1、.1The Standard of Shop DrawingFor Steel Structure鋼構(gòu)造詳圖設(shè)計(jì)標(biāo)準(zhǔn)第一章 General Note總則The standard is applicable for steel structure work such as bridges, ocean platform, architecture, etc., The standard should be carried out unless especial requirements of Owner.The standard forced to define the mon of shop
2、drawings. Shop drawings of specific project may vary with facilities and fabrication capacity of shop. The intent of the standard is to make detail design of steel structure and management standardization, high quality and unification.本標(biāo)準(zhǔn)適用于橋梁、海洋工程、建筑等鋼構(gòu)造工程。自本規(guī)定頒發(fā)后,如業(yè)主無特殊要求,均需按本規(guī)定執(zhí)行。本規(guī)定對車間圖紙的共通局部做了強(qiáng)
3、制規(guī)定,具體工程的車間圖紙容可隨工廠的設(shè)備及制造能力的不同而變化。本規(guī)定的目的是使鋼構(gòu)造詳圖設(shè)計(jì)和管理標(biāo)準(zhǔn)化、高質(zhì)量化及統(tǒng)一化。第二章Primary Requirements根本要求2.1 The Significance of Detail Design詳圖設(shè)計(jì)的重要性Any fabrication and assembly of steel structure should equiptechnical personnel who have e*cellent diathesis. Shop drawing design branch is its core.The quality of
4、shop drawing will direct affect the branch of fabrication, purchasing, QC, etc. It will bring great influence to schedule even.任何鋼構(gòu)造的制造和安裝都需要有一支素質(zhì)優(yōu)良的技術(shù)人員隊(duì)伍。深化設(shè)計(jì)部門是其中的核心。深化圖紙的質(zhì)量將直接影響到制造、采購、質(zhì)檢等部門,甚至?xí)て诋a(chǎn)生重大影響。2.2 Content of Detail Design詳圖設(shè)計(jì)的容The chief task of detail design is to plot initial design o
5、f steel structure put forward by architect and structural engineer to detail of construction. It contains connection strength design, shop working drawing, assembly drawing, parts drawing, material bill, typesetting drawing, etc. It may vary with various requirements of project.It must contain data
6、and note required by fabrication. The design personnel can show the fabrication requirements such as cutting of members, hole-punching manner, bolts, weld joint through drawing paper, lineation, sizes and notes.詳圖設(shè)計(jì)的主要任務(wù)是將建筑工程師和構(gòu)造工程師提出的鋼構(gòu)造初步設(shè)計(jì)進(jìn)一步繪制成施工詳圖,工作容主要為連接節(jié)點(diǎn)強(qiáng)度設(shè)計(jì)、車間加工圖、安裝布置圖、零件圖、材料清單、排板圖等容,具體可能
7、隨工程的要求不同而有所改變。詳圖必須包含制造所必須的數(shù)據(jù)和說明。設(shè)計(jì)人員可通過圖紙、線條、尺寸和注釋等,標(biāo)明構(gòu)件的切割、打孔方式、螺栓、焊縫等制造要求2.3 Process Relation between Detail Design and Fabrication, Assembly詳圖設(shè)計(jì)與制造、安裝等的工藝關(guān)系Detail design is very important segment in project. It restrict and promote with every craft branch. Design personnel should fully know the r
8、ecent specification, shop fabrication and field erection requirements.It should not only know the physical property, other specialityand structure where connected with steel structure, construction method, procedure, but also understand the bid of steel structure and contract definition. Relevant de
9、sign will not meet steel structure fabrication enterprise requirements until wholly mastering the knowledge above.詳圖設(shè)計(jì)是工程中極為重要的環(huán)節(jié),與各工藝部門之間是相互制約相互促進(jìn)的關(guān)系。詳圖人員必須充分了解最新的工程規(guī)、工廠制造和現(xiàn)場安裝的要求。不僅需要了解鋼材的物理特性、其它專業(yè)與鋼構(gòu)造相連接處的構(gòu)造及施工方法、施工流程,還需要懂得鋼構(gòu)造工程投標(biāo)和簽訂合同等方面的知識。只有充分具備了以上知識,相應(yīng)的設(shè)計(jì)才會(huì)滿足鋼構(gòu)造制造企業(yè)的要求。2.4 Software軟件Checking
10、putations of structure and point analyse.構(gòu)造驗(yàn)算和節(jié)點(diǎn)分析 SAP、MIDAS、ANSYS、E*CELGeneral drawing普通圖 AutoCADDetail drawing詳圖 *-STEEL、AutoCAD、SOLIDWORK第三章Drawing and Numbering System圖紙及編號系統(tǒng)3.1 Unit System單位制All drawings released to base shall be metricsizes. If contract document defines that it must be inch si
11、zes, dimension metric sizes and inch sizes on the drawings.所有下發(fā)至基地的圖紙全部采用公制尺寸。假設(shè)合同文件規(guī)定必須使用英制尺寸,則圖紙上應(yīng)同時(shí)標(biāo)注公制和英制尺寸。3.2Sheet Size and Layout圖幅尺寸和布局Drawing size and suggested location圖紙大小及推薦使用部位A0:840*1188 general layout總布置圖 A1:594*840A2:420mm*594mm member drawing構(gòu)件圖 A3:297mm*420mmA4:210mm*297mm parts dr
12、awing零件圖Clearance of inner and outer sheet boundary、外圖框間距:A0:left border左邊界50mm ,rest border其余邊界20mmA1:left border左邊界40mm ,rest border其余邊界15mmA2:left border左邊界25mm ,rest border其余邊界10mmA3:left border左邊界20mm ,rest border其余邊界5mmA4:left border左邊界15mm ,rest border其余邊界5mm Content of header area圖標(biāo)區(qū)容 Header
13、 area usually adopts pany standard title which contain all requirements defined by Owner and locate at the rightlower of the drawing.It can be properly revised if Owner have additional requirements. The header area should contain the information of project and version, technical personnel, pany info
14、rmation. Space 50mm75mm room to review and signet at the left of title.圖標(biāo)區(qū)一般情況下采用公司的標(biāo)準(zhǔn)圖標(biāo),應(yīng)包含業(yè)主明確的所有要求信息并布置在圖紙的右下方。如業(yè)主另外有要求可適當(dāng)修改。圖標(biāo)區(qū)要包含工程信息 、版本信息、技術(shù)人員、公司信息等容。圖標(biāo)左側(cè)要預(yù)留尺寸為50mm75mm左右的空間以供審圖蓋章使用。Figure color and setting圖形顏色及設(shè)置The lineation of inner and outer sheet boundary is black, the title district is
15、uniform style(unless additional requirements of Owner).外圖框的線條均采用黑色,圖標(biāo)區(qū)采用統(tǒng)一格式除非業(yè)主另有要求Drawing medium圖紙媒介a.Electronic documents and final shop drawings submitted to Owner is TIFF or PDF approved by Owner.提供至業(yè)主方的電子文檔和最終加工圖為業(yè)主同意的TIFF或PDF格式。b.Hard copy should be printed half. Print all when applicable(hal
16、f is preference).復(fù)印件應(yīng)縮半打印。假設(shè)規(guī)要求,則全紙打印首選縮半打印。c.The final copy version should meet every code: paper, vellum, film. The electronic document to be made for CD is better and may be used for respective contract.最終的復(fù)印版本應(yīng)符合每個(gè)規(guī):紙、仿牛皮紙、底片或膠片。制作成CD的電子文檔是較好的而且可以使用在各自的合同上。3.3 Drawing Scale圖紙比例尺a.Set shop drawin
17、g scale as follows:車間圖紙比例尺設(shè)定參考如下plan平面圖 A1 1:50 1:100 1:150 1:200 1:300 1:500 1:600 1:1000elevation立面圖 A1 1:50 1:100 1:150 1:200 1:300 1:500 1:600 1:1000joint standard drawing節(jié)點(diǎn)標(biāo)準(zhǔn)圖 A1 1:2 1:5 1:10 1:20 1:30weld standard drawing焊接標(biāo)準(zhǔn)圖A1 1:5 1:10 1:30 1:50lifting standard drawing吊裝標(biāo)準(zhǔn)圖A1 1:10 1:20 1:30
18、1:60 1:150curtain wall steel structure standard drawing幕墻鋼構(gòu)造標(biāo)準(zhǔn)圖A1 1:20 1:30 1:50 1:100 1:150 1:200elevator steel structure standard drawing電梯鋼構(gòu)造標(biāo)準(zhǔn)圖 A1 1:20 1:30 1:50 1:100 1:150 1:200stairs steel structure standard drawing樓梯鋼構(gòu)造標(biāo)準(zhǔn)圖 A1 1:20 1:30 1:50 1:100 1:150 1:200application, galvanizing standard
19、drawing涂裝、鍍鋅標(biāo)準(zhǔn)圖A1 1:20 1:30 1:50 1:100 1:150 1:200detail詳圖 A1 1:5 1:10 1:30 1:50A3 1:5 1:10 1:30 1:50local detail局部詳圖 A1 1:2 1:5 1:10b.In principle, one paper type of project can but use uniform scale.工程的一個(gè)圖紙類別原則上只能使用統(tǒng)一比例c.In principle, it can but dimension actual sizes in drawings. It may dimension
20、 actual numerical value onlywhen unavoidable.圖紙?jiān)瓌t上只能標(biāo)準(zhǔn)實(shí)際尺寸,在非不得已情況下可標(biāo)注實(shí)際數(shù)值。3.4 Font and Lineation字體以及線體a.Font variety is restricted in 12 type e*cept sheet boundary.(number, English is Romans; Chinese is Song typeface or HZ1; aspect ratio of letter is 0.7)除圖框外,字體種類限制在12種之(數(shù)字、英文Romans,中文宋體或HZ1,文字寬高比要
21、設(shè)定為0.7)b.Define the height of letter as follows.字體高度按下表規(guī)定the height of letter字體高度(mm)Application適用對象general drawing一般圖A1drawing name圖紙名3.5title of a*is, size between a*is, direction, lifting direction軸線名、軸間尺寸、方向、吊裝方向3main dimension, member mark, mon, special matters need attention, member list主要尺寸、構(gòu)
22、件號、共通事項(xiàng)、特別本卷須知、構(gòu)件清單2.5secondary dimension, various main dimension, local detail dimension次要尺寸、各種主要標(biāo)注、局部詳圖標(biāo)注detail詳圖A1member mark, main locating a*is構(gòu)件號、主定位軸線3main ponent and numbering of main parts which connected to main ponent, node number, main dimension, section title, inde* dimension, direction
23、, piece list title主部件以及與主部件連接的主要部件的編號、接點(diǎn)號、主要尺寸、斷面名稱、索引標(biāo)注、方向、零件表名稱2.5secondary ponent dimension and size, various main dimension, mon次要部件的注記以及尺寸、各種主要標(biāo)注、共通事項(xiàng)font not include in sheet boundary不含圖框的字體 c.All thickness of lineation must be uniform,range from 0.1mm to 0.25mm.各種線的線粗必須統(tǒng)一,控制在0.1mm0.25mm之d.The
24、 type of line usually takesthe default of *-steel. Define the following specification only when drawing with CAD: heavy line for object border, 0.25mm for the typing line width; fine dotted line for object dashed, 0.10mm for the typing line width; single dash dot line for object centerline, 0.15mm f
25、or the typing line width; fine line for dimension line, 0.13mm for the typing line width.線型一般均采用-steel默認(rèn)線型及比例。假設(shè)僅采用CAD制圖時(shí),暫做以下規(guī)定:物體邊界采用粗實(shí)線,打印線寬0.25mm;物體虛線采用細(xì)虛線,打印線寬0.10mm;物體中心線采用單點(diǎn)劃細(xì)線,打印線寬0.15mm;尺寸線采用細(xì)實(shí)線打印線寬0.13mm。e.fine line for outer sheet boundary,0.10mm for the typing line width; heavy line for
26、inner sheet boundary, 0.35mm for the typing line width外圖框采用細(xì)實(shí)線,打印線寬0.10mm;圖框采用粗實(shí)線,打印線寬0.35mmg.the height of te*t文本的高度:the annotations district: 3.0mm for title;2.5mm for content附注區(qū):題頭3.0mm;容2.5mm;the header area: 3.0mm for drawing number; 2.5mm for scale, version, date,etc;2.0mm for the rest, 0.15mm
27、 for the typing line width; Letter should be clear when printing half.圖標(biāo)區(qū):圖號3.0mm;比例、版本、日期等信息2.5mm;其余2.0mm打印線寬應(yīng)為0.15毫米;當(dāng)圖紙縮半打印時(shí),文字應(yīng)清晰可見。h.General, apply small font to piece mark assembled in shop, and apply big font to all te*ts.車間裝配用的零件標(biāo)號通常采用小字體,大寫字體通常用于所有文本。i.Member title with double underline spa
28、ces the first underline1mm and spaces the secondunderline2mm; 0.3mm for the first underline thickness, 0.13mm for the last.構(gòu)件名稱必須帶雙下劃線,離第一條下劃線1mm;第一條下劃線粗0.3mm,第二條下劃線0.13mm,二者間距1mm;j.Section must bewith single heavy underline, 0.3mm for the thickness,1mmfor the clearance of word line.剖面必須帶單條粗下劃線,線粗0.
29、3mm,字線間距1mm.3.5 Size Dimension尺寸標(biāo)注a.Indicate altitudewith meter and millimeter for other size. Do not show unit in drawings.除高程以米計(jì)以外其余尺寸以毫米記,圖中不標(biāo)注單位。b.Provide arrow dimension at the end of size. Space at least 1mm between dimension line and dimensioning position.尺寸端部統(tǒng)一規(guī)定采用箭頭標(biāo)注,尺寸線與標(biāo)注部位至少預(yù)留1mm的間隙c.Di
30、mension should be layered. The first layer is member locating point dimension, the second layer is member length and the third layer is locating of local detail on members, the fourth layer is dimensioning of local detail. Dimension line should avoid cross.尺寸要分層標(biāo)注,第一層尺寸為構(gòu)件定位點(diǎn)尺寸,第二層為構(gòu)件長度,第三層為局部細(xì)節(jié)在構(gòu)件上
31、的定位,第四層為局部細(xì)節(jié)的尺寸標(biāo)注。尺寸線應(yīng)盡量防止穿插。d.Dimension in the same series should be aligned in line.同一系列的尺寸應(yīng)整列對齊。e.In principle, the arrow at the end of dimension line is 1.5mm(general drawing)or 1.2mm (detail drawing).尺寸線端部的箭頭原則上為1.5mm(一般圖)或1.2mm(詳圖)f.Dimension Splice position and eccentricity size as follows:節(jié)點(diǎn)
32、板位置以及偏心尺寸按以下列圖要領(lǐng)標(biāo)注g.Dimension detail size as follows(n is greater than or equal to 3):細(xì)部尺寸按以下要領(lǐng)標(biāo)注。(n要大于等于3)h.Azimuth and the direction of diagrammatic presentation方位以及圖示方向3.6 Drawing Number圖紙編號a.See building project drawing number system as follows. Drawing number consists of drawing title, category
33、 code name and serial number.建筑工程圖紙編號系統(tǒng)(見下表)圖紙編號由圖紙名稱、種類代號加節(jié)號一局部為層號以及序號構(gòu)成。Drawing Name圖紙名稱Drawing No.圖紙編號Remark備注Layout of bolt at toe柱底螺栓布置圖A+code number+序號Detail is contained.含詳圖Plan平面圖F+floor mark+code number+樓層號+序號Layout of prepared hole and embedded parts is contained.含預(yù)留孔布置圖、預(yù)埋件布置圖Elevation立面圖
34、E+truss name+code number+桁架名+序號桁架名參閱附圖Joint standard drawing節(jié)點(diǎn)標(biāo)準(zhǔn)圖TS+code numberTS+序號Weld standard drawing焊接標(biāo)準(zhǔn)圖坡口標(biāo)準(zhǔn)圖TWS+ code number TWS+序號lifting standard drawing吊裝標(biāo)準(zhǔn)圖TKS+ code number TKS+序號elevator steel structure standard drawing電梯鋼構(gòu)造標(biāo)準(zhǔn)圖TEV+機(jī)號+序號curtain wall steel structure standard drawing幕墻鋼構(gòu)造標(biāo)準(zhǔn)
35、圖TCW+floor mark+ code numberTCW+樓層號+序號ALC steel structure standard drawingALC鋼構(gòu)造標(biāo)準(zhǔn)圖ALC+floor mark+ code numberALC+樓層號+序號stairs steel structure standard drawing樓梯鋼構(gòu)造標(biāo)準(zhǔn)圖TKF+stairs name+ code numberTKF+樓梯名+序號application, galvanizing standard drawing涂裝、鍍鋅標(biāo)準(zhǔn)圖TPS+floor mark+ code numberTPS+樓層號+序號Detail of
36、 main truss column head or other column head主桁架柱頭以及其他柱頭詳圖section+C+ code number節(jié)+C+序號分類方法參閱附圖Detail of main truss inclined piece(vertical plane)主桁架斜桿垂直面詳圖section+T+ code number節(jié)+T+序號Detail of main truss horizontal member主桁架水平桿件詳圖floor+G+code number樓層號+G+序號Detail of beam梁詳圖floor mark+B+ code number樓層
37、號+B+序號All kinds of trabecula is contained.含各類小梁Detail of interlaminar column層間柱詳圖floor mark+P+ code number樓層號+P+序號樓層號以柱頭所在的樓層為準(zhǔn)Detail of embedded parts預(yù)埋件詳圖floor mark+EMB+ code number樓層號+EMB+序號Detail of horizontal inclined piece水平小斜撐詳圖floor mark+H+ code number樓層號+H+序號Detail of vertical inclined piec
38、e垂直小斜撐詳圖floor mark+V+ code number樓層號+V+序號樓層號以柱頭所在的樓層為準(zhǔn)Steel casting鑄鋼件N+steel casting mark+ code number N+鑄鋼件號+序號Stairs樓梯K+stairs mark+ code numberK+樓梯號+序號b.Shop Drawing Numbering System橋梁工程圖紙編號系統(tǒng)見下表Prefi*前綴Contents Description容描述WDWelding Detail 焊接詳圖或標(biāo)準(zhǔn)圖WSWork Sheets(calculation and layouts used to
39、 prepare shop drawings; not to be reviewed as shop fabrication )工作表用于準(zhǔn)備加工圖的計(jì)算書和方案圖;不需要送審TDTypical details and layouts(details and layouts to prepare shop drawings; not to be reviewed as shop fabrication drawings)典型詳圖和方案圖用于準(zhǔn)備加工圖的詳圖和方案,不需要送審GNGeneral shop notes and typical details(lists appropriate no
40、tes for welding, paint, etc.) 車間制造的注解和典型詳圖對焊接、涂裝等列舉一些適當(dāng)?shù)淖⑨孊GBasic girder diagrams ( Web and flange cutting diagrams)根本大梁圖腹板和翼緣切割圖WCWeb camber details ( camber cutting and splicing of webs)腹板預(yù)拱度詳圖預(yù)拱度切割位置和腹板拼接FSFlange splicing details( assembly and splicing of flanges).翼緣板拼接詳圖翼緣板裝配和拼接。WC或BG圖應(yīng)包含腹板至翼緣的焊
41、接FWField work sheets ( used to obtain field dimensions and/or show required fieldwork, including field reaming and drilling) 現(xiàn)場工作表用于標(biāo)示工地工作的相關(guān)尺寸和/或工地鉸孔和鉆孔等工作HCHorizontal curve diagrams ( final line curve diagrams per piece with horizontal ordinates shown)水平曲線標(biāo)注方法標(biāo)注每段曲線在水平線上的最終橫、縱坐標(biāo)*Girder job standar
42、ds( parts details for I girders, bo* girders and tub girders)主梁零件標(biāo)準(zhǔn)圖工字梁、箱梁和槽式梁的零件詳圖ZStringer job standards縱梁零件標(biāo)準(zhǔn)圖MMiscellaneous job standards(parts details, rolled beams, cross frames, diaphragms, etc.) 雜項(xiàng)零件標(biāo)準(zhǔn)圖零件詳圖、軋制小梁、橫梁構(gòu)造、橫隔板等SB or SDSub-assemblies(Parts, shop or field assembled, as units prior t
43、o incorporating into a shipping piece or the structure)組件將多個(gè)零件在工廠或現(xiàn)場拼裝成的船運(yùn)部件或構(gòu)造件EAnchor bolt plans, field bolt and erection framing plans (location of shipping piece marks). Note: these are not erection procedure plans.錨固螺栓平面布置圖,現(xiàn)場安裝螺栓平面圖和構(gòu)造安裝圖帶標(biāo)記的船運(yùn)部件位置,說明:這些不是安裝工藝圖SAShop assembly diagrams(line ass
44、embly reaming, unit assembly, etc.工廠拼裝圖畫出裝配的鉸孔,裝配的組件等1 thruDetails of girders, cross frames, stringers, diaphragms, etc. 梁,橫梁構(gòu)造,縱梁,橫隔板等的詳圖SPShipping procedures(detailed procedure to ship unique pieces)船運(yùn)工藝特殊構(gòu)件的詳細(xì)船運(yùn)工藝WPWelding procedures( used to show required welding procedures; to be submitted and
45、approved separately from shop detail drawings)焊接工藝用來明確焊接工藝的要求;應(yīng)分別根據(jù)車間詳圖提交審核Note: Prefi* typically followed by numerical identification 1,2,3,etc.注釋:前綴通常是通過數(shù)值諸如1,2,3來確定。Shop Detail Drawing Numbering Sequence橋梁工程加工圖編號順序There should be a logical sequence in shop detail drawings that will aid the review
46、er and shop personnel. The approval review process will be e*pedited if all structure drawings are organized in a mon sequence. The prefi*ed drawings should be located within sets in the order shown in shop drawing numbering system.加工圖應(yīng)遵循邏輯的編號順序,以便為審圖者和生產(chǎn)人員效勞。如果所有的構(gòu)造圖按常用的順序整理完整,審圖過程就可以加快。圖紙的前綴應(yīng)根據(jù)前面的
47、圖紙編號系統(tǒng)里的相關(guān)條目進(jìn)展設(shè)置。Numbered drawings should be sequenced similarly to the following e*ample:已編號的圖紙順序應(yīng)和下表類似:Description描述Drawing No. 圖號Bearing Detail支座詳圖1Girders梁 2G1A2AC,2BC,2C*3G2A34G3A45G4A56G1B67G2B78G3B89G4B9Cross Frames, Diaphragms&other Misc.橫梁構(gòu)造,橫隔板以及其它雜項(xiàng)103.7 Marking System for Shipping Pieces
48、橋梁工程構(gòu)件編號系統(tǒng)Identifier名稱Description描述GGirder大梁用于翼緣、腹板的構(gòu)件BGBo* Girder鋼箱梁封閉的箱形構(gòu)件TGTub Girder平梁敞開的箱形構(gòu)件SStringer縱梁型鋼構(gòu)件DDiaphragm橫隔板介于主要構(gòu)件或板塊間的單個(gè)滾壓形式CF,K,*Cross Frame剪刀撐介于主要構(gòu)件之間的組合構(gòu)件,這些構(gòu)件主要為寬翼緣截面,角鋼等L or LBLateral Bracing橫向支撐所有水平面,對角支撐MSMiscellaneous雜項(xiàng)無法歸類的船運(yùn)散件DUDeck Units橋面單元通常指鐵路橋上附帶鋼板的平面梁ABAnchor Bolt錨固
49、螺栓BPBronze Plate銅板BRBrackets牛腿懸臂形式EBElastomeric Bearing彈性支座FB or BFloor Beams平面梁扎制型鋼或焊接工字梁PPPreformed Pad預(yù)制墊LPLeveling Plate水平測量用鋼板MPMasonry Plate砌筑板PPin銷RPRocker Plate平衡板SPSole Plate根底板WWasher墊圈WDWeld Detail Drawing焊接詳圖用在有許多焊接詳圖的復(fù)雜構(gòu)造Fracture critical pieces may be prefi*ed F, such as FG, FBG, FTG,
50、etc. This is optional and may be used by a Fabricator to differentiate this material. The above letters may be prefi*ed with the sheet number on which the piece is detailed,serving as a self-inde*ing system, and suffi*ed with a numerical identification. Longitudinal main members shall be suffi*ed A,
51、 B, C, etc. in addition to their numerical suffi*.臨界脆斷構(gòu)件可以加前綴“F,諸如FG,F(xiàn)BG,F(xiàn)TG等等。這是可選擇的,可以由制造商自己采用以區(qū)分這種材料。以上字母可以根據(jù)圖表編號加前綴,也能根據(jù)數(shù)值的區(qū)分加后綴??v向的主構(gòu)件,除了它們的數(shù)值后綴外,還可以加后綴A,B,C等。*Use letters as suffi* when details require more than one drawing.*當(dāng)詳圖需要不止一時(shí),用字母作為后綴。Note: Certain projects may require deviation from t
52、he Shop Detail Drawing Numbering System Sequence, dependent upon the Fabricators requirements. Also, WS, TD, GN, WC&FS drawings may be prepared and submitted with other necessary sheets/information (E&WP) prior to balance of detail drawings on large projects in order to begin with fabrication of the
53、se pieces. Partial submittals must be plete enough to allow checkers to adequately cross-reference information and avoid requiring later re-checking.注釋:具體工程也可能根據(jù)制造商的需要進(jìn)展調(diào)整使加工圖編號系統(tǒng),這樣順序有可能產(chǎn)生偏差。同時(shí),在一些大的工程中,為了在一開場就方便零件的裝配,要先準(zhǔn)備和提交WS,TD,GN,WC和FS圖紙 連同其它必要的圖紙/信息E和WP,目的是及時(shí)完成以上圖表以便讓復(fù)核人員能充分地相互對照,防止事后再次檢查。3.8
54、Building Project Member Numbering System建筑工程構(gòu)件編號系統(tǒng)Number member according to follow principle, the category code name of member is the same to drawing numbering.構(gòu)件根據(jù)以下原則編號,構(gòu)件的種類代號采用與圖紙編號一樣的種類代號。main column主要柱 section number+C+elevation number+serial number節(jié)號+C+立面號+序號main horizontal member of truss主要
55、桁架水平桿件section number+G+elevation number+serial number節(jié)號+G+立面號+序號main horizontal member of truss主桁架水平桿件floor number+G+elevation number+serial number樓層號+G+立面號+序號4beam, interlaminar beam梁、層間梁floor number+B+design mark+serial number樓層號+B+設(shè)計(jì)記號+序號M+floor number+B+design mark+serial numberM+樓層號+B+設(shè)計(jì)記號+序號5i
56、nterlaminar column層間柱floor number+P+design mark+serial number樓層號+P+設(shè)計(jì)號+序號6horizontal inclined brace水平小斜撐floor number+H+design mark+serial number樓層號+H+設(shè)計(jì)號+序號7vertical inclined brace垂直小斜撐floor number+V+design mark+serial number樓層號+V+設(shè)計(jì)號+序號8embedded parts預(yù)埋件floor number+EMB+serial number樓層號+EMB+序號3.9Pl
57、an建筑工程平面圖It contains a*is, member, member mark, bill of material(member mark, sectional dimension, material, node number), the end of shop, field splice,bracket length, plane brace, elevation brace(dashed line)and direction, direction of assembly, elevator, stairwell, curtain wall, part section, not
58、e.容包括軸線、構(gòu)件、構(gòu)件號、材料表構(gòu)件號、截面尺寸、材質(zhì)、節(jié)點(diǎn)號、工廠端點(diǎn)、工地拼節(jié)點(diǎn)、牛腿長度、平面支撐、立面支撐虛線表示及方向、安裝方向、電梯、樓梯井、幕墻、局部剖面、注記。3.10 Elevation建筑工程立面圖It contains a*is, member, member mark, bill of material(member mark, sectional dimension, material, node number), the end of shop, field splice, bracket length, elevation brace, etc.容包括軸線、構(gòu)
59、件、構(gòu)件號、材料表構(gòu)件號、截面尺寸、材質(zhì)、節(jié)點(diǎn)號、工廠端點(diǎn)、工地拼節(jié)點(diǎn)、牛腿長度、立面支撐等。3.11 Detail建筑工程節(jié)點(diǎn)圖It contains node number, node detail drawing, specification of gusset plate, specification of bolt and quantity, bolt length. It contains lifting ear, lifting hole, concrete press-in hole, steam hole.容包括節(jié)點(diǎn)號、節(jié)點(diǎn)大樣圖、節(jié)點(diǎn)板規(guī)格、螺栓規(guī)格及數(shù)量、螺栓長度。要領(lǐng)包
60、括吊裝耳板、吊孔、砼壓入孔、蒸氣孔。3.12 Standard Abbreviation標(biāo)準(zhǔn)縮寫See anne*ed table 3.見附表3第四章Standard of Model Building *-STEEL建模標(biāo)準(zhǔn)4.1 Set of Parameter參數(shù)設(shè)置 Server效勞器Use correct server name if multiple user.如果是多用戶,使用正確的效勞器名稱。 Autosave自動(dòng)存盤Modify the path of autosave to users list. Transfer the title of autosave to titl
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年P(guān)PP項(xiàng)目合作財(cái)務(wù)管理協(xié)議
- 主材供應(yīng)及合作框架合同 2024年版一
- 2025版區(qū)塊鏈技術(shù)應(yīng)用合伙人合作協(xié)議3篇
- 2025年度智能建筑安裝工程承包技師合同4篇
- 二零二五年度酒吧食品安全管理與承包合同
- 2025年度城市公交車定點(diǎn)維修與應(yīng)急保障合同
- 2025年度地鐵隧道鋼筋工勞務(wù)施工安全質(zhì)量保障合同
- 2025年度美團(tuán)外賣用戶隱私保護(hù)與服務(wù)承諾協(xié)議
- 二零二五年度涂料裝修工程進(jìn)度款支付合同
- 2024版弱電工程維保合同
- 2024-2030年中國食品飲料灌裝設(shè)備行業(yè)市場發(fā)展趨勢與前景展望戰(zhàn)略分析報(bào)告
- 建筑結(jié)構(gòu)課程設(shè)計(jì)成果
- 班級建設(shè)方案中等職業(yè)學(xué)校班主任能力大賽
- 纖維增強(qiáng)復(fù)合材料 單向增強(qiáng)材料Ⅰ型-Ⅱ 型混合層間斷裂韌性的測定 編制說明
- 習(xí)近平法治思想概論教學(xué)課件緒論
- 寵物會(huì)展策劃設(shè)計(jì)方案
- 孤殘兒童護(hù)理員(四級)試題
- 醫(yī)院急診醫(yī)學(xué)小講課課件:急診呼吸衰竭的處理
- 腸梗阻導(dǎo)管在臨床中的使用及護(hù)理課件
- 小學(xué)英語單詞匯總大全打印
- 衛(wèi)生健康系統(tǒng)安全生產(chǎn)隱患全面排查
評論
0/150
提交評論