1、Six Sigma helps to establish our course and to gauge our pace in the race for total customer satisfaction.Improved Sigma-Rating of ProcessImproved Product or Process QualityReduced Cost of OperationsGreater Customer SatisfactionTraditional Quality Costs(tangible)Lost OpportunityHidden FactoryAdditio

2、nal Costs of Poor Quality(intangible)(Difficult or impossible to measure)COPQ is a function of Sigma Capability InspectionWarrantyScrapReworkRejectsMore SetupsExpediting CostsLost salesLate DeliveryLost Customer LoyaltyExcess InventoryLong Cycle-TimesEngineering Change OrdersProfitTotal Cost to Manu

3、factureand DeliverProductsProfitTheoreticalCostsCost ofPoor QualityCOPQPrice ErosionTheoreticalCostsCost ofPoor QualityCOPQProfitTheoreticalCostsCOPQTimeReject RateHistorical Level ( 0)Natural Variation under 0 (30)Special VariationOptimum Level ( 1)Natural Variation under 1(31)Six Sigma is about im

4、proving profitability; improved quality and efficiency are immediate by-products.Sigma is a statistical unit of measure that reflects process capability. The sigma scale of measure is perfectly correlated to such characteristics as defects-per-unit, parts-per million defective, and the probability o

5、f a failure/error.2308,537366,80746,210523363.4 PPMProcessCapabilityDefects per Million Opp. Point of Inflection1 TUSLp(d)1234563 This is a 6 Sigma ProcessDeliveryPriceQualityCustomerSupplierNeedCycle TimeCostDefectsDoIdentify the Customers NeedCenter around the TargetReduce VariationReduce DefectsT

6、he output (Y) is perceived as a function of the input (X). What is the problem of our focus? Whats our goal? And by when? Whos the customer impacted? What are the CTXs in-concern? Whats the process under investigation?TimeReject RateBaseline NID( 0, 0)Natural Variation (30)Special VariationGoal NID(

7、 1, 1)Natural Variation (31)EntitlementOpportunity for Improvement ()0.7Internal Failure CostsExternal Failure Costs Scrap Cost to Customer Rework Warranty Cost Supplier Scrap & Rework Returned MaterialAppraisal CostsPrevention Costs Inspection Quality Planning Testing Process Planning Quality A

8、udits Process Control Initial & Maintenance Costs of Training Test & Inspection EquipmentOpportunity CostsHard Savings Potential Savings Soft Savings the focus and extent of the problem, based on measures of the process, the key data required to narrow the problem to its major factors or vit

9、al few root causes.Defect Rate = # Defects / # Units = 7 / 5 = 1.4 dpu1. Arm Height2. Arm thickness3. Bore hole Dia4. Swgae hole Dia5. Roughness6. Teardrop profile7. Roll8. PitchOpportunities per Unit = 8Number of Opportunities= Opportunities per Unit Number of Units= 8 5 = 40Defect Rate= # Defects

10、/ # Opportunities = (7 / 40 ) 106= 175,000 dpmo0.023.42336,21066,811308,770697,672-100,000200,000300,000400,000500,000600,000700,000800,00001234567Sigma CapabilityDefects Per Million OpportunityProcess968Accept32RejectFirst-Time Yield, Yft = 968 / 1000 = 0.9681,000InputProcess968Accept32Reject1,000I

11、nput(40 Defects)Throughput Yield, Ytp = e-(40/1000) = 0.961800ShipProcess A1,000Input50ScrapProcess B950Input25ScrapProcess C925Input125ScrapFinal Yield, Yf= Quantity Shipped / Quantity Built = 800 / 1,000 = 0.80A shortcoming of final yield is that it fails to consider the “hidden factory” or rework

12、.Hidden Factory : ad hoc systems and processes set up to correct errors made during the mainstream process.Rolled Throughput Yield= Ytp(A) Ytp(B) Ytp(C) = 0.7408 0.6393 0.5824= 0.2758675ShipProcess A1,000Input50ScrapRework200150Process B800Input (950)25ScrapRework300275Process C650Input(925)125Scrap

13、Rework250125Defects = 300 Ytp(A)= e300/1,000 = 0.7408Defects = 425 Ytp(B)= e425/950 = 0.6393Defects = 500 Ytp(C)= e500/925 = 0.5824Defects= 300Analyze Data/ProcessDevelop Causal HypothesisRefine or Reject HypothesisAnalyze Data/ProcessConfirm & Select Vital Few Causes What possible actions or id

14、eas required to address the root cause of the problem, and to achieve the goal? Which of the ideas are workable potential solutions? Which solution will most likely achieve the goal with the least cost or disruption? How can the chosen solution be tested for effectiveness, and then implemented perma

15、nentlyImplement ongoing measures and actions to sustain improvementDefine responsibility for process ownership and managementExecute “closed-loop” management and drive towards Six SigmaChampionManagementEmployeesFinanceTeamBlack BeltOptimized Process30 - 5010 - 154-8Key Process InputVariables (KPIVs)8 - 10KPIVsCritic

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論