全過(guò)程監(jiān)督和檢查。2.經(jīng)檢查發(fā)現(xiàn)的重大環(huán)境問(wèn)題的處理。3. 對(duì)施工區(qū)內(nèi)環(huán)境影響較大的污染源防護(hù)。4.對(duì)環(huán)境破壞性大的廢棄物的處理。5.重要文物保護(hù)。6.旁站過(guò)程中對(duì)現(xiàn)場(chǎng)環(huán)境狀況和環(huán)境保護(hù)情況進(jìn)行記錄,包括現(xiàn)場(chǎng)環(huán)境情況描述、環(huán)境監(jiān)測(cè)數(shù)據(jù)、環(huán)境保護(hù)措施落實(shí)情況等。7現(xiàn)場(chǎng)記錄通過(guò)文字、數(shù)據(jù)、圖表、聲像等形式。5.5 環(huán)境保護(hù)監(jiān)理檔案資料管理細(xì)則1

18、. 按照合同文件的要求,利用計(jì)算機(jī)技術(shù)對(duì)環(huán)境保護(hù)工程項(xiàng)目進(jìn)行編目、編碼、統(tǒng)計(jì)和檢索。2. 收集、整理、統(tǒng)計(jì)各類文件資料、文書(shū)資料、技術(shù)資料及檔案,并立卷、保管。3. 按公司檔案管理制度要求,做好檔案的檢點(diǎn)移交、編目、編號(hào)、檢索、統(tǒng)計(jì)和安全保管,對(duì)過(guò)期無(wú)利用價(jià)值的檔案資料經(jīng)公司有關(guān)領(lǐng)導(dǎo)組織鑒定后方能作銷毀處理。4. 負(fù)責(zé)收集國(guó)內(nèi)外工程監(jiān)理的有關(guān)規(guī)范和信息動(dòng)態(tài),做好工程大事記。5. 與有關(guān)圖書(shū)館定期聯(lián)系,經(jīng)常向公司分管技術(shù)領(lǐng)導(dǎo)提供與工程監(jiān)理技術(shù)有關(guān)的文獻(xiàn)資料索引。6. 負(fù)責(zé)收集并保管公司和各項(xiàng)目監(jiān)理人員拍攝的各種會(huì)議、工程監(jiān)理業(yè)務(wù)上的照片和像帶,并在整理標(biāo)注詳細(xì)說(shuō)明后嚴(yán)格按照項(xiàng)目進(jìn)行歸檔。7按規(guī)范

19、的格式打印、復(fù)印文件文本,對(duì)機(jī)密文件資料的打字、復(fù)印要做好保密工作,及時(shí)銷毀樣稿和廢紙;并對(duì)打字復(fù)印做出登記記錄。8負(fù)責(zé)對(duì)辦公設(shè)備的維護(hù)保養(yǎng)和調(diào)試,如計(jì)算機(jī)、復(fù)印機(jī)要做到半月進(jìn)行養(yǎng)護(hù)清潔。5.6 環(huán)境保護(hù)會(huì)議細(xì)則1. 監(jiān)理部每月定期召開(kāi)業(yè)主負(fù)責(zé)人、設(shè)計(jì)單位、工程監(jiān)理單位、各施工單位和有關(guān)各方參加的環(huán)境保護(hù)監(jiān)理例會(huì)。2. 總結(jié)每月或上一時(shí)段環(huán)境保護(hù)專項(xiàng)工程的施工進(jìn)度、形象、質(zhì)量、投資完成等情況。3. 整個(gè)工地環(huán)境保護(hù)措施落實(shí)情況,存在的問(wèn)題;安排下月或下一時(shí)段的工作,找出存在的問(wèn)題和解決措施、特別要注意的重點(diǎn)問(wèn)題等。4. 對(duì)專項(xiàng)環(huán)境保護(hù)方面的重大問(wèn)題,隨時(shí)召開(kāi)專題會(huì)議進(jìn)行研究處理。5. 定期組織

20、或針對(duì)具體的問(wèn)題臨時(shí)召集現(xiàn)場(chǎng)監(jiān)理人員內(nèi)部工作會(huì)議,檢查本周監(jiān)理工作,溝通情況,商討難點(diǎn)問(wèn)題,布置下周監(jiān)理工作計(jì)劃,總結(jié)經(jīng)驗(yàn),不斷提高監(jiān)理業(yè)務(wù)水平。針對(duì)監(jiān)理工作實(shí)施過(guò)程中出現(xiàn)的問(wèn)題組織討論,提出解決問(wèn)題的方法以及防止發(fā)生類似問(wèn)題的措施,同時(shí)編寫(xiě)并發(fā)布會(huì)議紀(jì)要或?qū)?nèi)部的工作制度進(jìn)行修改后實(shí)施。5.7 水污染防治監(jiān)理細(xì)則1.基礎(chǔ)開(kāi)挖和砂石料采集加工所產(chǎn)生的污水中含有大量的懸浮物(ss),承包人必須按設(shè)計(jì)要求設(shè)置水溝塞或擋板、沉淀池等凈化設(shè)施,保證排水懸浮物指標(biāo)達(dá)標(biāo)。2.清洗機(jī)械、車輛等的廢水含油量大,必須經(jīng)過(guò)油水分離器處理后方可排出。3.若工程項(xiàng)目有醫(yī)療單位,那么其污水處理必須執(zhí)行國(guó)家污水綜合排放標(biāo)

21、準(zhǔn)(gb8979-1996)。4.禁止向水體排放油類、酸液、堿液及其他有毒廢液,禁止在水體中清洗裝儲(chǔ)過(guò)油類或其他有毒污染物的容器;禁止向水體排放、傾倒生產(chǎn)廢渣、生活垃圾及其他廢物;禁止向水體排放或傾倒任何放射性強(qiáng)度超標(biāo)的廢水、廢渣。5.燃料庫(kù)、化學(xué)藥品庫(kù)等應(yīng)按照設(shè)計(jì)和合同要求,采取保護(hù)措施,避免污染土壤和水體。6.生活污水須經(jīng)化糞池發(fā)酵殺菌后,按要求進(jìn)行集中處理或?qū)S霉艿垒斔偷綗o(wú)危害水域?;S池的有效容積應(yīng)能至少滿足生活污水停留一天的要求,同時(shí)應(yīng)定期清理,以保證其有效容積。7為防止地下水污染,禁止利用滲坑、滲井、裂隙排放、傾倒廢水;防滲工程施工中加入的化學(xué)物質(zhì)不得污染地下水;生活水井周圍150

22、m范圍內(nèi)為水質(zhì)保護(hù)區(qū),應(yīng)設(shè)立標(biāo)志,區(qū)內(nèi)不得存在醫(yī)療點(diǎn)、畜禽飼養(yǎng)場(chǎng)、滲水廁所、滲水坑,不得堆放垃圾、糞便、廢渣和設(shè)置污水溝或污水管道。8承包人應(yīng)對(duì)本單位排放的污水進(jìn)行定期監(jiān)測(cè)和必要時(shí)的專門檢測(cè),若發(fā)現(xiàn)排放超標(biāo),必須采取相應(yīng)的措施予以糾正。必要時(shí),監(jiān)理機(jī)構(gòu)還可指派有資質(zhì)的監(jiān)測(cè)單位對(duì)其排放的污水進(jìn)行專門監(jiān)測(cè)。5.8 大氣污染防治監(jiān)理細(xì)則1.生產(chǎn)過(guò)程中產(chǎn)生的廢氣、粉塵必須達(dá)到國(guó)家排放標(biāo)準(zhǔn)。2.砂石料加工及拌和工序必須采取防塵措施。3.為防止運(yùn)輸揚(yáng)塵污染和物料滑落傷人,裝運(yùn)水泥、石灰、垃圾等一切易揚(yáng)塵的車輛,必須覆蓋封閉。4.為防治公路揚(yáng)塵污染,進(jìn)場(chǎng)公路及場(chǎng)內(nèi)施工路面必須定期灑水。5.各種燃油機(jī)械必須裝

23、置消煙除塵設(shè)備。6.嚴(yán)禁在施工區(qū)內(nèi)焚燒產(chǎn)生有毒或惡毒氣體的物質(zhì)。5.9 固體廢棄物處置監(jiān)理細(xì)則1.施工棄渣各固體廢棄物必須以國(guó)家固體廢棄物污染環(huán)境防治法為依據(jù),按設(shè)計(jì)要求送到指定棄渣場(chǎng),不得隨意堆放。2.儲(chǔ)存棄渣、固體廢棄物的場(chǎng)所,必須采取工程防腐措施,避免邊坡失穩(wěn)和棄渣流失。3.必須在施工區(qū)和生活營(yíng)地設(shè)置臨時(shí)垃圾儲(chǔ)存設(shè)施,防止垃圾流失,并定期將垃圾清走并進(jìn)行覆土掩埋。4.若工程項(xiàng)目有醫(yī)院或其他醫(yī)療單位,含菌垃圾應(yīng)送焚燒爐焚燒。5.禁止將含有鉛、鉻、砷、汞、氰、硫、銅、病原體等有害有毒成分的廢渣隨意傾倒或直接埋入地下。5.10 生態(tài)保護(hù)監(jiān)理細(xì)則1.加強(qiáng)保護(hù)野生動(dòng)植物的宣傳教育,提高保護(hù)野生動(dòng)植

24、物(包括水生動(dòng)植物)和生態(tài)環(huán)境的認(rèn)識(shí)。2.在施工過(guò)程中,必須注意保護(hù)動(dòng)植物資源,盡量減輕損壞現(xiàn)有生態(tài)。3.對(duì)亂砍亂伐和捕捉野生動(dòng)物的行為必須立即制止,并報(bào)告環(huán)境保護(hù)監(jiān)理和有關(guān)部門予以查處。4.發(fā)現(xiàn)或疑為珍稀動(dòng)植物及其棲息生長(zhǎng)地時(shí),必須立即采取保護(hù)措施,并及時(shí)報(bào)告環(huán)境保護(hù)監(jiān)理。5.承包人落實(shí)野生動(dòng)植物保護(hù)措施,包括各種遷移、隔離保護(hù)、建設(shè)動(dòng)物通道、改善棲息地環(huán)境、人工繁殖等各項(xiàng)措施。5.11 文物保護(hù)監(jiān)理細(xì)則1.加強(qiáng)文物保護(hù)知識(shí)的宣傳和教育,提高保護(hù)文物的自覺(jué)性。2.一切地上、地下文物均歸國(guó)家所有,不允許任何單位和個(gè)人竊為私有。3.在施工過(guò)程中,發(fā)現(xiàn)文物(或疑為文物)時(shí),承包人必須立即停止施工,

25、采取合理的保護(hù)措施防止移動(dòng)或損壞文物,并立即將情況通知環(huán)境保護(hù)監(jiān)理機(jī)構(gòu)和文物主管部門,執(zhí)行文物管理部門關(guān)于處理文物的指示。6主要工作方法和措施6.1 巡視與指令1. 監(jiān)理工程師應(yīng)經(jīng)常對(duì)施工現(xiàn)場(chǎng)進(jìn)行巡視,了解各項(xiàng)環(huán)境保護(hù)措施的落實(shí)狀況。對(duì)重點(diǎn)工序或重點(diǎn)施工地段,進(jìn)行檢查,了解環(huán)保進(jìn)展。2. 對(duì)巡視中發(fā)現(xiàn)的問(wèn)題,及時(shí)下達(dá)監(jiān)理工程師通知,指令施工方改正,并對(duì)整改結(jié)果進(jìn)行復(fù)查。6.2 設(shè)計(jì)文件中的環(huán)境保護(hù)項(xiàng)目按設(shè)計(jì)要求進(jìn)行驗(yàn)收1. 路基邊坡植草及地表排水系統(tǒng)。2. 棄碴場(chǎng)擋墻的砌筑及岸坡防護(hù)。棄碴場(chǎng)的植被綠化。3. 站場(chǎng)排污設(shè)施、排水系統(tǒng)。6.3 主要措施1. 環(huán)境保護(hù)與工程主體同步驗(yàn)收,環(huán)境保護(hù)不達(dá)

26、標(biāo)工程不予驗(yàn)收。2. 經(jīng)濟(jì)措施:工程量清單中技術(shù)措施費(fèi)列有環(huán)境保護(hù)費(fèi)用,如環(huán)境保護(hù)達(dá)不到要求,監(jiān)理工程師對(duì)該項(xiàng)費(fèi)用不予計(jì)價(jià)支付。3. 報(bào)告:對(duì)環(huán)境保護(hù)不重視或不采取有效措施的單位,及時(shí)向建設(shè)單位或水務(wù)主管部門報(bào)告,建議列入不良記錄。二、安全環(huán)保監(jiān)理一、 安全環(huán)保監(jiān)理的宗旨為“安全事故零指標(biāo)”。二、 安全環(huán)保監(jiān)理的方針:“安全第一、預(yù)防為主”、“安全事故零指標(biāo)”是本工程安全監(jiān)理工作的最高方針。三、 安全環(huán)保監(jiān)理工作的原則:1、 管生產(chǎn)必須管安全2、 安全具有否決權(quán)3、 職業(yè)安全衛(wèi)生“三同時(shí)”4、 事故處理的“四不放過(guò)”四、 安全環(huán)保監(jiān)理工作的組織原則為:以總監(jiān)為第一責(zé)任人,各部門負(fù)責(zé)人、駐地為本

27、部門的安全負(fù)責(zé)人,安全監(jiān)理工程師為直接負(fù)責(zé)人,各合同段項(xiàng)目部設(shè)置專職安全人員,具體負(fù)責(zé)本單位的安全環(huán)保工作。五、 本工程安全環(huán)保監(jiān)理目標(biāo)為:“四無(wú)一杜絕”和“一創(chuàng)建”。六、 安全環(huán)保監(jiān)理工作紀(jì)律:1、 遵守國(guó)家的法律和政府的有關(guān)條例、規(guī)定和辦法等。2、 認(rèn)真履行工程建設(shè)監(jiān)理合同所承諾的義務(wù)和承擔(dān)約定的責(zé)任。3、 堅(jiān)持公正的立場(chǎng),公平的處理有關(guān)各方的爭(zhēng)議。4、 堅(jiān)持科學(xué)的態(tài)度和實(shí)事求是的原則。5、 在堅(jiān)持按監(jiān)理合同的規(guī)定向業(yè)主提供技術(shù)服務(wù)的同時(shí),幫助被監(jiān)理者完成其擔(dān)負(fù)的建設(shè)任務(wù)。6、 不以個(gè)人的名義在報(bào)刊上刊登承攬監(jiān)理業(yè)務(wù)的廣告。7、 不得損害他人聲譽(yù)。8、 不泄漏所監(jiān)理工程需保密的事項(xiàng)。9、

28、不在任何承建商或材料設(shè)備供應(yīng)商中兼職。10、 不擅自接受業(yè)主額外的津貼,也不接受被監(jiān)理單位的任何津貼,不接受可能導(dǎo)致判斷不公的報(bào)酬。七、 監(jiān)理人員守則1、 嚴(yán)格遵守監(jiān)理規(guī)范,做到“嚴(yán)格監(jiān)理、熱情服務(wù) 、秉公辦事、一絲不茍”。2、 廉潔監(jiān)理、不吃、不拿、不卡、不要。3、 不介入施工單位購(gòu)進(jìn)原材料,施工人員參加等事項(xiàng)。4、 工作時(shí)間不準(zhǔn)飲酒,嚴(yán)禁酒后上崗。5、 努力鉆研業(yè)務(wù)知識(shí),學(xué)習(xí)合同文件、規(guī)范標(biāo)準(zhǔn)、熟悉圖紙,不斷提高業(yè)務(wù)水平。6、 安心監(jiān)理工作,吃苦耐勞,以駐地為家。7、 認(rèn)真做好各項(xiàng)監(jiān)理記錄,及時(shí)向上級(jí)匯報(bào)工程中出現(xiàn)的問(wèn)題,重大問(wèn)題不得私自處理。8、 改進(jìn)工作作風(fēng),提高辦事效率,樹(shù)立監(jiān)理公司良好形象。9、 遵守監(jiān)理處制定的各項(xiàng)生活、作息制度。八、 安全環(huán)保監(jiān)理規(guī)定1、 安全工程師職責(zé)(1) 在駐地監(jiān)理工程師指導(dǎo)下主持監(jiān)理處日常安全監(jiān)理工作。(2) 審查承包單位提出的安全技術(shù)措施,并監(jiān)督實(shí)施。(3) 編制項(xiàng)目安全監(jiān)理細(xì)則。(4) 組織定期的項(xiàng)目安全檢查,整理記錄,對(duì)安全隱患進(jìn)行監(jiān)督整改、驗(yàn)收。(5) 參加和協(xié)調(diào)專業(yè)監(jiān)理工程師對(duì)安全工進(jìn)行旁站巡視,平行檢查監(jiān)理,作好記錄。(6) 監(jiān)督承包單位按規(guī)定搭設(shè)安全設(shè)施,施工機(jī)械正確操作使用。(7) 檢查分部、分項(xiàng)工程安全狀況和簽署安全評(píng)價(jià)。(8) 參加安

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論