1、無The condensate pipe sizing chartThe condensate pipe sizing chart (Figure 14.3.5) can beused to size any type of condensate line, including:Drain lines containing no flash steam.Lines consisting of two-phase flow, such as trapdischarge lines, which are selected according to thepressures either side
2、of the trap.The chart (Figure 14.3.5):Works around acceptable flash steam velocities of 15- 20 m/s, according to the pipe size and the proportionof flash steam formed.Can be used with condensate temperatures lowerthan the steam saturation temperature, as will be thecase when using thermostatic steam
3、 traps.Is used to size trap discharge lines on full-loadconditions. It is not necessary to consider anyoversizing factors for start-up load or the removal ofnon-condensable gases.無May also be used to estimate sizes for pumped linescontaining condensate below 100C. This will bediscussed in Tutorial 1
4、4.4.Fig. 14.3.5 Condensate pipe sizing chart無Using the condensate pipe sizing chart (Also available inAppendix 14.3.2)Establish the point where the steam and condensate pressuresmeet (lower part of the chart, Figure 14.3.5). From this point, movevertically up to the upper chart to meet the required
5、condensaterate. If the discharge line is falling (non-flooded) and the selection ison or between lines, choose the lower line size. If the discharge lineis rising, and therefore likely to be flooded, choose the upper linesize.Note: The reasoning employed for the sizing of a steam trap isdifferent to
6、 that used for a discharge line, and it is perfectly normalfor a trap discharge line to be sized different to the trap it is serving.However, when the trap is correctly sized, the usual ancillaryequipment associated with a steam trap station, such as isolationvalves, strainer, trap testing chamber,
7、and check valve, can be thesame size as the trapping device selected, whatever the dischargeline size.A steam trap passing a full-load of 1000 kg/h at 6 bar g saturatedsteam pressure through a falling discharge line down to a flashvessel at 1.7 bar g.As the discharge line is non-flooded, the lower f
8、igure of 25 mm isselected from the chart (Figure 14.3.5).無Fig. 14.3.6 A non-flooded pressurised trap discharge line (referto Example 14.3.3)A steam trap passing a full-load of 1000 kg/h at 18 bar g saturatedsteam pressure through a discharge line rising 5 m up to apressurised condensate return line
9、at 3.5 bar g.Add the 0.5 bar static pressure (5 m head) to the 3.5 barcondensate pressure to give 4 bar g backpressure.As the discharge line is rising and thus flooded, the upper figure of32 mm is selected from the chart, (Figure 14.3.5).無Fig. 14.3.7 A flooded trap discharge line (refer to Example14
10、.3.4)A steam trap passing a full-load of 200 kg/h at 2 bar g saturatedsteam pressure through a sloping discharge line falling down to avented condensate receiver at atmospheric pressure (0 bar g).As the line is non-flooded, the lower figure of 20 mm is selectedfrom the chart, (Figure 14.3.5).無Fig. 1
11、4.3.8 A non-flooded vented trap discharge line (refer toExample 14.3.5)A pump-trap passing a full-load of 200 kg/h at 4 bar g saturatedsteam space pressure through a discharge line rising 5 m up to anon-flooded condensate return line at atmospheric pressure.The 5 m static pressure contributes the to
12、tal backpressure of 0.5bar g.As the trap discharge line is rising, the upper figure of 25 mm isselected from the chart, (Figure 14.3.5).無Fig. 14.3.9 A flooded trap discharge line (refer to Example14.3.6)Consider a condensate load of 200 kg/h to a receiver and pump.The pump discharge rate for this me
13、chanical type pump is taken assix times the filling rate, hence, the condensate rate taken for thisexample is 6 x 200 = 1 200 kg/h.Because the condensate will have lost its flash steam content toatmosphere via the receiver vent, the pump will only be pumpingliquid condensate. In this instance, it is only necessary to use thetop part of the chart in Figure 14.3.5. As the line from the pump isrising, the upper figure of 25 mm is chosen.Note: If the pumped line were longer than 100 m, the next largersize must be taken, which for
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 學校校門管理辦法
- 油氣回收改造管理辦法
- 沼液廢水排放管理辦法
- 法人薪資發(fā)放管理辦法
- 法院家具現(xiàn)貨管理辦法
- 注塑產(chǎn)品批次管理辦法
- 涇縣拔尖人才管理辦法
- 測量測繪生產(chǎn)管理辦法
- 濟南小區(qū)租戶管理辦法
- 海事行政裁量管理辦法
- 【2023有效教學設(shè)計原理、策略與評價讀書報告3600字】
- 頂管專項施工方案-人工頂管
- SYNTEC參數(shù)說明手冊
- 2023春國家開放大學-01880組織行為學-期末考試題帶答案
- 2012年度天津市科學技術(shù)獎評審結(jié)果
- 2022年臺州椒江區(qū)輔助警務(wù)人員招聘考試真題及答案
- 第二講土地估價技術(shù)報告難點及技術(shù)要求與處理辦法
- 房屋維修施工方案
- 2023版中國近現(xiàn)代史綱要課件:09第九專題 新民主主義革命偉大勝利
- 保滄高速河間服務(wù)區(qū)建設(shè)項目水資源論證報告(終)
- 海洋資源環(huán)境承載能力監(jiān)測預(yù)警指標體系和技術(shù)方法
評論
0/150
提交評論