H1263船ABS意見_第1頁
H1263船ABS意見_第2頁
H1263船ABS意見_第3頁
H1263船ABS意見_第4頁
全文預覽已結(jié)束

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、SHANGHAI JIANGNAN-CHANGXING SHIPYARD SITE OFFICE FAX:66996299TEL: 66996966 DATE:12 OCT 2012Subject: SCS H1263 Remaining Outstanding CommentsWith regard to the subject hull and insofar as Classification is concerned, the following comments are to be dealt with to the satisfaction of the attending Sur

2、veyor: 1. A USCG placard to be posted in the vicinity of oily water separator, overboard connection on port and starboard of upper deck, and a conspicuous place in Engine control room. 美國海岸警衛(wèi)隊防止油污染警告牌張貼于油水分離器、機艙控制室、主甲 板左右油污水排舷外接頭旁。(機調(diào))2. The IMO number fit on the No.5 Cargo hold should to be correct

3、ed.位于5 號貨艙的IMO number 需改正。(搭載)3. All self-closing device are to be completed such as E/R door, Emergency escape route doors and all doors in engine casing etc.機艙棚和應急逃生通道所有閉門器須安裝好。(模塊) 4. E/R emergency fire pumps: A caution plate to state that “Fire Pump Valves To Be Kept Open For Remote Starting”.應急

4、消防泵間張貼警告牌“Fire Pump Valves To Be Kept Open For Remote Starting”。(機調(diào),設(shè)計)5. Portside windlass normal noise should to be recheck.左錨機有噪音需重新檢查。 (船裝;配套) 6. Name plate of sounding/temperature measuring pipes for ballast tank, cargo holds bilge well and fuel oil tank to be fitted on upper deck. 主甲板上所有測深管和測溫

5、管需標明銘牌。(設(shè)計;船裝)7. Main engine Barred speed rang RPM: Tachometers should marked with the barred speed range and warning notices posted at all propulsion control station. 集控室、應急操控臺和駕駛臺主機轉(zhuǎn)速表須明顯標明主機臨界轉(zhuǎn)速值。 并張貼警告牌。(機調(diào),設(shè)計) 8. The expansion connecting flange of M/E, A/E and boiler exhaust pipe to be effectiv

6、ely encased with insulated cover. 主機、輔機和鍋爐排煙管膨脹接頭需包扎絕緣材料。(模塊) 9. The CO2 nozzles for engine control room is hidden by ceiling need to refit and to be painted red colour.控制室CO2 噴頭重裝。(機調(diào)) 10. Open/Close indicator to be fitted to all overboard valves. 機艙 所有排舷外閥需安裝開關(guān)狀態(tài)指示桿。(機調(diào)) 11. The name plate and ope

7、rating instructions of 2pcs hydraulic sea chest inlet valves (P&S) and 1pc ballast overboard valve (S) on the 2nd deck to be posted.位于機艙二甲板的三個手動液壓泵需清楚標明各自所控制的液動閥。(機調(diào)) 12. Oily water separator overboard discharge valve requires locking device to prevent bilge discharge overboard while vessel in p

8、ort. 油水分離器出海閥靠泊時需鎖住。(機調(diào)) 13. The ships name, call sign to be marked on the SART and TWO-WAY VHF. 船名和呼叫號應標在SART和TWO-WAY VHF 上。(模塊) 14. The ships name, call sign, MMSI, INMARSAT ID to be posted near the GMDSS radio equipment.GMDSS旁需張貼有船名、呼叫號、MMAI號和INMARSAT號的牌子。(模塊) 15. one air pipe should to be refitt

9、ed on the way of steering room. 舵機間空氣管需重裝。(機調(diào)) 16. The following inspections are to be reminded: a) Life saving and fire fighting Equipment b) Loading Instrument 所有救生,消防設(shè)備和裝載儀須配備齊全,以后安排檢驗。(設(shè)計;模塊;機調(diào);船裝) 17. The following drawings are to be submitted and approved by ABS Technique.a) Stability Booklet

10、b) Fire Control Plan 提供ABS認可的 穩(wěn)性報告和防火控制圖。(設(shè)計) 18. Supply fuel oil report of sea trial. 提供試航燃油報告。(配套) 19. A notice “NO BALLAST OPERATION DURING THE LIFEBOAT LAUNCHING” to be posted on the embarkation station, Ballast control room and bridge. 救生艇登艇站、壓載房和駕駛臺應張貼“NO BALLAST OPERATION DURING THE LIFEBOAT

11、LAUNCHING”警告。(設(shè)計:模塊;船裝) 20. Rubber mats to be installed on forward and after sides of main and emergency switchboard. 主配電板和應急配電板前后地板需鋪絕緣墊片。 (機調(diào);模塊) 21. Main engine steam smothering system valves to be painted red and system diagram including instructions are to be posted in a conspicuous location. 主

12、機掃氣箱層的蒸汽滅火閥需油紅色并張貼操作說明書。(機調(diào);涂裝) 22. Local water mist system suction valve ( fresh water tank outlet valve) should be placard “keep open” and locked in open position. 淡水柜出口閥(水基滅火進口閥)張貼“keep open”警告牌,并鎖在開的位置。 (機調(diào)) 23Steering gear operating instructions are to be permanently posted on navigation bridge

13、 and emergency steering gears operating instruction to be posted in the steering gear side.舵機操作方法需張貼在駕駛臺和應急操舵方法需張貼在舵機房。(機調(diào);模塊) 24.CO2 certificates and service engineer report shall be submitted after completion of test and the certificates/report retained on board.二氧化碳證書和試驗報告應保留在船上。(配套;品保) 25.The br

14、eak glass for all fire button to be installed with “break glass” 所有火警按鈕應使用同一型號的玻璃罩。(機調(diào)) 26.All emergency stop button to be installed,“ break glass”.所有應急停止按鈕應安裝好玻璃罩。(機調(diào)) 27.All electrical socket caps, service air pipe of E/R, accommodation, upper deck and fore castle, covers to be installed. 機房,生活區(qū),上

15、甲板和船首樓所有電線插座和日用空氣管安裝好蓋子。(模塊;機調(diào);船裝)28. Emergency fire pump suction/discharge valves are to be locked in open position , indicated with “KEEP OPEN” and painted in red paint. 應急救火泵進/出口閥應固定在開的位置,并有開/關(guān)指示標志,閥還需油 紅色(機調(diào);涂裝)29. E/R fire pump: A caution plate to state that “Fire Pump Valves To Be Kept Open Fo

16、r Remote Starting”.應急救火泵上方應張貼一張“Fire Pump Valves To Be Kept Open For Remote Starting”警示牌。(設(shè)計;機調(diào)) 30. Warning notice to be posted in way of fuel oil vent pipes on main deck, “No Open Flame”. 主甲板上油倉透氣管張貼“No open Flame” 警示牌。(設(shè)計;船裝) 31. EEBD and Immersion Suits are to be placed according to approved “Fi

17、re Control Plan”.應急逃生呼吸器和防寒服應按消防控制圖放好。(模塊) 32. The cover of all sounding pipe for waste oil tank, bilge tank, M/E sump tank, F.O draining tank, L.O draining tank,F(xiàn).O /L.O sludge tank ETC to be installed.機房污油柜,污水柜,主機滑油深柜,燃油/滑油泄放柜,燃油/滑油油渣柜測深管蓋子應裝好。(機調(diào)) 33. All deck and engine room fire hydrants to be

18、installed and painted red color.所有消防栓應安裝好并油紅色。(模塊;機調(diào);船裝;涂裝) 34. Life boat muster posters or signs instruction under emergency Lights. 救生艇的操作說明應張貼在應急照明下面。(船裝) 35. Plugs for scuppers to be provided on Main Deck. 甲板落水孔提供塞子。(船裝) 36.Add fire alarm buzzer on the way of ballast control room. 壓載控制室增加火警蜂鳴器。(

19、船裝;模塊) 37. All vent closures in the engine casing, accommodation, cargo hold cover to be fitted butterfly bolts and nuts 機艙棚,生活區(qū),及倉蓋上所有的通風關(guān)閉器缺少螺栓。(模塊;船裝) 38. The chemical box of dosing pump for sewage treatment plant to be installed.生活污水處理裝置需加裝化學藥品桶。(機調(diào)) 39.1 pc radar transponder to be located inside the free-fa

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論