![IT-in-Power-Distribution它的功率分布課件_第1頁](http://file4.renrendoc.com/view/c2f1a8b77778ed63b0702d4d19865288/c2f1a8b77778ed63b0702d4d198652881.gif)
![IT-in-Power-Distribution它的功率分布課件_第2頁](http://file4.renrendoc.com/view/c2f1a8b77778ed63b0702d4d19865288/c2f1a8b77778ed63b0702d4d198652882.gif)
![IT-in-Power-Distribution它的功率分布課件_第3頁](http://file4.renrendoc.com/view/c2f1a8b77778ed63b0702d4d19865288/c2f1a8b77778ed63b0702d4d198652883.gif)
![IT-in-Power-Distribution它的功率分布課件_第4頁](http://file4.renrendoc.com/view/c2f1a8b77778ed63b0702d4d19865288/c2f1a8b77778ed63b0702d4d198652884.gif)
![IT-in-Power-Distribution它的功率分布課件_第5頁](http://file4.renrendoc.com/view/c2f1a8b77778ed63b0702d4d19865288/c2f1a8b77778ed63b0702d4d198652885.gif)
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、IT in Power DistributionENGINEERING STAFF COLLEGE OF INDIAAn Autonomous Organ of the Institution of Engineers (India)IT in Power DistributionENGINENEED OF THE HOURDistribution system forms the ultimate link in the power system between the utility and end user. Customer expectations also have gone up
2、 to provide Reliable and quality power Timely redressal of complaints Accurate metering and billing without errors Facility & Flexibility of payment of bills from homeNEED OF THE HOURDistribution sNEED OF THE HOURMany more in the wish listThis can be only possible if the human element at work is rep
3、laced to a good extent by automating the operations and use of Information technology becomes indispensable at this juncture NEED OF THE HOURMany more in tWhat do we need to do to meet the expectationsReplace still old, conventional, manual systems being continued in most of discomsWith the growth o
4、f network and the number of customers adopt newer technologies that provide faster serviceNEED OF THE HOURWhat do we need to do to meet Where human intervention is unable to cope up, adopt automation using the available & powerful IT toolsThe end result should be that customers are to be provided se
5、rvice levels like in other sectors like banking, communications etc.All these would improve the image of the utilityNEED OF THE HOURWhere human intervention is un The focus areas of IT applications areQuality and reliability of supplyAccurate of billingEasy payment mechanismsBetter complaints handli
6、ng IT is used in energy audit, Estimation of baseline losses & Substation /Distribution automationAREAS OF FOCUS The focus areas of IT appliIT INITIATIVESAims atImprovement of efficiency by way of elimination of delays, duplication, drudgery in paperworkReduction in overall expenditure.Provides quic
7、k and efficient information systems like on line billing, collection and on line report generation.Very fast reconciliation between important activities of metering, billing and collection.Web based servicing.To attain transparency and gain credibility.Customer satisfaction.IT INITIATIVESAims atNew
8、TrendsAutomated Meter ReadingWeb Based ServicingTrouble Call Management SystemSCADAConsumer Analysis Tool (CAT)IT IMPLEMENTATION INITIATIVESNew TrendsIT IMPLEMENTATION INIT in System PlanningLoad forecast is an important parameter for system planningRequires accurate data of the system like energy c
9、onsumption for last 10 years, maximum demandMethods of load forecastTrends: The trends for the growth in energy and consumption are computed based on the past data areTo forecast the future demand / energyIT IN SYSTEM PLANNINGIT in System PlanningIT IN SYSEconometric Approach: Focuses on identificat
10、ion of correlation between demand and variables such as growth in GDP, population and households in the forecastEnd-use Approach: Focuses on uses of electricity, takes into account specific consumption of major appliances, degree of saturation of each appliance per customer, number of customer Using
11、 the load forecast developed using appropriate models, appropriate system planning package is to be selected for running the load flowsIT IN SYSTEM PLANNINGEconometric Approach: Focuses SCADA: Supervisory Control And Data Acquisition It is a system that enables an electric utility to remotely monito
12、r, coordinate and operate distribution components in a real time from remote location.IT IN SYSTEM OPERATIONSCADA: Supervisory Control AndThe basic components of SCADA system areControl centerControlled plantCommunication system SCADA platform uses a master slave communication principle and controls
13、 the remote end equipment through Remote Terminal UnitIT IN SYSTEM OPERATIONThe basic components of SCADA RTU can perform several functions like data acquisition, switching of circuit breakers / capacitors, changing of taps etc. based on the commands received from the control centre.IT IN SYSTEM OPE
14、RATIONRTU can perform several functiIn the later versions of SCADA, RTUs are being replaced with IEDs (Intelligent Electronic Devices), which have the capability of measuring, monitoring, control, protection and communicating to the local operator or to the remote host (Ex: Numerical Relays)IT IN SY
15、STEM OPERATIONIn the later versions of SCADA We can build a Distribution Automation system using the SCADA kernel which can accomplish many functions such as:Substation AutomationFeeder monitoring and controlLoad ManagementAutomated Meter readingTrouble call managementLoad Survey & Energy audit and
16、so onIT IN SYSTEM OPERATION We can build a Distribution A Feeder Monitoring and ControlTrippings and breakdowns in general and in rural areas in particular is a matter of serious concern which causes prolonged interruptions and consumer unrest and the same can be addressed through feeder monitoringA
17、utomation of the feeder control can be taken up using Auto reclosures near the breakers and sectionalisers in the lineIT IN SYSTEM OPERATION Feeder Monitoring and Control Feeder Monitoring and ControlFor any transient fault in the line, the auto reclosure first trips and then closes after a set time
18、Sectionalisers help us in isolating the fault during permanent faults and the supply can be restored for the rest of the line IT IN SYSTEM OPERATION Feeder Monitoring and Control Operation of SCADA requires a good Communication system for which the options available arePublic switched telephone netw
19、orksPower line carrier communicationRadio frequency (RF) point-to point/ point-to-multipoint communicationsIT IN SYSTEM OPERATION Operation of SCADA requiresOptical fibersVSATEthernet Choose a judicious system considering the functionality and costsIT IN SYSTEM OPERATIONOptical fibersIT IN SYSTEM OP
20、EIT in Metering SystemMetering technologies have evolved over a period of time starting from electromechanical meters to static meters and later on to the smart metersThe capabilities of meters range from simple recording of energy to communication of recorded energy to either a data collecting devi
21、ce or a billing computer through an appropriate communication system.Smart meters not only record energy, display the price signals given by the utility but can also run the appliances in the home as per the programme given by the user to optimise the costs.IT in Metering SystemMetering Static (Elec
22、tronic) Energy MetersThe static energy meters are micro processor based. The programmability of micro processor is useful to incorporate different features like tamper data, import-export, time-of day metering, load pattern analysis, remote meter reading.Tamper Data: Data pertaining to tamper such a
23、s missing potential, CT polarity reversal, phase sequence reversal can be detected.Static (Electronic) Energy MetStatic Energy Meters (cont.)Time of day metering: The meters have built in real time clock to record energy usage for different times of the day in different registers in the meter.Day is
24、 divided into different time zones, the duration of each time zone is programmable and the user can define their time zones as per their requirement. The meter records the energy consumed in each of the time zones separately and exhibits accordingly. For all HT &EHT consumers in TN & Kerala this is
25、done.Static Energy Meters Static Energy Meters (cont.)Load Survey Data :The meter has the provision to store the billing and tamper data for 35 days at specified logging interval. This is useful to draw the load curves of KWH, KVAH, KVA, which gives the load pattern of the consumerImport-export Mete
26、ring: The meter can measure the energy in both directions.Static Energy Meters MRI (Meter Reading Instrument)MRI: This is used for data transfer from/to meter to/from the system, for analysis of data and billing. The MRI can be preloaded with meter numbers to be read and optionally the MRI can also
27、have a bar code reader, which will be useful to identify the s.no. of the meter. In case of HT services with load survey data, MRI is very essential for transfer of data from meter to computer MRI can also be used for LT energy meters. MRI (Meter Reading Instrument)Printer also can be attached and a
28、 bill can be generated immediately upon reading the meter.MRI shall contain the meter sno. And the previous reading. The entire data can be off loaded at the end of the dayMRI (Meter Reading Instrument)Printer also can be attached aTelemeteringTransfer of metered data through a communi-cation networ
29、k is necessary, to have constant monitoringThe meter shall be connected to a telephone line at the consumer end via a modem.At the system end also the computer is connected to the telephone via a modem.Whenever data is to be accessed by the computer. the consumer telephone number to be dialed and th
30、e modem connected to the telephone will connect to the meter. TelemeteringTransfer of metereRemote MeteringAll 11 kv feeders with predominantly agl. Loads, major industrial loads and selected high value consumers are equipped with data loggers, which store data, which can be retrieved locally throug
31、h CMRI .They have communication port RS232 and are read remotely through dial up modemsThis helps in conducting load survey, avoid overloading of conductors and also in reduction of losses.Cases of tampered meters or meters not recording properly and cases of pilferage can be detected.Remote Meterin
32、gAll 11 kv feedeAutomatic Meter ReadingAutomatic Meter Reading is a technique to transfer the Meter data / information to a remote location via suitable communication media and necessary hardware set up.Electronic Energy MeterMedia Interface device (Out station)Data Communication MediaPSTN / GSMMedi
33、a Interface Device (In station)Host PC at Meter Reading Station with compatible softwareAMR uses various Communication technologies as PSTN / GSMAutomatic Meter ReadingAutomatWhat is AMIAMI stands for Advanced metering Infrastructure where not only the meter is read but many other functions such as
34、consumer demand management is also done using suitable controller through secure and suitable two way communicationWhat is AMIAMI stands for AdvaSMART METERSSmart meter is an advanced electrical metering device that records electricity consumption at regular defined intervals, communicates with util
35、ity servers on a real time basis, provides remote connect and disconnect facilities and captures significant events ie., power outage notification, demand side management and power quality monitoringSmart meters can also run the smart appliances as per the preset programmeSMART METERSSmart meter is
36、an Smart meters are equipped with AMI features like LAN, HAN, automatic switching, demand response as well as theft monitoring and control.The most important features of a smart meter is a 2 way interface between the meter and utility.This ensures the continuous monitoring and gives alerts in case t
37、he meter is subjected to any tamperingSMART METERSSmart meters are equipped withAMI ProcessMeter communicates with Meter Data Management System ( MDMS) on one side and the Home Area Network (HAN) Meter Data Management SystemMeter compliant to AMI ( Smart meter)Home Area networkZig bee communicationA
38、MI ProcessMeter communicates IT to Reduce AT&C LossesIT is an important tool to analyze the total input into the system by collecting the meter reading data from all the boundary metering pointsThe billed units and billed demand are collected from the server. The collected amounts are also gathered
39、from the server. The difference of the collected amount against the billing demand represents the AT&C losses IT to Reduce AT&C LossesIT is ENERGY LOSSES IN THE POWER DISTRIBUTION SYSTEMTechnical LossesCommercial Losses11 kV line losses.Theft by direct tapping.Distribution transformer losses (iron a
40、nd copper losses)Theft by tampering meters, CTs and PTs.LT line losses.Non-performing meters.Losses due to loose jumper connections.Under-performing meters.Short circuit and earth fault losses.Meters not read.Losses in service mains and energy meters.Mistakes in billing, etc.ENERGY LOSSES IN THE POW
41、ER DISDETERMINATION OF TECHNICAL LOSSES ON THE 11 KV FEEDERTechnical losses on the 11 kV feeder are assessed by conducting load flow analysis of the individual 11 kV feeders including distribution transformer and LT distribution losses. Steady state model of the network is used to find technical los
42、sesDETERMINATION OF TECHNICAL LOSDETERMINATION OF TECHNICAL LOSSES ON THE 11 KV FEEDERThe loads are considered to be of constant impedance.Load Factor of a transformer is evaluated by computing the energy input to the transformer and the peak load on the transformer and the hours for which the trans
43、former is in serviceDETERMINATION OF TECHNICAL LOSENERGY LOSSES IN THE POWER DISTRIBUTION SYSTEMLoss Load Factor is computed by using the formula LLF = 0.3 (LF) + 0.7 (LF) Commercial losses are assessed by deducting technical losses from the total losses of the feeder, i.e. the difference between en
44、ergy sent out and the energy sold. Commercial loss in the feeder = Energy loss Technical loss.ENERGY LOSSES IN THE POWER DISThe following activities are undertaken to record these losses:The meter reading schedules of meter readers are revised and made coterminous with distribution transformers.The
45、distribution transformer meter is also read and comparison is made between distribution transformer meter reading and sum total of consumption recorded in all other consumer meters coming under that distribution transformer. The difference is noted. If the losses are found to be high, action is init
46、iated to trace the installation causing losses.DETERMINING COMMERCIAL LOSSESThe following activities are uActions Recommended for Reducing Technical LossesReconfiguration;Reconductoring;Employing Shunt Capacitors;Conversion from Single Circuit to Double Circuit;Setting up of more substations;Changeo
47、ver from Low Voltage Distribution System (LVDS) to High Voltage distribution System (HVDS).Actions Recommended for ReduciActions Recommended for Reducing Commercial LossesChangeover to static meters with tamper proof data and remote metering facility;Replacing all burnt, stuck up, non-performing and
48、 underperforming meters;Calibrating the existing meters;Flying squads and Special task force for detection of pilferage of energy;AMR for online energy recording.Actions Recommended for ReduciIT in Energy Accounting and Energy AuditEnergy accounting and energy audit is an important tool for the util
49、ity, which provides the means to identify the areas of leakage, wastage or inefficient use of energy It helps in identifying measures suitable for reduction of T&D losses and can lead to significant cost and energy savingsIT in Energy Accounting and En ENERGY AUDITING IN A POWER UTILITY INVOLVESIden
50、tifying energy losses and quantifying them;Segregating the losses into technical and commercial losses;Estimating the energy conservation potential of a system; and Proposing economically viable and attractive solutions. ENERGY AUDITING IN A POWER UTPROCEDURE FOR CONDUCTING AN ENERGY AUDIT1. Gatheri
51、ng and collecting information in a specially designed, “Energy Systems Questionnaire” format, for the Utility under study, 2. Inter-and intra-utility comparison of the collected data.3. Assessment of present efficiency index for energy consumption in the utility/transformation.4. In-depth study of utility operation, equipment and system for a general review of the energy systems to assess the operational efficiency and potential for economising. PROCEDUR
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025至2031年中國傳感器網(wǎng)絡平臺行業(yè)投資前景及策略咨詢研究報告
- 2025年軟啟動控制裝置項目可行性研究報告
- 2025至2030年臺式數(shù)控超聲波清洗器項目投資價值分析報告
- 2025年中國鍍鋅中間體市場調(diào)查研究報告
- 2025年中國鋼鐵除蠟劑市場調(diào)查研究報告
- 家用視聽設(shè)備趨勢預測考核試卷
- 衛(wèi)生用品零售連鎖管理與擴張考核試卷
- 2025-2030年發(fā)光輪兒童滑板車企業(yè)制定與實施新質(zhì)生產(chǎn)力戰(zhàn)略研究報告
- 國際支付系統(tǒng)運作原理考核試卷
- 2025-2030年堅果油脂精煉設(shè)備行業(yè)跨境出海戰(zhàn)略研究報告
- 學校開學教師安全培訓
- 出口潛力分析報告
- 大美陜西歡迎你-最全面的陜西省簡介課件
- 三位數(shù)減三位數(shù)的減法計算題 200道
- 米粉項目可行性研究報告
- 蛇年元宵節(jié)燈謎大全(附答案)
- 2023年上海中僑職業(yè)技術(shù)大學單招考試職業(yè)技能考試模擬試題及答案解析
- 中國教育公益領(lǐng)域發(fā)展報告
- 第2章第1節(jié)有機化學反應類型課件高二下學期化學魯科版選擇性必修3
- 生物質(zhì)能利用原理與技術(shù) - 第二章生物質(zhì)能資源與植物
- 校本課程《竹之匠藝》
評論
0/150
提交評論