文檔簡介
1、Coca-cola standardization office ZZ5AB-ZZS YT-ZZ2C-ZZ682T-ZZT18本科畢業(yè)設計(論文)專業(yè)外文翻譯土木工程專業(yè)(道路與橋?qū)I(yè)名稱:梁)年級班級:道橋08-5班學生姓名:指導教師:二O一二年五月十八日Geometric Design of HighwaysThe road is one kind of linear construction used for travel. It is made of the roadbed, the road surface, the bridge, the culvert and the tunne
2、l. In addition, it also has the crossing of lines, the protective project and the traffic engineering and the route facility.The roadbed is the base of road surface, road shoulder, side slope, side ditch foundations. It is stone material structure, which is designed according to routes plane positio
3、n . The roadbed, as the base of travel, must guarantee that it has the enough intensity and the stability that can prevent the water and other natural disaster from corroding.The road surface is the surface of road. It is single or complex structure built with mixture. The road surface require being
4、 smooth, having enough intensity, good stability and anti- slippery function. The quality of road surface directly affects the safe, comfort and the traffic.Highway geometry designs to consider Highway Horizontal Alignment, Vertical Alignment two kinds of linear and cross- sectional composition of c
5、oordination, but also pay attention to the smooth flow of the line of sight, etc. Determine the road geometry, consider the topography, surface features, rational use of land and environmental protection factors, to make full use of the highway geometric components of reasonable size and the linear
6、combination.DesignThe alignment of a road is shown on the plane view and is a series of straight lines called tangents connected by circular. In modern practice it is common to interpose transition or spiral curves between tangents and circular curves.Alignment must be consistent. Sudden changes fro
7、m flat to sharp curves and long tangents followed by sharp curves must be avoided; otherwise, accident hazards will be created. Likewise, placing circular curves of different radii end to end (compound curves) or having a short tangent between two curves is poor practice unless suitable transitions
8、between them are provided. Long, flat curves are preferable at all times, as they are pleasing in appearance and decrease possibility of future obsolescence. However, alignment without tangents is undesirable on two-lane roads because some drivers hesitate to pass on curves. Long, flat curves should
9、 be used for small changes in direction, as short curves appear as “kink” . Also horizontal and vertical alignment must be considered together, not separately. For example, a sharp horizontal curve beginning near a crest can create a serious accident hazard.A vehicle traveling in a curved path is su
10、bject to centrifugal force. This is balanced by an equal and opposite force developed through cannot exceed certain maximums, and these controls place limits on the sharpness of curves that can be used with a design speed. Usually the sharpness of a given circular curve is indicated by its radius. H
11、owever, for alignment design, sharpness is commonly expressed in terms ofdegree of curve, which is the central angle subtended by a 100- ft length of curve. Degree of curve is inversely proportional to the radius.Tangent sections of highways carry normal cross slope; curved sections are super elevat
12、ed. Provision must be made for gradual change from one to the other. This usually involves maintaining the center line of each individual roadway at profile grade while raising the outer edge and lowering the inner edge to produce the desired super elevation is attained some distance beyond the poin
13、t of curve.If a vehicle travels at high speed on a carefully restricted path made up of tangents connected by sharp circular curve, riding is extremely uncomfortable. As the car approaches a curve, super elevation begins and the vehicle is tilted inward, but the passenger must remain vertical since
14、there is on centrifugal force requiring compensation. When the vehicle reaches the curve, full centrifugal force develops at once, and pulls the rider outward from his vertical position. To achieve a position of equilibrium he must force his body far inward. As the remaining super elevation takes ef
15、fect, further adjustment in position is required. This process is repeated in reverse order as the vehicle leaves the curve. When easement curves are introduced, the change in radius from infinity on the tangent to that of the circular curve is effected gradually so that centrifugal force also devel
16、ops gradually. By careful application of super elevation along the spiral, a smooth and gradual application of centrifugal force can be had and the roughness avoided.Easement curves have been used by the railroads for many years, but their adoption by highway agencies has come only recently. This is
17、 understandable. Railroad trains must follow the precise alignment of the tracks, and the discomfort described here can be avoided only by adopting easement curves. On the other hand, the motor-vehicle operator is free to alter his lateral position on the road and can provide his own easement curves
18、 by steering into circular curves gradually. However, this weaving within a traffic lane (but sometimes into other lanes) is dangerous. Properly designed easement curves make weaving unnecessary. It is largely for safety reasons, then, that easement curves have been widely adopted by highway agencie
19、s.For the same radius circular curve, the addition of easement curves at the ends changes the location of the curve with relation to its tangents; hence the decision regarding their use should be made before the final location survey. They point of beginning of an ordinary circular curve is usually
20、labeled the PC (point of curve) or BC (beginning of curve). Its end is marked the PT (point of tangent) or EC (end of curve). For curves that include easements, the common notation is, as stationing increases: TS (tangent to spiral), SC (spiral to circular curve), CS (circular curve to spiral), and
21、ST (spiral go tangent).On two-lane pavements provision of a wilder roadway is advisable on sharp curves. This will allow for such factors as (1) the tendency for drivers to shy away from the pavement edge, (2) increased effective transverse vehicle width because the front and rear wheels do not trac
22、k, and (3) added width because of the slanted position of the front of the vehicle to the roadway centerline. For 24-ft roadways, the added width is so small that it can be neglected. Only for 30mph design speeds and curves sharper than 220 does the added width reach 2 ft. For narrower pavements, ho
23、wever, widening assumes importance even on fairly flat curves. Recommended amounts of and procedures for curve widening are given in Geometric Design for Highways.GradesThe vertical alignment of the roadway and its effect on the safe and economical operation of the motor vehicle constitute one of th
24、e most important features of road design. The vertical alignment, which consists of a series of straight lines connected by vertical parabolic or circular curves, is known as the ugrade line. ” When the grade line is increasing from the horizontal it is known as a “plus grade, “ and when it is decre
25、asing from the horizontal it is known as a aminus grade. In analyzing grade and grade controls, the designer usually studies the effect of change in grade on the centerline profile.In the establishment of a grade, an ideal situation is one in which the cut is balanced against the fill without a grea
26、t deal of borrow or an excess of cut to be wasted. All hauls should be downhill if possible and not too long. The grade should follow the general terrain and rise and fall in the direction of the existing drainage. In mountainous country the grade may be set to balance excavation against embankment
27、as a clue toward least overall cost. In flat or prairie country it will be approximately parallel to the ground surface but sufficiently above it to allow surface drainage and, where necessary, to permit the wind to clear drifting snow. Where the road approaches or follows along streams, the height
28、of the grade line may be dictated by the expected level of flood water. Under all conditions, smooth, flowing grade lines are preferable to choppy ones of many short straight sections connected with short vertical curves.Changes of grade from plus to minus should be placed in cuts, and changes from
29、a minus grade to a plus grade should be placed in fills. This will generally give a good design, and many times it will avoid the appearance of building hills and producing depressions contrary to the general existing contours of the land. Other considerations for determining the grade line may be o
30、f more importance than the balancing of cuts and fills.Urban projects usually require a more detailed study of the controls and finer adjustment of elevations than do rural projects. It is often best to adjust the grade to meet existing conditions because of the additional expense of doing otherwise
31、.In the analysis of grade and grade control, one of the most important considerations is the effect of grades on the operating costs of the motor vehicle. An increase in gasoline consumption and a reduction in speed are apparent when grades are increase in gasoline consumption and a reduction in spe
32、ed is apparent when grades are increased. An economical approach would be to balance the added annual cost of grade reduction against the added annual cost of vehicle operation without grade reduction. An accurate solution to the problem depends on the knowledge of traffic volume and type, which can
33、 be obtained only by means of a traffic survey.While maximum grades vary a great deal in various states, AASHTO recommendations make maximum grades dependent on design speed and topography. Present practice limits grades to 5 percent of a design speed of 70 mph. For a design speed of 30 mph, maximum
34、 grades typically range from 7 to 12 percent, depending on topography. Wherever long sustained grades are used, the designer should not substantially exceed the critical length of grade without the provision of climbing lanes for slow-moving vehicles. Critical grade lengths vary from 1700 ft for a 3
35、 percent grade to 500 ft for an 8 percent grade.Long sustained grades should be less than the maximum grade on any particular section of a highway. It is often preferred to break the long sustained uniform grade by placing steeper grades at the bottom and lightening the grade near the top of the asc
36、ent. Dips in the profile grade in which vehicles may be hidden from view should also be avoided. Maximum grade forhighway is 9 percent. Standards setting minimum grades are of importance only when surface drainage is a problem as when water must be carried away in a gutter or roadside ditch. In such
37、 instances the AASHTO suggests a minimum of %.Sight DistanceFor safe vehicle operation, highway must be designed to give drivers a sufficient distance or clear version ahead so that they can avoid unexpected obstacles and can pass slower vehicles without danger. Sight distance is the length of highw
38、ay visible ahead to the driver of a vehicle. The concept of safe sight distance has two facets: u stoppingM (or no passing ) and passing .At times large objects may drop into a roadway and will do serious damage to a motor vehicle that strikes them. Again a car or truck may be forced to stop in the
39、traffic lane in the path of following vehicles. In dither instance, proper design requires that such hazards become visible at distances great enough that drivers can stop before hitting them. Further more, it is unsafe to assume that one oncoming vehicle may avoid trouble by leaving the lane in whi
40、ch it is traveling, for this might result in loss of control or collision with another vehicle.Stopping sight distance is made up of two elements. The first is the distance traveled after the obstruction comes into view but before the driver applies his brakes. During this period of perception and r
41、eaction, the vehicle travels at its initial velocity. The second distance is consumed while the driver brakes the vehicle to a stop. The first of these two distances is dependent on the speed of the vehicle and the perception time and brake-reaction time of the operator. The second distance depends
42、on the speed of the vehicle; the condition of brakes, times, and roadway surface; and the alignment and grade of the highway.On two-lane highways, opportunity to pass slow-moving vehicles must be provided at intervals. Otherwise capacity decreases and accidents increase as impatient drivers risk hea
43、d-on collisions by passing when it is unsafe to do so. The minimum distance ahead that must be clear to permit safe passing is called the passing sight distance. In deciding whether or not to pass another vehicle, the driver must weigh the clear distance available to him against the distance require
44、d to carry out the sequence of events that make up the passing maneuver. Among the factors that will influence his decision are the degree of caution that he exercises and the accelerating ability of his vehicle. Because humans differ markedly, passing practices, which depend largely on human judgme
45、nt and behavior rather than on the laws of mechanics, vary considerably among drivers.The geometric design is to ensure highway traffic safety foundation, the highway construction projects around the other highway on geometric design, therefore, in the geometry of the highway design process, if appe
46、ar any unsafe potential factors, or low levels of combination of design, will affect the whole highway geometric design quality, and the safety of the traffic to bring adverse impact. So, on the geometry of the highway design must be focus on.公路幾何設計公路是供汽車或其他車輛行駛的一種線形帶狀結構體。它是由路 基、路面、橋梁、涵洞和隧道組成。此外,它還有
47、路線交叉、工程和交 通工程及沿線設施。路基是路面、路肩、邊坡、等部分的基礎。它是按照路線的平面位 置在地面上開挖和成的土物。路基作為行車部分的基礎,必須保證它有 足夠的強度和穩(wěn)定性,可以防止水及其他自然災害的侵蝕。路面是公路表面的部分。它是用混合料鋪筑的單層或多層結構物。 路面要求光滑,具有足夠的強度,穩(wěn)定性好和抗?jié)窕δ?。路面質(zhì)量的 好環(huán),直接影響到行車的安全性、舒適性和通行。公路兒何線形設計要考慮公路平面線形、縱斷面線形兩種線形以及 橫斷面的組成相協(xié)調(diào),還要注意視距的暢通等等。確定公路兒何線形 時,在考慮地形、地物、土地的合理利用及環(huán)境保護因素時,要充分利 用公路兒何組成部分的合理尺寸和線
48、形組合。1、線形設計道路的線形反映在平面圖上是由一系列的直線和與直線相連的圓曲 線構成的?,F(xiàn)代設計時常在直線與圓曲線之間插入緩和曲線。線形應是連續(xù)的,應避免平緩線形到小半徑曲線的突變或者長直線 末端與小半徑曲線相連接的突然變化,否則會發(fā)生交通事故。同樣,不 同半徑的圓弧首尾相接(曲線)或在兩半徑不同的圓弧之間插入短直線 都是不良的線形,除非在圓弧之間插入緩和曲線。長而平緩的曲線在任 何時候都是可取的,因為這種曲線線形優(yōu)美,將來也不會廢棄。然而, 雙向道路線形全由曲線構成也是不理想的,因為一些駕駛員通過曲線路 段時總是猶豫。長而緩的曲線應用在拐角較小的地方。如果采用短曲 線,則會出現(xiàn)“扭結”。另
49、外,線路的平、縱斷面設計應綜合考慮,而 不應只顧其一,不顧其二,例如,當平曲線的起點位于豎曲線的頂點附 近時將會產(chǎn)生嚴重的交通事故。行駛在曲線路段上的車輛受到離心力的作用,就需要一個大小相同 方向相反的由超高和側向磨擦提供的力抵消它,這些控制值對于某一規(guī) 定設計車速可能采用曲線的曲率作了限制。通常情況下,某一圓曲線的 曲率是由其半徑來體現(xiàn)的。而對于線形設計而言,曲率常常通過曲線的 程度來描述,即100英尺長的曲線所對應的中心角,曲線的程度與曲線 的半徑成反比。公路的直線地段設置正常的路拱,而曲線地段則設置超高,在正常 斷面與超高斷面之間必須設置過渡漸變路段。通常的做法是維持道路每 一條中線設計
50、標高不變,通過抬高外側邊緣,降低內(nèi)側邊緣以形成所需 的超高,對于直線與圓曲線直接相連的線形,超高應從未到達曲線之前 的直線上開始,在曲線頂點另一端一定距離以外達到全部超高。如果車輛以高速度行駛在直線與小半徑的圓曲線相連的路段,行車 是極不舒服。汽車駛近曲線路段時,超高開始,車輛向內(nèi)側傾斜,但乘 客須維持身體的垂直狀態(tài),因為此時未受到離心力的作用。當汽車到達 曲線路段時,離心力突然產(chǎn)生,迫使乘客向外傾斜,為了維持平衡,乘 客必須迫使自己的身體向內(nèi)側傾斜。由于剩余超高發(fā)揮作用,乘客須作 進一步的姿勢的調(diào)整。當汽車離開曲線時,上述過程剛好相反。插入緩 和曲線后,半徑從無窮大逐漸過渡到圓曲線上的某一固
51、定值,離心力逐 漸增大,沿緩和曲線心設置超高,離心力平穩(wěn)逐漸增加,避免了行車顛 簸。緩和曲線在鐵路上已經(jīng)使用多年,但在公路上最近才得以應用,這 是可以理解的。火車必須遵循精確的運行軌道,采用緩和曲線后,上述 那種不舒服的感覺才能消除。然而,汽車司機在公路上可以隨意改變側 向位置,通過迂回進入圓曲線來為自己提供緩和曲線。但是在一個車道 上(有時在其他車道上)做這種迂回行駛是非常危險的。設計合理的緩 和曲線使得上述迂回沒有必要。主要是出于安全原因,公路部門廣泛采 用了緩和曲線。對于半徑相同的圓曲線來說,在未端加上緩和曲線就會改變曲線與 直線的相關位置,因此應在最終定線勘測之前應決定是否采用緩和曲 線。一般曲線的起點標為PC或BC,終點標為PT或EC。對含有緩和曲線 的曲線,通常的標記配置增為:TC、SC、CS和ST。對于雙向道路,急彎 處應增加路面寬度,這主要基于以下因素:(1)駕駛員害怕駛出路面邊 緣;(2)由于車輛前輪和后輪的行駛軌跡不同,車輛有效橫向?qū)挾燃?大;(3)車輛前方相對于公路中線傾斜而增加的寬度。對于寬度為24 英尺的道路,增加的寬度很小,可以忽略。只有當設計車速為 30mile/h,且曲度大于22時,加寬可達2英尺。然而,對于較窄的路 面,即使是在較平緩的曲線路段上,加寬也是很重要推薦加寬值及加寬 設計見公路線形設計2、縱坡線公路的
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024專利知識產(chǎn)權合同
- 2024五星級酒店食品供應與采購勞務合同
- 2024外架搭設合同
- 2024軟件項目委托開發(fā)合同
- 2024年度旅游景點開發(fā)合作協(xié)議
- 2024年度安置房買賣合同中的違約責任
- 2024年度新能源項目開發(fā)建設合同
- 文書模板-充電樁股份轉讓合同
- 2024年度貨物買賣合同商品描述與支付方式詳解
- 2024年幼兒園教育聯(lián)盟協(xié)議
- 國開電大 可編程控制器應用實訓 形考任務6實訓報告
- GB/T 34120-2023電化學儲能系統(tǒng)儲能變流器技術要求
- 跨國企業(yè)中方外派人員的跨文化適應
- 《道路交叉設計》課件
- 《活著》讀后感-課件
- 體檢報告匯總分析中風險的防范
- 村里建群管理制度
- 【城市軌道交通運營安全管理研究5300字】
- 2024年中核匯能有限公司招聘筆試參考題庫含答案解析
- 上海市2024屆高三7月模擬預測歷史試題(等級考)(解析版)
- 肺炎護理查房課件
評論
0/150
提交評論