




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、WORDSTANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: BATH REPAIRSSTANDARD: REPAIR BATH CHIPS AND SCRATCHES IN A PROFESSIONAL MANNER =PROCEDURE:When repairing baths, only “Bath Repair Kits” are to be used. Mix and ap
2、ply as per the instructions on the back side of the packet.NOTE: PAINT IS NOT TO BE USED UNDER ANY CIRCUMSTANCES.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: SERVICING A ROOM AIR CONDITIONERSTANDARD: SERVICE AIR
3、 CONDITIONER AS PER THE PROCEDURE ON EACH KEN-FIX-IT VISIT=PROCEDURE:1. Switch air conditioner on and check all four locations on the switch. Operate the fan correctly (i. e. off, low, medium and high).2. Operate the thermostat and check the cooling valve opens and closes. Leave thermostat set at th
4、e mid range.3. Check outer thermostat cover is tight and free of marks.4. Remove air filter and replace with spare from Ken-Fix-It trolley.5. Remove front cover and check drain pan is clear and drain is operating free of restrictions.6. Check insulation is fixed to cabinet securely.7. Check for any
5、water leaks from chilled water flexible lines, connections and valve.8. Remove any dust build up with a wire brush and coat area with rust proofing paint.9. Clean any dirt build up from the cooling coil and drain pan.10. Ensure support brackets are secure.11. Visual check of wiring to ensure plug co
6、nnections are tight and wiring is in good order and out of water.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: FURNITURE REPAIRSTANDARD: FURNITURE WILL BE REPAIRED TO ORIGINAL CONDITION.=PROCEDURE:Furniture repai
7、rs are to be carried out in a professional manner at all times. It is important that repairs carried out are not noticeable and are secure, as they are an receive a lot of abuse.Questionable furniture will not be put back into use, it will be reported to the Chief Engineer so a disposal notice can b
8、e written.When repairs are carried out, ensure there are no splinters or burrs protruding and it is sanded back in preparation for painting.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: PAINT REPAIRSSTANDARD: PAI
9、NT WILL BE REPAIRED SO PATCHES ARE NOT EVIDENT AND ORIGINAL COLOURS MATCHED. =PROCEDURE:The Ken-Fix-It cart will carry a stock of all Guestroom paint colours as per the architectural of colours. When repairing paint damage the surface should be cut back so excess layers will not occur. If the paint
10、cannot be perfectly matched so repair marks are not noticeable, the whole of the affected wall, furniture, bench tops, doors, etc. are to be cut back and repainted.Before repainting on a whole wall etc. ensure the patch has had sufficient time to dry as wet or damp paint will give an incorrect colou
11、r match.If an entire section is to be painted a Maintenance Request is to be written by the Ken-Fix-It and given to the Chief Engineer or Assistant Chief Engineer for signing and prioritising to the hotel painters.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMA
12、NHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: REPORTING OF KEN-FIX-IT WORK COMPLETESTANDARD: ALL REPORTS TO BE HANDED IN BY 1630 ON A DAILY BASIS. PROCEDURE:At the end of each days work the Ken-Fix-It is to return all completed room check lists to the assistant Engineers Office. Each completed she
13、et will have a date, Ken-Fix-Its signature and room number clearly written in the assigned spots.The Ken-Fix-It will mark the master room sheet, kept on the progress board with a cross inside the circle beside the rooms completed on that day with the day and month shown beside it (X) 1/9/352) (COMPL
14、ETE DATE ROOM NO)The rooms that have been blocked by the Ken-Fix-It for the following day will have a circle put beside the room number (i. e. o 353) (BLOCKED ROOM NO)The master room sheet will be a computer print of all room numbers by block available from the Assistant Chief Engineer. Master room
15、sheets will be completed at least three (3) times a year.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: CART STOCK LEVELS AS PER KEN-FIX-IT STOCK LISTSTANDARD: MAINTAIN CART STOCK LEVELS AS PER KEN-FIX-IT STOCK LI
16、ST. =PROCEDURE:1. Refer to attached Ken-Fix-It Stock List.2. Ken-Fix-It Stock List is minimum par levels to be carried at all times.3. This level is to be replenished at the end of each days work.4. If stores levels are running down, ensure they are re-ordered in the spare parts book.5. Periodic che
17、cks will be made by the Chief Engineer or Assistant.STANDARDS AND PROCEDURESDEPARTMENT: REPAIRS AND MAINT JOB CATEGORY: HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: BOILER CLEANINGSTANDARD: BOILER FIRE TUBES TO BE CLEANED AT TWELVE MONTHS INTERVALS AND LEFT FREE OF ALL SOOT AND CARBONS. =P
18、ROCEDURE:Under the direction of the Mechanical Department the boiler will be stripped down for cleaning. Before starting ensure the area is well ventilated.Overalls, breathing masks, safety glasses and rubber gloves are to be used while cleaning is in progress. Obtain all of the following items from
19、 the workshops and take to the boiler room:-1. I bag of rags2. All safety gear3. Boiler brush kit4. Industrial vacuum cleaner5. Heavy duty garbage bag 6. Lead lamp7. Hand cleaner gel8. Bannister brush and shovelClean tubes by pushing rods with a brush on the end up and down each fire tube. Leave vac
20、uum in the bottom of the boiler to vacuum up all soot. When tubes have been brushed put vacuum head over the top of each to remove any suspended soot. Clean down end plates and turbulence rods. Access the flue and clean with a bannister brush and vacuum.When boiler has been cleaned, clean all tools,
21、 plantrooms and outside of the boiler. Empty vacuum into plastic bag and dispose of to loading dock.STANDARDS AND PROCEDURESDEPARTMENT: REPAIRS AND MAINT JOB CATEGORY: HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: MACHINERY CLEANINGSTANDARD: MAINTAIN MACHINERY IN A CLEAN CONDITION AT ALL TI
22、MES.=PROCEDURE:Machinery will be kept clean by all Departments but specifically will come under the Handymans job to continuously go through plantrooms and clean machinery as per the attached schedule:1. When cleaning machinery with exposed moving parts, before isolating check with the Assistant Eng
23、ineer until equipment and operation is totally familiar.2. Always isolate moving equipment before cleaning.3. Equipment shall be cleaned with a damp cloth, dry cloth and wire brush if necessary.4. All excess oil and grease dust or general dirt is to be cleaned off.5. If during cleaning work, paint o
24、r seals are removed touch up with colour paint and if necessary undercoat with rust prohibitor.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY: REPAIRS AND MAINT MECHANIC/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: TROLLEY LUBRICATION AND REPAIRSSTANDARD: MAINTAIN TROLLEYS IN A SAFE AND
25、CLEAN OPERATING CONDITION.=PROCEDURE:Due to the continuous problems within other hotels caused by incorrect lubrication of trolleys the following procedure will be adopted:-1. Oil is not to be used to lubricate sleeve bearing on trolley wheels.2. Dry silicon spray is to be applied to the axle after
26、the wheel has been removed and axle and sleeve cleaned of all dust and or dirt.3. Refit wheel and spin to evenly spread lubricant over entire axle contact surface and check for noise to ensure enough lubricant has been applied.4. Any repair work carried out on a trolley is to be clearly indicated on
27、 the maintenance request form together with trolley number, to avoid continuous repair to fatigued materials.5. When replacing wheels, ensure treads are clean and lubricant free. Refit split pins, if used, by bending around and ensuring ends are flush with axles.SHERATON WENTWORTH SYDNEYJOB DESCRIPT
28、IONPOSITION TITLE KEN-FIX-ITDEPARTMENT ENGINEERINGDIVISION REPAIRS AND MAINTENANCEDATE 1 JUNE 1989=BASIC FUNCTIONRequired to perform in an all-around capacity with experience in all facets of trade and carrying out duties in a responsible and competent manner.ORGANISATIONAL RELATIONSHIPReports to: A
29、ssistant Chief Engineer.PRINCIPAL DUTIES AND RESPONSIBILITIESPrimarily responsible for maintaining the Guest rooms to the Quality standards as defined in the Sheraton Corporation Engineering Operations Manual and Sheraton Wentworth Hotel Ken-Fix-It maintenance check list.=REVIEWED BY:APPROVED BY:COM
30、PILED BY: APPROVED BY:REVISED:KEN-FIX-ITINDUCTION CHECK LIST1. HOTEL ORIENTATION.2. SGSS FOUR STANDARDS.MUST be completed within one month of Orientation.3. Complete a recognised First Aid Course within two months of Orientation.4. Have Training in knowledge of all standards for dress and personal a
31、ppearance, grooming and Guest relations.5. Possess all round trade skills.6. Have an operating knowledge of the Work Request System and Assignment Board.7. a) Know what the Ken-Fix-It program consists of.b) Know how the Ken-Fix-It program operates.c) Know what is needed to operate the program.d) Kno
32、w how to control and measure the program.e) Now the end of month reporting procedure for Ken-Fix-It .8. Possess a knowledge of the location of all Hotel facilities including: Bars, Restaurants, Function Rooms, etc.9. Departments objectives, activities and responsibility to other departments.10. Fami
33、liarisation with Hotel fire procedures and use of portable fire extinguishers and hose reels.DEPARTMENT ORIENTATIONCHECKLISTIndicate if actioned1. Introduction to:General Manager Manager2. Introduction to:Members of relevantDepartmentAnd closely related Departments3. Department FamiliarisationEquipm
34、ent Lockers Toilets Emergency exits Fire extinguishers, Fire hoses, fire blankets Photocopiers Staff dining room Pay office Uniform room Service lifts First aid kits Introduce to Departments first aiderCafé bar4. Departments Functions and Structure(i.e. objective, activitiesand how relates to o
35、therDepartments and overall Company)5. Position Duties(i.e. position descriptionand how position relatesto other activities of the Department)6. Departments Policies Proceduresbreaks, lunch hour timecards, pay daydepartment union delegateappearance, uniform, hygieneand hair styleemergency procedure
36、Code 88grievance proceduretransportation after midnightexhibit forms e.g. annualleave, absentee,workers compensationtermination clearance slipmeeting Q.I.P.,Safety,Weekly Department HeadsPackage passUnion slipNews sheet SheratonWorld Sheraton pacificSigned by: Department Head New Employee DateFile:
37、Relevant Department PersonnelS H E R A T O N W E N T W O R T H H O T E L= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = QUALITY STANDARDS MANUAL ENGINEER DEPARTMENT = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =TABLE OF CONTENTSIntroductionEngineering Department Ov
38、erviewYour personal Appearance ConductroomingClothing/UniformsHours of work and AttendanceGeneral ConductSafety StandardsWork in Guest RoomsTools of your TradeWork QualitySheraton Wentworth hotelEngineering Department Quality Standards Manual=Introduction=The Sheraton Wentworth is an International H
39、otel of very high standing and is known for its professionalism and quality of service worldwide. Much of the success of any Hotel is due to its Staff and the Sheraton Wentworth is no exception. In order to maintain our reputation as a first class Hotel, it is necessary to ensure our quality standar
40、ds are of the highest.This manual is designed to set out the guidelines by which the engineering department works and the personnel standards that are required. Reading this manual will allow you the opportunity to become familiar, or refresh yourself. With the standards that we expect of you and ho
41、pefully answer many questions you may have.The engineer department is an important department within any hotel and we, in this department, should readily and constantly recognize the necessity for work to be performed of the highest standard. Work that is carried out below standard will directly or
42、indirectly affect guest service or the product that we have to sell. Bad workmanship in guest rooms or public areas is readily identified by guests and adversely flavours guests opinions of our establishment. Poor workmanship can also lead to an unsafe condition of equipment, fixtures and fittings.
43、The Sheraton Corporation is both legally and also morally responsible of the promises and Employee safety when withinthe confines of the premises and this is something that should never be forgotten.DEPARTMENT STRUCTURECHIEF ENGINEERASSISTANT CHIEF ENGINEERMAINTENANCE ENGINEERPLANT ENGINEERELECTRICIAN/CARPENTER/FITTER/PAINTER/PLUMBER/HANDYMANKEN-FIX-ITTHE ENGINEERING DEPARTMENT, IN SHORT, IS RESPONSIBLE FOR THE MAINTENANCE AND PHYSICAL UPKEEP OF THE HOTEL. ONLY BY AN EFFECTIVE MAINTENANCE PROG
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 急診科的創(chuàng)新服務(wù)理念計(jì)劃
- 工作計(jì)劃中的資源配置技巧
- 利用大數(shù)據(jù)提升品牌決策能力計(jì)劃
- 三年級(jí)數(shù)學(xué)下冊(cè)一兩位數(shù)乘兩位數(shù)的乘法探索規(guī)律教案西師大版
- 口語(yǔ)交際:安慰 教學(xué)設(shè)計(jì)-2024-2025學(xué)年語(yǔ)文四年級(jí)上冊(cè)統(tǒng)編版
- 統(tǒng)編版小學(xué)語(yǔ)文二年級(jí)下冊(cè)第2課《找春天》精美課件
- 酮癥酸中毒護(hù)理診斷和護(hù)理措施
- 2025年塔城貨運(yùn)資格證考試口訣
- 酒水調(diào)制知識(shí)培訓(xùn)課件
- 2025年玉林如何考貨運(yùn)從業(yè)資格證
- 2025年湖南鐵道職業(yè)技術(shù)學(xué)院?jiǎn)握新殬I(yè)技能測(cè)試題庫(kù)新版
- 新媒體運(yùn)營(yíng)課件
- 《鼴鼠的月亮河》考試題附答案
- 2025年內(nèi)蒙古巴彥淖爾市交通投資集團(tuán)有限公司招聘筆試參考題庫(kù)附帶答案詳解
- 2025年新人教版物理八年級(jí)下冊(cè)全冊(cè)教案
- 微量注射泵培訓(xùn)
- 2025年人教版新教材英語(yǔ)小學(xué)三年級(jí)下冊(cè)教學(xué)計(jì)劃(含進(jìn)度表)
- 形象設(shè)計(jì)師三級(jí)習(xí)題庫(kù)及答案
- 2025年度能源行業(yè)員工聘用合同范本
- 相互批評(píng)意見(jiàn)500條【5篇】
- TMD減振原理與設(shè)計(jì)方法
評(píng)論
0/150
提交評(píng)論