ICS27.160

P61

RecordNumber:J2573-2018

ENERGYSECTORSTANDARD

OFTHEPEOPLE’SREPUBLICOFCHINA

中華人民共和國(guó)能源行業(yè)標(biāo)準(zhǔn)

PNB/T32046-2018

SpecificationforPreparationofPlanningReport

forPhotovoltaicPowerProjects

光伏發(fā)電工程規(guī)劃報(bào)告編制規(guī)程

IssuedonJune6,2018ImplementedonOctober1,2018

IssuedbyNationalEnergyAdministrationofthePeople’sRepublicofChina

Introduction

ThisEnglishversionisoneofChina’senergysectorstandardseriesinEnglish.Itstranslation

wasorganizedbyChinaRenewableEnergyEngineeringInstituteauthorizedbyNational

EnergyAdministrationofthePeople’sRepublicofChinaincompliancewithrelevant

proceduresandstipulations.ThisEnglishversionwasissuedbyNationalEnergy

AdministrationofthePeople’sRepublicofChinainAnnouncement[202x]No.xdatedxxxx,

202x.

ThisversionwastranslatedfromtheChineseStandardNB/T32046-2018,Specificationfor

PreparationofPlanningReportforPhotovoltaicPowerProjects,publishedbyChinaWater

&PowerPress.ThecopyrightisreservedbyNationalEnergyAdministrationofthePeople’s

RepublicofChina.Intheeventofanydiscrepancyintheimplementation,theChinese

versionshallprevail.

Manythanksgotothestafffromtherelevantstandarddevelopmentorganizationsandthose

whohaveprovidedgenerousassistanceinthetranslationandreviewprocess.

ForfurtherimprovementoftheEnglishversion,allcommentsandsuggestionsarewelcome

andshouldbeaddressedto:

ChinaRenewableEnergyEngineeringInstitute

No.2Beixiaojie,Liupukang,XichengDistrict,Beijing100120,China

Website:

Translatingorganizations:

ChinaRenewableEnergyEngineeringInstitute

POWERCHINABeijingEngineeringCorporationLimited

Translatingstaff:

Reviewpanelmembers:

NationalEnergyAdministrationofthePeople’sRepublicofChina

翻譯出版說(shuō)明

本譯本為國(guó)家能源局委托水電水利規(guī)劃設(shè)計(jì)總院按照有關(guān)程序和規(guī)定,統(tǒng)一組織翻

譯的能源行業(yè)標(biāo)準(zhǔn)英文版系列譯本之一。202x年x月x日,國(guó)家能源局以202x年第x

號(hào)公告予以公布。

本譯本是根據(jù)中國(guó)電力出版社出版的《光伏發(fā)電工程規(guī)劃報(bào)告編制規(guī)程》NB/T

32046—2018翻譯的,著作權(quán)歸國(guó)家能源局所有。在使用過(guò)程中,如出現(xiàn)異議,以中文

版為準(zhǔn)。

本譯本在翻譯和審核過(guò)程中,本標(biāo)準(zhǔn)編制單位及編制組有關(guān)成員給予了積極協(xié)助。

為不斷提高本譯本的質(zhì)量,歡迎使用者提出意見(jiàn)和建議,并反饋給水電水利規(guī)劃設(shè)

計(jì)總院。

地址:北京市西城區(qū)六鋪炕北小街2號(hào)

郵編:100120

網(wǎng)址:

本譯本翻譯單位:水電水利規(guī)劃設(shè)計(jì)總院

中國(guó)電建集團(tuán)北京勘測(cè)設(shè)計(jì)研究院有限公司

本譯本翻譯人員:

本譯本審核人員:

國(guó)家能源局

AnnouncementofNationalEnergyAdministration

ofthePeople’sRepublicofChina

[2018]No.8

AccordingtotherequirementsofDocumentGNJKJ[2009]No.52,“NoticeonReleasingthe

EnergySectorStandardizationAdministrationRegulations(tentative)anddetailed

implementationrulesissuedbyNationalEnergyAdministrationofthePeople’sRepublicof

China”,87sectorstandardssuchasWellboreQualityControlRequirementsforCoalbed

MethaneDirectionalWell,including47energystandards(NB)and40electricpower

standards(DL),areissuedbyNationalEnergyAdministrationofthePeople’sRepublicof

Chinaafterduereviewandapproval.

Attachment:DirectoryofSectorStandards

NationalEnergyAdministrationofthePeople’sRepublicofChina

June6,2018

Attachment:

DirectoryofSectorStandards

Adopted

SerialReplacedApproval

StandardNo.TitleinternationalImplementationdate

numberstandardNo.date

standardNo.

Specificationfor

NB/TPreparationofPlanning

172018-06-062018-10-01

32046-2018ReportforPhotovoltaic

PowerProjects

Foreword

AccordingtotherequirementsofDocumentGNKJ[2013]No.235issuedbyNationalEnergy

AdministrationofthePeople’sRepublicofChina,“NoticeonReleasingtheDevelopmentand

RevisionPlanoftheFirstBatchofEnergySectorStandardsin2013”,andafterextensive

investigationandresearch,summarizationofpracticalexperience,andwidesolicitationof

opinions,thedraftinggrouphaspreparedthisspecification.

Themaintechnicalcontentsofthisspecificationinclude:basicdata,solarenergyresources,

siteselectionandconstructioncondition,preliminaryconstructionschemeandenergyoutput

estimation,electricpowersystem,environmentalimpactandsoilandwaterconservation,

preliminaryinvestmentestimationandbenefitanalysis,developmentsequence,planning

implementationandsupporting,andconclusionsandrecommendations.

NationalEnergyAdministrationofthePeople’sRepublicofChinaisinchargeofthe

administrationofthisspecification.ChinaRenewableEnergyEngineeringInstitutehas

proposedthisspecificationandisresponsibleforitsroutinemanagement.ChinaRenewable

EnergyEngineeringInstituteisresponsiblefortheinterpretationofthespecifictechnical

content.Commentsandsuggestionsintheimplementationofthisspecificationshouldbe

addressedto:

ChinaRenewableEnergyEngineeringInstitute

No.2Beixiaojie,Liupukang,XichengDistrict,Beijing100120,China

Chiefdevelopmentorganizations:

ChinaRenewableEnergyEngineeringInstitute

POWERCHINABeijingEngineeringCorporationLimited

Chiefdraftingstaff:

YUShaofengQIZhichengYANGJiansheQINXiao

PENGTiankuiXULushiCHENQiaomei

Reviewpanelnumbers:

WANGJixueZHOUShaoyunZHANGWeiLYUZhou’an

GONGChuanheTAOHongboTIANJingkuiTANGHuan

QINChushengLIFaguiGONGChunjingWANGBiao

LIUGuopinZHOUZhiZHAOYanZHENGXueju

TANJiangjunLIShisheng

Contents

1GeneralProvisions.............................................................................................................1

2Terms...................................................................................................................................2

3BasicRequirements............................................................................................................3

4BasicData............................................................................................................................4

5SolarEnergyResources.....................................................................................................5

6SiteSelectionandConstructionConditions.....................................................................6

7PreliminaryConstructionSchemeandEnergyOutputEstimation..............................7

7.1PreliminaryConstructionScheme.....................................................................................7

7.2EnergyOutputEstimation.................................................................................................7

8ElectricPowerSystem.......................................................................................................8

8.1GeneralDescription...........................................................................................................8

8.2OutputCharacteristicandPowerConsumption................................................................8

8.3GridConnectionScheme..................................................................................................8

9EnvironmentalImpactandSoilandWaterConservation.............................................9

9.1PreliminaryAssessmentofEnvironmentalImpact...........................................................9

9.2PreliminaryAssessmentofSoilandWaterConservation................................................9

10PreliminaryInvestmentEstimationandBenefitAnalysis.........................................10

11DevelopmentSequence..................................................................................................11

12PlanningImplementationandSupporting..................................................................12

13ConclusionandRecommendation................................................................................13

AppendixAContentsofPlanningReport........................................................................14

ExplanationofWordinginThisSpecification....................................................................16

1GeneralProvisions

1.0.1Thisspecificationisformulatedwithaviewtostandardizingtheprinciples,workcontentand

depth,andtechnicalrequirementsforthepreparationofplanningreportforphotovoltaicpowerprojects.

1.0.2Thisspecificationisapplicabletothepreparationofplanningreportforphotovoltaicpower

projectsandphotovoltaicpowergenerationbaseinadministrativeregionsofcountylevelorabove.

1.0.3Inadditiontothisspecification,thepreparationofplanningreportforphotovoltaicpowerprojects

shallalsocomplywiththecurrentrelevantstandardsofChina.

1

2Terms

2.0.1technicallyexploitablecapacity

exploitablecapacitybasedonthesolarenergyresources,topographicandgeologicalconditions,andlaw

andregulatoryrequirements

2.0.2photovoltaicpowergenerationbase

overallplannedphotovoltaicpowergenerationstationsorphotovoltaicpowergenerationstationgroup

withanexploitablecapacityofnolessthan500MW

2

3BasicRequirements

3.0.1Theplanningofphotovoltaicpowerprojectshallimplementtheprincipleofoverallplanning,

comprehensivebalance,andrationalexploitation;complywiththenationaleconomydevelopmentplan,

andtheenergy,renewableenergy,andsolarenergydevelopmentplans;andbecoordinatedwiththe

requirementsforenvironmentalprotection,landuse,soilandwaterconservation,forestry,military,and

engineeringsafety.

3.0.2Theplanningreportforphotovoltaicpowerprojectsshallhighlighttheplanningobjectives,

principles,preparationbasis,plannedcapacity,planningscope,planningtargetyear,developmentstatus,

andnecessityanalysis.

3.0.3ThecontentsoftheplanningreportforphotovoltaicpowerprojectshouldcomplywithAppendix

Aofthisspecification.

3

4BasicData

4.0.1Thedataonsocio-economyandthedevelopmentplan,aswellastheenergysituationandthe

developmentplanofregionwheretheplannedprojectareaislocatedshallbecollected.

4.0.2Thedataonlanduseandthedevelopmentplan,aswellasthedataonenvironmentalprotection,

soilandwaterconservation,forestdistribution,mineralresourcedistribution,landuseformilitary

purposes,andculturalrelicsprotectionintheregionwheretheprojectareaislocatedshallbecollected.

4.0.3Thetopographicmapwithascaleofnolessthan1:10000orremotesensingimagedatameeting

theplanningrequirementsshallbecollected.Forthebuildingintegratedphotovoltaicpowergeneration

system,theplanandelevationviewsofthebuildingsshallbecollected.Fortheplanningofphotovoltaic

powergenerationbasewithcomplextopographicalconditions,thetopographicmapwithlargerscale

shouldbecollected.

4.0.4Thelong-seriessolarradiationdataandmeteorologicaldataofameteorologicalstationwithinthe

plannedareaoraroundshallbecollected.

4.0.5Theexistingsolarenergyresourceanalysisdataandthephotovoltaicpowergenerationdatainthe

plannedareashouldbecollected.

4.0.6Theas-observedsolarenergyresourcedataintheplannedareaandtheiranalysisshouldbe

collected.

4.0.7Thedataonhydrology,engineeringgeology,andtransportationintheplannedareashallbe

collected.

4.0.8Forthebuildingintegratedphotovoltaicpowergenerationsystem,therelevantdataaboutthe

buildingshallbecollected.

4.0.9Thedataonelectricpowersystemstatusanddevelopmentplanintheplannedareashallbe

collected.Forthephotovoltaicpowergenerationbase,theanalysisofenergyconsumptionshallbe

collected.Thephotovoltaicbaseplanning,whichhascompletedthespecialstudyontheelectricpower

consumption,thestudyfindingsmaybecited.

4.0.10Thelocalpoliciesconcerningphotovoltaicpowergenerationshallbecollected.

4.0.11Fortheintegratedphotovoltaicutilization,thelawsandregulationsandtechnicalstandardsof

relevantsectorsshallbecollected.

4

5SolarEnergyResources

5.0.1Thesourceofdataforthesolarenergyanalysisshallbestated,andthedatareliabilityshallbe

demonstrated.

5.0.2Thecharacteristicsanddistributionofthesolarenergyresourcesintheplannedareashallbe

stated.Theinterannualandannualsolarradiationvariationpatternsinthisareashallbepresented.The

interannualandannualsolarradiationvariationhistograms,typicaldailyradiationvariationpolylinechart

permonth,andannualradiationchoroplethmapshallbeplotted.

5.0.3Thehazardimpactsshallbeanalyzedandassessedpreliminarilybasedonthelong-term

observationdataiftheplannedsiteissusceptibletohydrometeorologicalhazardssuchasflood,typhoon,

andhail.

5.0.4Theconclusionofthesolarenergyresourceanalysisshallbepresented.

5

6SiteSelectionandConstructionConditions

6.0.1Potentialsitesforphotovoltaicpowerstationshallbeinitiallyproposedaccordingtotheplanning

objectivesandrequirements,andthedistributionandcharacteristicsofsolarenergyresourcesinthe

plannedarea.Thetechnicallyexploitablecapacityshallbeproposedandthealternativesitesofthe

plannedphotovoltaicpowerstationshallberecommendedwithoverallconsiderationoftheland

availability,sitesafety,developmentpattern,gridconnection,economy,etc.

6.0.2Thescopeofeachalternativephotovoltaicpowerstationshallbeproposed.Thesketchmapofthe

sitescopeandgeographicallocationshallbeprepared,andthesiteareashallbeestimated.

6.0.3Theconstructionconditionsofthealternativesitesshallbestated,including:

1Thetopographicandgeomorphologicalconditions;theeffectsoftheslope,orientation,surface

vegetationandobstacle,andsurroundingterrainandstructuresonthesubsequentdesign;and

roofingconditionsforthebuildingintegratedphotovoltaicpowergenerationsystem.

2Engineeringgeologicaloverview,physicalandmechanicalpropertiesofrockandsoil,etc.

3Accessibility.

4Gridconnectionconditions.

6.0.4Theconclusionofthesiteselectionandconstructionconditionsshallbepresented.

6

7PreliminaryConstructionSchemeandEnergyOutput

Estimation

7.1PreliminaryConstructionScheme

7.1.1Thedevelopmentmodeofaprojectshallbedeterminedaccordingtotheplanningpurpose,site

conditionsandrequirementsofcomprehensivelandutilization.

7.1.2Accordingtothedevelopmentlevelofphotovoltaicpowergenerationtechnology,thepreliminary

constructionschemeofphotovoltaicmodule,inverterandphotovoltaicarrayoperationmodeshallbeput

forward.

7.1.3Theinstallationcapacityofeachplanningstationshallbeputforwardaccordingtothelatitude,

constructionconditionsandpreliminaryconstructionschemeofthephotovoltaicpowerstation.

7.1.4Forlarge-scalephotovoltaicpowergenerationbase,thepublicinfrastructureconstructionscheme

shallbeputforward.

7.1.5Forphotovoltaicpowergenerationsystemconstruction,theinstallationcapacityandcombination

withexistingbuildingsshallbeproposedaccordingtotheroofareaandorientationofthebuildingsinthe

plannedarea.

7.2EnergyOutputEstimation

7.2.1Accordingtothesolarenergyresourceanalysisdata,installationscaleandpreliminary

constructionschemeoftheselectedphotovoltaicpowerstationsite,theefficiencyofeachplanned

photovoltaicpowerstationshallbeputforward.

7.2.2Theannualaverageon-gridpowerandannualequivalentfull-loadoperatinghoursofeach

plannedphotovoltaicpowerstationshallbeproposed.

7

8ElectricPowerSystem

8.1General

8.1.1Thecurrentsituationanddevelopmentplanningofthepowersystemoftheplannedphotovoltaic

powerstation,suchaspowerconsumptionrequirements,loadcharacteristics,gridstructureandpower

supplycomposition,shallbestated.

8.1.2Forthephotovoltaicpowerstationwithpowerevacuation,thecurrentsituationanddevelopment

planningofthepowersystematthereceivingendshallbestated.

8.2OutputCharacteristicandPowerConsumption

8.2.1Theoutputcharacteristicsofphotovoltaicpowerstationsintheplannedareashallbeanalyzed.

Accordingtotheanalysisresultsofsolarenergyresourcesandthepreliminaryconstructionschemeof

eachplannedphotovoltaicpowerstation,thetypicaldailyoutputcharacteristiccurveofeachmonthofthe

plannedphotovoltaicpowerstationshallbeproposed.Whentheplannedareaislarge,thetypicaldaily

outputcharacteristiccurveofeachmonthmaybeputforward.

8.2.2Accordingtothescaleoftheplannedphotovoltaicpowerstation,andconsideringtheanalysis

resultsofoutputperformances,thephotovoltaicpowerconsumptioncapacityofthereceivingendgridor

thepowersystemintheplannedareashallbeevaluated.

8.2.3Forthephotovoltaicpowergenerationbase,thecalculationresultsofpowerbalanceandpeakload

regulationcapacitybalanceshallbeputforward.

8.2.4Whenphotovoltaicpowerstationiscombinedwithotherenergysources,theoutput

complementaryanalysisresultsshouldbeproposed.

8.3GridConnectionScheme

8.3.1Thegridaccesssystemschemeshallbeproposed,whichshallincludetheconnectionmodeand

transmissionvoltagelevelbetweeneachplannedphotovoltaicpowerstationandthepowersystem,the

scaleofboostersubstationofsupportingphotovoltaicpowerstation,thegeographicallocationandwiring

diagramofeachplannedphotovoltaicpowerstationaccessingtothepowersystem.

8.3.2Forthephotovoltaicpowergenerationbase,thepowercollectionandaccessschemeshallbeput

forward.

8

9EnvironmentalImpactandSoilandWaterConservation

9.1PreliminaryEnvironmentalImpactAssessment

9.1.1Accordingtotheenvironmentalstatusandsiteinvestigation,themainenvironmentalimpact

factorsoftheplannedphotovoltaicpowerstationsiteareashouldbeanalyzed,identifiedandscreened,

andtheenvironmentalsensitiveconstraintsinvolvedshallbeexplained.

9.1.2Thepreliminarypredictionandassessmentofthemainenvironmentalimpactofeachplanned

photovoltaicpowerstationshallbecarriedout,andpreliminarycountermeasuresforthemainadverse

effectsshallbeputforward.

9.1.3Theoverallenvironmentalimpactassessmentshallbecarriedout,andthepreliminaryassessment

conclusionofprojectfeasibilityshallbeputforwardfromtheperspectiveofenvironmentalimpact.

9.2PreliminarySoilandWaterConservationAssessment

9.2.1Thepresentsituationofsoilandwaterconservationintheprojectareashallbebrieflydescribed.

9.2.2Accordingtothetechnicalschemeoftheplannedphotovoltaicpowerstation,thepreliminary

waterandsoilconservationschemeshallbeputforward.

9.2.3Thecomprehensiveevaluationandconclusionofsoilandwaterconservationshallbeputforward.

9

10PreliminaryInvestmentEstimationandBenefitAnalysis

10.0.1Thestaticinvestmentoftheprojectshallbeestimatedaccordingtotheconstructionconditions

andpreliminaryconstructionschemeofeachplannedphotovoltaicpowerstation,andtheinvestment

estimationtableshallbegiven.

10.0.2Accordingtotheplanningobjectives,theeconomicevaluationmethodoftheplannedproject

shallbeclarified,andthemaineconomicevaluationconclusionsshallbeputforwardaccordingtothe

on-gridpower,projectinvestmentandcurrentfiscalandtaxpoliciesofeachplannedphotovoltaicpower

station.Thesensitivityanalysisshouldbemadebasedonthepowerconsumptioncapacity.

10.0.3Forthephotovoltaicpowergenerationbaseinvolvingthecomprehensiveutilizationof

photovoltaic,theeconomicbenefitsofphotovoltaicandrelatedindustriesshallbeputforwardaccording

totheutilizationmode.

10.0.4Thesocialandenvironmentalbenefitsshallbepreliminarilyanalyzed.

10

11DevelopmentSequence

11.0.1Thescaleofplanningandconstructionlayoutforeachyearshallbeproposedaccordingtothe

socio-economyandenergydevelopmentplan,withrespecttotheconstructionconditionsofthe

photovoltaicpowerstation.

11.0.2Theconstructiontimesequencefortheplannedphotovoltaicpowerprojectshallbeproposed

accordingtotheplanningscaleandconstructionlayoutafteracomprehensiveanalysisofthefollowing

factors:

1Solarenergyresourceconditions.

2Gridconnectionconditionsandpowerconsumption.

3Transportationandinstallationconditions.

4Projectinvestmentandfinancialbenefitindicators.

5Earlystageprogressineachplannedphotovoltaicpowerproject.

11

12PlanningImplementationandSupporting

12.0.1Theguidelines,constructionmode,policymeasuresshallbeproposedfortheplanning

implementationaccordingtotheplanningrequirementsandimplementationscheme.

12.0.2Forphotovoltaicpowerstations,theimplementationplanoftheprojectqualitysupervision,

qualitycontrol,computerizedinformationmanagement,andoverallassessmentshallbeproposed

accordingtotheplanningimplementationrequirements.

12.0.3Theboundaryconditionsandrequirementsfortheconstructionofrecentdevelopmentprojects

shallbeputforward.

12

13ConclusionandRecommendation

13.0.1Theplanningprocessandachievementsshallbebriefed,andmainconclusionshallbegiven.

13.0.2Recommendationonthenextstageshallbeputforwardaccordingtotheplannin

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論