版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
1、The Stage 1 Disinfectants/Disinfection Byproduct Rule鄭州微信營銷 weikuaicheBackgroundPublic Health Protection For:Acute Microbial RisksChronic DBP RisksCross-Over ImpactsBackground (cont.)Public Health Protection for DBPs and DisinfectantsBalance RisksOptimization of Protection A Product of 6 Years of Co
2、llaborationRegNeg in 1992FACA in 1997ParticipantsWater Supply IndustryEnvironmental and Public Health GroupsLocal, State, and Federal GovernmentsBackground (cont.)Staged Process1996 Information Collection Rule On-Going ResearchFirst Set: Moderate Action to Balance RisksStage 1 DBPRIESWTRSpring/Summe
3、r2001Spring/Summer 2001Spring/Summer2001May2002May2002Background (cont.)Planned RulesFilter Backwash Recycling RuleLong Term 1 ESWTRGround Water RuleStage 2 DBPRLong Term ESWTRBackground (cont.)Large Population Potentially Exposed to DBPs Health Hazards of DBPs:Toxicology EvidenceEpidemiological Evi
4、denceBackground (cont.)Improve Protection Against Risks From:Known DBPsUnknown DBPsBalance Risks and Benefits Of:SWTRIESTWRLead and Copper RuleTotal Coliform RuleBackground (cont.)140 Million People Will Have Increased Protection From DBPs24 Percent Reduction in DBP Levels (National Average)Reductio
5、n in Exposure to:Haloacetic AcidsBromateChlorite Reduced Risks From:CancerReproductive EffectsDevelopmental EffectsRule StructureRule StructurePart 141 National Primary Drinking Water RegulationsSubpart A: 141.2 DefinitionsSubpart B: 141.12 MCLs for Organic ChemicalsSubpart C: 141.30 TTHM Sampling,
6、Analytical and Other RequirementsSubpart D: 141.32 Public NotificationSubpart F: 141.53 MCLGs and 141.54 MRDLGsSubpart G: 141.64 MCLs and MRDLs Subpart I: 141.89 Analytical RequirementsSubpart L:Disinfection Residuals, DBPs and DBPPsSubpart O: 141.154 Required Health InformationSubpart P:Enhanced Fi
7、ltration and DisinfectionRule StructurePart 142 National Primary Drinking Water Regulations Implementation142.14 Records Kept by States142.16 Special Primacy RequirementsProvisions of The Stage 1 Disinfectants and Disinfection Byproducts RuleSubpart A General141.2 DefinitionsEnhanced CoagulationEnha
8、nced SofteningGAC 10Haloacetic Acids (five) (HAA5)Maximum Residual Disinfectant Level (MRDL)Maximum Residual Disinfectant Level Goal (MRDLG)Subpart H SystemsSUVATotal Organic Carbon (TOC)Subpart BSubpart B Maximum Contaminant Levels141.12 MCLs for TTHMsPhases Out the Current MCLSubpart CSubpart C Mo
9、nitoring and Analytical Requirements141.30 TTHMs Sampling, Analytical, and Other RequirementsChanges to CitationsDesignates Effective DatesSubpart DSubpart D Reporting, Public Notification, and Recordkeeping 141.32 Public NotificationSubparts F and GSubparts F and G (cont.)Subparts F and G (cont.)Su
10、bparts F and G (cont.)Subparts F and G (cont.)Subpart L StructureSubpart L Disinfectant Residuals, Disinfection Byproducts, and Disinfection Byproduct Precursors141.130:General Requirements141.131: Analytical Requirements141.132: Monitoring Requirements141.133: Compliance141.134: Reporting and Recor
11、dkeeping141.: Treatment Techniques for Control of DBP Precursors 141.130 General Requirements 141.130 General RequirementsApplicabilityCWSs and NTNCWSs That Add Chemical DisinfectantsTNCWSs That Add Chlorine DioxideCompliance DatesSubpart H Serving 10,000 or More People3 Years January 1, 2002Possibl
12、e ExtensionsAll Other Systems5 YearsJanuary 1, 2004Qualified Personnel 141.131 Analytical Requirements 141.131 Analytical RequirementsSpecifies Analytical MethodsCertified Labs for:DBPs (chlorite exception)Parties Approved by the State for:DisinfectantsAlkalinityBromideTOC chloriteSUVADOCUV254pH 141
13、.132 Monitoring 141.132 Monitoring GeneralNormal Operating ConditionsMultiple Wells in Same Aquifer TTHM and HAA5Systems Must Monitor According to Plan 141.132 MonitoringDBPsRoutineTTHMs and HAA5Reduced 141.132 Monitoring DBPReduced Monitoring for TTHM and HAA5 As Long As:Quarterly MonitoringAnnual
14、Average of Samples Is No More Than 75 Percent of Either MCLLess Frequent MonitoringThe Result of the Sample (or Average) Is No More Than 75Percent of Either MCL 141.132 Monitoring DBPChloriteRoutineDaily At Entrance to DistributionMonthlyNear First CustomerAverage Residence TimeMaximum Residence Tim
15、eAdditional If Daily Sample MCL, Monitor the Following DayReduced One 3-Sample Set/Quarter If No Sample MCL for 1 YearRevert to Routine If Any Sample MCL 141.132 Monitoring DBP BromateRoutine1 Sample/Month/Plant at EntranceReducedIf Average Source Water Bromide Is MRDLWithout Booster Chlorination3 S
16、amples at 6 Hour Intervals as Close as Possible to First CustomerWith Booster ChlorinationFirst CustomerAverage RTMaximum RTReducedNo Reductions 141.132 Monitoring DBPPBromideOptional for Systems Using OzoneMonthly MeasurementsPurposeReduced Bromate Monitoring To:1 Sample/Quarter/Plant at EntranceIf
17、 Average Source Water Bromide Is 0.05 mg/L (Monthly for 1Year) 141.132 Monitoring DBPP“Paired Sampling Conventional Plants RoutineOne Paired Sample/MonthOne Source Water Alkalinity/MonthReducedOne Paired Sample/QuarterOne Source Water Alkalinity/Quarter If:Treated Water TOC 2.0 mg/L for 2 Years Or,T
18、reated Water TOC 3,300 Must Submit With First ReportPlan Must Include:Locations and SchedulesCompliance Calculation MethodologyEntire Distribution System 141.133 Compliance 141.133 Compliance GeneralFailure to Monitor Is Treated As a Violation for Entire 1Year Period:MCLsTTHM, HAA5, or BromateFailur
19、e to Monitor Is Treated As a Violation for Entire 1Year Period Which Makes It Impossible to Determine Compliance for:MRDLsChlorine or ChloramineAll Identified Compliance Samples Must Be Included in CalculationsIn First Year Out of Compliance When Average MCL 141.133 Compliance DBPTTHMs and HAA5Syste
20、ms Monitoring QuarterlyBased on Running Annual Arithmetic AverageComputed QuarterlyOf Quarterly Arithmetic AveragesSystems Monitoring Less FrequentlyIf Average is MCL, Increase Monitoring to QuarterlyCompliance Calculated After 1 Year of Quarterly MonitoringSystems on Reduced MonitoringWhen Annual A
21、verage Is MCLRevert to RoutineNo Violation 141.133 Compliance DBPBromateRunning Annual Arithmetic AverageComputed QuarterlyOf Monthly Samples (or Averages)ChloriteArithmetic Average of Each 3-Sample Set 141.133 Compliance Disinfectant ResidualsChlorine and ChloraminesRunning Annual Arithmetic Averag
22、eComputed Quarterly, of All SamplesIf a System Switches Disinfectants the Results of Both Must Be Used for Compliance CalculationsMRDLs Are Identical 141.133 Compliance Disinfectant ResidualsChlorine DioxideAcute ViolationsBased on Samples Collected on Consecutive DaysEntrance Sample MRDL and1 or Mo
23、re Distribution Sample(s) MRDLNonacute ViolationsBased on Consecutive Daily Samples at the Entrance2 Samples MRDL andAll Distribution Samples MRDL 141.133 Compliance DBP PrecursorsCompliance Determined As Specified by 141.(c)Discussed in DBPP Section ( 141.) 141.134 Reporting and Recordkeeping 141.1
24、34 Reporting and Recordkeeping GeneralReport to the StateMonitoring Quarterly or More FrequentlyWithin 10 Days of the QuarterMonitoring Less FrequentlyWithin 10 Days of the Monitoring Period 141.134 Reporting and Recordkeeping DBPTTHM and HAA5 Monitoring Quarterly or More Frequently:Number of Sample
25、s Last QuarterLocation, Date, and ResultArithmetic Average of Quarters SamplesAnnual Arithmetic Average of Quarterly AveragesWhether the MCL Was Exceeded 141.134 Reporting and Recordkeeping DBPTTHM and HAA5Monitoring at Least Annually:Number of Samples Last YearLocation, Date and ResultArithmetic Av
26、erage of All Samples Over YearWhether the MCL Was Exceeded 141.134 Reporting and Recordkeeping DBPTTHM and HAA5 Monitoring Less Frequently Than Annually:Location, Date, and Result of Last SampleWhether the MCL Was Exceeded 141.134 Reporting and Recordkeeping DBPChloriteNumber of Samples Taken Each M
27、onth for Last 3 MonthsLocation, Date, and Result of Last Quarters SamplesFor the Quarter, Each Months Arithmetic AverageWhether the MCL Was Exceeded and in Which Month 141.134 Reporting and Recordkeeping DBPBromateNumber of Samples in QuarterLocation, Date, and ResultAverage of Monthly Averages Over
28、 the Past YearWhether the MCL Was Exceeded 141.134 Reporting and Recordkeeping Disinfectant ResidualChlorine or ChloraminesNumber Each Month of the Last QuarterAverage of Each of the Past 12 MonthsAverage of Monthly Averages Over the Past YearWhether the MRDL Was Exceeded 141.134 Reporting and Recor
29、dkeeping Disinfectant ResidualChlorine DioxideDates, Results, and Locations During Last QuarterWhether the MRDL Was ExceededWhether the MRDL Was Exceeded in Any 2 Consecutive Daily Samples andWhether the Violation Was Acute or Nonacute 141.134 Reporting and RecordkeepingFor DBPP or Enhanced Coagulat
30、ion or Enhanced SofteningFor Subpart H Systems Using Conventional TreatmentSee Slides Following 141. 141. Treatment Technique For DBPP 141. Treatment Technique For DBPPDesignReduction of Known and Unknown DBPsApplicabilityConventional Subpart H SystemsRequirementsMeet One of the Alternative Complian
31、ce Criteria; orAchieve Required TOC Removals; orGet Waiver From State 141. Treatment Technique For DBPPConventional plants monitor forTOC (Raw and Finished)Alkalinity (Raw)SUVA(Raw and Finished)UV254DOCMagnesium(Raw and Finished)(Softening Systems Only) 141. Treatment Technique For DBPPTo Achieve Co
32、mpliance Systems Must Do One of the Following:Meet One or More Alternative Compliance CriteriaAchieve Step 1 TOC Removal RequirementsEstablish and Achieve Step 2 TOC Removal Requirements Obtain a State Waiver of the Requirements 141. Treatment Technique For DBPPAlternative Compliance Criteria 1. Sou
33、rce Water TOC 2.0 mg/L (Annual Average) 2. Treated Water TOC 2.0 mg/L (Annual Average)3. Source Water SUVA 2.0 L/mg-m (Annual Average)4. Treated Water SUVA 2.0 L/mg-m (Annual Average)5. Source Water TOC 60 mg/L andTTHM/HAA5 50 Percent of MCLs; Or,Clear and Irrevocable Financial Commitment to Technol
34、ogies That Limit TTHM/HAA5 to 50 Percent of MCLTechnologies Operational Within 6 1/2 Years6. TTHM/HAA5 50 Percent of MCLs and Using Only Chlorine 141. Treatment Technique For DBPPAdditional Alternative Compliance Criteria for Softening Systems 1. Treated Water Alkalinity 60-120 120 2.0 to 4.0 35% 25
35、% 15% 4.0 to 8.0 45% 35% 25% 8.0 50% 40% 30% 141. Treatment Technique For DBPPStep 2 Alternative Minimum TOC Removal RequirementsApplication Within 3 Months of FailureBench- or Pilot-scale Testing 10 mg/L Increments of Coagulant Step 2 Target pHStep 2 RemovalAn Incremental Dose Achieves 0.3 mg/L TOC
36、 RemovalPoint of Diminishing Return (PODR)States May Make Step 2 Retroactive 141. Treatment Technique For DBPPStep 2: Target pHAlkalinity (mg/L)Target pH 0-60 5.5 60-120 6.3 120-240 7.0 240 7.5 141. Treatment Technique For DBPPStep 2 (Cont.)When Alkalinity 4.0 to 8.0Bench Scale TestingDetermine Dose
37、 for 25 Percent RemovalBench Scale TestingEnhanced Coagulation and Enhanced SofteningStep 1: Required Removal of TOCSource Water Source Water Alkalinity TOC (mg/L) (mg/L as calcium carbonate) 0-60 60-120 120 2.0 to 4.0 35% 25% 15% 4.0 to 8.0 45% 35% 25% 8.0 50% 40% 30% 141. Treatment Technique For D
38、BPPStep 2: Target pHAlkalinity (mg/L)Target pH 0-60 5.5 60-120 6.3 120-240 7.0 240 7.5 Case Study 1 Results of pH Titration (alkalinity 120 - 240)Case Study 1 Jar Test ResultsThis utilitys goal is 25 percent TOC removalAlum Dose(mg/L)0102030405060708090100TOC(mg/L)5.455.505.505.004.784.523.603.243.0
39、02.782.53TOC Removal(%)00815223439444954Case Study 1 Estimating Dose0.00.51.01.52.02.53.03.54.04.55.05.56.00102030405060708090100Alum Dose (mg/L)Settled Water TOC (mg/L)25% TOC Removal54 mg/LSettled Water TOC vs. Coagulant DoseBench Scale TestingCase Study 2:After 12 Months This System:Is Unable to
40、Meet Step 1 Does Not Meet an Alternative Compliance Criterion.Case Study 2 Jar Test Results50% Ferric Sulfate Solution Dose (mg/L)09.5192838475766768595TOC (mg/L)4.23.93.32.92.82.52.32.32.12.02.0TOC Removal (%)7233134404545505252TOC Removed (Per Dose)0.300.600.400.100.300.200.000.200.100.00PODR at 2
41、.80 mg/L TOCor 34% removal0.3/9.5 slope line1.01.52.02.53.03.54.04.55.009.5192838475776859510450% Solution Ferric Sulfate Dose (mg/L)Settled Water TOC (mg/L)Settled Water TOC vs. Coagulant DoseCase Study 2 Determining Step 2 RemovalCase Study 2 Determining Step 2 Removal50% Solution Ferric Sulfate D
42、ose (mg/L)Settled Water TOC (mg/L)Settled Water TOC vs. Coagulant Dose3.0 mg/L or 28% Removal1.01.52.02.53.03.54.04.55.009.5192838475766768695Regression Liney = 2.56 exp (-0.0120 * x) + 1.71R2 = 0.99Bench Scale TestingCase Study 3A System With Alkalinity 0.3 mg/L TOC removalper dose 0.3 mg/LCase Stu
43、dy 5 PODR Never Reached Alum Dose(mg/L)05102030405060708090100TOC(mg/L)4.053.9543.853.73.83.63.43.33.23.23.2TOC Removal(%)31596111619212121TOC Removed(per dose)0.10-0.050.150.15-0.100.200.200.100.100.000.00Case Study 5 PODR Is Never Reached1.01.52.02.53.03.54.04.55.0020406080100Alum Dose (mg/L)Settl
44、ed Water TOC (mg/L)0.3/10 slope lineCurve never reaches 0.03 slopeSettled Water TOC vs. Coagulant DoseWorkshopStep 2 Bench Scale Testing 141.133 ComplianceFor DBPP 141.133 Compliance DBP PrecursorsCompliance Determined As Specified by 141.(b)Alternative Compliance Criteria Additional Alternative Com
45、pliance Criteria for SofteningStep 1 TOC ReductionsStep 2 TOC ReductionsEarly Monitoring Recommended 141.133 Compliance DBP PrecursorsFor Each of 12 MonthsDetermine Actual TOC Percent Removal Determine Required TOC Percent Removal Divide Actual by Required Add 12 Results Together Divide by 12Result
46、Must Be 1.00 for ComplianceSystem May Assign Monthly Value of 1.0 for Any Month One of the Alternative Compliance Criteria Is Met 141.133 Compliance DBP PrecursorsCompliance CalculationsMonthJan.Feb.Mar.Apr.MayJun.Jul.Aug.Sep.Oct.Nov.Dec.ATreated TOC(mg/L)4.64.04.4BSource TOC(mg/L)8.26.16.2C% remove
47、d(1-A/B) x 100443429DSource WaterAlkalinity (mg/L)707585ERequired TOCRemoval (%)403535FC/E1.100.941.031.070.981.241.101.071.021.100.980.83If average is 1.00, the PWS is in compliance (F) = 12.48 12.48/12= 1.04 141.134 Reporting and RecordkeepingFor DBPP and Enhanced Coagulation or Enhanced Softening
48、 141.134 Reporting and Recordkeeping DBPPA System Required to Meet Minimum TOC RemovalsNumber of Paired Samples Taken During Last QuarterLocation, Date, and Result of EachPaired Sample AlkalinityEach Months Average Percent TOC RemovalRequired TOC Percent RemovalCompliance Calculations Whether System
49、 Is in Compliance 141.134 Reporting and Recordkeeping DBPPSystems Monitoring for DBPP Monthly or Quarterly and Meeting Alternative Compliance CriteriaCriterion UsedNumber of Paired Samples in Last QuarterLocation, Date, and Result of EachPaired Sample AlkalinityFor Those Meeting TOC Criteria the Run
50、ning Annual Average Of:Source Water TOC orTreated Water TOCWhether the System Is in Compliance 141.134 Reporting and Recordkeeping DBPPSystems Monitoring for DBPP Monthly or Quarterly and Meeting Alternative Compliance CriteriaCriterion UsedNumber of Paired Samples in Last QuarterLocation, Date, and
51、 Result of EachPaired Sample AlkalinityFor Those Meeting SUVA Criteria the Running Annual Average Of:Source Water SUVA orTreated Water SUVAWhether the System Is in Compliance 141.134 Reporting and Recordkeeping DBPPSystems Monitoring for DBPP Monthly or Quarterly and Meeting Alternative Compliance C
52、riteriaCriterion UsedNumber of Paired Samples in Last QuarterLocation, Date, and Result of EachPaired Sample AlkalinityFor Those Meeting Source Water TOC, Alkalinity, and Distribution TTHM and HAA5 Criteria The Annual Average Source Water TOCThe Annual Average AlkalinityThe Annual Averages of TTHM a
53、nd HAA5Whether the System Is in Compliance 141.134 Reporting and Recordkeeping DBPPSystems Monitoring for DBPP Monthly or Quarterly and Meeting Alternative Compliance CriteriaCriterion UsedNumber of Paired Samples in Last QuarterLocation, Date, and Result of EachPaired Sample AlkalinityFor Those Sys
54、tems Using Only Chlorine and Whose TTHM and HAA5 Levels Are No More Than 50 Percent of the MCLsThe TTHM and HAA5 Running Annual AveragesWhether the System Is in Compliance 141.134 Reporting and Recordkeeping DBPPSoftening Systems Monitoring for DBPP Monthly or Quarterly and Meeting Alternative Compl
55、iance CriteriaCriterion UsedNumber of Paired Samples in Last QuarterLocation, Date, and Result of EachPaired Sample AlkalinityFor Softening Plants Lowering Alkalinity to 60 mg/LThe Running Annual Average Treated Water AlkalinityWhether the System Is in Compliance 141.134 Reporting and Recordkeeping
56、DBPPSoftening Systems Monitoring for DBPP Monthly or Quarterly and Meeting Alternative Compliance CriterionCriterion UsedNumber of Paired Samples of Last QuarterLocation, Date, and Result of EachPaired Sample AlkalinityFor Softening Systems Removing at Least 10 mg/L Mg HardnessThe Running Annual Ave
57、rage of Mg Hardness RemovalWhether the System Is in ComplianceCode of Federal RegulationsTitle 40Part 142NPDWR ImplementationSubpart BPrimary Enforcement Responsibility142.16 Special Primacy RequirementsEPAs Regulation of States for Purpose of Awarding PrimacyArrangement of GuidanceIESWTR Stage 1 DB
58、PRNote: Guidance Often Goes Beyond Minimum Requirements “Must“May or “ShouldStage 1 Disinfectants/ Disinfection Byproducts Rule Special Primacy Requirements 142.16Stage 1 DBPR 142.16 Special Primacy Requirements(h) Requirements for States to Adopt 40 CFR Part 141, Subpart L. In Addition to the Gener
59、al Primacy Requirements Elsewhere in This Part, Including the Requirement That State Regulations Be at Least As Stringent As Federal Requirements, an Application for Approval of a State Program Revision That Adopts Subpart L, Must Contain A Description of How the State Will Accomplish the Following
60、Program Requirements.Stage 1 DBPR 142.16 Special Primacy Requirements(h) A Description of How the State Will Accomplish the Following Program Requirements.(1) Interim Treatment(2) Qualification of Operators(3) DPD Test Kit Approval(4) Approval of Parties(5) Multiple Wells/Single Aquifer(6) Step 2 TO
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年度辦公用品及辦公設備租賃一體化服務合同
- 二零二五年度養(yǎng)老社區(qū)入住與緊急救援協(xié)議3篇
- 2025年度養(yǎng)豬場養(yǎng)殖廢棄物處理設施建設合同3篇
- 2025年度農(nóng)村房屋買賣合同及土地承包權轉(zhuǎn)讓與配套設施租賃及物業(yè)管理合同
- 2025年度農(nóng)副產(chǎn)品線上與線下銷售融合合作協(xié)議3篇
- 二零二五年度?;饭坟浳镞\輸安全管理合同3篇
- 二零二五年度公司經(jīng)理戰(zhàn)略合作伙伴關系聘用協(xié)議3篇
- 二零二五年度美發(fā)行業(yè)美容美發(fā)行業(yè)投資合作協(xié)議書3篇
- 2025年度農(nóng)村自建房合同協(xié)議書(含節(jié)能環(huán)保建筑材料)
- 二零二五年度農(nóng)村房屋置換項目合作框架協(xié)議
- 數(shù)據(jù)分析基礎與應用指南
- 人教版(PEP)小學六年級英語上冊全冊教案
- 廣東省廣州市海珠區(qū)2023-2024學年六年級上學期月考英語試卷
- 消防水域救援個人防護裝備試驗 大綱
- 機電樣板施工主要技術方案
- 涉稅風險管理方案
- 青島市2022-2023學年七年級上學期期末道德與法治試題
- 高空作業(yè)安全免責協(xié)議書范本
- 石油化學智慧樹知到期末考試答案章節(jié)答案2024年中國石油大學(華東)
- 手術后如何防止排尿困難
- 特種設備“日管控、周排查、月調(diào)度”表格
評論
0/150
提交評論