節(jié)點(diǎn)強(qiáng)度平面壓縮案例_第1頁(yè)
節(jié)點(diǎn)強(qiáng)度平面壓縮案例_第2頁(yè)
節(jié)點(diǎn)強(qiáng)度平面壓縮案例_第3頁(yè)
節(jié)點(diǎn)強(qiáng)度平面壓縮案例_第4頁(yè)
節(jié)點(diǎn)強(qiáng)度平面壓縮案例_第5頁(yè)
已閱讀5頁(yè),還剩81頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

StoneHoneycombReinforcedWallPanelSystem“SHPS”

Index

-Introduction

-StoneHoneycombReinforcedWallPanelSystem“SHPS”

-Whyusethe“SHPS”system?

-ManufacturingProcess

-Installationprocedure

-Keyissuestobeobserved

-Compliances

-OtherApplication

-JobReference

-Q&A

NaturalStoneHoneycombReinforcedPanel

TechnicalInfoProperties:

ReferenceStandard(GJB130.3-86)

(GJB130.5-86)

(ASTMC880-98)(ASTMC880-98)

ImpactStrength節(jié)點(diǎn)強(qiáng)度CompressStrength平面壓縮強(qiáng)度FlexuralStrengthindryconditionFlexuralStrengthinWetcondition

AcousticPerformance

=11.6N/cm

=1.69MPa

=11.47MPa

=12.23MPa

=23-48DB

NaturalStoneHoneycombReinforcedPanel

CompressiveStrength&ShearStrength

NormalAluminumCore

TechnicalInfo

AdhesiveStandard:JC887-2001

NaturalStoneHoneycombReinforcedPanel

StoneVeneer

Whyusethe“SHPS”system?

Problemsmaybefoundintraditionalinstallationpiecebypiecein-situinstallationMethod:

-UnevenFlatness,stepjoints

-Mis-alignments

-PoorRigidity

-Potentialin-situpolishing&grouting

-LongInstallationProcess

-Inconvenientforothertrades

-timeconsuming

-Lesscosteffective

-Morerepairandmaintenance

Whyusethe“SHPS”system?

Advantagesforusingthe“SHPS”system:

-Environment-Lessgarbage

-PhysicalProperties-stronger

-BetterQuality

-Easiertoinstall

-LowerCost

-Others

Whyusethe“SHPS”system?

Environment:

-

-

-

-

-

Lessstonematerial,e.g.RockUsageless50~70%Eliminatecementsandgrout

Recyclablepanelbacking,

Eliminatemostnoisepollutiononsite,Eliminatemostconstructiongarbage,

e.g.LessgarbagewillbegeneratedinmaintenanceworkEnhance“easydismantling“&recycleAluminummaterialinfuturerefurbishment

LightMaterial->ReduceBuildingWeight

-

-

82%Saving

“SHPS”System(AluminumHoneycomb)

TraditionalMethodCementandSand(Thickness:~50mm)

Weight

22Kg/M2

126Kg/M2

Whyusethe“SHPS”system?

PhysicalProperties:

“SHPS”System

TraditionalMethod

Strength

Stronger

Weaker

Flexibility

Better

Poor

Stability

Better

Poor

Rigidity

Higher

Lower

SoundInsulation

Better

Poor

Whyusethe“SHPS”system?

better

Stronger

Whyusethe“SHPS”system?

QualityControl

“SHPS”System

TraditionalMethod

Flatness

Even

Uneven

Joint

Monolithic

Step

Alignments

Straight

Crook

Polishingfinishes

Excellent

Poor

Grouting

Excellent

Poor

Whyusethe“SHPS”system?

Alignmentstraight

Nostepjoint

Whyusethe“SHPS”system?

Polishingfinishesexcellent

Groutingexcellent

Whyusethe“SHPS”system?

ConstructionConvenience

“SHPS”System

TraditionalMethod

InstallationProcess

Simply

MoreComplicated

ConstructionPeriod

Short

Long

RepairsandMaintains

Easy;Fast;lessbuildingmaterialgarbage

Difficult;Slow;Polluted;

Onsiteco-ordinationworks

Less

More

Whyusethe“SHPS”system?

Step-1

Step-2

A

Step-3

Step-4

Whyusethe“SHPS”system?

Step-5

Step-6

Step-7

Step–8

Whyusethe“SHPS”system?

Cost

“SHPS”System

TraditionalMethod

Stone

50~70%Less

Nosavings

OnSiteLabours

Less

High

Logistic

LightMaterial

HeavyMaterial

Storage

Lessspace

MoreSpace

RepairandMaintenanceCost

Low

High

CleaningCost

(CleaningGarbageafterinstallation)

Low

High

Whyusethe“SHPS”system?

step-1

step-2

B

Step-3

Step-4

Whyusethe“SHPS”system?

Pre-lay

Whyusethe“SHPS”system?

Pre-lay

Whyusethe“SHPS”system?

Others:

-

Enhancecomplicatedorcurvedsurfaceapplication

-

Preventstaining

-

Lesstotalthickness,facilitiesmoreusablefloorarea

“SHPS”P(pán)rojectProcess

Start

SimplifiedProcedure

Elaboration

Elaboration

ManufacturingProcess

Thefactory

LaiFung(Dongguan)PrefabricatedMarbleCo,Ltd

ManufacturingProcess

StoneSlab

SimplifiedManufacturingProcess:

Alum.HONEYCOMB

Panel

Adhesive

ManufacturingProcess

I.Q.C.forthefollowings:

Veinandcolorrange(checkagainstsample)

Absentangles,rupture,scarandblister.

Certifyincomingslabqualitywithapprovallabel.

Photographforrecords.

ManufacturingProcess

Rawmaterial(Stone)

ManufacturingProcess

RawmaterialqualityandcolourChecking

ManufacturingProcess

Q.C.forthefollowings:

MachinecalibrationwillbecarriedoutbeforestoneSlab

tobe

Orientationindicators

willbemarkedonthe

is

in

-PhotooffinalorientationaccordingtodesignelevationswillbesubmittoClientsforreviewandapproval

ManufacturingProcess

StoneslabcuttingProcess

ManufacturingProcess

Stoneslabpre-layprocess

ManufacturingProcess

Lamination–Marbleadheretoaluminumhoneycombpanel(12hours)

ManufacturingProcess

Q.C.forthefollowings:

Inspectionwillbecarriedoutduringthelaminationprocessinginordertoensuregoodbonding.

Toensurethestoneislayincorrectorderbyqualifiedinspector.

-

ManufacturingProcess

ColdpressingProcess

ManufacturingProcess

Q.C.forthefollowings:

OrientationindicatorsandnumbersmarkedonthebackofeachpanelwillbecheckedbeforecoldpressingprocessEnsure7kg/cm2pressureofcoldpressingaremeetto1hourafterthelaminationprocess.

-

-

ManufacturingProcess

BreakingProcess

ManufacturingProcess

I.Q.C.forthefollowings:

-

MachinecalibrationmustbecarriedoutbeforebreakingProcess.

Thicknesscalibrationprocesswillbecarriedouttomakesurethesemifinishesproducttomeettherequirements

-

ThicknesscalibrationProcess

ManufacturingProcess

Polishing

ManufacturingProcess

Makegoodprocess:

Allholes(ifany)willbefilledwithstonepowder.Coloredadhesive(ifnecessary)willbeapplied.

Surfaceofstoneshouldhavenocrack.

-

-

-

ManufacturingProcess

CuttoFinalSize&Sealertreatmentprocess

Cuttofinalsizeforproductioninaccordancetocutsheets.

Inspectionshouldbecarriedoutforanydefectsafterthisprocess.

Sealerwillbeappliedtothesurfacefortesting.

ManufacturingProcess

Labeling

Prefabpanelfinalpre-lay

ManufacturingProcess

Q.C.forthefollowings:

-Patternanddirection

Orientationindicatorsandnumberings

Checkingagainstcut-sheets

-

-

ManufacturingProcess

Protection-Protectivefilm,Foam,PolyethyleneSheetandKraft

ManufacturingProcess

illustrationdrawingsAttached

Location,

and

Packingbeforedelivery

Installation

Installationprocedure

一、地臺(tái)完成后做防水

二:地臺(tái)完成后執(zhí)補(bǔ)

Installationprocedure

三:安裝墻身板

四:安裝預(yù)留方通

Installationprocedure

五:方通安裝完成

六:安裝所有預(yù)留件

Installationprocedure

七:安裝碼仔后執(zhí)補(bǔ)防水

八:開(kāi)始做防水膜

Installationprocedure

九:所有鋁角、鋁通、預(yù)留件做防水

十:二次防水

Installationprocedure

十一:執(zhí)補(bǔ)防水

十二:泥水保護(hù)層

Installationprocedure

十三:安裝鋁底廊

十四、安裝鋁架(廠)

Installationprocedure

十五、復(fù)合板后加鋁角(廠)

十六、加防水條(廠)

Installationprocedure

十七、復(fù)合板后加碼片(廠)

十八、安裝第一件墻身板

Installationprocedure

十九、墻身碰口打膠

二十、安裝第二件墻身板

Installationprocedure

二十一、安裝第三件墻身板

二十二、安裝第四件墻身板

Installationprocedure

二十三、墻身復(fù)合板試水

InstallationIllustration

Vertical

InstallationIllustration

Horizontal

Separatedintotwopieces

InstallationIllustration

InstallationIllustration

Installationprocedure

Installationprocedure

Installationprocedure

InstallationIllustration

Keyissuestobeobserved

ToensureaccuratepositioningofMEPoutletconnections,MEPcontractorshouldinstalltemplatestocontroltheopenningpositions.

-

ClosecoordinationworkwithMEPcontractorsforprecisepositionofpredrilledholesonthepanel.

-

Allowablemaximumpanelis1220mmX3000mmduetologisticconstraintssuchaslift,dooropeningandcorridorspace.

-

Compliances

CompoundAdhesive:JC877-2001

AluminumHoneycombPanel:ChinaNationalStandard

BS4022:1970(ImpactStrengthTestofStonesAluminumComposite)

ASTMC880-98(FlexuralStrengthofNaturalBuildingStone)

QA/QCPlanbasedonISO9002

OtherApplication

Vanity

Vanity

Vanity

TVStand

Etc…….

Vanity

JobReference

Curveshowerbooth

JobReference

cityofdream-macau

oasisshowerroomphase1

oasisshowerroomphase2

JobReference

GalaxyHotel(Macau)–45,000m2,2010-2012

galaxyhotel-macau

okurahotel-macau

okurahotel5bay-macau

JobReference

Galaxycasino(Macau)–15,000m2,

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論