版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、史上最全石油英語(yǔ)詞匯(AC)Aabandoned oil & gas 報(bào)廢油氣井 abnormal formation pressure 異常地層壓力above ground equipment 地面設(shè)備abscissa 橫坐標(biāo)absorbent formation 滲透地層 absorption well 漏失井a(chǎn)rmoured cab
2、le 鎧裝電纜accessory , accessories, accessary附件,輔助的acceptance criteria 驗(yàn)收標(biāo)準(zhǔn) acceptance of risks 承擔(dān)風(fēng)險(xiǎn)acceptance of the bid 中標(biāo) accident analysis 事故分析accident free 無(wú)事故accident potential 事故隱患accide
3、nt prevention 事故預(yù)防acid fracturing 酸化壓裂a(bǔ)cid job 酸化作業(yè)acid-frac process 酸化壓裂工藝acid stimulation酸化增產(chǎn) actual data 實(shí)測(cè)資料actual data plot 實(shí)測(cè)曲線actuating system 傳動(dòng)系統(tǒng)assistant driller 副司鉆adapter substitute&
4、#160;轉(zhuǎn)換接頭,大小頭addendum 附錄additional well 補(bǔ)充井a(chǎn)djacent well 鄰井a(chǎn)djustment well 調(diào)整井a(chǎn)djust to zero 調(diào)零adjuster sub 調(diào)整短節(jié)adapter 適配器,接頭automatic fine tuning 自動(dòng)微調(diào)after-sale service 售后服務(wù),后續(xù)服務(wù)
5、 after-treatment profile log 油井(增產(chǎn))措施后生產(chǎn)剖面測(cè)井hole azimuth 井斜方向AL(acoustic logging)聲波測(cè)井a(chǎn)coustic amplitude log,amplitude log聲幅測(cè)井a(chǎn)djacent bed 圍巖apparent resistivity視電阻率ACBL(acoustic cement bond log)聲波
6、水泥膠結(jié)測(cè)井a(chǎn)ctivation logging活化測(cè)井ASC(after survey calibration)測(cè)后刻度amplitude type cement bond log聲幅水泥膠結(jié)測(cè)井a(chǎn)nnular space log環(huán)空測(cè)井 array sonic tool陣列聲波測(cè)井儀acoustic wavetrain logging聲波全波列測(cè)井a(chǎn)lemite gun 黃油槍 alligator wrench
7、活動(dòng)管鉗alternator 交流發(fā)電機(jī)A-mast A形井架amplifier 放大器 amplitude 振幅,聲波幅度annulus(油套管)環(huán)形空間 analog cable signal 模擬電纜信號(hào)anchor packer 卡瓦封隔器annual&
8、#160;survey 年檢annular blowout preventer環(huán)形防噴器annular pressure 環(huán)空壓力annular pressure operated test valve環(huán)空壓力控制測(cè)試閥annular reversing valve環(huán)空加壓反循環(huán)閥annular space 環(huán)形空間annular water detector環(huán)空找水儀annular water injection反注,環(huán)空注
9、入annulus blow out 環(huán)空井噴annulus completion fluid 環(huán)空完井液annulus (flow)line 環(huán)空(出油)管annulus fluid環(huán)空液體annulus logging環(huán)空測(cè)試annulus pack off環(huán)空封隔裝置annulus pressure firing system環(huán)空壓力起爆器annulus pressure response tool &
10、#160;APR工具,(哈里伯頓)環(huán)空加壓式測(cè)試閥annulus sample catcher環(huán)空取樣器anticline背斜antiknock agent 防爆劑antivibration防震,抗震API pup joint API標(biāo)準(zhǔn)油管短節(jié)apparent wellbore radius有效井筒半徑appraisal well 評(píng)價(jià)井
11、160; aqueous saturation 含水飽和度 APR(annulus pressure respondent)環(huán)空壓力控制式測(cè)試工具area operations superintendent 地區(qū)作業(yè)監(jiān)督armoured (electric) cable 鎧裝電纜
12、0; artificial bottom hole 人工井底artificial fracture 人造裂縫 artificial lift 機(jī)械采油assessment of bids 評(píng)標(biāo)assessment we
13、ll評(píng)價(jià)井a(chǎn)ssistant driller 副司鉆 assistant engineer助理工程師associated gas 伴生氣assurance factor安全系數(shù)atmospheric service常壓作業(yè)autocartogr
14、aph 自動(dòng)繪圖儀autoignition自動(dòng)點(diǎn)火AVL(acoustic velocity log )聲速測(cè)井a(chǎn)zimuth 井斜方位 Bbit 鉆頭,刀片 box
15、60;母扣,母接頭block區(qū)塊,滑輪車(chē),斷快back flow反循環(huán)洗井backup arm 推靠臂backup copy 副本bad earth 接地不良bail 提環(huán),提撈back off 倒扣,解卡bailer撈砂筒bailing 提撈作業(yè)bailing bucket 提撈筒bar drop投棒bar drop sub 投桿接頭,撞擊接頭barefoot completion 裸眼完井barefoo
16、t interval 裸眼井段barefoot well(bare hole)裸眼井bar fishing 打撈點(diǎn)火棒bar hydrostatic firing head 投棒壓力起爆器 basement rock基巖bastard connection 不合格的絲扣(接頭)bastard thread不合格的絲扣behind completion date沒(méi)有按期完工bit diameter鉆頭直徑breakd
17、own pressure 臨界壓力bailed dry (把井)掏空beam pumping unit 游梁式抽油機(jī)beam well (深井泵)抽油井bean up 放噴 bed of interest 目的層bellmouth喇叭口,錐形孔belly band 安全帶bell nipple喇叭口短節(jié)bottom hole fluid sampler井底流體取樣器bottom hole
18、 assembly 底部管柱結(jié)構(gòu)BHC(borehole compensated sonic log )井眼補(bǔ)償聲波測(cè)井background radiation放射性本底植banana plug香蕉插頭before calibration測(cè)前刻度BHTV(borehole televiewer)井下(聲波)電視borehole fluid sampler井眼流體取樣器 &
19、#160;bridle馬籠頭bradenhead flange 井口法蘭bottom hole 井底,井下big hole perforator大孔眼射孔器borehole status井眼狀況bottom-hole pressure ,closed井底關(guān)井壓力 bottom-hole pressure,flowing井底流動(dòng)壓力bottom-hole sample 井底取樣,井下取樣 bottom hole sampler井底取樣
20、器bid bond投標(biāo)保證金,投標(biāo)保證書(shū) bidder 投標(biāo)者bidding投標(biāo)bidding documents投標(biāo)文件,招標(biāo)文件bidding procedure 投標(biāo)程序bid opening開(kāi)標(biāo)big-entry-hole大射孔孔眼big-frac treatment(多層段)大型壓裂big repair大修bill of materials材料清單bit hook打撈工具blank footage槍接頭盲區(qū)blank off 油層封住,
21、封堵blank tubing空油管,盲槍blasting cap 起爆雷管bleeding off pressure 放壓block and tackle arrangement起下用滑車(chē)系統(tǒng) block diagram方框圖,結(jié)構(gòu)圖block-squeeze分段擠水泥blowdown放壓,衰竭式開(kāi)采blowing out井噴blowing well自噴井blowout capping 控制井噴blowout hookup(井口)防噴
22、裝置blowout preventer 防噴器blank plug 絲堵,堵頭blowout-prevention equipment防噴設(shè)備blowout-prevention procedure防噴措施bullets射孔彈blue sky exploratory well預(yù)探井bumper減震器back out(break out)卸開(kāi),松扣bobtail packer裸眼井測(cè)試封隔器bonding cable 接地電纜,地線booster傳爆管bor
23、e diameter孔徑,井眼直徑bore frame井身結(jié)構(gòu)borehole correction井眼校正borehole deviation井斜borehole effect井眼效應(yīng)borehole face井壁borehole log 測(cè)井曲線,錄井圖borehole operation井下作業(yè)borehole pressure井筒壓力borehole survey井下測(cè)量borehole wall井壁boring casing套管borings巖屑borin
24、g tower井架bottom hole turbine flowmeter井下渦輪流量計(jì)bottom nose (下井儀)尾端,(射孔)槍尾bottom-up firing槍尾起爆器box and pin公母接頭box coupling接箍bridge plug橋塞by-pass旁通brake handle剎把breakdown 故障,事故break off pin type circulating sub斷銷(xiāo)式反
25、循環(huán)閥breaking out pipe卸扣bridge plugging(打)橋塞封堵bridge the hole (在井中)打橋塞bring in a well完井投產(chǎn)bring out production投產(chǎn),進(jìn)行開(kāi)采broken down 解堵brought in well投產(chǎn)井button switch按鈕開(kāi)關(guān)bushing 套筒 basket 打撈籃,水泥傘 bottomed 下到
26、井底borehole televiewer井下電視buffer減震器 build up壓力恢復(fù)bubble 氣泡,水泡bubble head泡泡頭bubble point pressure飽和壓力bucket rod抽油桿buck up緊扣build up of fluid液面恢復(fù)build the pressure打壓build up of pressure壓力恢復(fù)bull dog wrench管鉗bullet
27、160;gun射孔槍bullet hole射孔孔眼bumper spring 減震器彈簧burr毛刺,去毛刺by-pass pipe旁通管Ccontractor承包商C&F (cost and freight)成本加運(yùn)費(fèi)價(jià),到岸價(jià)cement in place注水泥完畢 cabin操作室cable armour電纜外皮cable bond(joint)電纜接頭cable conductor纜芯cable configuration電纜規(guī)格cable
28、 continuity電纜通斷情況cable core纜芯cable drum(reel)電纜滾筒cable duct 電纜槽cable fishing tool頓鉆打撈工具cable formation test電纜地層測(cè)試cable head電纜頭cable kinking電纜扭結(jié)cable-laid rope鋼絲繩cable loop繩扣cable oil電纜油cable ringing電纜打結(jié)cable slack電纜松弛cab
29、le winch(work) 電纜絞車(chē)contract award date合同簽定日期cake泥餅caliper井徑儀calibration標(biāo)定,調(diào)試,刻度calibrated標(biāo)定過(guò)的calibrating jig刻度架caliper logging井徑測(cè)量calling of bids招標(biāo)callow表層camp equipment野外作業(yè)設(shè)備camp site施工現(xiàn)場(chǎng)cap rock蓋層cap 雷管capping bed,cap formation蓋
30、層carbonate rock碳酸鹽巖cased hole套管井cased hole completion 下套管完井cased hole formation tester套管井地層測(cè)試器case in 下套管cased well下套管井casing(case pipe)套管casing/cementation report套管固井報(bào)告casing cementing套管注水泥casing collar(coupling) 套管接箍CC
31、L(casing collar locator) 套管接箍測(cè)井casing grade套管鋼級(jí)casing gun 電纜輸送套管射孔槍casing head spool套管頭四通casingless completion 無(wú)套管完井casing list 套管記錄casing over pressure套管加壓,環(huán)空加壓 casing packer套管封
32、隔器casing perforation(套管)射孔casing perforation operator射孔作業(yè)工casing perforation service射孔作業(yè)casing perforation tool射孔器材casing perforation type射孔方式casing point下套管深度casing program套管程序casing setting depth套管下入深度casing shoe套管鞋casing t
33、op spacing套補(bǔ)距casing-tubing annulus油套環(huán)空casing wear套管損壞caution sign警告標(biāo)志cave-in井壁坍塌core barrel取芯筒CBL(cement bond logging)水泥膠結(jié)測(cè)井carbon/oxygen logging碳氧比測(cè)井carbon/oxygen spectral logging 碳氧比能譜測(cè)井casing caliper log 套管內(nèi)徑測(cè)井casing inspe
34、ction log套管探傷測(cè)井CBIL(circumferential borehole imaging logging system)環(huán)形井眼成象測(cè)井系統(tǒng)CET(cement evaluation tool)水泥評(píng)價(jià)測(cè)井 channelling竄槽channelling detection找竄check shots檢驗(yàn)地震測(cè)井completion date 完井日期 cellar井口cellar connection(鉆井)井口裝置cemen
35、ted to水泥返至cementing documentation固井設(shè)計(jì)cementing truck水泥車(chē)cement job quality固井質(zhì)量cement sheath水泥環(huán)cement squeeze擠水泥cement top水泥返高centering device扶正器casing fluid level套管液面深度channel(射孔)孔道,管道,途徑change over變扣接頭change over sub大小頭charge射孔彈,費(fèi)
36、用charge penetration射孔彈穿透深度charge strip(射孔)彈架charge type(射孔)彈型chief operator主操Chinese side中方christmas tree采油樹(shù)christmas tree gauge井口壓力表contract item合同條款casing inside diameter套管內(nèi)徑cement in place固井作業(yè)結(jié)束closed-in pressure關(guān)井壓力 circ
37、uit tester萬(wàn)用表clay 粘土caliper log井徑測(cè)井claim 索賠claimer索賠人claim for breaking an agreement 違約賠償claim for payment 要求付款claim indemnity索賠claim rejection拒賠 claystone粘土巖,泥巖clean out (清砂、清蠟)修井
38、0; clean-out of well 洗井clean-out operation(service)洗井作業(yè) clean-out report修井報(bào)告clear working place安全工作區(qū) clip繩卡closed-in關(guān)井closed-in well關(guān)閉井,
39、停產(chǎn)井closed-in casing pressure關(guān)井套管壓力closed-in tubing pressure關(guān)井油管壓力cementer固井公司,固井隊(duì)工人 condensate凝析油coarse adjustment(control)粗調(diào) &
40、#160; coarse -thread joint 粗扣接頭change of contract合同變更c(diǎn)asing outside diameter套管外徑coiled rod 連續(xù)抽油桿coiled tubing連續(xù)油管,小油管coiled tubing service連續(xù)油管作業(yè)coiled tubing unit連續(xù)油管作業(yè)機(jī)coiled tubing operation小油管作業(yè)
41、collar接箍,法蘭盤(pán),井口,鉆鋌collared hole下了表層套管的井combination collar(coupling)轉(zhuǎn)換接箍combination tool組合下井儀commercial accumulation(deposit)有開(kāi)采價(jià)值的油氣藏commercial bed有開(kāi)采價(jià)值的油氣層commercial field有開(kāi)采價(jià)值的油氣田commingling production多層合采commissioning trial試用投產(chǎn)communication竄槽
42、60; communication between zones竄層compensated density log補(bǔ)償密度測(cè)井CDNT(compensated density-neutron tool)補(bǔ)償?shù)貙用芏戎凶訙y(cè)井儀compensated forma
43、tion densilog補(bǔ)償?shù)貙用芏葴y(cè)井CNL(compensated neutron log)補(bǔ)償中子測(cè)井compensated sonic log補(bǔ)償聲波測(cè)井conductivity log電導(dǎo)率測(cè)井conglomerate礫巖completion damage完井污染completion date完井日期 completion evaluation完井評(píng)價(jià)completion fluid完井液completion operation 完井作業(yè)completi
44、on perforating完井射孔completion well test完井測(cè)試completion factor完井指數(shù)completion interval完井層段completion string完井管柱condensate field凝析氣田condensate pool凝析油藏condensate well凝析油氣井conductor line 導(dǎo)線conductor wire纜芯線connection end接頭consent 插座 con
45、sole面板constant maintenance定期保養(yǎng)consumable material消耗材料consumable accessories耗損件contact probe探頭contact sonde(井下儀器的)探頭container horizon(rock)含油層,儲(chǔ)集層contamination污染continental shelf大陸架contingency意外情況
46、0; contingency plan(procedures)應(yīng)急措施contract area合同區(qū)contract award date 合同簽定日期contract duration合同期限contracted block合同區(qū)contracted construction承包施工contract life合同有效期限contract(or)emp
47、loyee施工人員contract item合同條款contributing zone生產(chǎn)層control fluid壓井液controlled directional well定向井control of well kick and blowout井涌井噴控制control panel remote遙控面板conventional DST常規(guī)地層測(cè)試conventional gun普通射孔器conventional operation常規(guī)作業(yè)co
48、nventional overbalanced perforating 常規(guī)正壓射孔 conventional pumping unit普通抽油機(jī)conventional well常規(guī)井conventional workover rig常規(guī)修井作業(yè)core barrel巖心筒core bit取心鉆頭CST(core sample taker)井壁取心器cored well取心井coupled tubing油管立柱coupling
49、60;tubing connection油管接箍連接 cement plug水泥塞casing pressure-closed關(guān)井套壓casing pressure-flowing開(kāi)井套壓combination production logging組合測(cè)井 crystal quartz gauge石英晶體壓力crab(winch,crane)吊車(chē),起重機(jī)crown block天車(chē)crook
50、ed stem 彎曲的管柱 cross over短節(jié),變扣接頭cross over circulation 反循環(huán) cross over sub(joint)變扣接頭,轉(zhuǎn)換接頭crowbar 撬杠
51、60; crown platform天車(chē)平臺(tái)CST(chronological sample taker,chronological sidewall core tool)井壁取心器cartage運(yùn)費(fèi)complete trip in hole 完成(儀器)下井作業(yè)cable telemetry system電纜遙測(cè)系統(tǒng)cable transmission system電纜傳輸系統(tǒng)curr
52、ent maintenance 日常維修cushion 液墊,測(cè)試墊customs海關(guān),關(guān)稅cut-off date截止日期Ddrilling and production platform鉆井采油平臺(tái)drift angle(定向井)傾角data acquisition equipment數(shù)據(jù)采集裝置daily capacity(output,production,rate)日產(chǎn)量daily servicing日常維護(hù)damaged formation受污染地層da
53、maged well污染井damaged well productivity污染井產(chǎn)能damaged zone污染帶damaged factor污染系數(shù)damage skin 損害表皮damper減震器damping spring減震彈簧data readback數(shù)據(jù)回放day to day operation日常業(yè)務(wù)drill collar鉆鋌dead time 停工時(shí)間dead well停產(chǎn)井dead work
54、 準(zhǔn)備工作,非生產(chǎn)性工作 decenter 偏心decentralized casing 偏心套管 decentralized gun偏心射孔器decentralized wellhead偏心井口decentralizi
55、ng device偏心裝置decline factor遞減系數(shù)decline rate 遞減速度decline exponent遞減系數(shù)deep penetrating gun深穿透射孔槍deep penetration charge 深穿透射孔彈deep penetrator深井射孔彈ILD(deep induction log),deep investigation induction log深感應(yīng)測(cè)井LLD(deep l
56、aterolog)深側(cè)向測(cè)井 depth mark of cable電纜深度記號(hào)Dewar flask,Dewar thermos bottle測(cè)井保溫瓶default clause違約條款defective casing/liner cementation固井不合格defective insulation絕緣不良deficient
57、well低效井deflected hole(well)斜井,定向井 degree of damage污染程度degree of dip傾角degree of reserve recovery采出程度degree of saturation飽和度dehydrated crude脫水原油deliverability產(chǎn)能,產(chǎn)油delivery
58、;point供應(yīng)點(diǎn)demodulator檢波器demobilization復(fù)員,遣散demobilization cost遣散費(fèi)demonstrated reserves探明儲(chǔ)量demurrage charge(fee)延遲費(fèi)density log密度測(cè)井deparaffin清蠟depleted field枯竭油田depleted oil sand枯竭油層depth in下入深度depreciation charge折舊費(fèi)depth correction校深depth discrepa
59、ncy深度誤差depth of bottom hole measurement井底測(cè)量深度,測(cè)量?jī)x器下入深度depth of plunger泵掛深度depth of setting下入深度depth out 起出深度depth sounding測(cè)液面深度derrick井架,鉆塔derrick apples井架落物derrick floor鉆臺(tái)derrick guy(wire)井架繃?yán)Kderrick lowering放倒井架derrick
60、;raising立井架desanding device除砂裝置description of reservoir油藏描述design pressure 設(shè)計(jì)壓力desired flow rate 預(yù)期產(chǎn)量desired location 預(yù)定位置desired setting position預(yù)定坐封位置detector檢波器,引爆器,雷管detail design施工設(shè)計(jì)detailed rules and regulations細(xì)則d
61、etail specifications詳細(xì)說(shuō)明書(shū)detecting head 探頭,探針detention time 停留時(shí)間deterioration老化,磨損determining depth of fluid探測(cè)液面深度detonating cord導(dǎo)爆索detonation爆燃,爆炸detonator 雷管deviation井斜development program開(kāi)發(fā)方案development well開(kāi)發(fā)井deviated hole(well)斜井,定
62、向井 direct hydrocarbon indication直接油氣顯示down hole power supply井下供電DAL(digital acoustic log)數(shù)字陣列聲波difference between reservoir pressure and injection pressure 注水壓差differential pressure壓差 differential pressu
63、re firing head壓差起爆器digital multimeter數(shù)字萬(wàn)用表digital integrated circuit數(shù)字集成電路DCBIL(digitally circumferential borehole imaging log)數(shù)字井周成像diminishing pressure遞減壓力diphase雙相diphasic flow 雙相流動(dòng)dipper撈砂筒diplog地層傾角測(cè)井diplog tool-4 arm四臂地層傾角測(cè)井
64、儀dipmeter地層傾角測(cè)井儀 dip傾角DDL(direct digital logging)數(shù)控測(cè)井distance of “zone”mark零長(zhǎng)dipping rod量油桿dipping tub量油管direct-current generator直流發(fā)電機(jī)direct flushing正循環(huán)洗井direct grounding直接接地directional drilling定向鉆井directives for construction施工指令director
65、60;general 總裁,總監(jiān)disabling accident嚴(yán)重傷害事故displaced well生產(chǎn)井disruptive test擊穿實(shí)驗(yàn),耐壓實(shí)驗(yàn) distance between wells井距distance between rotary table and wellhead聯(lián)入distance between tubing and bushing油補(bǔ)距distance measurement遙測(cè)dista
66、nce of zero mark零長(zhǎng)distillate field凝析氣田distinguishability分辨率division 刻度,分公司dividing range (油水,油氣)分界面dog-leg狗腿depth logger測(cè)井深度dual lower casing 下部雙層套管DDL(dual laterolog)雙側(cè)向測(cè)井dual induction focused log雙感應(yīng)聚焦測(cè)井dual induction-
67、laterolog雙感應(yīng)側(cè)向測(cè)井dual induction-laterolog 8雙感應(yīng)八側(cè)向測(cè)井DIL(dual induction log)雙感應(yīng)測(cè)井dual laterolog-microspherically focused log雙感應(yīng)微球形聚焦測(cè)井dual-spaced density log雙源距密度測(cè)井DSN(dual-spaced neutron log)雙源距中子測(cè)井dual-spacing thermal decay time
68、60;log雙源距中子壽命測(cè)井dual lower tubing下部雙層油管drilling mud鉆井液depth offset深度補(bǔ)償drilled out鉆出,鉆碎(水泥塞)dolomite(dolostone)白云巖date of availability有效期限drilling-out cement(plug)鉆水泥塞drilling-out depth鉆水泥塞深度dog house井口值班房double O-ring seal雙O形圈密封double d
69、rum drawworks(hoist),double drum rope winch雙滾筒絞車(chē)dog shift夜班double-shift work兩班倒downflow well注水井downhole blow-out preventer井下防噴器downhole calibration井下標(biāo)定,現(xiàn)場(chǎng)調(diào)試 downhole completion equipment井下完井裝置down hole completion
70、fluid 井下完井液 down hole equipment井下工具downhole instrument,downhole probe,downhole tool下井儀器downhole operation井下作業(yè) downhole instrument cable井下電纜down
71、 hole sampling井底取樣downhole string井下管柱downhole television井下電視downhole testing井下測(cè)試downhole test string井下測(cè)試管柱 downhole water flow regulator井下配水器downhole test tool,downhole well test equipment井下測(cè)試工具downhole remedial
72、60;operation井下大修作業(yè),修井作業(yè)down hole tools installation井下工具連接down setting packer stroke封隔器坐封下滑距離 downslide下滑down time(downtime)停工時(shí)間 deepen加深draft agreement協(xié)議草案
73、0; draft contract合同草本drawworks unit絞車(chē)drillable bridge plug可鉆式橋塞drift diameter gauge,drift size gauge tool通井規(guī)drillable packer可鉆式封隔器d
74、rill collar stand鉆鋌立柱drilled proved reserves鉆井探明儲(chǔ)量driller司鉆driller's log 司鉆記錄,鉆井記錄drilling completion program鉆井完井方案drilling crew 鉆井隊(duì)drilling foreman鉆井隊(duì)長(zhǎng)drilling induced damage鉆井引起的損害drilling returns鉆井返出流體drilling rig,dril
75、l unit鉆機(jī)drilling supervisor鉆井監(jiān)督drill pipe frozen卡鉆DST(drill stem test)鉆桿測(cè)試drowned well水淹井drum spool絞車(chē)滾筒dry well干井dry pipe空油管drillsite井場(chǎng),鉆井工地daily service report日?qǐng)?bào)DST interval(地層)測(cè)試井段DST personnel測(cè)試人員DST/TCP(drillstem test/tub
76、ing conveyed perforating)油管傳輸射孔與地層測(cè)射聯(lián)作DST string(地層)測(cè)試管串DSTT(drillstem test tool)中途測(cè)試工具,地層測(cè)試器duration of test測(cè)試周期duration of the contract合同期限duty cycle作業(yè)周期dynamic log動(dòng)態(tài)測(cè)井,生產(chǎn)測(cè)井Eearly field life 油田開(kāi)發(fā)初期earth bar接地棒earthing&
77、#160;wire地線eccentric annulus偏心環(huán)空eccentric injection mandrel偏心配水器 edge water flood邊緣注水edge water incursion邊水侵入edge well邊緣井evacuation,escape and rescue 人員撤離,逃生和救護(hù)engineering flow diagram工藝流程圖effluent pressure井口流體壓力efflux
78、射流,流出egress pressure出口壓力external-internal upset內(nèi)外加厚的(管子)electrical logging電測(cè)electrical detonator電雷管electrical line unit電纜試井裝置electric line operation電纜作業(yè)electric line set packer電纜坐封封隔器electric monoconductor單芯電纜electric wireline uni
79、t operation電纜絞車(chē)操作EL(electric log)電法測(cè)井 ES(electric survey)電法勘探electrode電極electrode pad電極極板e(cuò)lectromagnetic flowmeter電磁流量計(jì)electronic cartridge電子線路短節(jié)elevator plug提升短節(jié) elevator吊卡emergency decree 安全技術(shù)規(guī)程emergency measures應(yīng)急措施emergency escape
80、應(yīng)急出口emergency shutdown緊急關(guān)井,緊急停工employment contract雇用合同 employment dismissal解雇endless tubing連續(xù)油管enhanced oil recovery強(qiáng)化采油,提高采收率enhanced recovery scheme強(qiáng)化采油方案enhanced water injection強(qiáng)化注水environmental pollution環(huán)境污染environmental conservati
81、on環(huán)境保護(hù)environmental regulations環(huán)保規(guī)定end of date截止日期equipment component list設(shè)備元件明細(xì)表 equipment list設(shè)備清單equipment maintenance設(shè)備維修保養(yǎng)equipment malfunction設(shè)備故障equipment operating instructions設(shè)備操作說(shuō)明 equipment out設(shè)備發(fā)運(yùn)equipment specification manual設(shè)備技術(shù)手冊(cè)erected cost安裝費(fèi)用erection
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024籃球場(chǎng)施工合同范本
- 2024汽車(chē)運(yùn)輸合同范本簡(jiǎn)單最簡(jiǎn)單的運(yùn)輸合同范本
- 2024聯(lián)合種植合同范文
- 2024年園林綠化施工合同樣本
- 2024個(gè)人服務(wù)合同范文
- 2024年修訂版:陳先生的婚前協(xié)議
- 2024店鋪商品轉(zhuǎn)讓合同范本
- 2024年企業(yè)高管離婚協(xié)議書(shū)范例
- 2024年地產(chǎn)項(xiàng)目聯(lián)合投資協(xié)議
- 2024年廣告創(chuàng)意設(shè)計(jì)委托協(xié)議
- 行業(yè)規(guī)范守則管理制度
- 視頻剪輯課件
- 大米食品安全培訓(xùn)
- 七年級(jí)上歷史半期測(cè)試題
- 膀胱腫瘤電切術(shù)護(hù)理查房
- 宮角妊娠教學(xué)查房課件
- 外賣(mài)運(yùn)營(yíng)培訓(xùn)手冊(cè)
- 一年級(jí)上冊(cè)語(yǔ)文聲調(diào)練習(xí)題7套
- 銷(xiāo)售個(gè)人績(jī)效申請(qǐng)模板
- 《茶館(節(jié)選)》-統(tǒng)編版高中語(yǔ)文選擇性必修下冊(cè)
- 冷庫(kù)有限空間預(yù)案演練
評(píng)論
0/150
提交評(píng)論