




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、1. Sequence of Operation & Targets1.1. Process Sequence of operationPress spring pin to dimension 16.56 0.15mm Spring pin press force: MAX 3000 N1.2. Process Output1.4. TargetsTargetST 40Cycle time (sec)12FTQ (%)0.34%Uptime (%)99.5%OP 40 target 1.1. Equipment Sequence of operationOperation Sequence:
2、Unload FG/Load the needle bearing and castingInitiate toggle switchSpring pin and casting presentsClamping the castingRead part label for traceabilityPress tooling go down, press spring pin to the correct dimension ( QC17)Press tooling return.Unclamping the casting1.3. Part Orientation and operator
3、motionsLoad spring pin vertically on OP40 tooling.3. Review Machine / Tooling Design Concepts3.1. Product print / KPC / QCIQC 11 Check after assembly of bearings, bearing stake, pressing of spring pin and idle pin. Bore ID=46.015 0.015 mm. ( CMM audit test , 3 pcs each week)QC 17 Press spring pin to
4、 dimension 16.56 0.15mm3.2 Part to tool interface Components support areas End surface of spring pinCylinder surface of spring pinEnd surface of spring pinCylinder surface of spring pin3. Machine Design ConceptsOperator load the spring pin into press toolingError proofing sensor for needle bearing p
5、resentsRF TAG reader for traceability.Servo machine drive the press tooling go down, press spring pin to correct dimensionServo machinePress toolingClamp tooling3. Tooling Design ConceptsIdle pinPress toolingOperator load Spring Pin on the press tooling.The magnet of tooling attract Spring PinPress
6、tooling should be flexible to compensate variation of tooling, Spring pin and its boss. Control Gap= TBD.Servo machine drive the tooling go down, press the Spring Pin into boss.Tooling touch the top surface of pin boss, press force and stroke meet spec, servo stop, then drive the tooling return.Tool
7、ing contact surface3.7 Change over model to model3.7 Change over Change press stroke parameter Quick change tooling 3. Review Machine / Tooling Design Concept3.9 Standards for the RegionErgonomic standard.Machine height 2000 mm.Total Height 2200 mm.Bench height 900 mmWork area height 1100 mm Equipme
8、nt Voltage: 380/220 Vac Frequency: 50 HzColor: light blue Akzo Nobel 51042. Review Preliminary Process Documentation2.1. Specific Documentation PFD2.2. Specific Documentation PFMEA2.3. Specific Documentation PCP9. Review Measurement & Calibration Methodology9.0 Review Measurement & Calibration Metho
9、dologyDisplacement: in servo machine, measure press tooling strokeWould be certificated by third party each year.Load cell: in servo machine, measure press forceWould be certificated by third party each year.First-off gauge for Spring Pin positionWould be certificated by manufacturer, certificated b
10、y quality each year.MSA is needed.7.1. What is measured?Spring pin dimension between pin top surface and pin boss top surface1 sample will be record in process audit document7.1. What is measured?Spring pin measure strategyIndicator probe touch the top surface of pinDial indicator locate on the TPS
11、surfaceMeasure dimension between TPS surface and pin top surface7.2. How it is measured?Spring pin position procedure:Load dial indicator on the calibrate plate, probe touch the top surface of calibrate pin.Adjust the dial indicator to zeroMove dial indicator on the TPS surface, probe touch the top
12、surface of spring pinRecord data of dial indicator Dial indicatorIndicator probeLocating blockTop surface of spring pinTPS surfaceCalibrate pinCalibrate plate7.5. Hardware requirementsAll gages need be in verification / calibration system of BDW18. Supplier Exceptions to the Equipment17. Equipment T
13、iming Plan 17.1. Equipment timing plan11. Review MQ Plan11.2. Review MQ1 plan4. Review Electrical Design Concept4.1 Sensor strategy / error proofingThe equipment has the follow poke yokes:Sensor detect pin on the press toolingLoad cell monitor the press forceDisplacement measure stroke5. Review Hydr
14、aulic Design Concept6. Review Pneumatic Design Concept7. Review Data acquisition & Measurement System Concept8. Review Machine Controls Program Design Concept10. Ergonomic / Safety Requirements12. Supplier Documentation Requirements12.Supplier Documentation Requirements13. Spare parts 14. Equipment
15、Warranty Requirements14. Discuss warranty periodWarranty -Two years warranty from the validation date for workmanship and design.Technical support from supplier site by phone, support in site need be quote.15. Facility Utility Requirements15.1. Regional StandardErgonomic std per Design- in Ergonomics Check list for China. Total equipment height 2.2 mtsVoltage 380/220 50 hzPressure Air 6 barOP 40 Spring pin assembly16. Shipping / Rigging / Installation Requirements16. Shipping/Rigging/ Install
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- led顯示屏采購合同范本
- 教材 課題申報(bào)書
- 人防工程專用合同范本
- 政研會(huì)課題申報(bào)書格式
- 代理書畫銷售合同范本
- 東易日盛合同范本
- 合同范本簡歷
- 合伙快遞合同范本
- 北京建委 施工合同范本
- 全民養(yǎng)羊合同范本
- 太陽能光伏發(fā)電安裝工程監(jiān)理實(shí)施細(xì)則
- 小學(xué)科學(xué)課件《水》
- 減鹽防控高血壓培訓(xùn)課件
- 小學(xué)信息技術(shù)四年級(jí)上冊第2課《我的小簡歷》說課稿
- 全新版大學(xué)高階英語:綜合教程 第3冊 Unit 6 China Rejuvenated課件
- 2024年下半年江蘇省鹽城市射陽縣人民政府項(xiàng)目辦公室招聘易考易錯(cuò)模擬試題(共500題)試卷后附參考答案
- 醫(yī)療行業(yè)信息安全等級(jí)保護(hù)
- 新公務(wù)員法培訓(xùn)講稿
- 用人部門面試官培訓(xùn)
- 《現(xiàn)代家政導(dǎo)論》電子教案 2.1模塊二項(xiàng)目一家庭及功能認(rèn)知
- 荊州市國土空間總體規(guī)劃(2021-2035年)
評(píng)論
0/150
提交評(píng)論