《水電工程招標設(shè)計報告編制規(guī)程》_第1頁
《水電工程招標設(shè)計報告編制規(guī)程》_第2頁
《水電工程招標設(shè)計報告編制規(guī)程》_第3頁
《水電工程招標設(shè)計報告編制規(guī)程》_第4頁
《水電工程招標設(shè)計報告編制規(guī)程》_第5頁
已閱讀5頁,還剩162頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

ICS27.140

P59

備案號:Jxxxx-2021N

中華人民共和國能源行業(yè)標準

PNB/Txxxxx-2022

代替DL/T5212-2005

水電工程招標設(shè)計報告編制規(guī)程

Specificationforcompilingtenderdesignreport

ofhydropowerproject

(征求意見稿)

2022-xx-xx發(fā)布2022-xx-xx實施

國家能源局發(fā)布

國家能源局

公告

2022年第x號

依據(jù)《國家能源局綜合司關(guān)于下達2018年能源領(lǐng)域行業(yè)標準制

(修)訂計劃及英文版翻譯出版計劃的通知》(國能綜通科技〔2018〕

100號)有關(guān)規(guī)定,經(jīng)審查,國家能源局批準《xxxxxxxxxx》等xxx

項行業(yè)標準,其中能源標準(NB)xx項,電力標準(DL)xxx項和

石油天然氣標準(SY)xxx項,現(xiàn)予以發(fā)布。

附件:行業(yè)標準目錄

國家能源局

2022年x月x日

附件:

行業(yè)標準目錄

序號標準編號標準名稱代替標準采標號批準日期實施日期

...

水電工程招標設(shè)計DL/T

xxNB/Txxxxx-20222022-xx-xx2022-xx-xx

報告編制規(guī)程5212—2005

...

NB/T5212—2022

前言

根據(jù)《國家能源局綜合司關(guān)于下達2018年能源領(lǐng)域行業(yè)標準制(修)訂計

劃及英文版翻譯出版計劃的通知》(國能綜通科技〔2018〕100號)的要求,規(guī)

程編制組經(jīng)廣泛調(diào)查研究,認真總結(jié)實踐經(jīng)驗,并在廣泛征求意見的基礎(chǔ)上修訂

本規(guī)程。

本規(guī)程統(tǒng)一了水電工程招標設(shè)計報告的編制原則、程序、工作內(nèi)容和深度,

對招標設(shè)計報告的編寫體例、內(nèi)容等做出了規(guī)定。

本規(guī)程的主要技術(shù)內(nèi)容包括:總則、基本規(guī)定、綜合說明、水文泥沙、工程

地質(zhì)、工程規(guī)模、工程布置及建筑物、機電及金屬結(jié)構(gòu)、消防設(shè)計、工程分標規(guī)

劃、施工組織設(shè)計、建設(shè)征地和移民安置、環(huán)境保護與水土保持、勞動安全與工

業(yè)衛(wèi)生、工程投資、財務(wù)分析等。

本規(guī)程修訂的主要技術(shù)內(nèi)容包括:

本規(guī)程代替了《水電工程招標設(shè)計報告編制規(guī)程》DL/T5212-2005。

——將“范圍”一章修改為“總則”,并提出了制定本規(guī)程的目的、規(guī)程的適用

范圍、主要依據(jù)、作用和執(zhí)行相關(guān)標準的要求;

——將“規(guī)范性引用文件”一章修改為“引用標準名錄”,修改并補充了有關(guān)標

準名稱,列入“本規(guī)程用詞說明”章之后;

——將“總則”一章修改為“基本規(guī)定”;

——將“概述”一章修改為“綜合說明”;

——“工程地質(zhì)”章增加了水庫移民安置區(qū)工程地質(zhì)條件評價和水庫專項工

程地質(zhì)條件條款;

——“工程布置及建筑物”章增加了“過魚建筑物”節(jié),補充了相應(yīng)的設(shè)計內(nèi)容

要求;

——“施工組織設(shè)計”章增加了“標準化工地建設(shè)及智慧工地建設(shè)”節(jié),將原

“料源規(guī)劃與土石方平衡”一節(jié)修改為“料源選擇與料場開采”;補充了渣場布置、

防洪排水及建筑物布置設(shè)計條款。

——將“建設(shè)征地和移民安置”章的“執(zhí)行概算”一節(jié)修改為“補償費用”;簡化

1

NB/T5212—2022

了“建設(shè)征地和移民安置”章的有關(guān)編制內(nèi)容。

——將“環(huán)境保護設(shè)計”一章修改為“環(huán)境保護與水土保持”,將“環(huán)境保護措

施設(shè)計”、“環(huán)境監(jiān)測設(shè)計”、“環(huán)境管理計劃”、“實施進度計劃”四節(jié)內(nèi)容合并調(diào)整

為“環(huán)境保護”節(jié);增加了“水土保持”節(jié);刪除了原“分標規(guī)劃”、“投資概算”兩節(jié)。

——“勞動安全與工業(yè)衛(wèi)生”章增加了“安全設(shè)施”、“職業(yè)病防護設(shè)施”、“治安

反恐防范設(shè)施”、“應(yīng)急設(shè)施”、“標識標志”、“實施方案”、“附圖、附件”七節(jié),并

補充了相關(guān)內(nèi)容規(guī)定。

——“工程投資”章刪除原“一般要求”節(jié);“主體標招標設(shè)計概算”、“招標設(shè)計

概算”兩節(jié),修改為“標段招標設(shè)計概算”、“招標設(shè)計總概算”兩節(jié),并調(diào)整了相

應(yīng)條款內(nèi)容。

本規(guī)程由國家能源局負責管理,由水電水利規(guī)劃設(shè)計總院提出并負責日常管

理,由能源行業(yè)水電勘測設(shè)計標準化技術(shù)委員會負責具體技術(shù)內(nèi)容的解釋。執(zhí)行

過程中如有意見或建議,請寄送水電水利規(guī)劃設(shè)計總院(地址:北京市西城區(qū)六

鋪炕北小街2號,郵編:100120)。

本規(guī)程主編單位:水電水利規(guī)劃設(shè)計總院

中國電建集團華東勘測設(shè)計研究院有限公司

本規(guī)程主要起草人員:待補充

本規(guī)程主要審查人員:待補充

2

NB/T5212—2022

目次

前言·····························································································1

1總則··································································································1

2基本規(guī)定····························································································2

3綜合說明····························································································5

3.1工程特性···················································································5

3.2勘測設(shè)計過程、項目核準或?qū)徟闆r···············································5

3.3項目建設(shè)條件及建設(shè)管理要求························································5

3.4主要設(shè)計成果·············································································5

3.5附圖、附表及附文·······································································6

4水文泥沙····························································································7

4.1水文氣象基本資料·······································································7

4.2徑流··························································································7

4.3洪水··························································································7

4.4泥沙··························································································7

4.5施工期水文預(yù)報和運行期水情自動測報系統(tǒng)······································7

4.6水位流量關(guān)系曲線·······································································8

4.7附圖、附表················································································8

5工程地質(zhì)····························································································9

5.1概述··························································································9

5.2區(qū)域構(gòu)造穩(wěn)定性··········································································9

5.3水庫工程地質(zhì)·············································································9

5.4擋水建筑物工程地質(zhì)···································································11

5.5泄水建筑物工程地質(zhì)···································································13

5.6輸水建筑物工程地質(zhì)···································································14

5.7廠區(qū)工程地質(zhì)············································································15

5.8通航建筑物工程地質(zhì)···································································16

5.9主要輔助建筑物和臨時建筑物工程地質(zhì)··········································16

I

NB/T5212—2022

5.10天然建筑材料··········································································17

5.11附圖、附件·············································································17

6工程規(guī)?!ぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁ?9

6.1規(guī)劃、設(shè)計成果和工程任務(wù)··························································19

6.2徑流調(diào)節(jié)計算············································································19

6.3洪水調(diào)節(jié)計算············································································20

6.4工程特征值復(fù)核·········································································20

6.5水庫正常運行方式和能量指標·······················································21

6.6水庫初期蓄水和電站初期運行方式················································21

6.7水庫泥沙沖淤分析和回水計算·······················································22

6.8附圖························································································22

7工程布置及建筑物··············································································24

7.1設(shè)計依據(jù)及基本資料···································································24

7.2樞紐布置··················································································24

7.3擋水建筑物···············································································24

7.4泄水建筑物···············································································25

7.5輸水建筑物···············································································26

7.6發(fā)電廠房及開關(guān)站······································································28

7.7通航建筑物···············································································29

7.8過魚建筑物···············································································30

7.9邊坡工程··················································································30

7.10安全監(jiān)測················································································31

7.11工程量匯總表··········································································31

7.12附圖·······················································································32

8機電及金屬結(jié)構(gòu)·················································································35

8.1概述························································································35

8.2水力機械··················································································35

8.3電氣························································································36

8.4控制保護和通信·········································································38

II

NB/T5212—2022

8.5金屬結(jié)構(gòu)··················································································40

8.6采暖通風··················································································42

8.7附圖························································································42

9消防設(shè)計··························································································44

10工程分標規(guī)劃···················································································46

10.1概述·······················································································46

10.2分標規(guī)劃依據(jù)··········································································46

10.3分標原則················································································47

10.4分標方案及比選·······································································47

10.5選定的分標方案·······································································47

10.6工程招標計劃··········································································48

10.7附表、附圖·············································································48

11施工組織設(shè)計···················································································50

11.1施工條件················································································50

11.2施工導(dǎo)流················································································51

11.3料源選擇與料場開采·································································56

11.4主體工程施工··········································································58

11.5施工交通運輸··········································································61

11.6施工工廠設(shè)施··········································································62

11.7施工總布置·············································································65

11.8施工總進度·············································································68

11.9施工資源供應(yīng)··········································································69

11.10標準化工地建設(shè)及智慧工地建設(shè)················································69

11.11附圖·····················································································70

12建設(shè)征地和移民安置··········································································72

12.1概述·······················································································72

12.2設(shè)計依據(jù)················································································72

12.3建設(shè)征地范圍和實物指標···························································72

12.4農(nóng)村移民安置規(guī)劃····································································72

III

NB/T5212—2022

12.5城市和集鎮(zhèn)遷建規(guī)劃·································································73

12.6企業(yè)處理規(guī)劃··········································································73

12.7專業(yè)項目處理規(guī)劃····································································73

12.8庫底清理················································································73

12.9補償費用················································································73

12.10實施組織設(shè)計·········································································73

12.11附圖、附件············································································74

13環(huán)境保護與水土保持··········································································75

13.1概述·······················································································75

13.2環(huán)境保護················································································75

13.3水土保持················································································77

13.4附圖、附件·············································································77

14勞動安全與工業(yè)衛(wèi)生··········································································79

14.1概述·······················································································79

14.2安全設(shè)施················································································79

14.3職業(yè)病防護設(shè)施·······································································80

14.4治安反恐防范設(shè)施····································································80

14.5應(yīng)急設(shè)施················································································81

14.6標識標志················································································82

14.7實施方案················································································83

14.8附圖、附件·············································································83

15工程投資·························································································85

15.1分標概算················································································85

15.2標段招標設(shè)計概算····································································86

15.3招標設(shè)計總概算·······································································89

16財務(wù)分析·························································································91

附錄A水電工程招標設(shè)計報告編制目錄·····················································92

附錄B水電工程分標段招標設(shè)計報告編制目錄············································96

附表C水電工程特性表··········································································99

IV

NB/T5212—2022

本規(guī)程用詞說明····················································································106

引用標準名錄·······················································································107

1總則·······························································································109

2基本規(guī)定·························································································110

3綜合說明·························································································111

3.1工程特性················································································111

3.2勘測設(shè)計過程、項目核準或?qū)徟闆r············································111

3.3項目建設(shè)條件及建設(shè)管理要求·····················································111

3.4主要設(shè)計成果··········································································111

3.5附圖、附表及附文····································································111

4水文泥沙·························································································112

4.1水文氣象基本資料····································································112

4.2徑流·······················································································112

4.3洪水·······················································································112

4.4泥沙·······················································································113

4.5施工期水文預(yù)報和運行期水情自動測報系統(tǒng)···································113

4.6水位流量關(guān)系曲線····································································113

5工程地質(zhì)·························································································114

5.1概述·······················································································114

5.2區(qū)域構(gòu)造穩(wěn)定性·······································································114

5.3水庫工程地質(zhì)··········································································114

5.4擋水建筑物工程地質(zhì)·································································115

5.5泄水建筑物工程地質(zhì)·································································116

5.6輸水建筑物工程地質(zhì)·································································116

5.7廠區(qū)工程地質(zhì)··········································································116

5.9主要輔助建筑物和臨時建筑物工程地質(zhì)·········································117

5.10天然建筑材料·········································································117

5.11附圖、附件············································································117

6工程任務(wù)、規(guī)模和運行特性·································································118

V

NB/T5212—2022

6.1規(guī)劃、設(shè)計成果和工程任務(wù)························································118

6.2徑流調(diào)節(jié)計算··········································································118

6.3洪水調(diào)節(jié)計算··········································································118

6.4工程特征值復(fù)核·······································································119

6.5水庫運行方式和能量指標···························································120

6.6水庫初期蓄水和電站初期運行方式···············································121

6.7水庫泥沙沖淤分析和回水計算·····················································121

6.8工程任務(wù)、規(guī)模和運行特性附圖··················································122

7工程布置及建筑物·············································································123

7.1設(shè)計依據(jù)及基本資料·································································123

7.2樞紐布置················································································123

7.3擋水建筑物·············································································123

7.4泄水建筑物·············································································123

7.5輸水建筑物·············································································124

7.6發(fā)電廠房和開關(guān)站····································································124

7.7通航建筑物·············································································125

7.8過魚建筑物·············································································125

7.9邊坡工程················································································125

7.10安全監(jiān)測···············································································126

8機電及金屬結(jié)構(gòu)················································································127

8.1概述·······················································································127

8.2水力機械················································································127

8.3電氣·······················································································127

8.4控制保護和通信·······································································128

8.5金屬結(jié)構(gòu)················································································128

9消防設(shè)計·························································································129

10工程分標規(guī)劃·················································································130

10.1概況·····················································································130

10.2分標規(guī)劃依據(jù)·········································································130

VI

NB/T5212—2022

10.3分標原則···············································································130

10.4分標方案比選·········································································131

10.5選定的分標方案······································································131

10.6工程招標計劃·········································································132

11施工組織設(shè)計·················································································133

11.1施工條件···············································································133

11.2施工導(dǎo)流···············································································133

11.3料源選擇與料場開采································································134

11.4主體工程施工·········································································135

11.5施工交通運輸·········································································136

11.6施工工廠設(shè)施·········································································137

11.7施工總布置············································································137

11.8施工總進度············································································138

11.9施工資源供應(yīng)·········································································139

11.11附圖···················································································139

12建設(shè)征地移民安置···········································································140

12.1概述·····················································································140

12.2設(shè)計依據(jù)···············································································140

12.3建設(shè)征地范圍和實物指標··························································140

12.4農(nóng)村移民安置規(guī)劃···································································140

12.5城市和集鎮(zhèn)遷建規(guī)劃································································141

12.6企業(yè)處理規(guī)劃·········································································141

12.7專業(yè)項目處理規(guī)劃···································································141

12.8庫底清理···············································································141

12.9補償費用···············································································141

12.10實施組織設(shè)計·······································································142

13環(huán)境保護與水土保持········································································143

13.1概述·····················································································143

13.2環(huán)境保護···············································································143

VII

NB/T5212—2022

13.3水土保持···············································································143

14勞動安全與工業(yè)衛(wèi)生········································································145

14.1概述·····················································································145

14.2安全設(shè)施···············································································145

14.3職業(yè)病防護設(shè)施······································································146

14.4治安反恐防范設(shè)施···································································146

14.5應(yīng)急設(shè)施···············································································146

14.6標識標志···············································································147

14.7工程(工作)量··········································································147

14.8實施方案···············································································148

14.9附圖、附件············································································148

15工程投資·······················································································149

15.1概述·····················································································149

16財務(wù)分析·······················································································150

VIII

NB/T5212—2022

Contents

Foreword··········································································································1

1Generalprovision···························································································1

2Basicrequirement···························································································2

3Comprehensiveinstruction················································································5

3.1Engineeringcharacteristics······································································5

3.2Surveyanddesignprocessandapproval······················································5

3.3Projectconstructionconditionsandconstructionmanagementrequirements···········5

3.4Maindesignachievements·······································································5

3.5Attacheddrawings,schedulesandattachments···············································5

4Hydrologyandsediment···················································································7

4.1Hydrologyandmeteorology·····································································7

4.2Runoff·······························································································7

4.3Flood···················································

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論