任務(wù)書(shū)和摘要_第1頁(yè)
任務(wù)書(shū)和摘要_第2頁(yè)
任務(wù)書(shū)和摘要_第3頁(yè)
任務(wù)書(shū)和摘要_第4頁(yè)
任務(wù)書(shū)和摘要_第5頁(yè)
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、中 國(guó) 礦 業(yè) 大 學(xué)本科生畢業(yè)設(shè)計(jì)姓 名: 劉曉亮 學(xué) 號(hào): 03030852 學(xué) 院: 機(jī)電工程學(xué)院 專(zhuān) 業(yè): 機(jī)械工程及自動(dòng)化 設(shè)計(jì)題目: 中煤層采煤機(jī)截割部設(shè)計(jì) 專(zhuān) 題: 指導(dǎo)教師: 楊寅威 職 稱(chēng): 副教授 2007 年 6 月 25 徐州中國(guó)礦業(yè)大學(xué)畢業(yè)設(shè)計(jì)任務(wù)書(shū)學(xué)院 機(jī)電學(xué)院 專(zhuān)業(yè)年級(jí) 機(jī)械工程及自動(dòng)化 學(xué)生姓名 劉曉亮 任務(wù)下達(dá)日期: 2007年 3月 5 日畢業(yè)設(shè)計(jì)日期: 2007年 3月 26 日 至 2007 年 6 月 25日畢業(yè)設(shè)計(jì)題目: 中煤層采煤機(jī)截割部設(shè)計(jì)畢業(yè)設(shè)計(jì)專(zhuān)題題目:畢業(yè)設(shè)計(jì)主要內(nèi)容和要求: 參考參數(shù)截割部功率: 180KW 滾筒截深: 650MM采高范圍

2、: 1.33.0MM 適應(yīng)煤質(zhì)硬度:f<2.5煤層傾角: Y<25 電動(dòng)機(jī)轉(zhuǎn)速: 1460轉(zhuǎn)/分滾筒轉(zhuǎn)速: 45-50轉(zhuǎn)/分頂板中等穩(wěn)定、地板起伏不大液壓無(wú)鏈牽引 設(shè)計(jì)要求1、完成采煤機(jī)總體方案設(shè)計(jì)2、截割部傳動(dòng)及結(jié)構(gòu)設(shè)計(jì)3、完成截割部的組件、零件工作圖設(shè)計(jì)院長(zhǎng)簽字: 指導(dǎo)教師簽字:摘 要在參考國(guó)內(nèi)外有關(guān)中厚煤層采煤機(jī)的情況下,完成了截割電機(jī)功率為180KW總裝機(jī)功率為450KW的截割式滾筒液壓牽引采煤機(jī)的整機(jī)方案設(shè)計(jì)及對(duì)采煤機(jī)截割部進(jìn)行了重點(diǎn)設(shè)計(jì)。主機(jī)身采用整體結(jié)構(gòu)形式,取消了長(zhǎng)螺柱及傳統(tǒng)意義上的螺栓聯(lián)接;此結(jié)構(gòu)簡(jiǎn)單、可靠,且尺寸小,大大的降低了采煤機(jī)的機(jī)身高度。截割部采用四級(jí)傳

3、動(dòng)前三級(jí)為直齒傳動(dòng),第四級(jí)為行星傳動(dòng)。在前三級(jí)的直齒傳動(dòng)利用直齒傳動(dòng)設(shè)計(jì)的一般原理,設(shè)計(jì)出適合截割部的齒輪傳動(dòng)依次分為截一軸系,惰一軸系,截二軸系,截三軸系,惰二軸系;采用了兩個(gè)惰軸系是本設(shè)計(jì)的創(chuàng)新點(diǎn),它即滿足了傳動(dòng)強(qiáng)度的要求又滿足了截割高度對(duì)截割部長(zhǎng)度的要求。在第四級(jí)行星傳動(dòng)中,用運(yùn)2KH行星減速器設(shè)計(jì)的原理,設(shè)計(jì)出適合截割部的一級(jí)2KH型行星減速器,并將它和滾筒直接聯(lián)結(jié),大大簡(jiǎn)化了截割部的設(shè)計(jì),節(jié)省了材料、空間。此外對(duì)截割部上的其它部分如離合器,內(nèi)噴霧系統(tǒng)也進(jìn)行了詳細(xì)設(shè)計(jì)及校合。關(guān)鍵詞:采煤機(jī) 截割部 行星輪減速器ABSTRACTReference to the domestic and

4、international thick seam Shearer circumstances, Cutting completed the electrical power of 180 KW total installed power of 450 KW of cutting-cylinder hydraulic traction Shearer Whole program design and right shearer cutting focus of the Department of Design. Host overall body structure, eliminating a

5、 long stud, and the traditional sense of the bolt; This structure is simple, reliable, and small size, greatly reducing the height of Shearer's fuselage. Cutting Part 4 used to drive before three straight tooth drive, the fourth level of planetary transmission. The former three straight drive ge

6、ar teeth through the direct transmission of the general design principles, designed for cutting the Department of Gear were divided into a closed shaft, the shaft an inert, as of two shaft, up 3 shaft, and inert two shafts; using two inert shaft is the innovation in design, It is a drive to meet the

7、 strength to meet the demands of the cutting height on the cutting Minister degree requirements. In the fourth grade planetary transmission, and use Win two KH planetary reducer design principle, designed for cutting the Department of a two-KH planetary reducer, and it will directly link drum, greatly simplified the cutting of the design, saving materials and space. In addition to cutting the Department of the other parts such as clutch, which spray s

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論