版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、 SH/T3903-2004附錄A Attachment A(規(guī)范性附錄)(Regulatory Attachment)承包單位用表 Forms for Construction ContractorA.1 表SH/T3903A.1A.14給出了施工階段監(jiān)理工作承包單位用表格式,表號(hào)與名稱(chēng):-SH/T 3903A.1 工程開(kāi)工/復(fù)工報(bào)審表-SH/T 3903A.2 施工組織設(shè)計(jì)(方案)報(bào)審表-SH/T 3903A.3 包單位資格報(bào)審表-SH/T 3903A.4 報(bào)驗(yàn)申請(qǐng)表-SH/T 3903A.5 工程款支付申請(qǐng)表-SH/T 3903A.6 監(jiān)理工程師通知回復(fù)單-SH/T 3903A.7 工程
2、臨時(shí)延期申請(qǐng)表-SH/T 3903A.8 費(fèi)用索賠申請(qǐng)表-SH/T 3903A.9 工程材料/構(gòu)配件/設(shè)備報(bào)審表-SH/T 3903A.10 工程竣工報(bào)驗(yàn)單-SH/T 3903A.11 施工進(jìn)度計(jì)劃報(bào)審表-SH/T 3903A.12 工程質(zhì)量事故處理方案報(bào)審表-SH/T 3903A.13 主要施工設(shè)備進(jìn)場(chǎng)報(bào)審表-SH/T 3903A.14 單機(jī)試車(chē)申請(qǐng)表A.2 表SH/T3903A.15A.16給出了勘察/設(shè)計(jì)階段監(jiān)理工作承包單位用表格式,表號(hào)與名稱(chēng):-SH/T 3903A.15 勘察/設(shè)計(jì)費(fèi)用支付報(bào)審表-SH/T 3903A.16 勘察/設(shè)計(jì)進(jìn)度調(diào)整報(bào)審表SH/T 3903-A.1工程開(kāi)工/
3、復(fù)工報(bào)審表Works Commencement/Resumption Approval Request工程名稱(chēng) Works Title:編號(hào) Item No: 致 (監(jiān)理單位) To (CS/CMC)我單位承擔(dān)的工程,已完成了以下各項(xiàng)工作,具備了開(kāi)工/復(fù)工條件,特此申請(qǐng)施工,請(qǐng)核查并簽發(fā)開(kāi)工/復(fù)工指令。 We have fulfilled the following activities for the work contracted by us, the works commencement/works resumption conditions are available,therefor
4、e the construction is applied hereby, please review and issue works commencement/works resumption orders.附Attached:1 開(kāi)工報(bào)告 commencement Report;2 證明文件 Supporting documents。承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project Manage 日 期Date 審查意見(jiàn)Review Comments:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief Supervision Engineer 日 期Date SH/T 3
5、903-A.2施工組織設(shè)計(jì)(方案)報(bào)審表Construction Organization Design Approval Request工程名稱(chēng) Works Title:編號(hào) Item No:致 (監(jiān)理單位)To (CS/CMC)我方已根據(jù)施工承包合同的有關(guān)規(guī)定完成了工程施工組織設(shè)計(jì)(方案)的編制,并經(jīng)我單位技術(shù)負(fù)責(zé)人審查批準(zhǔn),請(qǐng)予以審查。According to the related regulations of the construction contract, we have completed the preparation of the construction organiz
6、ation design , and it has been reviewed and approved by the technical responsible people of our company, please review it.附Attached:施工組織設(shè)計(jì)/施工方案。Construction Organization Design /Construction Plan。承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project Manager 日 期Date 專(zhuān)業(yè)監(jiān)理工程師審查意見(jiàn) Review comments from discipline supervisi
7、on engineer:專(zhuān)業(yè)監(jiān)理工程師Discipline Supervision Engineer 日 期Date 總監(jiān)理工程師審核意見(jiàn) Review comments from chief supervision engineer:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief Supervision Engineer 日 期Date SH/T 3903-A.3分包單位資格報(bào)審表Subcontractor Qualification Approval Request工程名稱(chēng) Works Title: 編號(hào) Item No:致 (監(jiān)理單位)To (CS/CMC)經(jīng)考察,我方認(rèn)為擬選擇的(分
8、包單位)具有承擔(dān)下列工程的施工資質(zhì)和施工能力,可以保證本工程項(xiàng)目按合同的規(guī)定進(jìn)行施工。分包后,我方仍承擔(dān)承包合同的全部責(zé)任。請(qǐng)予以審查和批準(zhǔn)。After investigation, we think the proposed (subcontractor) has the qualification and capability for contracting the following works, and can assure that this works will be constructed as per the contract regulations. After subcon
9、tracting this works, we still hold the whole responsibilities of the lump sum contractor. Please review and approve it.附Attached:1 分包單位資質(zhì)材料 Subcontractor Qualification Documents;2 分包單位業(yè)績(jī)材料 Subcontractor Performance Documents。分包工程名稱(chēng)(部位)Subcontracted works(Location)工程數(shù)量Works Quantity擬分包工程合同額Contract p
10、rice of proposed subcontracted works分包工程占全部工程Percentage of subcontracted works合 計(jì) Totals承包單位(章)Contractor (Chop)項(xiàng)目經(jīng)理Project manager 日 期Date 專(zhuān)業(yè)監(jiān)理工程師審查意見(jiàn) Review comments from discipline supervision engineer:專(zhuān)業(yè)監(jiān)理工程師Discipline Supervision Engineer 日 期 Date 總監(jiān)理工程師審核意見(jiàn) Review comments from chief supervisi
11、on engineer: 項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief Supervision Engineer 日 期Date SH/T 3903-A.4報(bào)驗(yàn)申請(qǐng)表Inspection Request工程名稱(chēng) Works Title: 編號(hào) Item No: 致 (監(jiān)理單位)To (CS/CMC)我單位已完成了工作,經(jīng)自檢合格,現(xiàn)報(bào)上該工程報(bào)驗(yàn)申請(qǐng)表,請(qǐng)予以審查和驗(yàn)收。We have completed the works, after the self inspection, the works is on spec, now we submit the inspection requ
12、est for this works, please inspect and accept.附Attached:承包單位(章)Contractor (Chop)項(xiàng)目經(jīng)理Project Manager 日 期Date 審查意見(jiàn) Review comments:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總/專(zhuān)業(yè)監(jiān)理工程師 Chief/discipline supervision engineer 日 期Date SH/T 3903-A.5工程款支付申請(qǐng)表Works Payment Request工程名稱(chēng) Works Title:編號(hào) Item No: 致 (監(jiān)理單位)To (CS/CMC)我方已完成了工作,按施工
13、承包合同的規(guī)定,建設(shè)單位應(yīng)在年月日前支付該項(xiàng)工程款共(大寫(xiě))(小寫(xiě)),現(xiàn)報(bào)上工程付款申請(qǐng)表,請(qǐng)予以審查并開(kāi)具工程款支付證書(shū)。We have completed the Works, according to the contract regulations, the owner should make the payment of total of (amount in words), (say ) for this works before . Now we submit the Works Payment Request, please review and issue the works
14、 payment certificate.附件Attached:1 工程量清單 Quantity List;2 計(jì)算方法 Calculation Methods。 承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project Manager 日 期Date SH/T 3903-A.6監(jiān)理工程師通知回復(fù)單Correspondence to Supervision Engineer Notice工程名稱(chēng) Works Title: 編號(hào) Item No: 致 (監(jiān)理單位)To (CS/CMC)我方接到編號(hào)為的監(jiān)理工程師通知后,已按要求完成了工作,現(xiàn)報(bào)上,請(qǐng)予以復(fù)查。After we rece
15、ived the supervision engineer notice of , we have completed the jobs,now we submit it , please recheck.詳細(xì)內(nèi)容 Detailed contents:承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date 復(fù)查意見(jiàn) Recheck comments:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總/專(zhuān)業(yè)監(jiān)理工程師Chief/discipline supervision engineer 日 期Date SH/T 3903-A.7工程臨時(shí)延期申請(qǐng)表Works Tempo
16、rary Delay Request工程名稱(chēng) Works Title:編號(hào) Item No: 致 (監(jiān)理單位)To (CS/CMC)根據(jù)承包合同條款條的規(guī)定,由于原因,我方申請(qǐng)工程延期,請(qǐng)予以批準(zhǔn)。According to clauses of the construction contract clauses , due to the reasons, we request the works delay, please approve it.合同交工日期Contract As Build Date:申請(qǐng)延長(zhǎng)交工日期Delayed As Build Date:附件Attached:1 工程延
17、期的依據(jù)及工期計(jì)算 Works delay basis and working period calculation:2 證明材料 Supporting documents。承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date SH/T 3903-A.8費(fèi)用索賠申請(qǐng)表Cost Claim Request工程名稱(chēng) Works Title: 編號(hào) Item No: 致 (監(jiān)理單位)To (CS/CMC)根據(jù)承包合同條款條的規(guī)定,由于的原因,我方要求索賠金額(大寫(xiě)),請(qǐng)予以批準(zhǔn)。According to clauses of the construct
18、ion contract ,due to the reasons, we request the cost claim of (amount in words) ,please approve it.索賠的詳細(xì)理由及經(jīng)過(guò) Detailed cause and course of the claim:索賠金額的計(jì)算 Calculation of claimed amount:附Attached:證明材料 Supporting documents承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date SH/T 3903-A.9工程材料/構(gòu)配件/設(shè)備報(bào)審
19、表Works Materials/Components/Equipment Inspection Request工程名稱(chēng) Works Title:編號(hào) Item No:致 (監(jiān)理單位)To (CS/CMC)我方于年月日進(jìn)場(chǎng)的工程材料/構(gòu)配件/設(shè)備數(shù)量如下(見(jiàn)附件)?,F(xiàn)將質(zhì)量證明文件及自檢結(jié)果報(bào)上,擬用于下述部位:,請(qǐng)予以審核。We have mobilized the following materials/components/equipment for the works on its quantity is listed below(see the attachments).Now, w
20、e submit the quality documents and our self inspection results, The proposed locations for use as follows: ,Please review it. 附件Attached:1 數(shù)量清單 Quantity List;2 質(zhì)量證明文件 Quality Documents;3 自檢結(jié)果 Self Inspection Results。承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date 審查意見(jiàn)Review comments:經(jīng)檢查上述工程材料/構(gòu)配件
21、/設(shè)備,符合/不符合設(shè)計(jì)文件和規(guī)范的要求,準(zhǔn)許/不準(zhǔn)許進(jìn)場(chǎng),同意/不同意使用于擬定部位。After the inspection, the above materials /components/equipment,meet/do not meet the requirements of the design documents and specifications. site mobilization is allowed/site mobilization is not allowed, use for the proposed locations is allowed /not allo
22、wed.項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總/專(zhuān)業(yè)監(jiān)理工程師Chief/discipline supervision engineer 日 期Date SH/T 3903-A.10工程竣工報(bào)驗(yàn)單Works Completion Inspection Request工程名稱(chēng) Works Title: 編號(hào) Item No: 致 (監(jiān)理單位)To (CS/CMC)我方已按合同要求完成了工程,經(jīng)自檢合格,請(qǐng)予以檢查和驗(yàn)收。We have completed the works according to the requirements of the contract,after the self check
23、, it is on spec, please inspect and accept.附Attached:承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date 審查意見(jiàn)Review comments:經(jīng)初步驗(yàn)收,該工程:after the preliminary inspection and acceptance, this works:1 符合/不符合我國(guó)現(xiàn)行法律、法規(guī)要求;meet/not meet the requirements of the current state laws and regulations.2 符合/不符合我國(guó)現(xiàn)行工
24、程建設(shè)標(biāo)準(zhǔn);meet/not meet the requirements of the current national standards.3 符合/不符合設(shè)計(jì)文件要求;meet/not meet the requirements of the design documents.4 符合/不符合施工合同要求。Meet/not meet the requirements of the construction contract.綜上所述,該工程初步驗(yàn)收合格/不合格,可以/不可以組織正式驗(yàn)收。Based on the above points, the preliminary inspectio
25、n and acceptance of this works is on spec/off spec, formal inspection and acceptance can be/can not be organized .項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH/T 3903-A.11施工進(jìn)度計(jì)劃報(bào)審表Construction Schedule Approval Request工程名稱(chēng) Works Title:編號(hào) Item No:致 (監(jiān)理單位)To (CS/CMC)我方已根據(jù)承包合同的有關(guān)規(guī)定編制完成了年月日 至
26、年月日的:We have completed the preparations of the following schedules from to according to the related regulations of the construction contract:1 工程施工總進(jìn)度計(jì)劃 Project Construction Overall Schedule;2 工程施工月進(jìn)度計(jì)劃 Project Construction Monthly Schedule;3 工程施工周進(jìn)度計(jì)劃 Project Construction Weekly Schedule;4 計(jì)劃 sched
27、ule。并經(jīng)我單位技術(shù)負(fù)責(zé)人審查批準(zhǔn),現(xiàn)報(bào)上,請(qǐng)予以審查。我們將嚴(yán)格按審查通過(guò)的進(jìn)度計(jì)劃組織施工。It has been reviewed and approved by our technical responsible people. Now we submit it to you, please review. We will organize the construction by strictly following the approved schedule.附Attached:圖表、說(shuō)明書(shū)共頁(yè)。Drawings and charts, instruction books, tot
28、ally in pages.承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date 審查意見(jiàn) Review comments:同意此進(jìn)度計(jì)劃。Approved this schedule.不同意此進(jìn)度計(jì)劃,請(qǐng)按以下要求修改再報(bào):Not approved this schedule, please modify it according to the following requirements, and resubmit it:專(zhuān)業(yè)監(jiān)理工程師Discipline supervision engineer 日 期Date 審核意見(jiàn) Review co
29、mments:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH/T 3903-A.12工程質(zhì)量事故處理方案報(bào)審表Works Quality Incident Solution Approval Request工程名稱(chēng) Works Title: 編號(hào) Item No: 致 (監(jiān)理單位)To (CS/CMC)年月日在(工程部位)發(fā)生 工程質(zhì)量事故,已于月日發(fā)出工程質(zhì)量事故報(bào)告(編號(hào):),經(jīng)我方組織對(duì)該質(zhì)量事故進(jìn)行詳細(xì)調(diào)查、分析和研究,現(xiàn)將詳情及處理方案報(bào)上,請(qǐng)審查。On , at (works location), there was
30、 works qualtity incident, the works quality incident report (item No ) has been issued on , after we investigated, analyzed and studied it, now we submit the details and solution to you, please review.附Attached: 事故詳情及處理方案 Incident Details and Solution。承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Da
31、te 審核意見(jiàn) Review comments:同意此事故處理方案。Approved the solution for this incident.不同意此事故處理方案,修改后再報(bào)。Not approved the solution for this incident,please modify it and resubmit.按以下意見(jiàn)修改后執(zhí)行:To implement it after modified as per the following comments.項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH/T 3903
32、-A.13主要施工設(shè)備進(jìn)場(chǎng)報(bào)審表Major Construction Equipment Mobilization Approval Request工程名稱(chēng) Works Title: 編號(hào) Item No: 致 (監(jiān)理單位)To (CS/CMC)我方承擔(dān)的工程,按合同規(guī)定的主要施工設(shè)備、機(jī)具及檢測(cè)設(shè)備、工具擬進(jìn)場(chǎng),并經(jīng)自檢合格,請(qǐng)查驗(yàn)。We contracted the works, we are going to mobilize the major construction equipment and tools as well as the inspection equipment an
33、d tools specified by the contract, after the self inspection, they are on spec, please inspect.附Attached:承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date 審查意見(jiàn) Review comments:經(jīng)檢查上述施工設(shè)備、機(jī)具及檢測(cè)設(shè)備、工具,符合/不符合施工組織設(shè)計(jì)文件和相關(guān)要求,準(zhǔn)許/不準(zhǔn)許進(jìn)場(chǎng)。According to our inspection, the above equipment, tools and the inspectio
34、n equipment and tools meet/do not meet the requirements of the construction organization design documents and other rules, site mobilization allowed /site mobilization not allowed.不準(zhǔn)許進(jìn)場(chǎng)原因如下:The reasons for not allowing site mobilization are listed below:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總/專(zhuān)業(yè)監(jiān)理工程師Chief/discipline supervi
35、sion engineer 日 期Date SH/T 3903-A.14單機(jī)試車(chē)申請(qǐng)表Pre-commissioning Request工程名稱(chēng) Works Title:編號(hào) Item No: 致 (監(jiān)理單位)To (CS/CMC)我方已按合同要求完成了試車(chē)準(zhǔn)備工作,經(jīng)自檢合格,請(qǐng)予以檢查,并準(zhǔn)予試車(chē)。We have completed the commissionig preparations according to the contract requiremetns, after the self check, the preparations are on spec, please c
36、heck and approve the Pre-commissioning test.附Attached:承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date 審核意見(jiàn) Review comments:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總/專(zhuān)業(yè)監(jiān)理工程師Chief/discipline supervision engineer 日 期Date SH/T 3903-A.15勘察/設(shè)計(jì)費(fèi)用支付報(bào)審表Geotech/Design Payment Approval Request工程名稱(chēng) Works Title:編號(hào) Item No:致 (監(jiān)理單位)To (C
37、S/CMC)根據(jù)委托設(shè)計(jì)合同第條款,我單位已于年月日交付設(shè)計(jì)文件,建設(shè)單位應(yīng)支付該項(xiàng)勘察設(shè)計(jì)費(fèi)共(大寫(xiě))(小寫(xiě):),請(qǐng)予以審核。According to clauses of the Entrusted Design Contract, we have submitted the design documents on ,Owner should make the payment of (amount in words)(say:)for geotechdesign, please review.附Attached:勘察設(shè)計(jì)單位(章)Geotech/Design Unit(Chop)項(xiàng) 目 經(jīng)
38、 理Project manager 日 期Date 審核意見(jiàn) Review comments:經(jīng)審核同意按合同第條款支付勘察設(shè)計(jì)費(fèi)共(大寫(xiě))(小寫(xiě):)。After reviewed, the total payment of (amount in words)(say:)for geotechdesign fees are approved to be made as per clause of the contract.項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH/T 3903-A.16勘察設(shè)計(jì)進(jìn)度調(diào)整報(bào)審表Geotech/
39、Design Schedule Change Approval Request工程名稱(chēng) Works Title:編號(hào) Item No:致 (監(jiān)理單位)To (CS/CMC)我單位承擔(dān)的工程的 勘察/基礎(chǔ)工程設(shè)計(jì)/詳細(xì)工程設(shè)計(jì)原定完成,現(xiàn)擬調(diào)整到完成,請(qǐng)予以審批。Geotech/BED/DED of the works contracted by us was scheduled to be completed on ,Now is rescheduled to completed on ,Please review and approve it.調(diào)整原因 Change reasons:勘察設(shè)計(jì)
40、單位(章)Geotech/Design Unit(Chop)計(jì) 劃 工 程 師Planning engineer 項(xiàng) 目 經(jīng) 理Project manager 日 期Date 審查意見(jiàn) Review comments:同意調(diào)整。Change approved.不同意調(diào)整.Change not approved.根據(jù)下列要求調(diào)整:To be changed as per the following requirements:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date 附錄BAttachment B(規(guī)范性附錄)(Regulatory
41、 Attachment)監(jiān)理單位用表 Forms for CS/CMCB.1 表SH/T3903B.1B.8給出了段監(jiān)理單位用表格式,表號(hào)與名稱(chēng):-SH/T 3903B.1 監(jiān)理工程師通知單;-SH/T 3903B.2 工程暫停令;-SH/T 3903B.3 工程款支付證書(shū);-SH/T 3903B.4 工程臨時(shí)延期審批表;-SH/T 3903B.5 工程最終延期審批表;-SH/T 3903B.6 費(fèi)用索賠審批表;-SH/T 3903B.7 監(jiān)理備忘錄;-SH/T 3903B.8 監(jiān)理日志。B.2 表SH/T3903B.9.1B.9.6給出了段監(jiān)理月報(bào)用表格式,編號(hào)與名稱(chēng)-SH/T 3903B.
42、9.1 監(jiān)理月報(bào)封面;-SH/T 3903B.9.2 月工程情況概要;-SH/T 3903B.9.3 月工程質(zhì)量控制情況評(píng)析;-SH/T 3903B.9.4 月工程進(jìn)度控制情況評(píng)析;-SH/T 3903B.9.5 月HSE管理情況評(píng)析;-SH/T 3903B.9.6 月工程費(fèi)用控制情況評(píng)析。SH/T 3903-B.1監(jiān)理工程師通知單Supervision Engineer Notice工程名稱(chēng) Works Title: 編號(hào) Item No:致 (承包單位)To (Contractor)事由Subject:內(nèi)容Contents:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總/專(zhuān)業(yè)監(jiān)理工程師Chief/disci
43、pline supervision engineer 日 期Date SH/T 3903-B.2工程暫停令Works Suspension Order工程名稱(chēng) Works Title:編號(hào) Item No:致 (承包單位)To (CS/CMC)由于原因,現(xiàn)通知你方必須于年月日時(shí)起,對(duì)本工程的部位(工作)實(shí)施暫停施工,并按下述要求做好各項(xiàng)工作:Due to ,we notify you now to stop the construction on the locations (jobs) of for this works, please do the jobs as per the foll
44、owing requirements.項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH/T 3903-B.3工程款支付證書(shū)Works Payment Certificate工程名稱(chēng) Works Title: 編號(hào) Item No: 致 (建設(shè)單位)To (CS/CMC)根據(jù)承包合同的規(guī)定,經(jīng)審核承包單位的付款申請(qǐng)和報(bào)表,并扣除有關(guān)款項(xiàng),同意本期支付工程款共(大寫(xiě))(小寫(xiě):)。請(qǐng)按合同規(guī)定及時(shí)付款。According to the contract regulations, after reviewed the payment re
45、quest and reporting tables and deducted the related costs, we agree with the payment of(amount in words)(say:)。Please make the payment per the contract in a timely manner.其中Among which:1 承包單位申報(bào)款為:The requested payment of contractor: 2 經(jīng)審核承包單位應(yīng)得款為: The reviewed payment of contractor: 3 本期應(yīng)扣款為: The de
46、ducted payment: 4 本期應(yīng)付款為: The due payment: 附件Attached:1 承包單位的工程付款申請(qǐng)表及附件 Contractor Works Payment Request and Attachments;2 項(xiàng)目監(jiān)理機(jī)構(gòu)審查記錄 CS/CMC Review Records。項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH/T 3903-B.4工程臨時(shí)延期審批表Works Delay Temporary Approval工程名稱(chēng) Works Title: 編號(hào) Item No:致 (承包單位)T
47、o (Contractor)根據(jù)承包合同條款條的規(guī)定,我方對(duì)你方提出的工程延期申請(qǐng)(第號(hào))要求延長(zhǎng)工期日歷天的要求,經(jīng)過(guò)審核評(píng)估:According to clausesof the contract, we reviewed your Works Delay Request (No.)of for the durations of calendar days: 暫時(shí)同意工期延長(zhǎng)日歷天。使交工日期(包括已指令延長(zhǎng)的工期)從原來(lái)的年月日延遲到年月日。請(qǐng)你方執(zhí)行。 Delay of calendar days approved temporarily , which will delay the
48、as build date (included the instructed delayed working period) from to Please follow it. 不同意延長(zhǎng)工期,請(qǐng)按約定交工日期組織施工。 Delay not approved, please organize the construction as per the agreed as built date.說(shuō)明Notes:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH/T 3903-B.5工程最終延期審批表Works Delay Final Ap
49、proval工程名稱(chēng) Works Title:編號(hào) Item No:致 (承包單位)To (Contractor)根據(jù)施工合同條款條的規(guī)定,我方對(duì)你方提出的工程延期申請(qǐng)(第號(hào))要求延長(zhǎng)工期日歷天的要求,經(jīng)過(guò)審核評(píng)估:According to clauses of the contract , we reviewed your Works Delay Request (No.) of for the durations of calendar days: 最終同意工期延長(zhǎng)日歷天。使交工日期(包括已指令延長(zhǎng)的工期)從原來(lái)的年月日延遲到年月日。請(qǐng)你方執(zhí)行。Delay of calendar days
50、 approved finally, which will delay the as build date (included the instructed delayed working period) from to Please follow it. 不同意延長(zhǎng)工期,請(qǐng)按約定交工日期組織施工。 Delay not approved, please organize the construction as per the agreed as built date.說(shuō)明Notes:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH
51、/T 3903-B.6費(fèi)用索賠審批表Cost Claim Approval工程名稱(chēng) Works Title:編號(hào) Item No:致 (承包單位)To (Contractor)根據(jù)承包合同條款條的規(guī)定,你方提出的費(fèi)用索賠申請(qǐng)(第號(hào)),索賠(大寫(xiě)),經(jīng)我方審核評(píng)估:According to clauses of the contract, we have reviewed and assessed your cost claim request (No. ) with sum of (amount in words):不同意此項(xiàng)索賠。This claim not approved同意此項(xiàng)索賠,金額為(大寫(xiě))。This claim approved, the sum (amount in words)理由Reasons:索賠金額
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 教育類(lèi)課題申報(bào)書(shū)分工
- 2018贛州課題申報(bào)書(shū)
- 合同范本剪輯制作
- 育人平臺(tái)課題申報(bào)書(shū)
- 旅游教改課題申報(bào)書(shū)范本
- 教改研究課題申報(bào)書(shū)
- 下浮類(lèi)合同范本
- 痛經(jīng)課題申報(bào)書(shū)
- 單位全供貨合同范本
- 合同范例軟件全
- 2025年湖南國(guó)防工業(yè)職業(yè)技術(shù)學(xué)院?jiǎn)握新殬I(yè)技能測(cè)試題庫(kù)完整版
- 過(guò)敏性休克完整版本
- DBJ15 31-2016建筑地基基礎(chǔ)設(shè)計(jì)規(guī)范(廣東省標(biāo)準(zhǔn))
- 2024年益陽(yáng)醫(yī)學(xué)高等專(zhuān)科學(xué)校單招職業(yè)適應(yīng)性測(cè)試題庫(kù)及答案解析
- 城鎮(zhèn)詳細(xì)設(shè)計(jì)控制性詳細(xì)規(guī)劃
- 智能垃圾桶系統(tǒng)的設(shè)計(jì)論文
- 質(zhì)量管理體系過(guò)程識(shí)別矩陣圖及與條款對(duì)照表
- 北碚區(qū)幼兒園
- 9宮格數(shù)獨(dú)題(word可打印)
- 2021年度錨索張拉機(jī)具及錨桿拉力計(jì)技術(shù)規(guī)格書(shū)
- 2022年人力資源管理師課程表
評(píng)論
0/150
提交評(píng)論