




版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、Good is good, but better carries it.精益求精,善益求善。azxxxXX農(nóng)村安全飲水監(jiān)理規(guī)劃fhfh fh PAGE supervision in large and medium goods vehicle. A is established large vehicles and small vehicles classification management of motor vehicle test mode, increased medium van car, and dangerous goods transport car, and school
2、car test project; II is established motor vehicle test regulatory platform, achieved motor vehicle test full process video, and data remote regulatory; three is strictly motor vehicle identification management, equipped with unified of identification equipment and tool, using mobile identification T
3、erminal, and law enforcement records instrument, technology identification means. As to 20XX years June 20 statewide motor vehicle keep volume for 567,408 car, and last year earlier than growth 75,814 car, growth 13.36%; this year January-June, vehicles management section and license archives manage
4、ment section total accepted the motor vehicle registration business 42,543 car times, which registered registration 6,905 car times, and transfer registration 3,592 car times, and change registration 1033 car times, and mortgage registration 696 car times, and cancellation registration 187 car times
5、, and into business 980 car times, and Archives corrections 81 pieces times, and issued test qualified logo 25,429 car times, and other vehicles business 3,640 car times; supervision Survey Section relies on motor vehicle detection remote issued test qualified logo software platform supervision moto
6、r vehicle test, and identification situation 7418l liangci, investigation motor vehicle exception business 30 car times, his pards business warning 244 article, vehicles and driving people sound video regulatory screenshots 1852 Zhang, checks motor vehicle archives 716 pieces times, and medium bus,
7、and medium above truck, and Of hazardous chemicals, vehicles and school buses and other key vehicle inspection record of 420. (C) based on their own, and strict adherence to defense, more cheating, false false fugitive suspects, robbery suspect vehicles and the Internet crackdown. DMV full play to t
8、he first line of Defense position control, investigating cheating, fake identification and robbery suspect vehicles through operational work, and carefully examine the documents and legal proof, check traffic violations, traffic accidents, the fugitive suspect suspected vehicles and theft than to wo
9、rk, further tight car, driving management business formalities review procedures. . Truck driver information management platform. Motor vehicles and traffic police departments, State transport authority to further clarify the Division of labour, implementation responsibility, strengthen our collabor
10、ation and management together, reinforcing the management of drivers on which strongly synthetic warfare and information warfare. 3 strictly implemented. From May 1 up, a is implemented complex road and bad weather driving exam, currently DMV is urged contractors party in treasures driving school in
11、creased simulation Highway, and continuous urgent detours, and snow days, and wet sliding road, and burst situation disposal, subjects II field to driving exam project, is expected目 錄TOC o 1-3 h u HYPERLINK l _Toc256000000 第一章 工程概況 PAGEREF _Toc256000000 h 4 HYPERLINK l _Toc256000001 1.5 工程等級(jí)、類(lèi)型和主要施工
12、方法 PAGEREF _Toc256000001 h 6 HYPERLINK l _Toc256000002 第二章 監(jiān)理工作的范圍、內(nèi)容、目標(biāo) PAGEREF _Toc256000002 h 11 HYPERLINK l _Toc256000003 2.1 監(jiān)理工程范圍: PAGEREF _Toc256000003 h 11 HYPERLINK l _Toc256000004 2.2 監(jiān)理工作范圍 PAGEREF _Toc256000004 h 11 HYPERLINK l _Toc256000005 2.3 相關(guān)服務(wù)范圍 PAGEREF _Toc256000005 h 12 HYPERLI
13、NK l _Toc256000006 2.4 監(jiān)理工作及相關(guān)服務(wù)內(nèi)容 PAGEREF _Toc256000006 h 12 HYPERLINK l _Toc256000007 2.5 監(jiān)理工作目標(biāo) PAGEREF _Toc256000007 h 13 HYPERLINK l _Toc256000008 2.6 監(jiān)理工作程序 PAGEREF _Toc256000008 h 14 HYPERLINK l _Toc256000009 2.6.1 工程質(zhì)量控制程序 PAGEREF _Toc256000009 h 15 HYPERLINK l _Toc256000010 2.6.2 工程進(jìn)度控制程序 P
14、AGEREF _Toc256000010 h 16 HYPERLINK l _Toc256000011 2.6.3 工程造價(jià)控制程序 PAGEREF _Toc256000011 h 17 HYPERLINK l _Toc256000012 2.6.4 工序交接檢驗(yàn)程序 PAGEREF _Toc256000012 h 18 HYPERLINK l _Toc256000013 2.6.5 工程竣工驗(yàn)收程序 PAGEREF _Toc256000013 h 19 HYPERLINK l _Toc256000014 2.6.6 工程變更處理程序 PAGEREF _Toc256000014 h 20 HY
15、PERLINK l _Toc256000015 2.6.7 安全文明施工管理工作程序 PAGEREF _Toc256000015 h 21 HYPERLINK l _Toc256000016 第三章 監(jiān)理工作依據(jù) PAGEREF _Toc256000016 h 22 HYPERLINK l _Toc256000017 3.1 法律、法規(guī) PAGEREF _Toc256000017 h 22 HYPERLINK l _Toc256000018 3.2 技術(shù)標(biāo)準(zhǔn) PAGEREF _Toc256000018 h 22 HYPERLINK l _Toc256000019 3.3 建設(shè)工程監(jiān)理合同及其他
16、合同文件 PAGEREF _Toc256000019 h 23 HYPERLINK l _Toc256000020 第四章 監(jiān)理組織形式、人員配備及進(jìn)退場(chǎng)計(jì)劃、監(jiān)理人員崗位職責(zé) PAGEREF _Toc256000020 h 24 HYPERLINK l _Toc256000021 4.1 項(xiàng)目監(jiān)理機(jī)構(gòu)建立 PAGEREF _Toc256000021 h 25 HYPERLINK l _Toc256000022 4.2 項(xiàng)目監(jiān)理部人員組成 PAGEREF _Toc256000022 h 25 HYPERLINK l _Toc256000023 4.3 項(xiàng)目監(jiān)理人員崗位職責(zé) PAGEREF _T
17、oc256000023 h 26 HYPERLINK l _Toc256000024 第五章 監(jiān)理工作制度 PAGEREF _Toc256000024 h 30 HYPERLINK l _Toc256000025 5.1 施工階段監(jiān)理工作制度 PAGEREF _Toc256000025 h 30 HYPERLINK l _Toc256000026 5.1.1 設(shè)計(jì)文件、施工圖審查制度 PAGEREF _Toc256000026 h 30 HYPERLINK l _Toc256000027 5.1.2 施工圖紙會(huì)審及設(shè)計(jì)交底制度 PAGEREF _Toc256000027 h 31 HYPERL
18、INK l _Toc256000028 5.1.3 施工組織設(shè)計(jì)、專(zhuān)項(xiàng)施工方案(包括安全文明施工)審查制度 PAGEREF _Toc256000028 h 31 HYPERLINK l _Toc256000029 5.1.4 工程開(kāi)工審批制度 PAGEREF _Toc256000029 h 31 HYPERLINK l _Toc256000030 5.1.5 工程材料、半成品、構(gòu)配件質(zhì)量檢驗(yàn)制度 PAGEREF _Toc256000030 h 31 HYPERLINK l _Toc256000031 5.1.6 隱蔽工程、分項(xiàng)(部)、分部工程質(zhì)量驗(yàn)收制度 PAGEREF _Toc2560000
19、31 h 32 HYPERLINK l _Toc256000032 5.1.7 工程竣工預(yù)驗(yàn)收、竣工驗(yàn)收制度 PAGEREF _Toc256000032 h 32 HYPERLINK l _Toc256000033 5.1.8 工程變更復(fù)核審簽及經(jīng)濟(jì)技術(shù)簽證審簽制度 PAGEREF _Toc256000033 h 32 HYPERLINK l _Toc256000034 5.1.9 工程質(zhì)量事故、安全事故處理制度 PAGEREF _Toc256000034 h 33 HYPERLINK l _Toc256000035 5.1.10 施工進(jìn)度監(jiān)督及報(bào)告制度 PAGEREF _Toc2560000
20、35 h 33 HYPERLINK l _Toc256000036 5.1.11 監(jiān)理報(bào)告制度 PAGEREF _Toc256000036 h 34 HYPERLINK l _Toc256000037 5.1.12 工地例會(huì)及其他會(huì)議制度 PAGEREF _Toc256000037 h 34 HYPERLINK l _Toc256000038 5.1.13 新材料、新技術(shù)、新工藝、新設(shè)備審查制度 PAGEREF _Toc256000038 h 34 HYPERLINK l _Toc256000039 5.1.14 工程開(kāi)工令、工程暫停令、工程復(fù)工令、監(jiān)理通知單簽發(fā)制度 PAGEREF _Toc
21、256000039 h 35 HYPERLINK l _Toc256000040 5.1.15 監(jiān)理工作日志制度 PAGEREF _Toc256000040 h 35 HYPERLINK l _Toc256000041 5.1.16 現(xiàn)場(chǎng)監(jiān)理巡視制度 PAGEREF _Toc256000041 h 36 HYPERLINK l _Toc256000042 5.1.17 旁站監(jiān)理制度 PAGEREF _Toc256000042 h 36 HYPERLINK l _Toc256000043 5.1.18 監(jiān)理月報(bào)制度 PAGEREF _Toc256000043 h 36 HYPERLINK l _
22、Toc256000044 5.1.19 平行檢驗(yàn)管理制度 PAGEREF _Toc256000044 h 37 HYPERLINK l _Toc256000045 5.1.20 工程款支付證書(shū)簽審制度 PAGEREF _Toc256000045 h 37 HYPERLINK l _Toc256000046 5.1.21 工程索賠簽審制度 PAGEREF _Toc256000046 h 37 HYPERLINK l _Toc256000047 5.1.22 安全文明施工監(jiān)理監(jiān)督檢查制度 PAGEREF _Toc256000047 h 38 HYPERLINK l _Toc256000048 5.
23、2 項(xiàng)目監(jiān)理部?jī)?nèi)部管理制度 PAGEREF _Toc256000048 h 39 HYPERLINK l _Toc256000049 5.2.1 項(xiàng)目監(jiān)理部?jī)?nèi)容工作會(huì)議制度 PAGEREF _Toc256000049 h 39 HYPERLINK l _Toc256000050 5.2.2 對(duì)外行文審批制度 PAGEREF _Toc256000050 h 39 HYPERLINK l _Toc256000051 5.2.3 監(jiān)理資料檔案管理制度 PAGEREF _Toc256000051 h 39 HYPERLINK l _Toc256000052 5.2.4 廉政管理制度 PAGEREF _
24、Toc256000052 h 40 HYPERLINK l _Toc256000053 第六章 工程質(zhì)量控制 PAGEREF _Toc256000053 h 41 HYPERLINK l _Toc256000054 6.1 工程質(zhì)量控制原則 PAGEREF _Toc256000054 h 41 HYPERLINK l _Toc256000055 6.1.1 工程質(zhì)量控制原則 PAGEREF _Toc256000055 h 41 HYPERLINK l _Toc256000056 6.1.2 監(jiān)理實(shí)施細(xì)則編制計(jì)劃 PAGEREF _Toc256000056 h 41 HYPERLINK l _T
25、oc256000057 6.2 工程質(zhì)量控制內(nèi)容及工作方法 PAGEREF _Toc256000057 h 43 HYPERLINK l _Toc256000058 6.3 監(jiān)理會(huì)議 PAGEREF _Toc256000058 h 43 HYPERLINK l _Toc256000059 6.3.1第一次工地會(huì)議 PAGEREF _Toc256000059 h 43 HYPERLINK l _Toc256000060 6.3.2監(jiān)理例會(huì)及專(zhuān)題會(huì)議 PAGEREF _Toc256000060 h 47 HYPERLINK l _Toc256000061 6.4 施工圖會(huì)審與設(shè)計(jì)交底 PAGERE
26、F _Toc256000061 h 48 HYPERLINK l _Toc256000062 6.5 監(jiān)理審查 PAGEREF _Toc256000062 h 50 HYPERLINK l _Toc256000063 6.5.1審查內(nèi)容 PAGEREF _Toc256000063 h 51 HYPERLINK l _Toc256000064 6.5.2開(kāi)工審查 PAGEREF _Toc256000064 h 51 HYPERLINK l _Toc256000065 6.5.3施工組織設(shè)計(jì)審查 PAGEREF _Toc256000065 h 52 HYPERLINK l _Toc25600006
27、6 6.5.4專(zhuān)項(xiàng)施工方案審查 PAGEREF _Toc256000066 h 54 HYPERLINK l _Toc256000067 6.5.5分包單位(含勞務(wù)分包)資質(zhì)及人員資格審查 PAGEREF _Toc256000067 h 55 HYPERLINK l _Toc256000068 6.5.6 材料、構(gòu)配件、設(shè)備進(jìn)場(chǎng)資質(zhì)審查 PAGEREF _Toc256000068 h 56 HYPERLINK l _Toc256000069 6.5.7新材料、新工藝、新技術(shù)、新設(shè)備的質(zhì)量認(rèn)證審查 PAGEREF _Toc256000069 h 60 HYPERLINK l _Toc256000
28、070 6.5.8施工控制測(cè)量成果及保護(hù)措施審查 PAGEREF _Toc256000070 h 60 HYPERLINK l _Toc256000071 6.5.9施工單位試驗(yàn)室審查 PAGEREF _Toc256000071 h 61 HYPERLINK l _Toc256000072 6.5.10 定期對(duì)施工單位計(jì)量設(shè)備和檢定報(bào)告審查 PAGEREF _Toc256000072 h 61 HYPERLINK l _Toc256000073 6.5.11工程竣工驗(yàn)收?qǐng)?bào)審表及資料審查 PAGEREF _Toc256000073 h 62 HYPERLINK l _Toc256000074 6
29、.6 監(jiān)理指令 PAGEREF _Toc256000074 h 62 HYPERLINK l _Toc256000075 6.6.1簽發(fā)工程開(kāi)工令 PAGEREF _Toc256000075 h 62 HYPERLINK l _Toc256000076 6.6.2簽發(fā)工程暫停令 PAGEREF _Toc256000076 h 63 HYPERLINK l _Toc256000077 6.6.3簽發(fā)工程復(fù)工令 PAGEREF _Toc256000077 h 63 HYPERLINK l _Toc256000078 6.6.4簽發(fā)監(jiān)理通知單 PAGEREF _Toc256000078 h 65 H
30、YPERLINK l _Toc256000079 6.7 報(bào)告 PAGEREF _Toc256000079 h 65 HYPERLINK l _Toc256000080 6.7.1每月監(jiān)理月報(bào) PAGEREF _Toc256000080 h 65 HYPERLINK l _Toc256000081 6.7.2質(zhì)量事故報(bào)告 PAGEREF _Toc256000081 h 66 HYPERLINK l _Toc256000082 6.7.3質(zhì)量評(píng)估報(bào)告 PAGEREF _Toc256000082 h 67 HYPERLINK l _Toc256000083 6.8 旁站 PAGEREF _Toc2
31、56000083 h 68 HYPERLINK l _Toc256000084 6.8.1關(guān)鍵部位、關(guān)鍵工序確定 PAGEREF _Toc256000084 h 68 HYPERLINK l _Toc256000085 6.8.2旁站監(jiān)理程序 PAGEREF _Toc256000085 h 69 HYPERLINK l _Toc256000086 6.8.3旁站監(jiān)理的主要工作內(nèi)容 PAGEREF _Toc256000086 h 69 HYPERLINK l _Toc256000087 6.8.4旁站監(jiān)理的范圍及內(nèi)容 PAGEREF _Toc256000087 h 70 HYPERLINK l
32、_Toc256000088 6.9 巡視 PAGEREF _Toc256000088 h 71 HYPERLINK l _Toc256000089 6.9.1設(shè)計(jì)文件、建設(shè)標(biāo)準(zhǔn)、專(zhuān)項(xiàng)施工方案執(zhí)行情況的符合性檢查 PAGEREF _Toc256000089 h 71 HYPERLINK l _Toc256000090 6.9.2施工工藝、作業(yè)順序的符合性檢查 PAGEREF _Toc256000090 h 71 HYPERLINK l _Toc256000091 6.9.3專(zhuān)職質(zhì)量及安全管理人員、特種作業(yè)人員資格的符合性檢查 PAGEREF _Toc256000091 h 71 HYPERLIN
33、K l _Toc256000092 6.9.4檢查作業(yè)環(huán)境滿(mǎn)足施工要求 PAGEREF _Toc256000092 h 72 HYPERLINK l _Toc256000093 6.9.5巡視檢查記錄 PAGEREF _Toc256000093 h 72 HYPERLINK l _Toc256000094 6.10 驗(yàn)收 PAGEREF _Toc256000094 h 72 HYPERLINK l _Toc256000095 6.10.1材料、構(gòu)配件、設(shè)備進(jìn)場(chǎng)驗(yàn)收 PAGEREF _Toc256000095 h 72 HYPERLINK l _Toc256000096 6.10.2平行檢驗(yàn) P
34、AGEREF _Toc256000096 h 73 HYPERLINK l _Toc256000097 6.10.3過(guò)程驗(yàn)收、檢驗(yàn)批、隱蔽工程、分項(xiàng)工程驗(yàn)收 PAGEREF _Toc256000097 h 74 HYPERLINK l _Toc256000098 6.10.4分部工程驗(yàn)收 PAGEREF _Toc256000098 h 75 HYPERLINK l _Toc256000099 6.10.5單位工程竣工驗(yàn)收 PAGEREF _Toc256000099 h 76 HYPERLINK l _Toc256000100 6.10.6工程質(zhì)量缺陷、工程質(zhì)量事故處理 PAGEREF _Toc
35、256000100 h 82 HYPERLINK l _Toc256000101 第七章 工程造價(jià)控制 PAGEREF _Toc256000101 h 85 HYPERLINK l _Toc256000102 7.1 工程造價(jià)控制原則 PAGEREF _Toc256000102 h 85 HYPERLINK l _Toc256000103 7.2 工程款審查、支付程序 PAGEREF _Toc256000103 h 86 HYPERLINK l _Toc256000104 7.3 工程造價(jià)控制內(nèi)容及工作方法 PAGEREF _Toc256000104 h 86 HYPERLINK l _Toc
36、256000105 7.4 審查 PAGEREF _Toc256000105 h 86 HYPERLINK l _Toc256000106 7.4.1審查工程款支付報(bào)審文件(含預(yù)付款、進(jìn)度款、竣工結(jié)算) PAGEREF _Toc256000106 h 86 HYPERLINK l _Toc256000107 7.4.2審查竣工結(jié)算支付文件 PAGEREF _Toc256000107 h 89 HYPERLINK l _Toc256000108 7.4.3審查工程變更支付文件 PAGEREF _Toc256000108 h 90 HYPERLINK l _Toc256000109 7.4.4審查
37、費(fèi)用索賠支付文件 PAGEREF _Toc256000109 h 90 HYPERLINK l _Toc256000110 7.5 指令 PAGEREF _Toc256000110 h 91 HYPERLINK l _Toc256000111 7.6 報(bào)告 PAGEREF _Toc256000111 h 92 HYPERLINK l _Toc256000112 7.7 工程造價(jià)控制的其他工作 PAGEREF _Toc256000112 h 92 HYPERLINK l _Toc256000113 第八章 工程進(jìn)度控制 PAGEREF _Toc256000113 h 93 HYPERLINK l
38、 _Toc256000114 8.1 工程進(jìn)度控制原則 PAGEREF _Toc256000114 h 93 HYPERLINK l _Toc256000115 8.2 工程進(jìn)度控制內(nèi)容及工作方法 PAGEREF _Toc256000115 h 94 HYPERLINK l _Toc256000116 8.3 會(huì)議 PAGEREF _Toc256000116 h 94 HYPERLINK l _Toc256000117 8.4 審查 PAGEREF _Toc256000117 h 95 HYPERLINK l _Toc256000118 8.5 指令 PAGEREF _Toc256000118
39、 h 96 HYPERLINK l _Toc256000119 8.6 報(bào)告 PAGEREF _Toc256000119 h 97 HYPERLINK l _Toc256000120 8.7 工程進(jìn)度控制的其他監(jiān)理工作 PAGEREF _Toc256000120 h 97 HYPERLINK l _Toc256000121 第九章 安全生產(chǎn)及文明施工管理的監(jiān)理工作 PAGEREF _Toc256000121 h 98 HYPERLINK l _Toc256000122 9.1 安全生產(chǎn)和文明施工管理的監(jiān)理工作原則 PAGEREF _Toc256000122 h 98 HYPERLINK l _
40、Toc256000123 9.1.1安全生產(chǎn)和文明施工管理的監(jiān)理工作原則 PAGEREF _Toc256000123 h 98 HYPERLINK l _Toc256000124 9.1.2安全文明施工管理實(shí)施細(xì)則編制計(jì)劃 PAGEREF _Toc256000124 h 99 HYPERLINK l _Toc256000125 9.2 安全生管理的監(jiān)理內(nèi)容及工作方法 PAGEREF _Toc256000125 h 100 HYPERLINK l _Toc256000126 9.3 會(huì)議 PAGEREF _Toc256000126 h 100 HYPERLINK l _Toc256000127
41、9.4 審查 PAGEREF _Toc256000127 h 101 HYPERLINK l _Toc256000128 9.4.1審查安全生產(chǎn)體系情況 PAGEREF _Toc256000128 h 101 HYPERLINK l _Toc256000129 9.4.2審查專(zhuān)項(xiàng)施工方案 PAGEREF _Toc256000129 h 104 HYPERLINK l _Toc256000130 9.5 指令 PAGEREF _Toc256000130 h 106 HYPERLINK l _Toc256000131 9.6 報(bào)告 PAGEREF _Toc256000131 h 107 HYPER
42、LINK l _Toc256000132 9.7 巡視 PAGEREF _Toc256000132 h 107 HYPERLINK l _Toc256000133 9.8 復(fù)查、驗(yàn)收 PAGEREF _Toc256000133 h 111 HYPERLINK l _Toc256000134 9.9 安全生產(chǎn)管理的其他監(jiān)理工作 PAGEREF _Toc256000134 h 112 HYPERLINK l _Toc256000135 第十章 合同與信息管理 PAGEREF _Toc256000135 h 115 HYPERLINK l _Toc256000136 10.1 合同與信息管理內(nèi)容 P
43、AGEREF _Toc256000136 h 115 HYPERLINK l _Toc256000137 10.2 工程暫停與復(fù)工管理 PAGEREF _Toc256000137 h 116 HYPERLINK l _Toc256000138 10.2.1工程暫停與復(fù)工管理內(nèi)容及工作方法 PAGEREF _Toc256000138 h 116 HYPERLINK l _Toc256000139 10.2.2工程暫停與復(fù)工管理工作內(nèi)容 PAGEREF _Toc256000139 h 116 HYPERLINK l _Toc256000140 10.3 工程變更管理 PAGEREF _Toc256
44、000140 h 117 HYPERLINK l _Toc256000141 10.3.1工程變更管理內(nèi)容及工作方法 PAGEREF _Toc256000141 h 117 HYPERLINK l _Toc256000142 10.3.2工程變更管理工作內(nèi)容 PAGEREF _Toc256000142 h 117 HYPERLINK l _Toc256000143 10.4 費(fèi)用索賠管理 PAGEREF _Toc256000143 h 119 HYPERLINK l _Toc256000144 10.4.1費(fèi)用索賠管理內(nèi)容及工作方法 PAGEREF _Toc256000144 h 119 HY
45、PERLINK l _Toc256000145 10.4.2處理費(fèi)用索賠管理工作內(nèi)容 PAGEREF _Toc256000145 h 119 HYPERLINK l _Toc256000146 10.5 工程延期與工程延誤管理 PAGEREF _Toc256000146 h 122 HYPERLINK l _Toc256000147 10.5.1工程延期與工程延誤管理內(nèi)容及工作方法 PAGEREF _Toc256000147 h 122 HYPERLINK l _Toc256000148 10.5.2工程延期與工程延誤管理工作內(nèi)容 PAGEREF _Toc256000148 h 122 HYP
46、ERLINK l _Toc256000149 10.6 施工合同爭(zhēng)議管理 PAGEREF _Toc256000149 h 124 HYPERLINK l _Toc256000150 10.6.1施工合同爭(zhēng)議管理內(nèi)容及工作方法 PAGEREF _Toc256000150 h 124 HYPERLINK l _Toc256000151 10.6.2施工合同爭(zhēng)議管理工作內(nèi)容 PAGEREF _Toc256000151 h 124 HYPERLINK l _Toc256000152 10.7 施工合同解除管理 PAGEREF _Toc256000152 h 126 HYPERLINK l _Toc25
47、6000153 10.7.1施工合同解除管理內(nèi)容及工作方法 PAGEREF _Toc256000153 h 126 HYPERLINK l _Toc256000154 10.7.2施工合同解除管理工作內(nèi)容 PAGEREF _Toc256000154 h 126 HYPERLINK l _Toc256000155 10.8 信息管理工作 PAGEREF _Toc256000155 h 127 HYPERLINK l _Toc256000156 10.8.1信息管理的工作內(nèi)容 PAGEREF _Toc256000156 h 127 HYPERLINK l _Toc256000157 10.8.2信
48、息管理措施 PAGEREF _Toc256000157 h 129 HYPERLINK l _Toc256000158 第十一章 組織協(xié)調(diào) PAGEREF _Toc256000158 h 130 HYPERLINK l _Toc256000159 11.1 組織協(xié)調(diào)的工作內(nèi)容 PAGEREF _Toc256000159 h 130 HYPERLINK l _Toc256000160 11.2 組織協(xié)調(diào)的工作方法 PAGEREF _Toc256000160 h 131 HYPERLINK l _Toc256000161 11.3 組織協(xié)調(diào)措施 PAGEREF _Toc256000161 h 13
49、1 HYPERLINK l _Toc256000162 第十二章 監(jiān)理工作設(shè)施 PAGEREF _Toc256000162 h 132 HYPERLINK l _Toc256000163 12.1 建設(shè)單位提供設(shè)施 PAGEREF _Toc256000163 h 132 HYPERLINK l _Toc256000164 12.2 監(jiān)理單位提供設(shè)施 PAGEREF _Toc256000164 h 132 HYPERLINK l _Toc256000166 第十三章 相關(guān)服務(wù) PAGEREF _Toc256000166 h 134 HYPERLINK l _Toc256000167 13.1 相
50、關(guān)服務(wù)的基本內(nèi)容 PAGEREF _Toc256000167 h 134 HYPERLINK l _Toc256000168 13.2 保修期服務(wù)基本流程 PAGEREF _Toc256000168 h 134 HYPERLINK l _Toc256000169 13.2 保修期服務(wù)基本流程 PAGEREF _Toc256000169 h 135 HYPERLINK l _Toc256000170 13.3 工程保修階段監(jiān)理服務(wù)工作內(nèi)容與工作方法 PAGEREF _Toc256000170 h 135 HYPERLINK l _Toc256000171 13.3.1工程保修階段監(jiān)理服務(wù)工作方法
51、 PAGEREF _Toc256000171 h 135 HYPERLINK l _Toc256000172 13.3.2工程保修階段監(jiān)理服務(wù)工作內(nèi)容 PAGEREF _Toc256000172 h 137第一章 工程概況1.1 建設(shè)工程名稱(chēng):XXXXXXXX投資項(xiàng)目;1.2 建設(shè)工程地點(diǎn):XXXXXXXXX;1.3 建設(shè)工程組成及建筑規(guī)模:本工程為農(nóng)村安全飲水工程,該工程主要由水源工程、提水管道、管理方、高位水池、配水管網(wǎng)等部分組成。本工程涉及XX市XX鎮(zhèn)XX人的飲水不安全問(wèn)題、XXXX鄉(xiāng)XXX人的飲水不安全問(wèn)題、XX鄉(xiāng)XXX人的飲水不安全問(wèn)題、XXX鄉(xiāng)XXXX人的飲水不安全問(wèn)題。圖1 平面
52、布置圖 1.4 工程概況:項(xiàng)目概況表一(二期綜合樓)工程名稱(chēng)建設(shè)地點(diǎn)建設(shè)用途總建筑面積(m2)農(nóng)村安全飲水參建單位審圖、監(jiān)督單位建設(shè)專(zhuān)業(yè)分包施工圖審查項(xiàng)管質(zhì)量監(jiān)督綿陽(yáng)市建設(shè)工程質(zhì)量監(jiān)督站勘察安全監(jiān)督綿陽(yáng)市建設(shè)工程安全監(jiān)督站設(shè)計(jì)總包勞務(wù)分包待定監(jiān)理建設(shè)規(guī)模建筑特征投資總額(元)工程規(guī)模結(jié)構(gòu)類(lèi)型計(jì)劃開(kāi)工日期結(jié)構(gòu)安全等級(jí)計(jì)劃完工日期工程防洪標(biāo)準(zhǔn)質(zhì)量要求安全要求工程等級(jí)抗震設(shè)防烈度監(jiān)理費(fèi)金額工程地質(zhì)構(gòu)造工程特點(diǎn)概述 1.5 工程等級(jí)、類(lèi)型和主要施工方法:(一)工程等級(jí)及類(lèi)型本工程根據(jù)水利水電工程等級(jí)劃分及洪水標(biāo)準(zhǔn)(SL252-2000)有關(guān)規(guī)定工程等級(jí)為V級(jí),根據(jù)村鎮(zhèn)供水工程技術(shù)規(guī)范,本工程規(guī)模為17
53、0m3/d,為V型供水工程,主要建筑物劃分為5級(jí),次要建筑物為5級(jí).本工程主要建筑物為供水管網(wǎng)及附屬設(shè)施等。(二)主要施工方法1.1、土方開(kāi)挖本工程土方開(kāi)挖主要采用挖掘機(jī)。土方開(kāi)挖必須與管道敷設(shè)密切配合,不出現(xiàn)重復(fù)挖、填的現(xiàn)象。并合理安排施工計(jì)劃,使土方開(kāi)挖與管道敷設(shè)保持一致,避免溝槽開(kāi)挖后長(zhǎng)時(shí)間暴露,防止受雨水及地表水侵蝕。1.2、石方開(kāi)挖開(kāi)挖均采用從上至下,分層開(kāi)挖的程序施工。選用10m3移動(dòng)空壓機(jī)供風(fēng),手風(fēng)鉆鉆孔,人工集渣、裝渣,小四輪拖拉機(jī)出渣。局部修邊,底部的石方由人工開(kāi)挖,棄渣運(yùn)至指定渣場(chǎng)堆放。13、土石方回填主要開(kāi)挖棄渣作為建筑物填料,不夠部分再?gòu)牧蠄?chǎng)開(kāi)采。填筑量不大的,采用人工
54、方法施工。分層鋪料,分層厚度控制在20cm以?xún)?nèi),選用蛙式打夯機(jī)壓實(shí)或人工夯實(shí)。1.4、混凝土澆筑(1)混凝土澆筑前,要對(duì)砼保護(hù)層厚度控制措施進(jìn)行檢查,本工程采用水泥砂漿墊塊墊塞。(2)在澆筑砼前,模板和鋼筋上的垃圾、泥土和鋼筋上的油污等雜物必須清楚干凈,模板澆水濕潤(rùn)。(3)基礎(chǔ)混凝土分層連續(xù)澆灌完成,每一臺(tái)高度內(nèi)應(yīng)整體連續(xù)澆灌搗層,沒(méi)澆筑完一臺(tái)階應(yīng)稍停0.5-1.0h,使初步獲得沉實(shí),再澆筑上層,以防止下臺(tái)階混凝土溢起,在上臺(tái)根部出現(xiàn)爛脖子,每一臺(tái)階澆筑完,表面用砂板抹平。施工縫留于基礎(chǔ)頂面。上下兩層混凝土之間應(yīng)交叉振搗密實(shí)。(4)墩柱上部混凝土澆筑時(shí),在頂部搭設(shè)操作平臺(tái),混凝土采用人工吊葫蘆
55、拉到操作平臺(tái)處,用串筒將混凝土送入模板內(nèi),防止下料過(guò)程發(fā)生離析現(xiàn)象。澆筑過(guò)程中通過(guò)敲擊墩柱模板辨別砼澆筑的位置,并通過(guò)柱身的檢查口查看混凝土的澆筑情況,防止空柱、狗洞現(xiàn)象。(5)砼澆筑振搗完畢,須在12h內(nèi)澆水養(yǎng)護(hù),并應(yīng)考慮溫度的原因,采用熱水養(yǎng)護(hù)及保溫措施,使砼強(qiáng)度保持正常增長(zhǎng)。分別采取相應(yīng)措施進(jìn)行認(rèn)真養(yǎng)護(hù)。柱梁用麻袋包裹,現(xiàn)澆板用麻袋覆蓋,可以取得較好的養(yǎng)護(hù)效果。(6)混凝土試件在混凝土澆筑地點(diǎn)隨機(jī)抽取,每100m3混凝土(每一工作班)取樣不得少于一次;每次取樣至少留置一組標(biāo)準(zhǔn)試件,同條件養(yǎng)護(hù)試件的留置組數(shù)應(yīng)根據(jù)實(shí)際需要確定。如使用的原材料、配合比或施工方法有變化時(shí),均應(yīng)另行留置試塊。1.
56、5、管道工程1)管槽開(kāi)挖 (1)管槽開(kāi)挖以直線為宜,槽底開(kāi)挖寬度為DN+0.2m。遇到管道在地下連接時(shí),應(yīng)適當(dāng)增加借口處槽底寬度,管道槽底不宜小于DN+0.5m,以方便安裝對(duì)接為宜。 (2)管道埋設(shè)時(shí),最小管頂覆土深度應(yīng)符合下列要求: 埋設(shè)在車(chē)行道下時(shí),不應(yīng)小于0.8m。 埋設(shè)在人行道下時(shí),不應(yīng)下雨0.6m。(3)當(dāng)橫穿車(chē)行道達(dá)不到設(shè)計(jì)深度時(shí),應(yīng)采取敷設(shè)鋼制套管的措施進(jìn)行保護(hù)。(4)管槽必須轉(zhuǎn)彎時(shí),轉(zhuǎn)彎角度不宜過(guò)小,彎曲半徑應(yīng)符合下列規(guī)定:PE管道 允許彎曲半徑R(mm)D50 30D(5)人工開(kāi)挖管槽時(shí),要求溝槽底部平整、密實(shí),無(wú)尖銳物體。溝底可以有起伏,但必須平滑地支撐管材,若有超挖時(shí),必
57、須回填夯實(shí)。2)管道連接PE給水管道有熱熔連接和電熔連接。熱熔連接又分熱熔承插連接和熱熔對(duì)接連接,電熔連接分為電熔承插和電熔鞍型連接。設(shè)計(jì)采用熱熔對(duì)接連接方式施工,它的主要步驟有:材料準(zhǔn)備:將管道或管材置于平坦位置,放于對(duì)接機(jī)上,留足10-20mm的切削余量。夾緊:根據(jù)所焊制的管段、管件選擇合適的卡瓦夾具,夾緊管材,為切削做好準(zhǔn)備。切削:切削所焊制管段、管件端面雜質(zhì)和氧化層,保證兩對(duì)接端面平整、光潔、無(wú)雜質(zhì)。對(duì)中:兩焊管段斷面要完全對(duì)中,錯(cuò)邊越小越好,錯(cuò)邊不能超過(guò)壁厚的10%。否則將影響對(duì)接質(zhì)量。加熱:對(duì)接溫服一般在121-230攝氏度之間為宜,加熱板和加熱時(shí)間冬夏有別,以?xún)啥嗣嫒廴陂L(zhǎng)度1-2
58、mm為佳。切換:將加熱板拿開(kāi),迅速讓兩熱熔端面相粘并加壓,為保證熔融對(duì)接質(zhì)量,切換周期越短越好。熔融對(duì)接:是焊接的關(guān)鍵,對(duì)接過(guò)程應(yīng)始終處于熔融壓力下進(jìn)行,卷邊寬度2-4mm為宜。冷卻:保持對(duì)接壓力不變,讓借口緩慢冷卻,冷卻時(shí)間長(zhǎng)短以手摸卷邊生硬,感覺(jué)不到熱為準(zhǔn)。對(duì)接完成:冷卻好厚松開(kāi)卡瓦,移開(kāi)對(duì)接機(jī),重新準(zhǔn)備下一接口連接。3)安裝施工管道鋪設(shè)應(yīng)在溝底標(biāo)高和管道基礎(chǔ)質(zhì)量檢查合格后進(jìn)行,在鋪設(shè)管道前要對(duì)管材、管件等重新作一次外觀價(jià)差,發(fā)現(xiàn)有問(wèn)題的管材、管件均不得采用。管道不得鋪設(shè)在凍土上,鋪設(shè)管道和管道試壓過(guò)程中,應(yīng)防止溝底凍結(jié)。管材連接好后平穩(wěn)放入溝槽內(nèi)。部分回填、試壓、全部回填。在條件允許下管
59、徑不大時(shí),可將2或3根管在溝槽上接好,平穩(wěn)放入溝槽內(nèi)。管材在吊動(dòng)及放入溝內(nèi)時(shí),應(yīng)采用可靠的軟帶吊具,平穩(wěn)下溝,不與溝壁或溝底激烈碰撞,應(yīng)防止劃傷、扭曲或過(guò)大的拉伸和彎曲。聚乙烯給水管道宜蛇形敷設(shè),并宜隨地形彎曲敷設(shè),其允許彎曲半徑應(yīng)符合規(guī)范規(guī)定。當(dāng)管材敷設(shè)采用托管法時(shí),拉力不得大于管材屈服拉伸強(qiáng)度的50%。由于PE管材本身具有較好的柔韌性和伸縮性,所有管道安裝均未考慮伸縮節(jié)的安裝。在PE管道穿越鐵路、公路時(shí),應(yīng)設(shè)鋼筋混凝土套管,套管的最小直徑為聚乙烯PE管道管徑加200mm;管道穿過(guò)地下室或地下構(gòu)筑物外墻時(shí)應(yīng)采取嚴(yán)格的防水措施。在管道彎頭、三通、漸縮接頭、消防栓等處均用C20砼設(shè)置混凝土支墩,
60、法蘭閥門(mén)用磚砌支墩加固。PE管道與金屬閥門(mén)、消防栓連接處用鋼塑轉(zhuǎn)換裝置,并需設(shè)閥門(mén)井,聚乙烯閥門(mén)連接可不設(shè)閥門(mén)井,但需設(shè)閥門(mén)護(hù)套管。在管路隆起部位或上坡地段均應(yīng)設(shè)置排氣閥,以減小氣、水混壓對(duì)管道的沖擊。管道與排氣閥的比例設(shè)計(jì)為1:8。PE管道敷設(shè)時(shí),宜隨走向埋設(shè)金屬示蹤線,距管頂不大于300mm處設(shè)警示帶,警示帶上應(yīng)標(biāo)出醒目的提示字樣。管道安裝和鋪設(shè)工程中斷時(shí),應(yīng)用木塞等將關(guān)口封閉,防止雜物進(jìn)入。4)回填夯實(shí)管道安裝敷設(shè)完畢,待隱蔽工程驗(yàn)收后,應(yīng)立即回填,回填時(shí),應(yīng)符合下列規(guī)定:防止槽內(nèi)積水造成管道漂浮,如有積水,應(yīng)立即排盡。對(duì)石方、土方混合地段的管槽回填時(shí),應(yīng)先裝運(yùn)粘土或砂土回填至管頂200
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 重慶市物業(yè)服務(wù)合同范本示例
- 保理合同(日元)
- 房屋使用權(quán)合同轉(zhuǎn)租協(xié)議樣本
- 檢測(cè)服務(wù)合同范本:機(jī)構(gòu)合作篇
- 資產(chǎn)配置基金合同例文
- 度標(biāo)準(zhǔn)私人承包協(xié)議合同
- 農(nóng)產(chǎn)品購(gòu)銷(xiāo)合同經(jīng)典合同范文
- 房地產(chǎn)項(xiàng)目苗木采購(gòu)合同書(shū)模板
- 家電配件的表面裝飾與標(biāo)識(shí)技術(shù)考核試卷
- 中介服務(wù)行業(yè)的人力資源服務(wù)標(biāo)準(zhǔn)考核試卷
- DB11 938-2022 綠色建筑設(shè)計(jì)標(biāo)準(zhǔn)
- 部編版語(yǔ)文八年級(jí)下冊(cè)第六單元名著導(dǎo)讀《鋼鐵是怎樣煉成的》問(wèn)答題 (含答案)
- 2022譯林版新教材高一英語(yǔ)必修二單詞表及默寫(xiě)表
- 全國(guó)青少年機(jī)器人技術(shù)等級(jí)考試:二級(jí)培訓(xùn)全套課件
- 九種中醫(yī)體質(zhì)辨識(shí)概述課件
- (外研版)英語(yǔ)四年級(jí)下冊(cè)配套同步練習(xí) (全書(shū)完整版)
- 小學(xué)數(shù)學(xué)計(jì)算能力大賽實(shí)施方案
- 古詩(shī)詞誦讀《虞美人》課件-統(tǒng)編版高中語(yǔ)文必修上冊(cè)
- 文物學(xué)概論-中國(guó)古代青銅器(上)
- 制作拉線課件
- 某物業(yè)公司能力素質(zhì)模型庫(kù)(參考)
評(píng)論
0/150
提交評(píng)論