版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
PAGEPAGE2元壩氣田17億立方米/年滾動(dòng)建產(chǎn)地面集輸工程YB27-1/2~YB29復(fù)線管道工程YB204-1~YB205段樁號(hào)BC17-BC35土建施工施工方案編制人:審核人:批準(zhǔn)人:四川德陽慶達(dá)實(shí)業(yè)有限公司2016目錄第一章、概述1、工程概況··························································42、編制依據(jù)及規(guī)范····················································43、施工內(nèi)容及現(xiàn)場情況················································5第二章、施工準(zhǔn)備1、技術(shù)準(zhǔn)備··························································82、施工隊(duì)伍準(zhǔn)備······················································83、物資準(zhǔn)備(機(jī)械、材料、資金)·······································114、建立項(xiàng)目HSE管理制度··············································115、現(xiàn)場施工條件準(zhǔn)備··················································12第三章、施工方案1、測量······························································132、土石方開挖························································143、土石方回填························································184、水工保護(hù)··························································22第四章、各項(xiàng)管理和保證措施1、管理目標(biāo)保證措施·················································282、工程質(zhì)量保證措···················································283、安全技術(shù)保證措施·························294、文明施工保證措施·························295、工期保證措施···························30第五章施工進(jìn)度計(jì)劃·················································32第六章工作危害分析表················································33第七章應(yīng)急預(yù)案1、應(yīng)急預(yù)案·························································372、編制依據(jù)·························································383、組織管理職責(zé)·····················································394、應(yīng)急程序·························································415、事故危險(xiǎn)狀態(tài)識(shí)別·················································44國家現(xiàn)行的有關(guān)規(guī)定、規(guī)范給水排水構(gòu)筑物工程施工及驗(yàn)收規(guī)范GB50141-2008土方與爆破工程施工及驗(yàn)收規(guī)范GB50201-2012建筑地基基礎(chǔ)工程施工質(zhì)量驗(yàn)收規(guī)范GB50202-2002(2011版)砌體工程施工質(zhì)量驗(yàn)收規(guī)范GB50203-2011混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范GB50204-2002(2011版)鋼結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范GB50205-2011屋面工程質(zhì)量驗(yàn)收規(guī)范GB50207-2012地下防水工程質(zhì)量驗(yàn)收規(guī)范GB50208-2011建筑地面工程施工質(zhì)量驗(yàn)收規(guī)范GB50209-2010建筑裝飾裝修工程質(zhì)量驗(yàn)收規(guī)范GB50210-2011給水排水管道工程施工及驗(yàn)收規(guī)范GB50268-2008建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)GB50300-2013建筑基坑工程檢測技術(shù)規(guī)范GB50497-2009建筑地基處理技術(shù)規(guī)范JGJ79-2012埋地鋼質(zhì)管道陰極保護(hù)參數(shù)測量方法GB/T21246-2007埋地鋼質(zhì)管道陰極保護(hù)技術(shù)規(guī)范GB/T21448-20082.3、安全規(guī)范石油化工建設(shè)工程施工安全技術(shù)規(guī)范GB50484-2008施工現(xiàn)場臨時(shí)用電安全技術(shù)規(guī)范JGJ46-2005建筑施工土石方工程安全技術(shù)規(guī)范JGJ180-20093、施工內(nèi)容及現(xiàn)場情況本段管道與已建成營運(yùn)的輸氣管道近距離并行,施工前須查明該管道的位置、埋深及走向,施工過程中嚴(yán)格控制作業(yè)帶寬度,嚴(yán)禁采用爆破方式施工。3.1、BC31~BC35樁管道斜坡向上敷設(shè)后,緊靠井場水泥公路敷設(shè),本段管道2次穿越寬約2.0~3.0m的鄉(xiāng)村土路,2次穿越寬約3.5~4.0m的村級(jí)水泥公路,車流量較小,可采用開挖方式通過,管頂距路面深度不宜小于2.5m,穿越水泥公路建議采取套管保護(hù)措施3.2、BC26~BC30樁管道穿越一小型河流后沿階梯狀斜坡向上敷設(shè),斜坡被各級(jí)平臺(tái)分割,坡角約20°~40°,各級(jí)陡坎高約1.5~4.0m,局部為近于直立的陡坡、陡崖,坡體松散堆積層厚度不均,陡坡、陡崖段強(qiáng)~中風(fēng)化基巖廣泛出露地表,陡坡、陡崖段施工過程中易發(fā)生崩落、掉塊、垮塌等現(xiàn)象,施工時(shí)應(yīng)盡量降低對邊坡的擾動(dòng),管道宜嵌入中風(fēng)化穩(wěn)定基巖內(nèi),及時(shí)清除破碎、松動(dòng)的危巖,溝槽開鑿后應(yīng)及時(shí)回填、封固,并對下部管道采取防撞擊措施,同時(shí)采取適宜的護(hù)坡穩(wěn)管和水工保護(hù)措施。階梯狀斜坡上覆崩坡積土層結(jié)構(gòu)較松散,厚度不均,管溝開挖易發(fā)生溝壁坍塌以及各級(jí)陡坎土體垮塌;管道應(yīng)盡量避開雨季施工,嚴(yán)格控制作業(yè)帶寬度,避免對斜坡土體造成過大擾動(dòng),要密切注意斜坡上方土體的穩(wěn)定性,充分利用現(xiàn)有平臺(tái),自上而下、逐級(jí)施工,及時(shí)回填,迅速修復(fù)受損的堡坎,并采取適宜的護(hù)坡穩(wěn)管和水工保護(hù)措施。3.3、BC25~BC26樁管道穿越一小型河流,河床寬約15.0m,勘察期間水量較小,水面寬約6.0m,水深約0.2~0.3m,最深處約0.5m,河床質(zhì)為漂石、塊石及卵石,調(diào)查厚度約1.5m,下伏為中風(fēng)化粉砂巖,本段河流屬山區(qū)雨源型溪溝,具暴漲暴落的特征,源短流急,雨季流量大、流速快,具較強(qiáng)的沖刷作用,過溝段管道宜嵌入中風(fēng)化穩(wěn)定基巖內(nèi),采用混凝土封固,并采取防沖刷和防浮穩(wěn)管措施,同時(shí)對穿越段兩側(cè)岸坡采取防沖刷措施。斜坡段坡體呈階梯狀,斜坡上覆崩坡積土層結(jié)構(gòu)較松散,厚度不均,管溝開挖易發(fā)生溝壁坍塌以及各級(jí)陡坎土體垮塌;管道應(yīng)盡量避開雨季施工,嚴(yán)格控制作業(yè)帶寬度,避免對斜坡土體造成過大擾動(dòng),要密切注意斜坡上方土體的穩(wěn)定性,充分利用現(xiàn)有平臺(tái),自上而下、逐級(jí)施工,及時(shí)回填,迅速修復(fù)受損的堡坎,并采取適宜的護(hù)坡穩(wěn)管和水工保護(hù)措施。3.4、BC20~BC26樁管道沿階梯狀陡斜坡向下敷設(shè),斜坡被各級(jí)平臺(tái)分割,坡角約20°~40°,各級(jí)陡坎高約1.5~4.0m,局部為近于直立的陡坡、陡崖,坡體松散堆積層厚度不均,陡坡、陡崖段強(qiáng)~中風(fēng)化基巖廣泛出露地表,陡坡、陡崖段施工過程中易發(fā)生崩落、掉塊、垮塌等現(xiàn)象,施工時(shí)應(yīng)盡量降低對邊坡的擾動(dòng),管道宜嵌入中風(fēng)化穩(wěn)定基巖內(nèi),及時(shí)清除破碎、松動(dòng)的危巖,溝槽開鑿后應(yīng)及時(shí)回填、封固,并對下部管道采取防撞擊措施,同時(shí)采取適宜的護(hù)坡穩(wěn)管和水工保護(hù)措施。階梯狀斜坡上覆崩坡積土層結(jié)構(gòu)較松散,厚度不均,管溝開挖易發(fā)生溝壁坍塌以及各級(jí)陡坎土體垮塌;管道應(yīng)盡量避開雨季施工,嚴(yán)格控制作業(yè)帶寬度,避免對斜坡土體造成過大擾動(dòng),要密切注意斜坡上方土體的穩(wěn)定性,充分利用現(xiàn)有平臺(tái),自上而下、逐級(jí)施工,及時(shí)回填,迅速修復(fù)受損的堡坎,并采取適宜的護(hù)坡穩(wěn)管和水工保護(hù)措施。3.5、BC17~BC21樁管道沿階梯狀陡斜坡向下敷設(shè),斜坡被各級(jí)平臺(tái)分割,坡角約20°~40°,各級(jí)陡坎高約1.5~4.0m,局部為近于直立的陡坡、陡崖,坡體松散堆積層厚度不均,陡坡、陡崖段強(qiáng)~中風(fēng)化基巖廣泛出露地表,陡坡、陡崖段施工過程中易發(fā)生崩落、掉塊、垮塌等現(xiàn)象,施工時(shí)應(yīng)盡量降低對邊坡的擾動(dòng),管道宜嵌入中風(fēng)化穩(wěn)定基巖內(nèi),及時(shí)清除破碎、松動(dòng)的危巖,溝槽開鑿后應(yīng)及時(shí)回填、封固,并對下部管道采取防撞擊措施,同時(shí)采取適宜的護(hù)坡穩(wěn)管和水工保護(hù)措施。階梯狀斜坡上覆崩坡積土層結(jié)構(gòu)較松散,厚度不均,管溝開挖易發(fā)生溝壁坍塌以及各級(jí)陡坎土體垮塌;管道應(yīng)盡量避開雨季施工,嚴(yán)格控制作業(yè)帶寬度,避免對斜坡土體造成過大擾動(dòng),要密切注意斜坡上方土體的穩(wěn)定性,充分利用現(xiàn)有平臺(tái),自上而下、逐級(jí)施工,及時(shí)回填,迅速修復(fù)受損的堡坎,并采取適宜的護(hù)坡穩(wěn)管和水工保護(hù)措施。3.6、工程承包范圍概況:本標(biāo)段內(nèi)的線路交樁放線、管溝土石方開挖、管溝土石方回填、施工作業(yè)帶的清理、施工臨時(shí)道路清障及修筑、施工場地和施工臨時(shí)道路的清理及地貌恢復(fù)、與管道安裝單位的施工配合。3.7、施工場地自然條件及社會(huì)依托:該段施工地屬蒼溪縣陵江鎮(zhèn)大洋村,茶店鄉(xiāng)五顯村。BC17~BC35樁,管道順溝谷-斜坡敷設(shè),沿線溝谷切割深、地形起伏大,相對高差156.30~224.50m,地表斜坡較陡,坡度一般20°~40°,局部近于直立;上覆土層厚度不均,基巖埋深變化較大,在山頂及陡坡、陡崖部位成片出露。管道沿斜坡中部狹窄的剝蝕平臺(tái)敷設(shè),局部切緩坡坡腳,相對高差1.00~28.00m,地表坡度一般小于15°,局部有陡坎;上覆土層厚度不均,基巖埋深變化較大,局部陡坎處基巖出露地表。第二節(jié)施工區(qū)域平面圖第二章施工準(zhǔn)備為按期保質(zhì)完成本項(xiàng)目,工程開工后立即按計(jì)劃組織機(jī)械、材料、人員進(jìn)場;并和業(yè)主、監(jiān)理及設(shè)計(jì)單位各方聯(lián)系,進(jìn)行圖紙會(huì)審,協(xié)助設(shè)計(jì)單位完善施工設(shè)計(jì)圖紙;對進(jìn)場的成品、半成品、設(shè)備、材料進(jìn)行自檢、專檢,并向監(jiān)理工程師提交產(chǎn)品合格證和質(zhì)保書。同時(shí)完成臨時(shí)設(shè)施工程,積極快速地投入正常的生產(chǎn)中。第一節(jié)技術(shù)準(zhǔn)備1.1、現(xiàn)場踏勘、收集有關(guān)資料1.1.11.1.2、調(diào)查水源、電源情況:調(diào)查施工水源、電源的供應(yīng)能力及接駁地點(diǎn)、線路距離;1.1.31.1.41.1.51.2、圖紙會(huì)審、設(shè)計(jì)交底1.2.11.2.21.2.31.3、編制施工組織設(shè)計(jì),按ISO9001標(biāo)準(zhǔn)編制質(zhì)量計(jì)劃,建立HSE管理機(jī)構(gòu)體系。1.3.11.3.2、按ISO9001質(zhì)量體系標(biāo)準(zhǔn)及公司ISO9001程序文件和質(zhì)量手冊編制本項(xiàng)目的質(zhì)量計(jì)劃。1.3.3、按GB/T240001-ISO14001環(huán)境管理體系、GB/T28001-2001職業(yè)健康、安全管理體系標(biāo)準(zhǔn)要求,結(jié)合本工程實(shí)際情況及具體要求,建立HSE管理機(jī)構(gòu)體系。1.3.4、作業(yè)中自覺做到遵章守紀(jì),嚴(yán)禁“三違”;自覺做好HSE觀察,落實(shí)“七想七不干”工作要求;切實(shí)做到“三不傷害1.3.1.3.1.4、編制預(yù)算文件由預(yù)算部門根據(jù)設(shè)計(jì)圖紙、預(yù)算定額、施工組織設(shè)計(jì)編制預(yù)算成本節(jié)約計(jì)劃。第二節(jié)施工隊(duì)伍準(zhǔn)備2.1根據(jù)本項(xiàng)目的具體情況建立本項(xiàng)目的項(xiàng)目經(jīng)理部管理機(jī)構(gòu),選擇高素質(zhì)的管理人員和專業(yè)技術(shù)人員及富有施工經(jīng)驗(yàn)的施工隊(duì)伍進(jìn)行該工程的施工。2.2對進(jìn)場的各級(jí)干部、工人進(jìn)行必要的技術(shù)、安全施工管理的崗前培訓(xùn)和法制教育,教育各級(jí)干部工人樹立明確的質(zhì)量、安全和文明施工意識(shí),遵守有關(guān)施工和安全文明施工的有關(guān)制度法規(guī),遵守地方治安法規(guī)。(施工現(xiàn)場管理框架結(jié)構(gòu)圖)2.3施工管理機(jī)構(gòu)及安全保證體系項(xiàng)目經(jīng)理李文森項(xiàng)目經(jīng)理李文森現(xiàn)場負(fù)責(zé)人青敏技術(shù)負(fù)責(zé)人青貴友現(xiàn)場負(fù)責(zé)人青敏技術(shù)負(fù)責(zé)人青貴友物資負(fù)責(zé)人楊帆機(jī)械負(fù)責(zé)人韓湘瑜施工員干九宏物資負(fù)責(zé)人楊帆機(jī)械負(fù)責(zé)人韓湘瑜施工員干九宏技術(shù)負(fù)責(zé)人青貴友質(zhì)檢員賴東爾安全負(fù)責(zé)人劉子敬資料員青勇安全保證體系圖安全保證體系安全保證體系思想保證提高全員意識(shí)施工技術(shù)安全規(guī)則教育安安全第一、預(yù)防為主強(qiáng)有力的組織、措施保證組織保證措施保證建立各級(jí)安全組織建立醫(yī)療保健機(jī)構(gòu)建立勞動(dòng)保護(hù)防疫機(jī)構(gòu)有力的后勤保障措施安全生產(chǎn)、事事相關(guān)、人人有責(zé)制度保證各項(xiàng)安全生產(chǎn)制度可靠的醫(yī)療保健措施完善的勞動(dòng)保護(hù)措施通暢靈敏的通信措施各工種安全生產(chǎn)制度月季年安全檢查制度安全總結(jié)評比制度經(jīng)濟(jì)保證包保責(zé)任制監(jiān)督檢查獎(jiǎng)罰分明經(jīng)濟(jì)兌現(xiàn)事事講安全處處有保障實(shí)現(xiàn)安全目標(biāo)生生產(chǎn)必須安全安全為了生產(chǎn)應(yīng)急保障應(yīng)急組織應(yīng)急設(shè)備物質(zhì)應(yīng)急培訓(xùn)、演練應(yīng)急響應(yīng)程序應(yīng)急救援預(yù)案的啟動(dòng)、進(jìn)行、終止和恢復(fù)工作生產(chǎn)費(fèi)投入第三節(jié)物資準(zhǔn)備(機(jī)械、材料、資金)3.1、材料準(zhǔn)備材料部門根據(jù)施工組織設(shè)計(jì)的材料需用量計(jì)劃編制材料采購計(jì)劃或材料生產(chǎn)計(jì)劃,并根據(jù)質(zhì)量計(jì)劃及材料供應(yīng)商評審材料確定材料供應(yīng)商。3.2、機(jī)械準(zhǔn)備3.2.13.2.23.3、資金準(zhǔn)備根據(jù)本工程的合同文件的要求及施工組織設(shè)計(jì)中的資金需用量專款專用。第四節(jié)建立項(xiàng)目HSE管理制度根據(jù)我公司的ISO9001程序文件及質(zhì)量手冊的要求及本工程所建立的HSE管理機(jī)構(gòu)體系要求,結(jié)合本工程的工程特點(diǎn)建立本項(xiàng)目的管理制度,使項(xiàng)目的各項(xiàng)管理工作按照ISO9001質(zhì)量保證體系的要求進(jìn)行運(yùn)行,確保項(xiàng)目達(dá)到既定的施工目標(biāo),本項(xiàng)目建立的管理制度有:機(jī)組組織管理制度機(jī)組現(xiàn)場標(biāo)準(zhǔn)化管理制度機(jī)組技術(shù)管理制度機(jī)組信息管理制度機(jī)組健康(HEALTH)管理制度機(jī)組環(huán)境(ENVIRONMENT)管理制度機(jī)組安全(SAFETY)管理制度機(jī)組生產(chǎn)管理制度機(jī)組質(zhì)量管理制度機(jī)組機(jī)械設(shè)備管理制度機(jī)組料具管理制度機(jī)組管理制度機(jī)組計(jì)量管理制度機(jī)組技術(shù)資料管理制度機(jī)組現(xiàn)場保衛(wèi)及治安管理制度詳見施工現(xiàn)場相關(guān)制度管理第五節(jié)現(xiàn)場施工條件準(zhǔn)備5.1、建立平面控制點(diǎn)網(wǎng)及水準(zhǔn)高程系統(tǒng)根據(jù)設(shè)計(jì)單位提供的控制點(diǎn)和水準(zhǔn)基點(diǎn)沿場地周圍布設(shè)精確的控制網(wǎng)和水準(zhǔn)高程系統(tǒng)。5.1.1、線路復(fù)測、5.15.1.4、測量人員和儀器配備5.2、本工程為復(fù)線工程新建管道沿元壩試采工程已建YB27-1/2~YB29管道并行敷設(shè),與已建管道凈距約6m,根據(jù)設(shè)計(jì)、業(yè)主要求及現(xiàn)場實(shí)際勘查情況,需采取以下準(zhǔn)備措施:5.2.1、用雷迪地下金屬探測儀進(jìn)行復(fù)查,并在沿途間隔20米及轉(zhuǎn)交樁處設(shè)置明顯標(biāo)識(shí),明確標(biāo)注出元壩試采工程已建5.2.2、5.2.3、全線除途經(jīng)道路、水塘和人員頻繁經(jīng)過區(qū)域,均需在已建管道向新建管道側(cè)邊緣外1.0m處架設(shè)1.0m第三章工程施工方案第一節(jié)測量工程測量前對管線探測儀、水準(zhǔn)儀等測量儀器進(jìn)行校定,儀器必須經(jīng)校驗(yàn)合格且在有效期內(nèi)方可使用。1.1、管道測量定樁1.1.1、現(xiàn)場成立測量放線工作組,由測量隊(duì)長或工程師主持具體施工工作,工作組下設(shè)2個(gè)施工測量放線小組,每個(gè)小組配備:施工技術(shù)員1人、測量工2人、輔助工4人。測量人員依據(jù)線路平面、斷面圖、設(shè)計(jì)控制樁、水準(zhǔn)標(biāo)樁進(jìn)行測量放線。根據(jù)設(shè)計(jì)樁號(hào),用管線探測儀1.1.2、1.1.3、1.1.4、管道采取彈性敷設(shè)、冷彎敷設(shè)處,測量人員依據(jù)管線平面、斷面圖,采用坐標(biāo)法確定敷設(shè)曲線,每10m1.1.5、1.1.6、1.1.7、1.2、放線1.2.1、線路軸線和施工作業(yè)帶邊界線定樁后,測量人員在兩樁點(diǎn)間拉設(shè)百米繩,沿繩撒白石灰進(jìn)行劃線,放出管線軸線、作業(yè)帶邊界線1.2.2、1.2.3、沿線地形坡度不大于15°,適于機(jī)械化溝左施工地段約占全線的96%,作業(yè)大寬度不小于12米第二節(jié)土石方開挖工程2.1、土方開挖前,應(yīng)做好以下各項(xiàng)準(zhǔn)備工作:管溝開挖的質(zhì)量對管線的埋深質(zhì)量影響較大,埋深達(dá)不到設(shè)計(jì)要求,將影響以后的安全運(yùn)行。管溝開挖要依圖進(jìn)行,如遇見和圖紙不符情況應(yīng)及時(shí)上報(bào)監(jiān)理,得到監(jiān)理指令后方可進(jìn)行開挖。2.1.1、設(shè)置排水防洪設(shè)施:在施工區(qū)域內(nèi)設(shè)置臨時(shí)性排水溝。2.1.2、修建臨時(shí)設(shè)施:施工作業(yè)便道2.1.3、首先對圖紙所定管位進(jìn)行探測,探測分儀器探測和挖坑探測,探明管位下方有無其他管線、光纜等障礙物。探測結(jié)果匯總后制定出穿越障礙物得方案方可進(jìn)入下步程序。2.1.4、放線:管位為中線,放出管溝放坡的邊線,在保證管溝深度的前提下,以保證不塌方為宜。2.1.5、所用設(shè)備及材料:土方運(yùn)輸車、單斗挖掘機(jī)、裝載機(jī)、空氣壓縮機(jī)、抽水泵、風(fēng)鉆、鐵鎬、鐵鍬、撬杠、頂木等。2.2、土石方工程施工工藝2.2.1A在管溝開挖前,按規(guī)范和設(shè)計(jì)圖及現(xiàn)場的土質(zhì)情況確定管溝的邊坡比;B開挖時(shí),質(zhì)量檢查員一定要始終進(jìn)行監(jiān)督檢查,對不符合質(zhì)量要求的地方(如坡比、挖深等)及時(shí)整改,確保各項(xiàng)指標(biāo)均達(dá)到規(guī)范和設(shè)計(jì)要求;C開挖時(shí)挖出的土石方應(yīng)放在施工的另側(cè),距管溝邊不小于1米;D如遇見巖石或硬質(zhì)土層時(shí),溝底深度應(yīng)超挖0.2m,以滿足細(xì)土回填的深度;E地下水位小于溝底深度地段,及挖深超過5米得管溝開挖,應(yīng)進(jìn)行坡比試驗(yàn),并由監(jiān)理確定,否則應(yīng)采取井點(diǎn)降水或打鋼板樁等措施;F遇見原地埋管線時(shí),障礙物兩側(cè)3米應(yīng)進(jìn)行人工開挖。重要設(shè)施要征得主管部門同意,并在其監(jiān)督下進(jìn)行;2.2.22.2.2.1、施工作業(yè)帶清理及掃線1)根據(jù)管道經(jīng)過的地形地貌及地質(zhì)情況進(jìn)行作業(yè)帶平整。施工前,同業(yè)主或監(jiān)理及地方政府一起,對作業(yè)帶內(nèi)的建(構(gòu))筑物和植(作)物林等進(jìn)行清點(diǎn)造冊,對重要地形、地貌、重要構(gòu)筑物進(jìn)行錄像作為將來恢復(fù)依據(jù)。施工作業(yè)帶的寬度為12米2)辦好征(占)地手續(xù)。3)清理程序:準(zhǔn)備工作→放線→作業(yè)帶邊界處理→作業(yè)帶清理4)準(zhǔn)備工作:工程技術(shù)人員熟悉線路圖紙、現(xiàn)場勘查線路、地形地貌,選用合理的機(jī)械及施工方法,向操作人員進(jìn)行交底。5)放線:根據(jù)規(guī)定的作業(yè)帶寬度用白灰放線作業(yè)帶邊界線及排(濾)水溝、筑土壩位置。6)石方段橫坡段管溝開挖,由于石方段地表土層較少(100mm-300mm成施工便道。7)作業(yè)帶清理、平整必須采取相應(yīng)保護(hù)措施保護(hù)農(nóng)田、果林、植被及配套設(shè)施,減少或防止水土流失。8)清理、平整作業(yè)帶時(shí),保護(hù)線路控制樁,如有損壞測量工立即進(jìn)行補(bǔ)樁恢復(fù)。9)山區(qū)、丘陵地段及坡度大、滑坡等地段,清除時(shí)防止傾覆、塌方。對淺丘地形而言,作業(yè)帶平整掃線后,將縱坡降至10°~18°,橫坡降至10°~15°;山地地形將縱坡降至18°~30°,橫坡降至15°以內(nèi)。10)作業(yè)帶經(jīng)過普通公路時(shí),雖不需掃線,但必須把履帶設(shè)備倒過公路。設(shè)備越過公路時(shí),采用在公路上鋪輕型橋排,橋排下墊土袋的方式跨路,以防履帶設(shè)備壓壞路面。11)作業(yè)帶經(jīng)過溝渠及中小型河流、溝渠且無繞行便道的地方時(shí)采用埋設(shè)砼涵管過水及架設(shè)鋼管排過橋的二種方法進(jìn)行過河便道修筑。2.2.3.管溝開挖1)管溝開溝前,工程技術(shù)人員、測量工、施工員等熟悉掌握線路、樁位、地形、地貌及地質(zhì)情況,并向操作者交底清楚、明確。2)管溝開挖前,工程技術(shù)人員,編制好作業(yè)指導(dǎo)書,明確管溝深度、寬度及邊坡坡度以及棄土位置、原則和質(zhì)量要求,向施工員、操作者進(jìn)行技術(shù)交底,明確任務(wù)、職責(zé)。3)測量放線:測量工按藍(lán)圖,依據(jù)所交樁位采用坐標(biāo)法用全站儀放出管道中心、管溝邊線,打下控制樁及引樁,供復(fù)核、檢查后撒白灰線。4)在管溝開挖前應(yīng)進(jìn)行移樁,轉(zhuǎn)角樁按轉(zhuǎn)角的角平分線移動(dòng),其余軸線樁應(yīng)平移至堆土或組焊一側(cè)距施工作業(yè)帶邊界線200mm處。對移樁困難地段,可采用增加引導(dǎo)樁、參照物標(biāo)記等方法來確定原位置。5)有地下障礙物時(shí),障礙物兩側(cè)各3m范圍內(nèi)應(yīng)采用人工開挖。對重要設(shè)施應(yīng)征得其管理方的同意,并在其監(jiān)督下開挖管溝。6)溝深超過5m的管溝開挖,可根據(jù)實(shí)際倩況,采取邊坡適當(dāng)放緩,加支撐或采取階梯式開挖措施。深度在5m以內(nèi)管溝最陡邊坡坡度土壤類別最陡邊坡坡度坡頂無載荷坡頂有靜載荷坡頂有動(dòng)載荷中密的沙土1:1.001:1.251:1.5中密的碎石類土(充填物為沙土)1:0.751:1.001:1.25硬塑的粉土1:0.671:0.751:1.00中密的碎石類土(充填物為粘性土)1:0.51:0.671:0.75硬塑的粉質(zhì)粘土、粘土1:0.331:0.501:0.67老黃土1:0.101:0.251:0.33軟土(經(jīng)井點(diǎn)降水)1:1.00--硬質(zhì)巖1:01:01:07)管溝開挖:采取松動(dòng)微量爆破,配合機(jī)械開鑿的方式進(jìn)行。8)對于溝下組裝管線,在各管口連接處開挖操作坑,操作坑低于管底0.6m,基坑尺寸依據(jù)管道縱橫向各延伸0.5m以上,并在管溝縱向方向打木(鋼)板樁支撐,保證焊坑邊坡穩(wěn)定。9)施工機(jī)械在丘陵、低山區(qū)等地段挖溝,根據(jù)坡度大小、土壤的類別、性質(zhì)及狀態(tài)采取相應(yīng)的措施、防傾覆、防下陷。山區(qū)石方段采用履帶式挖掘機(jī)破碎方法進(jìn)行管溝開挖時(shí),應(yīng)制定相應(yīng)的安全防護(hù)措施,由于大洋溝穿越上游340米處為大洋溝水庫。10)管溝開挖應(yīng)按施工規(guī)范要求進(jìn)行。11)施工承包商及現(xiàn)場監(jiān)理、業(yè)主代表共同對作業(yè)帶進(jìn)行驗(yàn)收,并作好驗(yàn)收簽字記錄,驗(yàn)收合格后方可進(jìn)場施工。重點(diǎn)檢查管溝變坡點(diǎn)情況,管溝溝底平直度、管溝上方是否有墜石,及溝底細(xì)土回填是否符合設(shè)計(jì)及規(guī)范要求。溝底加寬裕量K值(m)施工方法溝上組裝焊接溝下組裝焊接地質(zhì)條件旱地溝內(nèi)有積水巖石旱地溝內(nèi)有積水巖石b(m)0.50.70.90.81.00.9當(dāng)管溝深度大于3m而小于5m時(shí),管溝溝底寬度應(yīng)按上式計(jì)算值再加寬0.2m;當(dāng)管溝深度超過5m時(shí),管溝溝底寬度應(yīng)根據(jù)工程地質(zhì)情況酌情處理。2.2.4由于上坡推土或填土高、寬而降低挖掘機(jī)挖機(jī)的作業(yè)效率的有關(guān)數(shù)據(jù)。2.2.5、挖掘機(jī)施工方法2.2.5.1、適用范圍適用于開挖含水量不大于27%的一~四類的土和經(jīng)爆破后的巖石和土。巖塊及土塊粒徑應(yīng)小于土斗口寬度的1/3。正鏟主要用于開挖停機(jī)面以上的土方,工作面的高度一般不小于1.5m,過低一次不易裝滿鏟斗,生產(chǎn)效率將降低。正鏟經(jīng)濟(jì)合理的挖土高度見下表,開挖高度超過挖土機(jī)挖掘高度時(shí),可分層開挖。正鏟開挖應(yīng)配備一定數(shù)量的自卸汽車運(yùn)土,汽車道路應(yīng)設(shè)置在正鏟斗回轉(zhuǎn)半徑之內(nèi),可以在同一平面內(nèi),也可略高于正鏟的停機(jī)面,以便正鏟下溝槽挖土。由于正鏟不便于轉(zhuǎn)移,一般用于較大型土方工程。2.2.5.2、開挖方法1)開挖方式根據(jù)開挖路線與運(yùn)輸汽車相對位置的不同,一般有兩種:A正向開挖,側(cè)向裝土向前進(jìn)行方向挖土,汽車位于挖掘機(jī)的側(cè)面裝車,鏟臂卸土?xí)r角度在90°內(nèi),且汽車行駛方便,生產(chǎn)率高,一般采用較多。開挖高度參考數(shù)值(m)土的類別鏟斗容量(m3)0.51.01.52.0一~二三四1.52.02.52.02.53.02.53.03.53.03.54.0B側(cè)向開挖,側(cè)向裝土正鏟沿側(cè)向挖土,汽車停在正鏟的側(cè)向裝土,鏟臂卸土?xí)r角度亦在90°內(nèi),但運(yùn)輸汽車要側(cè)行車,生產(chǎn)效率要降低一些。正向挖土,后方裝車正鏟向前進(jìn)方向挖土,汽車停在正鏟的后面,鏟臂回轉(zhuǎn)角度較大(在180°左右),運(yùn)輸汽車要側(cè)行,生產(chǎn)效率降低,僅用于開挖工作面狹小且較深的基坑(槽)、管溝和路塹等工程。2.2.5.3、運(yùn)行路線和施工方法A、土方運(yùn)輸?shù)倪\(yùn)行路線和施工方法依工程大小、運(yùn)距長短、土的性質(zhì)和地形條件等而定。橢圓形及“S”字型運(yùn)行路線B、運(yùn)行路線是從挖方到填方按橢圓形路線回轉(zhuǎn),作業(yè)時(shí)應(yīng)常調(diào)換方向行駛,以避免機(jī)械行駛部分的單側(cè)磨損,適于長100m內(nèi),填土高1.5mC、“S”字形運(yùn)行路線是陡坎、斜坡時(shí)按“S”字形運(yùn)行,一個(gè)循環(huán)完成兩次挖土和卸土作業(yè),裝土和卸土沿直線開行時(shí)進(jìn)行,轉(zhuǎn)變時(shí)剛好把土裝完傾卸完畢,但兩條路線間的夾角a應(yīng)小于60°,適用于填筑路基、場地平整工程。影響生產(chǎn)效率參考表土的類別回轉(zhuǎn)角度90°130°180°一~四100%87%77%2.2.5.4、挖土方法和提高生產(chǎn)率措施分層挖土:將開挖面按機(jī)械的合理挖掘高度分為多層開挖,當(dāng)開挖面高度不能成為一次挖掘深度的整數(shù)倍時(shí),則可在挖方的邊緣或中部先開一條淺槽作為第一次挖土運(yùn)輸路線,然后再逐次開挖直至基坑底部。這種方法多用于開挖大型基坑或溝渠。多層挖土:將開挖面按機(jī)械的合理開挖高度,分為多層同時(shí)開挖,以加快開挖速度,土方可以分層運(yùn)出,變可分層遞送,至最上層用汽車運(yùn)出。這種方法適用于開挖邊坡或大型基坑。中心開挖法:挖掘機(jī)先在管溝的中心開挖,然后轉(zhuǎn)向兩側(cè)開挖,運(yùn)輸汽車按“八”字形停放裝土。挖土區(qū)宜在40m以上,以便汽車靠近挖掘機(jī)裝車。這種方法適用于開挖較寬的山坡和基坑。第三節(jié)回填土方工程4.1、回填施工準(zhǔn)備1)土方回填的準(zhǔn)備工作:場地回填之前場地表土清理應(yīng)已施工完畢并驗(yàn)收合格,質(zhì)量滿足設(shè)計(jì)技術(shù)要求(場地表土清理標(biāo)段已先行招標(biāo)并施工)?;靥钪皯?yīng)清除沉積于水中的樹木、沉船等雜物。A:回填土方和壓實(shí)1、土料處理:1)填土應(yīng)嚴(yán)格控制含水量,施工前應(yīng)檢驗(yàn),當(dāng)土的含水量大于最優(yōu)含水量范圍時(shí),應(yīng)采用翻松、晾曬、風(fēng)干法降低之,或采取換土回填,均勻摻入干土或其它吸水材料等措施來降低,若由于含水量過大夯實(shí)時(shí)產(chǎn)生橡皮土,應(yīng)翻松晾干至最佳含水量時(shí)再回填夯實(shí)。如含水量偏低,可采用預(yù)先灑水潤濕。若鋪土后發(fā)現(xiàn)含水量小于最優(yōu)含水量時(shí),可灑水溫潤。2)當(dāng)用噴水器潤濕前,先用秒表測量單位時(shí)間噴水器的流量,然后確定1m33)在氣候干燥時(shí),須采取加速挖土、運(yùn)土、平土和碾壓過程,以減少土的水分散失。4)作業(yè)要求:對于密實(shí)度要求的填方,應(yīng)按所選用的土料、壓實(shí)機(jī)械的性能,通過試驗(yàn)確定含水量控制范圍,每層鋪土厚度,壓實(shí)遍數(shù),進(jìn)行水平分層鋪土碾壓到設(shè)計(jì)規(guī)定的質(zhì)量要求。對于無密實(shí)度要求或允許自然沉實(shí)的填方,可直接填筑,不壓(夯)實(shí),但應(yīng)預(yù)留一定的沉陷量。對回填土方和砂工程,應(yīng)嚴(yán)格按設(shè)計(jì)規(guī)定的鋪土厚度回填并壓實(shí),使之有足夠的強(qiáng)度與穩(wěn)定性。填方宜盡量采用同類土填筑,如采用兩種透水性不同的土填筑時(shí),應(yīng)將透水性較大的土層置于透水性較水的土層之下,邊坡不得用透水性較小的土封閉,以免填方形成水囊。4.2、填方邊坡:1)、永久性填方的邊坡坡度應(yīng)根據(jù)填方高度、土的種類和其重要性在設(shè)計(jì)中規(guī)定。按規(guī)定時(shí),根據(jù)土的種類可參考下表采用,此時(shí)的邊坡應(yīng)為1:1.5。4.3、人工填土方法:用手推車送土,人工用鐵鍬、耙、鋤等工具進(jìn)行填土,由場地最低部分開始,由一端向另一端自下而上分層鋪填,每層虛鋪土厚度,用人工木夯夯實(shí)時(shí);砂質(zhì)土不大于0.3m,粘性土為20cm,用打夯機(jī)械夯實(shí)時(shí),不大于30cm。邊角人工夯填土一般用60~80kg重的木夯,由4~8人拉繩,二人扶夯,舉高不小于0.5m,一夯壓半夯,按次序進(jìn)行。大面積人工回填多用于打夯機(jī)夯實(shí)。兩機(jī)平行時(shí),其間距不得小于3m,在同一夯行路線上,前后間距不得小于10m。4.4、機(jī)械填土方法:1)挖土機(jī)填土:挖土機(jī)填土須自上而上分層鋪填,一般每層鋪厚不宜大于30cm,大坡度填土,亦應(yīng)分層推平,不得居高臨下,不分層次,一次挖填。挖土機(jī)運(yùn)土回填,可先在路線上的某中間點(diǎn)逐步分段集中成一個(gè)大堆,再分為若干次運(yùn)送至卸土地點(diǎn),分段距離約為10~15m,以減少運(yùn)土的漏失量。土方推至填方部位時(shí),履帶應(yīng)重迭一半。填土程序一段采用縱向鋪填順序,從挖土區(qū)段至填土區(qū)段,以40~60m距離為宜。2)自卸汽車填土:用自卸汽車運(yùn)來的填土,卸下常是成堆的,需用推土機(jī)推開攤平,使其每層的鋪土厚度不大于30~50cm(隨選用的壓實(shí)機(jī)械而定),由于汽車不能在虛土上行駛,因而卸土推平和壓實(shí)工作采取分段交叉進(jìn)行,并可利用汽車行駛作部分壓實(shí)工作。4.5、填土的壓實(shí):壓實(shí)的一般要求:1)密實(shí)度要求填方的密實(shí)度要求和質(zhì)量指標(biāo)通常以壓實(shí)系數(shù)λc表示。壓實(shí)系數(shù)為土的控制(實(shí)際)干土密度pd與最大干土密度pdmax的比值。最大干土密度pdmax是當(dāng)最優(yōu)含水量,通過標(biāo)準(zhǔn)的擊實(shí)方法確定的。密實(shí)度要求一般由設(shè)計(jì)根據(jù)工程結(jié)構(gòu)性質(zhì)、使用要求以及土的性質(zhì)確定,2)含水量控制填方含水量的大小,對土的回填壓實(shí)效果有直接影響。在壓(夯)實(shí)前應(yīng)預(yù)先試驗(yàn)求出符合密實(shí)度要求條件下的最優(yōu)含量和最少壓(夯)實(shí)遍數(shù)。填土壓實(shí)時(shí),應(yīng)使回填土的含水量在最優(yōu)含水量范圍之內(nèi)。各種土的最優(yōu)含水量和最大干密度的參考數(shù)值,粘性土料施工含水量與最優(yōu)含水量之差可控制在-4~+2%范圍內(nèi)(使用振動(dòng)碾時(shí),可控制在-6+2%范圍內(nèi))。工地簡單檢驗(yàn)一般以手握成團(tuán)落地開花為適宜。土的最優(yōu)含水量和最大干密度參考表項(xiàng)次土的種類變動(dòng)范圍項(xiàng)次土的種類變動(dòng)范圍最優(yōu)含水量%(重量比)最大干密度(g/cm3)最優(yōu)含水量%(重量比)最大干密度(g/cm3)12砂土砂土8~1219~231.80~1.881.57~1.7034粉質(zhì)粘土粉土12~1516~221.35~1.951.61~1.80注:1、表中的最大密度應(yīng)根據(jù)現(xiàn)場實(shí)際達(dá)到的數(shù)字為準(zhǔn)。2、一般性的回填可不作此項(xiàng)測定。3、鋪土厚度和壓實(shí)遍數(shù)填方每層鋪土厚度和壓實(shí)遍數(shù)視土的性質(zhì)、設(shè)計(jì)要求的壓實(shí)系數(shù)和使用的壓(夯)實(shí)機(jī)具性能而定,一般應(yīng)進(jìn)行現(xiàn)場碾(夯)壓試驗(yàn)確定。B:水田、池塘、軟土的處理施工區(qū)域部分的所有池塘應(yīng)使用電泵排水,除低水位,用挖掘機(jī)除塘底淤泥,盡量清除干凈。若淤泥太深,可僅挖至-0.3米(黃基),但應(yīng)記錄未清淤泥部分面積,中心坐標(biāo),淤泥面高程。之后分層回填粗砂,每層30cm,用振動(dòng)壓路機(jī)碾壓6—8遍,直至與塘邊自然地面齊平。C、其他機(jī)具對密實(shí)度要求不高的大面積填方,在缺乏碾壓機(jī)械時(shí),可采用推土機(jī)、拖拉機(jī)或鏟運(yùn)機(jī)結(jié)合行駛、推(運(yùn))土、平土來壓實(shí)。對松填的特厚土層亦可采用重錘夯實(shí)、強(qiáng)夯等機(jī)具方法來夯實(shí)。工準(zhǔn)備階段人員、機(jī)具設(shè)備進(jìn)場,土樣試驗(yàn)工準(zhǔn)備階段人員、機(jī)具設(shè)備進(jìn)場,土樣試驗(yàn)施工測量放樣施工測量放樣土土方施工階段土方范圍內(nèi)清理場地→土方范圍內(nèi)清理場地→填前壓實(shí)→自檢試驗(yàn)土質(zhì)試驗(yàn)土質(zhì)→確定機(jī)具組合和最佳含水量最佳碾壓遍數(shù)運(yùn)土(取土場或利用土)、控制含水量運(yùn)土(取土場或利用土)、控制含水量攤鋪攤鋪→整平→穩(wěn)壓碾壓→碾壓→自檢壓實(shí)度工程驗(yàn)收恢復(fù)樁志→工程驗(yàn)收恢復(fù)樁志→詳細(xì)放樣→土方整平加工→自檢整理全部檢測資料、施工原始記錄整理全部檢測資料、施工原始記錄→歸檔土方工程流程圖第四節(jié)水工保護(hù)施工1.水工保護(hù)的主要形式根據(jù)設(shè)計(jì)給定水工保護(hù)的形式,結(jié)合不同地形地貌主要采用的形式有以下幾種:1、1、石砌擋土墻主要形式如下圖示意:砂礫石濾水層砂礫石濾水層3:7灰土墊層片石護(hù)坡排水溝石砌擋土墻泄水孔1:51:01.2、擋土坎主要形式有石砌擋土坎及灰土擋土坎,如下圖示:灰土擋土坎灰土擋土坎輸氣管道粘土夯實(shí)條石過粱或塊石砌拱管線1.3、護(hù)坡M10砂漿砌塊石厚250--300M10砂漿砌塊石厚250--300碎石或卵石墊層厚100管線粘土夯實(shí)條石過粱或塊石砌拱輸氣管管線排水溝M5水泥砂漿砌片石3:7灰土墊層2)所護(hù)邊坡的地質(zhì)條件應(yīng)是自然穩(wěn)定狀態(tài)。1.4護(hù)壁1)護(hù)壁的主要形式如下圖示:灰土分層夯實(shí)灰土分層夯實(shí)管道護(hù)坡管線堡坎護(hù)壁砂礫石濾水層3:7灰土2)當(dāng)邊坡為基巖或穩(wěn)定密實(shí)的土層時(shí)采用護(hù)壁,否則采用擋土墻。1.5垂直堡坎1)垂直堡坎的主要形式如下圖示意:1:51:5條石堡坎(護(hù)壁)1:2水泥砂漿砌筑管線1.6護(hù)岸設(shè)計(jì)水位碎石或卵礫石墊層設(shè)計(jì)水位碎石或卵礫石墊層漿砌堆石1.7排水溝排水溝的主要形式如下圖示意:素土夯實(shí)素土夯實(shí)漿砌片石1.8沖溝頭處理1)沖溝頭處理形式如下圖示:3;7灰土夯實(shí)3;7灰土夯實(shí)擋土墻2:8灰土回填管道沖溝頭處理形式(線—1796/6)2)本形式適用于濕陷性BC26樁號(hào)管道中心較近的沖溝頭布處理,對上游匯水還應(yīng)采取截引、排水處理。2、水工保護(hù)施工總體要求2.1根據(jù)管道沿線的地形變化情況,結(jié)合現(xiàn)場實(shí)際,對設(shè)計(jì)的水工保護(hù)進(jìn)行復(fù)核后再實(shí)施,同時(shí)根據(jù)施工過程及管道敷設(shè)完成后的安全及水土保持,有針對性的補(bǔ)充部分水工保護(hù)措施(報(bào)送業(yè)主、設(shè)計(jì)、監(jiān)理等部門批準(zhǔn))。2.2水工保護(hù)應(yīng)作為重點(diǎn)質(zhì)量控制環(huán)節(jié),水工保護(hù)使用原材料必須符合設(shè)計(jì)及施工驗(yàn)收規(guī)范要求,需進(jìn)場復(fù)試的材料必須化驗(yàn)合格后方可使用。2.3嚴(yán)格控制回填土的密實(shí)度,在最佳含水率條件下進(jìn)行回填、夯實(shí)。2.4砌筑砂漿要控制好砂漿的和易性和強(qiáng)度等級(jí)確保砌筑質(zhì)量。砌體表面要平滑通順,塊石等砌材要上下錯(cuò)縫,內(nèi)外搭接,護(hù)坡石塊要落穩(wěn)壓實(shí)。2.5裝配式混凝土壓重塊要接縫嚴(yán)密,灌縫密實(shí),現(xiàn)澆混凝土連續(xù)覆蓋層等施工時(shí),嚴(yán)格控制混凝土塌落度,振搗密實(shí),保持強(qiáng)度等級(jí)。2.6各項(xiàng)水工保護(hù)措施要重點(diǎn)控制好基層,基礎(chǔ)及接縫處的質(zhì)量。3、水工保護(hù)措施及主要施工方法3.1濕陷性土地段1)濕陷性土地段的管溝,應(yīng)在最優(yōu)含水率下回填夯實(shí),密實(shí)度應(yīng)達(dá)到0.92以上,斜坡地段砌筑灰土或石砌擋土坎,管溝上砌筑漿砌片石(或灰土)截水溝,斜坡上修建鱗坑固土。2)濕陷性土地段管溝應(yīng)按設(shè)計(jì)要求進(jìn)行超挖并回填2:8灰土夯實(shí)、平整保證管道落穩(wěn)落實(shí)。3)石砌擋土坎可采用條石、片石、毛石或粒徑不小于150mm的卵石砌筑,砌筑砂漿采用M5水泥砂漿,過梁條石或砌拱塊石強(qiáng)度不小于MU10。4)灰土擋土坎采用3:7石灰土加水分層夯實(shí),壓實(shí)系數(shù)不小于0.94。3.2黃土沖溝1)沖溝溝坡設(shè)環(huán)行截水溝引流排水,管道上下沖溝段設(shè)置灰土擋土坎、石砌擋土墻等并用編制物裝土或漿砌片(塊)石護(hù)坡。2)石砌擋土墻a所用石料強(qiáng)度應(yīng)不小于MU20,石料的容重不小于20KN/m3。石料要有兩個(gè)較大平面,砌筑前石料應(yīng)進(jìn)行修整,使石料大致方正。b擋土墻采用M5(常年水位以下采用M7.5)水泥砂漿砌筑,1:2或1:3水泥砂漿勾縫。擋土墻基礎(chǔ)應(yīng)置于穩(wěn)定土層中,如基底為巖石,墻身可置于巖石上(灰土墊層取消),但應(yīng)將表層風(fēng)化層鑿除,如巖石為斜坡,要把巖石鑿成階梯行。c擋土墻應(yīng)使砌體強(qiáng)度達(dá)到設(shè)計(jì)要求后再填土,夯實(shí)回填土或砂礫石濾水層時(shí),要避免砌體震動(dòng)破壞。3)溝下游分級(jí)設(shè)谷坊(2:8或3:7灰土)淤土;溝床內(nèi)灰土夯實(shí);4)沖溝底部溝壁修筑灰土護(hù)壁或條石(混凝土預(yù)制塊)護(hù)壁等措施。a灰土護(hù)壁采用3:7石灰土加水分層夯實(shí)成型,石灰土壓實(shí)系數(shù)應(yīng)不小于0.94;b石砌護(hù)壁采用MU20條石(或C20預(yù)制混凝土塊)、M5水泥砂漿砌筑。護(hù)壁應(yīng)砌筑在堅(jiān)實(shí)可靠的地基上,若地面有風(fēng)化或崩塌現(xiàn)象,應(yīng)清除或處理后再施工。如果基底為堅(jiān)硬巖石,3:7灰土基礎(chǔ)墊層可不做,護(hù)壁直接砌于基巖上。護(hù)壁施工時(shí),在陡壁上開一槽橫斷面,尺寸與護(hù)壁斷面尺寸相符,每邊適當(dāng)放大0.2—0.5m,砌筑石壁用砂漿填塞,使護(hù)壁與陡壁連為整體,外壁應(yīng)與原陡壁齊平。3.3陡坡地段1)陡坡坡頂環(huán)行截水溝引流排水,上彎道處設(shè)灰土基礎(chǔ)并采用防水措施;管線上坡段采用漿砌片石(或塊石)護(hù)坡、土工編制物裝土護(hù)坡或2:8灰土夯實(shí)護(hù)坡以及間隔約50m設(shè)平行溝截流排水,同時(shí)于管溝兩側(cè)各約10m范圍的魚鱗坑,在陡坡中部分級(jí)設(shè)置2:8灰土平臺(tái)基礎(chǔ)以釋放應(yīng)力;在下彎道處設(shè)灰土基礎(chǔ)并采取防水措施。2)塊石護(hù)坡施工時(shí),首先進(jìn)行坡面平整,并進(jìn)行夯拍,施工灰土墊層時(shí),應(yīng)將遇到的洞穴等填塞密實(shí),填方的坡面應(yīng)分層夯實(shí)。塊石護(hù)坡采用M5水泥砂漿砌筑,使用的塊石堅(jiān)硬無風(fēng)化。當(dāng)?shù)責(zé)o石材的地方,可采用預(yù)制混凝土板(400×400×60)或3:7灰土做護(hù)坡(邊坡穩(wěn)定的情況下)。3)截排水溝施工時(shí),土層中開挖的水溝一般采用梯形斷面,邊坡坡度1:1—1:5。水溝深度、寬度應(yīng)與原排水溝尺寸相符,新做水溝根據(jù)地形及排水量確定斷面,溝底寬一般為800mm、600mm、4)水溝的起點(diǎn)和終點(diǎn)應(yīng)與既有溝渠平頂銜接。水溝縱向坡度不小于2‰,土層中開挖的水溝縱坡,不宜大于8‰,超過時(shí),根據(jù)計(jì)算流速進(jìn)行鋪砌加固,防止沖刷。5)排水溝引水入橋涵處,應(yīng)控制水溝溝底標(biāo)高不低于橋涵入口標(biāo)高。鋪砌水溝使用的片石厚度應(yīng)大于150mm,石材應(yīng)堅(jiān)硬無風(fēng)化,使用的卵石不宜成球狀,當(dāng)水流速不大,土質(zhì)良好處,水溝可不用墊層而直接將石塊嵌入土中。為防止水滲入土層處,墊層下須鋪一層100厚C10混凝土。3.4滑坡地段管道應(yīng)繞避滑坡段,對可能存在的滑坡段施工時(shí)要注意因管道施工改變原有邊坡,損毀植被,影響排水而導(dǎo)致的滑坡產(chǎn)生,施工時(shí)采取適當(dāng)放坡、護(hù)坡等措施進(jìn)行預(yù)防。3.5河流、沖溝穿越1)為防止管道在下溝后上浮,穿越河流、沖溝的管道在下溝后均應(yīng)及時(shí)進(jìn)行配重,如裝配式普通混凝土加重塊或連續(xù)混凝土覆蓋。2)穿越河流、沖溝時(shí),管道安裝就位后應(yīng)及時(shí)恢復(fù)岸坡。恢復(fù)岸坡時(shí)根據(jù)具體情況選用適宜護(hù)岸水工保護(hù)措施:水流極緩對岸坡基本無沖刷的河流、水渠或岸坡較緩、不明顯的水塘采用防滲截水墻A型;有一定流速,對岸坡有沖刷的河流、水渠或岸坡較陡的水塘采用防滲截水墻B型;對筑有堤壩、水位高于自然地面的河流、溝渠、水塘采用防滲截水墻C型。3)漿砌片石護(hù)岸基礎(chǔ)埋置深度必須在沖刷線以下0.8m,并置于穩(wěn)定的巖石或卵石層上,否則采取基礎(chǔ)防沖刷措施。漿砌片石采用M5水泥砂漿砌筑,使用的片石堅(jiān)硬不易風(fēng)化,護(hù)岸表面應(yīng)勾縫?;淄临|(zhì)有變化處,應(yīng)設(shè)置沉降縫,可考慮將沉降縫與伸縮縫合并設(shè)置,護(hù)岸寬度應(yīng)不小于8m。3.9山區(qū)臨時(shí)水工保護(hù)措施本標(biāo)段管線途徑黃土高原、丘陵及中低山地段,管線沿溝谷,沖溝、河灘地敷設(shè)較多,洪水沖刷嚴(yán)重,雨后瞬時(shí)成災(zāi),管線下溝后如不能及時(shí)回填則可能因洪水造成管道沖移和漂浮。因此,管線下溝后要采取臨時(shí)水工保護(hù)措施。對于位于坡根的管溝,則在管溝開挖時(shí)就要沿管溝貼山坡開出排水溝,以免下雨時(shí)從山坡下來的雨水直接沖刷管溝,如下圖:排水溝排水溝管線坡根水工保護(hù)示意圖2)管道下溝后,如不能及時(shí)回填,在迎水一側(cè)用裝土的編制袋修筑截水墻,墻寬2m,高1m。同時(shí)需用袋裝土堆砌在管線上,壓住管子,以防下雨時(shí)溝內(nèi)積水造成管線漂浮或細(xì)土流失,一般地段間隔50m,積水地段間隔20m,每處壓管長度4m。如下圖:管線臨時(shí)穩(wěn)管示意圖管線臨時(shí)穩(wěn)管示意圖3)如管溝位于山腳下,山體容易塌方或出現(xiàn)滾石,則需及時(shí)對危險(xiǎn)地段的管道覆土,以防止損壞管道。4)在山前平坦段施工時(shí),要防止洪水對管溝的沖刷,每段管溝的開挖應(yīng)與管道組裝、焊接、下溝回填緊密結(jié)合,完成一段開挖一段,并結(jié)合中短期天氣預(yù)報(bào),每段長度不宜超過1.5km(不留死頭)。5)水工保護(hù)安全措施:a施工前應(yīng)對所有人員進(jìn)行安全教育。b施工現(xiàn)場周圍的有滾石地段應(yīng)設(shè)立明顯的警示標(biāo)志。c施工時(shí)應(yīng)注意陡坡的情況,如有滑塌的可能必須及時(shí)處理,對有可能墜落的危險(xiǎn)物應(yīng)及時(shí)清理。d對山地坡度較大地段的材料堆放要放在平整地帶,如無平整地帶,周圍要加設(shè)圍護(hù)以防止毛石等滾落墜下傷人。第四章各項(xiàng)管理和保證措施1、實(shí)施目標(biāo):1.1、質(zhì)量目標(biāo):本工程的質(zhì)量目標(biāo)定為優(yōu)良等級(jí)標(biāo)準(zhǔn),嚴(yán)格按設(shè)計(jì)圖紙和施工規(guī)范優(yōu)質(zhì)高速地組織施工。三級(jí)質(zhì)量控制點(diǎn)設(shè)置序號(hào)質(zhì)量檢測點(diǎn)控制要素1A級(jí)(共檢點(diǎn))施工單位提前24小時(shí)以書面形式通知業(yè)主(或設(shè)計(jì))和監(jiān)理,業(yè)主(或設(shè)計(jì))和監(jiān)理應(yīng)在停檢當(dāng)天進(jìn)行檢查,檢查合格三方(或四方)會(huì)簽有關(guān)文件后方可進(jìn)行下一道工序。2B級(jí)(監(jiān)理見證點(diǎn))施工單位提前24小時(shí)通知監(jiān)理,監(jiān)理現(xiàn)場檢查確認(rèn)合格后,簽署有關(guān)文件后方可進(jìn)行下一道工序。3C級(jí)(一般檢查點(diǎn))施工單位進(jìn)行自檢,監(jiān)理現(xiàn)場不定期巡查,如發(fā)現(xiàn)有不符合施工規(guī)范、標(biāo)準(zhǔn),書面或口頭通知限期整改。⑵本工程質(zhì)量控制要點(diǎn)見以下附表:基礎(chǔ)施工質(zhì)量控制要點(diǎn)序號(hào)階段控制點(diǎn)類別控制內(nèi)容1準(zhǔn)備階段施工組織設(shè)計(jì)A審查施工組織設(shè)計(jì)的針對性、可行性2設(shè)計(jì)交底A設(shè)計(jì)中的特殊要求,施工中應(yīng)注意的問題和材料選用等3施工圖會(huì)審A對施工圖存在的問題,不明確及施工不便的地方進(jìn)行討論4材料檢驗(yàn)B檢查合格證、抽檢記錄、材料規(guī)格材質(zhì)是否符合設(shè)計(jì)要求5施工設(shè)備進(jìn)場B檢查設(shè)備的型號(hào)、數(shù)量、性能是否滿足施工要求6施工方案審查B施工進(jìn)度、施工機(jī)具、施工技術(shù)措施、質(zhì)量保證措施等7施工階段測量放線B坐標(biāo)、水準(zhǔn)點(diǎn)測量成果8隔離防護(hù)網(wǎng)安裝A地質(zhì)與設(shè)計(jì)相符、幾何尺寸符合設(shè)計(jì)要求9管溝開挖B設(shè)計(jì)規(guī)范要求及規(guī)范標(biāo)準(zhǔn)10管溝驗(yàn)收B工程質(zhì)量驗(yàn)收標(biāo)準(zhǔn)11回填B設(shè)計(jì)規(guī)范要求及規(guī)范標(biāo)準(zhǔn)12水工保護(hù)B基礎(chǔ)、配合比、材質(zhì)報(bào)告、隱蔽記錄13地貌恢復(fù)C規(guī)范要求14工程交接基礎(chǔ)交安裝A基礎(chǔ)各項(xiàng)數(shù)據(jù)、坐標(biāo)、標(biāo)高、螺栓或孔間距尺寸、外觀質(zhì)量、安裝、復(fù)測驗(yàn)收15交工技術(shù)文件、竣工圖A交工技術(shù)文件數(shù)據(jù)準(zhǔn)確、會(huì)簽齊全、質(zhì)量評定資料完善、初評合格1.2、工期目標(biāo):按照建設(shè)方的統(tǒng)一部署安排及公司決定,項(xiàng)目部將精心組織施工,確保在預(yù)定工作周期內(nèi)保質(zhì)保量完成任務(wù)。1.3、安全目標(biāo):完善安全措施,提高安全意識(shí),杜絕重傷和重死亡事故發(fā)生。1.4、文明施工目標(biāo):劃分職責(zé),嚴(yán)格按施工平面圖進(jìn)行管理,設(shè)專人打掃現(xiàn)場和周圍道路清潔,做到物流有序,施工順暢,文明施工。1.5、服務(wù)目標(biāo):服務(wù)周到,業(yè)主滿意,信守合同,認(rèn)真協(xié)調(diào)與有關(guān)各方面的關(guān)系,接受并積極配合業(yè)主和監(jiān)理對工程質(zhì)量、工程進(jìn)度、計(jì)劃協(xié)調(diào)、現(xiàn)場管理的控制與監(jiān)督。2、工程質(zhì)量保證措施2.1、關(guān)鍵工序和特殊過程的控制。(1)對影響工程質(zhì)量的關(guān)鍵工序和特殊過程實(shí)施控制。(2)特種作業(yè)的施工人員要經(jīng)過專業(yè)培訓(xùn),考核合格后方可上崗。(3)項(xiàng)目部技術(shù)人員、質(zhì)檢員應(yīng)對關(guān)鍵工序和特殊過程進(jìn)行指導(dǎo)監(jiān)督,工程處主任工程師對控制情況進(jìn)行檢查。2.2、及時(shí)做好施工日志,隱蔽驗(yàn)收記錄、原始記錄和現(xiàn)場簽證等工程技術(shù)資料。2.4、對施工完畢的工程對其管道進(jìn)行試通鑒定,經(jīng)檢驗(yàn)合格,方可繼續(xù)后續(xù)工序的施工。3、安全技術(shù)保證措施3.1、安全管理目標(biāo)(1)本工程項(xiàng)目杜絕重大傷亡、設(shè)備、管線、消防事故。(2)本工程項(xiàng)目創(chuàng)建安全生產(chǎn)標(biāo)化工地、文明工地。(3)嚴(yán)格遵守國家各項(xiàng)政策、法令,有關(guān)安全生產(chǎn)單項(xiàng)法規(guī)《中華人民共和國建筑法》,及國家標(biāo)準(zhǔn)《建筑安全施工檢查標(biāo)準(zhǔn)》(JGJ59—99)和地方標(biāo)準(zhǔn)。本工程將建立完整的安全組織機(jī)構(gòu),確定分管安全生產(chǎn)的項(xiàng)目負(fù)責(zé)人,規(guī)定職責(zé)和權(quán)限,對項(xiàng)目專職安全員及相關(guān)人員直至到班組和工人建立安全生產(chǎn)責(zé)任制,進(jìn)行自下而上的層層簽約,明確各自的職責(zé)和權(quán)限。3.2、安全管理措施(1)施工地段設(shè)立醒目安全標(biāo)識(shí),設(shè)置警戒繩,確保施工過程安全。(2)施工人員上崗前必需進(jìn)行安全教育、培訓(xùn),并按要求持證上崗。(3)施工現(xiàn)場嚴(yán)禁無關(guān)人員進(jìn)入,施工人員進(jìn)入施工現(xiàn)場必須配戴安全帽,嚴(yán)格遵守“十不準(zhǔn)”規(guī)定。(4)本施工項(xiàng)目涉及施工沿線的地下管線的保護(hù)、基坑開挖等重點(diǎn)部位,落實(shí)監(jiān)控人員,確定監(jiān)控的措施方案和方式,實(shí)施重點(diǎn)監(jiān)控,必要時(shí)連續(xù)監(jiān)控。(5)對起重設(shè)備的操作人員和指揮人員進(jìn)行交底。對起重作業(yè)的各種索具,安全系數(shù)K>8,起重索定期檢查,對斷絲超標(biāo)的、鋼絲繩棱角邊快口損壞的,及時(shí)予以報(bào)廢,防止鋼絲繩在吊運(yùn)中被拉斷,把桿反彈。嚴(yán)禁雨天、霧天在高壓線附近作業(yè)。如特殊情況要吊運(yùn),必須制訂相關(guān)的技術(shù)措施,擴(kuò)大吊運(yùn)距離。(6)安全用電,現(xiàn)場施工用高低壓線及設(shè)備禁止使用破損或絕緣性能差的電線,嚴(yán)禁電線隨地走。(7)施工現(xiàn)場使用的配電箱與開關(guān)箱,就應(yīng)該采用具有防雨、防潮、防塵、功能標(biāo)準(zhǔn)的電箱。(8)注意現(xiàn)場安全用電,當(dāng)出現(xiàn)用電故障時(shí)應(yīng)由維護(hù)電工處理,其他人員不得私自處理。雨天施工時(shí)應(yīng)注意漏電,現(xiàn)場的接線盒及其他用電設(shè)備應(yīng)用塑料布或其他物件遮蓋,以防進(jìn)水漏電;嚴(yán)格執(zhí)行《施工現(xiàn)場臨時(shí)用電安全技術(shù)規(guī)定》(9)氧氣、乙炔氣瓶運(yùn)輸與裝卸必須嚴(yán)格遵守安全規(guī)定,注意輕拿輕放,嚴(yán)禁碰撞和野蠻裝卸;氧氣瓶與乙炔瓶不得混合或并排放置,使用時(shí)氧氣瓶與乙炔瓶距離不小于5米,距明火不小于10米,嚴(yán)禁平放使用或平放乙炔氣瓶,夏季露天使用時(shí)要做好防曬措施,嚴(yán)禁在烈日下爆曬。4、工程文明施工保證措施4.1、施工現(xiàn)場掛牌:施工現(xiàn)場出入口設(shè)置施工牌和施工平面圖,在設(shè)牌的同時(shí),還將設(shè)置施工現(xiàn)場安全生產(chǎn)橫幅。4.2、通過開展文明施工活動(dòng),努力提高施工現(xiàn)場全體職工素質(zhì),養(yǎng)成遵章守法和文明施工的習(xí)慣。4.3、合理布置施工設(shè)備,實(shí)現(xiàn)人、財(cái)、物、場所在空間上的最佳組合。施工臨建設(shè)施完整,布置得當(dāng),環(huán)境清潔,切實(shí)有效地做好工地衛(wèi)生工作,嚴(yán)防各種流傳病傳入。4.4、避免和減少地面的損壞。4.5、施工現(xiàn)場設(shè)備應(yīng)經(jīng)常清洗,保持現(xiàn)場環(huán)境衛(wèi)生,干凈整齊,無污物。溝槽開挖的土方和施工完的余土及時(shí)外運(yùn)。4.6、治安綜合治理工作列入施工大綱,貫穿于施工全過程。4.7、健全消防管理網(wǎng)絡(luò),做到消防制度齊全,消防設(shè)備配備合理,性能完好可靠。消防栓、消防器材周圍暢通不得堆物,消防器材應(yīng)有專人負(fù)責(zé)維護(hù)管理。5、工期保證措施為了加速施工進(jìn)度,確保本工程按合同工期完成全部施工任務(wù),盡快發(fā)揮投資效益,本工程擬采用三項(xiàng)有效的保證措施。5.1、組織措施成立項(xiàng)目管理部,按國家項(xiàng)目法組織施工,確??偣て?。5.2、管理措施(1)物資落實(shí):開工前,組織專業(yè)人員編制各類物資和半成品計(jì)劃,專人負(fù)責(zé)落實(shí)采購工作,做到材料、半成品按時(shí)適量供應(yīng),杜絕由于物資供應(yīng)而影響施工進(jìn)度現(xiàn)象發(fā)生。(2)勞動(dòng)力落實(shí):安排技術(shù)素質(zhì)好、有類似工程施工經(jīng)驗(yàn)的工人、管理人員投入施工,施工人員使用我公司的基本力量,全公司范圍內(nèi)統(tǒng)一調(diào)配,在專業(yè)工種和勞動(dòng)力需要等方面,滿足現(xiàn)場施工需要。(3)機(jī)械落實(shí):公司優(yōu)先安排該工程需要的一切施工機(jī)械,力求提高施工機(jī)械化水平,減輕勞動(dòng)強(qiáng)度,加速施工進(jìn)度,詳見附表“本工程機(jī)械設(shè)備計(jì)劃表”。(4)措施落實(shí):為確保按期完成本工程,在保證質(zhì)量、安全的前提下,認(rèn)真落實(shí)加快工程進(jìn)度的具體措施,推行“三定期獎(jiǎng)”的承包辦法。第五章施工進(jìn)度計(jì)劃在此施工方案審批通過后,于第二天開始準(zhǔn)備管溝施工開挖工作,按照開挖施工工序,各段具體日程安排如下表,施工進(jìn)度按照每天一報(bào)、一周分段總結(jié)、工期120天。單段工期計(jì)劃工日項(xiàng)目102030405060708090100110120施工準(zhǔn)備、現(xiàn)場勘察定位放線與測量設(shè)備進(jìn)場、開挖特殊地段施工管溝回填水工保護(hù)地貌恢復(fù)設(shè)備退場第六章、工作危害分析表單位:西南元壩項(xiàng)目部作業(yè)類型:管道施工工藝評估時(shí)間:作業(yè)步驟危害及結(jié)果風(fēng)險(xiǎn)度防范控制措施施工帶清理、管溝開挖施工帶清理①對地下障礙不了解,破壞地下管線、電纜、光纜高技術(shù)員一定要向甲方了解清楚管線及地下障礙物具體位置并進(jìn)行標(biāo)識(shí),認(rèn)真交底,專人監(jiān)護(hù)。②在莊稼地里施工時(shí),非工作人員在內(nèi),傷人高禁止非工作人員進(jìn)入施工區(qū)管溝開挖①帶車人員對地上、地下障礙標(biāo)記不留心,造成生產(chǎn)管線破裂或電纜光纜損壞,造成地面污染,觸電傷人或通訊中斷事故高施工人員提高安全意識(shí)、積極配合技術(shù)員,注意留心技術(shù)員所做標(biāo)識(shí),不可野蠻施工②開挖過程中遇沖溝,不進(jìn)行放坡,或設(shè)備緊靠溝邊行駛造成單斗側(cè)翻或打滑翻車高嚴(yán)格按技術(shù)要求放坡,施工前進(jìn)行驗(yàn)收,設(shè)備必須離溝邊2.5米以上行駛和停靠。③人工放坡時(shí),不按技術(shù)要求放坡造成塌方,人員被埋高嚴(yán)格執(zhí)行技術(shù)要求,派專人監(jiān)護(hù)施工。④開挖管溝時(shí),溝內(nèi)有積水、油污、雜物,污染環(huán)境高及時(shí)清理溝內(nèi)積水、油污和雜物石方段開挖①單斗作業(yè)旋轉(zhuǎn)半徑內(nèi)站人,碰傷人員中嚴(yán)禁單斗作業(yè)旋轉(zhuǎn)半徑內(nèi)站人,派專人現(xiàn)場監(jiān)護(hù)②石方外運(yùn)時(shí),裝車過滿使石方散落,砸傷人員頭部中嚴(yán)禁裝車過滿,采取防灑落措施,派專人監(jiān)督檢查管線拉運(yùn)施工前準(zhǔn)備①吊帶用鋼絲繩有磨損、斷股現(xiàn)象,造成吊物摔壞,人員砸傷低使用前檢查,有磨損、斷股的及時(shí)更換②起重場地不平整有溝、洞、土質(zhì)松軟,起重機(jī)傾覆,人員傷亡低吊裝前對起重場地進(jìn)行平整、加固裝車①吊車吊臂下方站人,吊臂折斷砸傷人高起重臂下嚴(yán)禁站人,派專人現(xiàn)場監(jiān)督②吊件起10CM時(shí)沒暫停,檢查制動(dòng)裝置,制動(dòng)失靈砸傷人中嚴(yán)格執(zhí)行預(yù)吊程序③吊件從人身或駕駛室上空越過,使人員砸傷中嚴(yán)禁吊件從人身或駕駛室上空越過,加強(qiáng)起重工的教育、培訓(xùn)④起重臂及吊件上有人或有浮置物,吊件物未綁防打轉(zhuǎn)牽引繩,人員摔傷中起吊前嚴(yán)格檢查,嚴(yán)禁起重臂及吊件上有人或有浮置物,吊物上必須綁晃繩⑤起吊速度不均勻,快起快落,吊物砸傷人低加強(qiáng)對起重工的教育、培訓(xùn),現(xiàn)場派專人監(jiān)護(hù)施工⑥吊件長時(shí)間懸空停留,短時(shí)間停留指揮人員離開工作崗位,吊物摔壞、砸傷人員高嚴(yán)禁吊件長時(shí)間懸空停留,嚴(yán)禁指揮人員擅離崗位⑦起重機(jī)運(yùn)轉(zhuǎn)時(shí),進(jìn)行檢修,傷手中嚴(yán)禁設(shè)備運(yùn)轉(zhuǎn)時(shí)進(jìn)行檢修⑧起吊物未綁牢,吊鉤懸掛點(diǎn)與吊物重心不在同一垂線上,偏拉斜吊,吊物擺動(dòng)撞傷人中起吊前認(rèn)真檢查捆綁的牢固程度,嚴(yán)禁偏拉斜吊,現(xiàn)場派專人監(jiān)督⑨落鉤時(shí)吊物局部落地,吊物未放置好,松鉤,吊物摔壞、砸傷腳中落鉤應(yīng)緩慢,將吊物放穩(wěn)后方可松鉤,人員應(yīng)站在吊物的側(cè)面⑩起吊成堆物件時(shí),無防止?jié)L動(dòng)或翻倒措施,吊物砸傷人低嚴(yán)格按技術(shù)要求采取防滾動(dòng)或翻倒措施捆綁用綱絲繩捆扎沒有木楔掩牢,貨物散落,砸傷人低捆綁完畢后認(rèn)真檢查,派專人現(xiàn)場監(jiān)督施工。拉運(yùn)①拉運(yùn)過程,車速過快,無防滑鏈,發(fā)生交通事故低拉運(yùn)過程應(yīng)慢速行駛,嚴(yán)禁急剎車,雪天戴防滑鏈②拉運(yùn)超載,發(fā)生交通事故低嚴(yán)禁超載拉運(yùn)③中途未停車檢查,捆綁是否松動(dòng),貨物散落砸傷人高派專人押運(yùn),中途嚴(yán)格停車檢查④貨物超長未加警示標(biāo)志,發(fā)生交通事故中貨物超長必須設(shè)置警示標(biāo)志卸車①貨物堆放處不平整,無采取保護(hù)措施,貨物摔壞砸傷人低平整堆放場地,派專人監(jiān)督施工②貨物不能輕吊輕放,摔落物件,傷人低加強(qiáng)起重工的教育培訓(xùn),貨物應(yīng)輕吊輕放擺管鋪設(shè)機(jī)具準(zhǔn)備①爬犁制作不合理,無防滑、防竄管保護(hù)措施,人員砸傷撞傷低嚴(yán)格按技術(shù)要求設(shè)置防滑、防竄管保護(hù)措施,使用前認(rèn)真檢查拖管、吊管①往爬犁上吊管時(shí),扶管人員站立位置不對,被管子撞傷中扶管人員應(yīng)站在管子的側(cè)面②爬犁上坐人前進(jìn),人員摔下受傷中禁止爬犁上坐人,派專人監(jiān)督、檢查③爬犁前進(jìn)時(shí),管子無掩牢,管子散落砸傷腳低爬犁前進(jìn)前應(yīng)認(rèn)真檢查管子是否掩牢,否則不得前進(jìn)擺管鋪設(shè)①推卸管子時(shí),施工人員站在爬犁前方,被管子砸傷腳中施工人員應(yīng)站在爬犁的側(cè)后方,派專人監(jiān)護(hù)②擺動(dòng)管子時(shí),直接用撬棍撬管口,管子卸于斜坡處無防滾滑措施,管子滾落,砸傷人員中斜坡處擺動(dòng)管子應(yīng)采取防滑滾措施,派專人現(xiàn)場監(jiān)護(hù)施工管線組對組對前準(zhǔn)備①吊管機(jī)大臂安裝不牢固,起重失靈,吊物砸傷人高安裝完畢后派專人按標(biāo)準(zhǔn)加大檢查力度,合格后方可使用②所使用吊帶破損,吊帶斷開,吊物砸傷人高吊帶使用前嚴(yán)格檢查,合格后方可使用清口、清管①清口人員不戴護(hù)目鏡、口罩、手套,人員受損中打磨砂輪機(jī)必須佩戴護(hù)目鏡②清口人員正對管口站立,人員被管口擠傷中清口人員必須站在管子的側(cè)后方管線組對前擺管①組對人員站在吊管機(jī)吊臂下方或管口前方,被吊物砸傷或擠傷低組隊(duì)人員嚴(yán)禁站在吊管機(jī)吊臂下和管口前方,派專人監(jiān)護(hù)施工②吊管機(jī)組對竄管時(shí),用手扶管口或竄管速度過快傷人,手?jǐn)D傷或被撞傷低竄管應(yīng)緩慢,嚴(yán)禁用手扶管口,派專人監(jiān)護(hù)施工管線組對①管道組對時(shí)強(qiáng)力對口,撬棍打滑飛出傷人低嚴(yán)禁管道強(qiáng)力組對管線焊接領(lǐng)料砂輪片質(zhì)量不合格或砂輪片規(guī)定轉(zhuǎn)速與砂轉(zhuǎn)機(jī)轉(zhuǎn)速不符,員工保管不善,隨處丟棄,造成潮濕、破損,打磨時(shí)砂輪片破裂飛出傷人高使用前進(jìn)行認(rèn)真檢查,不符合質(zhì)量標(biāo)準(zhǔn)的砂輪片嚴(yán)禁使用設(shè)備機(jī)具準(zhǔn)備①選擇焊機(jī)的電源、電壓等級(jí)不相符,把線破損漏電,人員觸電低使用前認(rèn)真檢查線路,不合格不得使用并更換②電焊機(jī)露天放置,未加防雨罩,人員觸電,低配備防雨罩,按規(guī)定使用③使用手動(dòng)、電動(dòng)工具、電源線不符合規(guī)范,有破損處或無漏電保護(hù)裝置,造成使用人員觸電高加大檢查力度,對破損嚴(yán)重等情況要及時(shí)更換;加大培訓(xùn)力度,使員工安全熟練的使用手動(dòng)、電動(dòng)工具;完善防范控制措施,無漏電保護(hù)的,配備合格的裝置④焊鉗松動(dòng),鉗柄不能絕緣、隔熱,燙傷手低焊接前檢查,及時(shí)更換勞保著裝①電焊工沒戴護(hù)目鏡,面罩漏光造成弧光傷眼低焊接前佩戴護(hù)目鏡,派專人監(jiān)護(hù)施工管線分段試漏、試壓試漏、試壓前準(zhǔn)備工作①壓力表沒有檢驗(yàn)、無鉛封,指示不準(zhǔn)確,超壓爆裂傷人低按規(guī)定進(jìn)行校驗(yàn),使用前檢查,不合格禁止使用②試壓時(shí)采用臨時(shí)盲板,強(qiáng)度不夠,盲板破裂打傷人中嚴(yán)格按技術(shù)要求采用相應(yīng)的臨時(shí)盲板,試壓前核對試壓①試壓過程中巡線人員離管道太近管道上站人,人員傷害低按規(guī)定線路行走,距管距離應(yīng)大于3米②試壓時(shí)發(fā)現(xiàn)焊縫滲漏,帶壓修理,造成人員傷害中嚴(yán)禁帶壓修理,應(yīng)卸壓后補(bǔ)焊③冬季試水壓未采取防凍措施,管線爆裂傷人低嚴(yán)格落實(shí)防凍措施,派專人監(jiān)督施工④試壓時(shí),盲板對面站人,盲板飛出將人擊傷中試壓時(shí)盲板對面30米內(nèi)嚴(yán)禁有人補(bǔ)口補(bǔ)傷①刷底漆不均勻,漏涂,流淌現(xiàn)象,污染環(huán)境低加強(qiáng)技術(shù)培訓(xùn),減少流淌、滴漏②熱收縮套補(bǔ)口時(shí)加熱不均勻,加熱人員不戴手套、口罩,燙傷手、吸入有毒氣體中加熱人員要穿戴好防護(hù)用品,派專人監(jiān)督檢查③瀝青燒制時(shí),周邊雜草未清干凈,無人監(jiān)護(hù),引起火災(zāi)中用火點(diǎn)10米范圍內(nèi)的可燃物應(yīng)清除干凈④瀝青澆注時(shí),施工人員不戴手套、口罩,不穿勞保,燙傷手中施工人員必須穿戴齊全勞保用品⑤纏繞玻璃絲布時(shí),施工人員不戴手套、口罩,不穿勞保,吸入有害物質(zhì)引發(fā)塵肺病中施工人員必須穿戴齊全勞保用品下溝、連頭、整體試壓下溝①吊管機(jī)站位離管溝太近,指揮起重工站在吊管機(jī)內(nèi)側(cè),塌方吊管機(jī)傾覆,人員被砸傷中吊管機(jī)必須距溝邊2.5米以上②指揮起重工口令、指揮不一致,多臺(tái)吊管機(jī)下放速度不同步,吊管機(jī)傾覆,人員被砸傷低派專人統(tǒng)一指揮,口令應(yīng)一致,嚴(yán)防誤操作③下溝前,未檢查吊具是否綁扎牢固,管子掉落砸傷人低起吊前認(rèn)真檢查,派專人監(jiān)督施工碰死口①起重工指揮不當(dāng)碰撞人低加強(qiáng)起重工技術(shù)培訓(xùn),提高操作技能②溝內(nèi)人員對口時(shí),溝邊站人,焊接設(shè)備停放溝邊近(塌方),摔壞設(shè)備、砸傷人中嚴(yán)格按技術(shù)措施放坡,施工前檢查,派專人現(xiàn)場監(jiān)護(hù)施工③吊車擺動(dòng)管子時(shí),速度過快,人員站在管子上摔傷低嚴(yán)禁管子上站人④焊工焊口時(shí)無人監(jiān)護(hù),可能造成人員傷害中派專人監(jiān)護(hù)焊工施焊通球①通球時(shí),收發(fā)球裝置處無專人監(jiān)護(hù),所設(shè)警戒區(qū)域不明顯,球飛出擊傷人低設(shè)置明顯的警戒區(qū),30米范圍嚴(yán)禁有無關(guān)人員②通球時(shí),管道沿線無專人安全巡邏,管道爆裂傷人高必須派專人安全巡邏試壓試壓時(shí)發(fā)現(xiàn)焊縫滲漏,帶壓修理,管線爆裂傷人高嚴(yán)禁帶壓修理清理廢料清理不徹底環(huán)境污染低第七章施工應(yīng)急預(yù)案1、應(yīng)急預(yù)案為了貫徹國家及相關(guān)部門的安全方針。以及在發(fā)生緊急事故時(shí),提高對突發(fā)事件的整體應(yīng)急能力,確保應(yīng)急工作高效,有序的進(jìn)行,有效的保護(hù)員工的生命,財(cái)產(chǎn)安全,保護(hù)環(huán)境,最大限度的降低或減少緊急事故造成的危害和不良后果?,F(xiàn)場指揮組、搶險(xiǎn)救援組、應(yīng)急搶險(xiǎn)方案制定組、物資設(shè)備保障組、安全保衛(wèi)組、后勤保障組(交通運(yùn)輸、通訊保障及醫(yī)療救護(hù)保障)、財(cái)務(wù)保障組、事故調(diào)查組、善后處理組等九個(gè)工作組。為加強(qiáng)事故處理能力,與天然氣管道運(yùn)營單位建立聯(lián)系機(jī)制,配合管道企業(yè)巡護(hù)人員對管道進(jìn)行日常檢查。在施工過程中服從管道企業(yè)現(xiàn)場管理人員的管理,對危害管道安全的情形或者隱患及時(shí)排除。應(yīng)急救援組織機(jī)構(gòu)如下:組長:李文森副組長:楊帆組員:鐘生全、青貴友、青敏、梁垚、賴東爾、青勇應(yīng)急救援組織機(jī)構(gòu)圖如下:圖6.1應(yīng)急救援組織結(jié)構(gòu)圖(1)現(xiàn)場指揮組組長:李文森副組長:楊帆組員:鐘生全、青貴友、青敏、(2)搶險(xiǎn)救援組組長:青敏副組長:鐘生全組員:梁垚、賴東爾、青勇機(jī)械設(shè)備人員(3)應(yīng)急搶險(xiǎn)方案制定組組長:楊帆副組長:鐘生全組員:梁垚、賴東爾、青勇機(jī)械設(shè)備人員(4)物資設(shè)備供應(yīng)保障組組長:青勇副組長:鐘生全組員:(5)安全保衛(wèi)組組長:青敏副組長:鐘生全組員:機(jī)組相關(guān)人員(6)后勤保障組(交通運(yùn)輸、通訊及醫(yī)療衛(wèi)生保障)組長:楊帆組員:梁垚、賴東爾、青勇2、編寫依據(jù)2.1《中華人民共和國安全生產(chǎn)法》2.2《中華人民共和國消防法》2.3國務(wù)院《關(guān)于進(jìn)一步加強(qiáng)安全生產(chǎn)工作的決定》2.4國務(wù)院《關(guān)于特別重大事故行政責(zé)任追究的決定》2.5國務(wù)院《使用有毒物品作業(yè)場所勞動(dòng)保護(hù)條例》2.6《天然氣工程安全技術(shù)規(guī)范》實(shí)施細(xì)則2.7國家安全生產(chǎn)監(jiān)督管理局《關(guān)于應(yīng)急預(yù)案框架指南的說明》2.8衛(wèi)生部第25號(hào)令《職業(yè)病危害事故調(diào)查公司理辦法》2.9SY/6455—2000《陸上石油工業(yè)安全術(shù)語》2.10Q/SHS0001.12001《中國石油化工集團(tuán)公司安全、環(huán)境與健康(HSE)管理體系》3、應(yīng)急救援組織管理職責(zé)(1)應(yīng)急救援領(lǐng)導(dǎo)小組應(yīng)急救援領(lǐng)導(dǎo)小組應(yīng)抓好日常施工安全監(jiān)督檢查,制定施工安全防范措施和應(yīng)急搶險(xiǎn)預(yù)案,并落實(shí)到施工現(xiàn)場。接到現(xiàn)場事故報(bào)告20分鐘內(nèi)項(xiàng)目經(jīng)理立即組織有關(guān)人員率隊(duì)趕赴現(xiàn)場指揮搶險(xiǎn)救援工作。并按應(yīng)急搶險(xiǎn)職能機(jī)構(gòu)開展工作。到現(xiàn)場后立即調(diào)查事故發(fā)生原因、發(fā)生地點(diǎn)、設(shè)備損失等情況,報(bào)告應(yīng)急辦,及時(shí)組織人員、機(jī)具、材料進(jìn)行搶險(xiǎn)修復(fù)工作。應(yīng)急救援領(lǐng)導(dǎo)小組組長負(fù)責(zé)向當(dāng)?shù)卣块T、建設(shè)單位、集團(tuán)公司應(yīng)急救援(響應(yīng))領(lǐng)導(dǎo)小組報(bào)告。結(jié)合現(xiàn)場實(shí)際、制定搶險(xiǎn)救援具體方案,迅速到達(dá)事故發(fā)生現(xiàn)場,組織指揮現(xiàn)場應(yīng)急人員開展應(yīng)急救援,并采取措施控制危害源,防止事故的進(jìn)一步擴(kuò)大,最大限度地減少事故造成的人身傷亡和財(cái)產(chǎn)損失,保護(hù)好事故現(xiàn)場。(2)搶險(xiǎn)搶修組由各架子隊(duì)隊(duì)長負(fù)責(zé),根據(jù)應(yīng)急救援領(lǐng)導(dǎo)小組制定的搶險(xiǎn)救援具體方案實(shí)施搶險(xiǎn)救援工作,并保證隧道內(nèi)通道的暢通。(3)通訊聯(lián)絡(luò)組由領(lǐng)導(dǎo)小組通訊負(fù)責(zé)通知各有關(guān)人員迅速趕到現(xiàn)場,根據(jù)實(shí)際情況與當(dāng)?shù)赝ㄐ挪块T協(xié)商,共同建立應(yīng)急救援通信保障體系,確保事故發(fā)生后應(yīng)急救援指揮通信暢通。負(fù)責(zé)向社會(huì)救援機(jī)構(gòu)報(bào)警,請求提供幫助,報(bào)警時(shí)要清楚說明事故發(fā)生時(shí)間、地點(diǎn)、方位、事故是否造成人員傷亡等情況。報(bào)警后,要立即派人在現(xiàn)場的通道口迎接救護(hù)車、救援人員、救援車輛的進(jìn)入。負(fù)責(zé)事故處理中各救援隊(duì)伍之間的通訊聯(lián)系。(4)醫(yī)療救護(hù)組由指揮部辦公室負(fù)責(zé),負(fù)責(zé)現(xiàn)場的醫(yī)療救護(hù),組織救護(hù)車輛及醫(yī)務(wù)人員、器材進(jìn)入指定地點(diǎn),組織現(xiàn)場搶救傷員,對事故中的負(fù)傷人員進(jìn)行包扎救治、人工呼吸、心臟按摩蘇醒等應(yīng)急處置措施,對傷情嚴(yán)重的,應(yīng)立即與當(dāng)?shù)蒯t(yī)療機(jī)構(gòu)聯(lián)系,專人負(fù)責(zé)送至附近醫(yī)院,辦理入院手續(xù),實(shí)施緊急搶救。發(fā)生災(zāi)害時(shí),能迅速趕赴現(xiàn)場搶救人員和處理災(zāi)害。指揮部就近和地方救護(hù)隊(duì)簽訂救護(hù)協(xié)議,發(fā)生災(zāi)害時(shí),及時(shí)通知地方救護(hù)隊(duì)進(jìn)行救援,指揮部成立輔助救護(hù)隊(duì),輔助救護(hù)隊(duì)是不脫產(chǎn)的救護(hù)隊(duì),作為專業(yè)化礦山救護(hù)隊(duì)的助手和后備軍。輔助救護(hù)隊(duì)是由從事通風(fēng)、消防、安裝、運(yùn)輸、瓦斯檢驗(yàn)測定等工作,有經(jīng)驗(yàn),身體符合專職救護(hù)隊(duì)員標(biāo)準(zhǔn)的工人,以及工程技術(shù)人員所組成。(5)疏散警戒組由指揮部外協(xié)部負(fù)責(zé),事故發(fā)生時(shí),負(fù)責(zé)現(xiàn)場周圍人員和群眾安全疏散工作,避免二次傷害,設(shè)置警戒線,保護(hù)現(xiàn)場,維持現(xiàn)場秩序,保證現(xiàn)場道路暢通,禁止無關(guān)人員、車輛通行和進(jìn)入。(6)后勤保障組由指揮部機(jī)械物資部部長負(fù)責(zé),準(zhǔn)備和保證應(yīng)急救援車輛、物資、資金、人員等所需應(yīng)急資源的供應(yīng),并確保供應(yīng)渠道暢通、便捷。(7)善后處理組負(fù)責(zé)傷亡人員的親屬接待、安撫和善后理賠工作,保障社會(huì)穩(wěn)定。積極穩(wěn)妥深入細(xì)致地做好善后處理工作,包括:穩(wěn)定員工、受傷者及其家屬的情緒;對安全事故或突發(fā)緊急事件中的傷亡人員、應(yīng)急處置工作人員按有關(guān)規(guī)定給予撫恤或賠償;與保險(xiǎn)單位一起做好傷亡人員及財(cái)產(chǎn)損失的理賠工作等。(8)事故調(diào)查組由安全總監(jiān)負(fù)責(zé),調(diào)查組收集事故資料,掌握事故情況,查明事故原因,評估事故影響程度和損失,分清事故責(zé)任并提出相應(yīng)處理意見,提出防止事故重復(fù)發(fā)生的意見和建議,寫出應(yīng)急處置報(bào)告。(9)事故搶險(xiǎn)指揮要求事故搶險(xiǎn)設(shè)立現(xiàn)場搶險(xiǎn)領(lǐng)導(dǎo)小組,實(shí)行組長負(fù)責(zé)制及分專業(yè)逐級(jí)負(fù)責(zé)制。指揮部應(yīng)急搶險(xiǎn)領(lǐng)導(dǎo)小組成員到事故現(xiàn)場前,由架子隊(duì)?wèi)?yīng)急搶險(xiǎn)領(lǐng)導(dǎo)小組負(fù)責(zé)現(xiàn)場搶險(xiǎn)救援指揮。指揮部應(yīng)急搶險(xiǎn)領(lǐng)導(dǎo)小組成員到達(dá)事故現(xiàn)場后統(tǒng)一組織指揮搶險(xiǎn)救援工作。現(xiàn)場搶險(xiǎn)領(lǐng)導(dǎo)小組一旦成立,各部門、各單位要按照應(yīng)急搶險(xiǎn)職能機(jī)構(gòu)要求,迅速開展工作。首先建立通訊通道,并指定專人負(fù)責(zé)聯(lián)絡(luò)和通報(bào)情況。各參加搶險(xiǎn)部門到達(dá)現(xiàn)場時(shí),其負(fù)責(zé)人應(yīng)立即向現(xiàn)場指揮部報(bào)到,并在現(xiàn)場登記,接受現(xiàn)場領(lǐng)導(dǎo)小組的指揮。4、應(yīng)急程序(1)分級(jí)管理、分級(jí)響應(yīng)事故(事件)一旦發(fā)生,應(yīng)急救援領(lǐng)導(dǎo)小組立即啟動(dòng)應(yīng)急預(yù)案,并以電話、傳真、書面、即時(shí)通信等形式報(bào)告上級(jí)部門、當(dāng)?shù)卣?、建設(shè)單位相關(guān)部門應(yīng)急救援(響應(yīng))領(lǐng)導(dǎo)小組,報(bào)告內(nèi)容應(yīng)能準(zhǔn)確傳遞事故(事件)災(zāi)難信息。事故或突發(fā)緊急事件報(bào)告的內(nèi)容包括:a.事故發(fā)生項(xiàng)目名稱,事故發(fā)生單位概況。b.事故發(fā)生的時(shí)間、地點(diǎn)(線路里程及地名)以及事故現(xiàn)場情況。c.事故的簡要經(jīng)過(包括應(yīng)急救援情況)。d.事故已經(jīng)造成或者可能造成的傷亡人數(shù)(包括下落不明、涉險(xiǎn)的人數(shù))和初步估計(jì)的直接經(jīng)濟(jì)損失。e.已經(jīng)采取的措施。f.其他應(yīng)當(dāng)報(bào)告的情況。(2)先期處置一旦發(fā)生安全事故或突發(fā)緊急事件,指揮部應(yīng)急領(lǐng)導(dǎo)小組在接到報(bào)告后,應(yīng)迅速組織應(yīng)急人員趕赴現(xiàn)場,在第一時(shí)間內(nèi)指揮部應(yīng)急領(lǐng)導(dǎo)小組負(fù)責(zé)事故現(xiàn)場的指揮,組織人員、物資設(shè)備、車輛、通訊系統(tǒng)使用、調(diào)度工作,按應(yīng)急預(yù)案組織搶救,啟用應(yīng)急響應(yīng)和緊急疏散措施,并及時(shí)向上級(jí)單位報(bào)告。另外可直接向社會(huì)救助系統(tǒng)請求援助。a.當(dāng)發(fā)生事故時(shí),應(yīng)急救援領(lǐng)導(dǎo)小組啟動(dòng)爆炸及中毒事故應(yīng)急現(xiàn)場處置方案,自救組將遇險(xiǎn)人員迅速撤離危險(xiǎn)地點(diǎn),根據(jù)現(xiàn)場情況,在確保安全的前提下,適時(shí)調(diào)整并調(diào)集人員、設(shè)備和物資搜救被困人員。b.搶險(xiǎn)搶修組根據(jù)應(yīng)急救援領(lǐng)導(dǎo)小組制定的搶險(xiǎn)救援具體方案實(shí)施搶險(xiǎn)救援工作。c.通訊聯(lián)絡(luò)組根據(jù)實(shí)際情況與當(dāng)?shù)赝ㄐ挪块T協(xié)商,共同建立應(yīng)急救援通信保障體系,確保事故發(fā)生后應(yīng)急救援指揮通信暢通。負(fù)責(zé)向社會(huì)救援機(jī)構(gòu)報(bào)警,請求提供幫助,報(bào)警時(shí)要清楚說明事故發(fā)生時(shí)間、地點(diǎn)、方位、事故是否造成人員傷亡等情況。報(bào)警后,要立即派人在現(xiàn)場的通道口迎接救護(hù)車、救援人員、救援車輛的進(jìn)入。負(fù)責(zé)事故處理中各救援隊(duì)伍之間的通訊聯(lián)系。d.醫(yī)療救護(hù)組負(fù)責(zé)現(xiàn)場傷員的醫(yī)療搶救工作,根據(jù)傷員受傷程度做好轉(zhuǎn)運(yùn)工作。立即對搶救出的人員進(jìn)行緊急處理,然后送往就近醫(yī)院救治。簽訂協(xié)議的專業(yè)救護(hù)隊(duì)伍在發(fā)生災(zāi)害時(shí),能迅速趕赴現(xiàn)場搶救人員和處理災(zāi)害。項(xiàng)目部輔助救護(hù)隊(duì)作為專業(yè)救護(hù)隊(duì)的助手和后備軍,協(xié)助專職救護(hù)隊(duì)完成緊急救災(zāi)任務(wù),為執(zhí)行偵察災(zāi)情任務(wù)的專職救護(hù)隊(duì)充當(dāng)向?qū)?,?dān)任災(zāi)區(qū)的安全崗哨,引導(dǎo)遇災(zāi)工人安全撤出隧道,為專職礦山救護(hù)隊(duì)運(yùn)送救災(zāi)設(shè)備和材料,配合搶險(xiǎn),當(dāng)發(fā)生事故時(shí),在專職礦山救護(hù)隊(duì)尚未到達(dá)現(xiàn)場之前,迅速奔赴事故現(xiàn)場,引導(dǎo)和救助工人撤離或協(xié)助其自救,采取有效措施控制災(zāi)情發(fā)展,將災(zāi)害消除在初始階段。e.疏散警戒組負(fù)責(zé)維護(hù)現(xiàn)場,將獲救人員轉(zhuǎn)至安全地帶;對危險(xiǎn)區(qū)域進(jìn)行有效的隔離。在救護(hù)傷員的同時(shí),應(yīng)注意保護(hù)事故現(xiàn)場,及時(shí)組織人員疏散、撤離危險(xiǎn)區(qū)域,防止事故進(jìn)一步擴(kuò)大。凡與事故、突發(fā)事件有關(guān)的物件、痕跡、殘留物等應(yīng)保持原樣,如搶救傷員需要移動(dòng)某些物件改變狀態(tài)時(shí)必須做出標(biāo)識(shí)和記錄。事故發(fā)生時(shí),負(fù)責(zé)現(xiàn)場周圍人員和群眾安全疏散工作,避免二次傷害,設(shè)置警戒線,保護(hù)現(xiàn)場,維持現(xiàn)場秩序,保證現(xiàn)場道路暢通,禁止無關(guān)人員、車輛通行和進(jìn)入。f.后勤保障組負(fù)責(zé)保證應(yīng)急處置的通訊、物資、設(shè)備和資金及時(shí)到位及后勤其他保障。g.善后處理組妥善安置傷亡人員和接待傷亡人員的家屬,按有關(guān)規(guī)定做好理賠工作。h.事故調(diào)查組收集事故資料,掌握事故情況,查明事故原因,評估事故影響程度和損失,分清事故責(zé)任并提出相應(yīng)處理意見,提出防止事故重復(fù)發(fā)生的意見和建議,寫出應(yīng)急處置報(bào)告。i.人員全部疏散后,停工觀察。根據(jù)觀察結(jié)果,采取有效的技術(shù)措施(瓦斯排放或消滅火源高溫點(diǎn))進(jìn)行災(zāi)后恢復(fù)。(3)人員撤離程序撤離程序:先撤離、后研究搶險(xiǎn)方案,先近后離的次序撤離。(4)避難措施①在隧道按一定的間隔距離設(shè)置備有應(yīng)急電源的應(yīng)急(誘導(dǎo))燈。在應(yīng)急燈的附近要設(shè)通信設(shè)備、避難用器具、滅火器等。②隧道應(yīng)急救援領(lǐng)導(dǎo)小組制定避難、演練訓(xùn)練計(jì)劃,定期、不定期進(jìn)行安全退避的避難演練,做到所有施工人員熟知,并將演練結(jié)果記錄保存。(5)救援措施①救護(hù)計(jì)劃指揮部應(yīng)急救援領(lǐng)導(dǎo)小組制定詳細(xì)的救護(hù)計(jì)劃。②救護(hù)設(shè)備為對緊急事故的發(fā)生有所準(zhǔn)備,不但要準(zhǔn)備救護(hù)所必須的呼吸用保護(hù)器具、便攜式照明用器具、擔(dān)架、便攜式氧氣瓶等救護(hù)設(shè)備和器械設(shè)備,還要進(jìn)行嚴(yán)格管理,以便能夠隨時(shí)有效使用。救護(hù)設(shè)備和機(jī)械,安質(zhì)部必須經(jīng)常進(jìn)行檢查、督促維修和保養(yǎng)管理,以便在緊急時(shí)能夠立即使用。③救護(hù)訓(xùn)練就有關(guān)救護(hù)必須的機(jī)械器具等的使用方法、急救措施、救護(hù)方法等救護(hù)訓(xùn)練。救護(hù)訓(xùn)練要對呼吸用的保護(hù)用具、救護(hù)機(jī)器、測定儀器、儀表等的操作和使用方法進(jìn)行訓(xùn)練,以便為了救護(hù)而入洞的救護(hù)人員能夠安全活動(dòng)。并且,除了對受傷者做人工呼吸、心臟按摩蘇醒搶救措施外,還要進(jìn)行止血等應(yīng)急治療。再者,訓(xùn)練內(nèi)容還必須包含自救、互救訓(xùn)練。訓(xùn)練周期規(guī)定為每月訓(xùn)練一次,要求認(rèn)真做好訓(xùn)練記錄。④救護(hù)措施當(dāng)發(fā)生險(xiǎn)情時(shí),值班安全員應(yīng)立即組織人員迅速撤離危險(xiǎn)區(qū)域,確保施工人員生命安全。撤離危險(xiǎn)場所后,立即清點(diǎn)現(xiàn)場施工人員數(shù)量,并上報(bào)有關(guān)情況給應(yīng)急領(lǐng)導(dǎo)小組。應(yīng)急救援領(lǐng)導(dǎo)小組接到通知后,應(yīng)立
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 【正版授權(quán)】 IEC 60335-2-111:2024 EN-FR Household and similar electrical appliances - Safety - Part 2-111: Particular requirements for electric ondol mattress with a non-flexible heated
- 【正版授權(quán)】 IEC 60335-2-111:2024 RLV EN Household and similar electrical appliances - Safety - Part 2-111: Particular requirements for electric ondol mattress with a non-flexible heated
- 2024年幼兒園安全工作計(jì)劃秋季(三篇)
- 2024年客房服務(wù)員崗位職責(zé)集錦范文(二篇)
- 2024年城鎮(zhèn)安全獎(jiǎng)懲考核制度模版(四篇)
- 2024年員工試用期工作總結(jié)參考樣本(四篇)
- 2024年年個(gè)人工作計(jì)劃范本(三篇)
- 2024年員工試用期轉(zhuǎn)正工作總結(jié)簡單版(三篇)
- 2024年學(xué)校美術(shù)教學(xué)工作計(jì)劃范本(二篇)
- 2024年圖書出版合同經(jīng)典版(三篇)
- 【數(shù)學(xué)】山西省太原市2024屆高三上學(xué)期期中試題(解析版)
- 江蘇開放大學(xué)2023年秋《科學(xué)思維方法論 060053》形成性作業(yè)三參考答案
- 隱患整改延期申請單格式
- 2023蘇泊爾應(yīng)收賬款應(yīng)收賬款論文:應(yīng)收賬款 應(yīng)收賬款管理 應(yīng)收賬款控制
- 23S519 小型排水構(gòu)筑物(帶書簽)
- 竣工決算服務(wù)方案模版
- 古詩詞中的數(shù)學(xué)
- 26 西門豹治鄴 一等獎(jiǎng)創(chuàng)新教學(xué)設(shè)計(jì)(2課時(shí))
- 砂漿回彈計(jì)算表
- 關(guān)于成立消防安全組織機(jī)構(gòu)的通知
- 2023年檢察院法院書記員考試匯總
評論
0/150
提交評論