ConstructionPlan施工方案ConstructionPlan施工方案Section1.0PlasterboardPartitiononMetalStud第一節(jié)輕鋼龍骨隔斷施工方案1.1RequirementofMaterials,ComponentsandFittings材料及構(gòu)配件規(guī)定Eachkindofstud,fittingsandsurfacematerialsshouldaccordwiththecurrentrequirement.Re-testingwillbeconductedwhenmorethan500squaremetersman-madeboardsareused.ProvidetestreportofTVOCandformaldehydeforwater-basedadhesive.各類龍骨,配件和罩面材料及膠粘劑材質(zhì)應(yīng)符合現(xiàn)行規(guī)定.人造板材使用量不不大于500平米時應(yīng)進(jìn)行復(fù)檢;水性膠粘劑必要有TVOC和甲醛檢測報告。Filledwithinsulationmaterial:Theglasswool,rockwool,etc.shouldbeconsistentwiththedesignrequirements填充隔音材料:玻璃棉,巖棉等應(yīng)符合設(shè)計規(guī)定。1.2MainEquipmentandTools重要機(jī)具Electricalmachine&tools:Electricalsaw,Hand-heldelectricdrill,impactingdrill,DCweldingmachine,andcuttingmachine電動機(jī)具:電鋸,手電鉆,沖擊電鉆,直流電焊機(jī),切割機(jī)。Manualtool:manualsaw,pliers,riveter,screwdriver,levelandsteellevel手動工具:手鋸,鉗子,拉鉚鉗,螺絲刀,靠尺,鋼水平尺。1.3MetalStudInstallation龍骨安裝Thetype,size,colorofthematerialsandthestructurefixingmethodofthepartitionshouldcomplywiththedesign.
隔斷工程應(yīng)用材料品種、規(guī)格、顏色以及隔斷構(gòu)造固定辦法應(yīng)符合設(shè)計規(guī)定。Asperthedrawings,settinglinesonthecleanedfloorforthewalllocatinganddrawingoutthelocationsofdoors,windowsandpreformedopenings.
按圖紙規(guī)定,在清潔干凈地面上放墻位線定位,并標(biāo)出門、窗及預(yù)留孔位置,擬定墻體位置Installthetopandbottomstudsatthewalllocation,screwsshallbeusedtofixthestudsandthespacebetweenscrewsis600mm.在墻體位置上安裝沿地、沿頂龍骨,固定龍骨采用螺釘固定,螺釘間距為600mm。Theverticalstudswillbeinstalledintothetopandbottomstuds,adjustingthedimensionsandverticality,theverticalstudsbythewallswillbefixedbyscrewevery800mmandtheotherverticalstudsbyrivets.Whenthestudslocatedatdoors,windowsandthepreformedopenings,additionalstudswillbeaddedandtobefixedbyrivets.豎向龍骨上、下兩端插入沿地、頂龍骨,按規(guī)定調(diào)節(jié)尺寸,放垂直,靠墻兩邊豎龍骨,用螺釘將其固定,釘距800mm,其他龍骨采用抽心鉚釘固定。但當(dāng)龍骨位置在門口、窗口或其她預(yù)留孔時,重要加撐并用鉚釘固定。1.4GypsumBoard石膏板安裝Installation安裝Thegypsumboardshouldbeinstalledinverticalandthesealededgeoftheboardshouldbeparallelwiththeverticalmetalstud.25mmscrewsshouldbeinstalledtofirmthegypsumboardsonmetalstudalongthecenterlineoftheverticalstudflange將石膏板邊(有封口一邊)與豎向龍骨平行。對準(zhǔn)豎向龍骨翼緣中心線上,用25mm螺釘固定。Theself-tappingscrewtotheedgeofboardsshouldbewithin10to16mm.Thecenterscrewswillbeevery300mmandthesurroundscrews200mm自攻螺釘與石膏板邊沿距離不得不大于10mm,也不得不不大于16mm。螺釘固定位置中距為300mm,周邊間距為200mm。Whenfixingtheboards,theworkshouldbedonefromthemiddletothelongandshortedges;afterscrewdrovein,theheadsshouldbeslightlysubmergedintotheboardbutnotmorethan1.5mmbrokenthefacepaper.固定板時,應(yīng)從一塊板中部向長邊及短邊固定,螺釘就位后,釘頭略埋入板內(nèi)。埋入深度不不不大于1.5mm,并不能破壞紙面。Thejointsofgypsumboardsshouldbetight,butnotpressthemintotheposition.石膏板對接時應(yīng)靠緊,但不能強(qiáng)壓就位。Thejointsoftheboardsshouldbestaggeredandthebothsidesboardjointsshouldnotbeonthesamestuds.墻面對接縫應(yīng)錯開,墻兩面接縫不能落在同一條豎龍骨上。Theexternalcornerofgypsumboardsshouldbemetalprotected.石膏板墻陽角須使用金屬護(hù)角包角。TreatmentandMakingupoftheJoints解決接縫Theconcaveareaatthegypsumboardjointsshouldbecaulkedbyspecialstickypastethroughwideputtyknife.在石膏板對接所形成接縫用寬刮刀均勻地添上專用粘接劑粘接。Plasteringthecenterlineofpunchedpapertapealignwithjoints,squeezingthestickypasteintotheholesbywidescraper.Removingalltheresidualpasteandtheairholesunderthepapertape,thescraperwillbe45degreestothewall.Sufficientstickypasteshouldbesqueezedintoensurethestrengthofthejoints.將穿孔紙帶中線對準(zhǔn)接縫,用寬刮刀按入接縫粘固粉。用刮刀順著接縫刮去多余粘固粉并除去紙帶下氣泡,刮刀應(yīng)與接縫約成45度角。紙帶下應(yīng)留有足夠粘固粉,以使接縫粘合牢固。Scrapingverythinstickypasteonthepapertapeavoidingthetapecrinklingandcracking.Thedryoutwillbewaiting(normallyforonehour).及時刮上薄薄一層粘固粉。這可以防止紙帶邊卷起或起皺,以免裂開。等待干燥(在正常條件下需要1小時)。Afterdryingout,plasterthesecondlayerofstickypaste150mmwiderthanthefirstandwaitingforitdryingout.燥后用抹刀再抹上第二層接縫粘固粉,比第一層寬150mm,等其干燥。Whenthesecondstickygreasedriedout,coatingagainthethirdlayerofstickypasteatleast50mmwiderthanthesecondarylayer.Theresidualpasteshouldberemovedandfinishthesurfacesmoothly.等第二層干燥后,用抹刀再抹上一層粘固粉,應(yīng)比前一層至少寬50mm。刮去接縫上多余粘固粉,使表面平整光滑。Afterthestickypastetotallydriedout,150#sandpaperwillbeusedtofinishthejointssmoothly.完全干燥后,用砂紙板與接縫成對角輕輕打磨,以使表面平滑。應(yīng)使用150號砂紙。Inordertoobtaintheopticalplaneface,thejointsshouldavoid.Ifinevitable,themethodsameasconcaveedgejointswillbeusedtojointingonthestuds,butspecialstickygreaseshouldbeincreasedto600mmwide.Asthewiderstickygreasewillbegoodforsmoothingthefinishedsurface.為了獲得最佳整修平面,應(yīng)盡量避免對接縫。如果無法避免,可采用與凹陷邊沿接縫相似方式在龍骨框上進(jìn)行對接,但是蓋縫粘固粉需加寬到600mm。加寬蓋縫粘固粉有助于獲得平整光滑表面。Forinnercorners,plasteringstickypasteoncornersides,themiddlefoldedpapertapesareputintocornersbyscraperorangledtools.Whentotaldry,plasteringagainandbeingsurethislayeriswiderthanthefirst.Sandpaperfinishingmustbedonewhenitdriedtotally內(nèi)角解決。用寬刮刀在墻角兩邊刮上粘固粉。將紙帶沿中心線折起,然后用刮刀或角度工具按入粘固粉。完全干燥屢次刮上一層粘固粉,保證邊沿寬于前一層。完全干燥后用砂紙輕輕打磨。Forexternalcorners,plasteringstickypastesontothemetalprotectivecornersidesandsqueezepasteintotheholes.Whentotaldry,secondplastershouldbedoneandthesecondbewiderthanthefirst.Sandpaperfinishingisdonewhenitdriedtotally.外角解決。用寬刮刀在釘在墻角上護(hù)角兩邊刮上粘固粉,刮時用力將粘粉壓入護(hù)角孔眼。干燥后再用平抹刀刮上一層粘固粉,邊沿應(yīng)寬于前一層。完全干燥后用砂紙輕輕打磨。Treatmenttoscrewholes,plaster3timesstickypasteontheholes,thewayissameasthatforjoints.Everyplastershouldbe25mmwiderthantheformerone.Whendriedout,sandpaperworklightly.螺絲孔釘解決。在螺絲孔上刮上三層粘固粉,辦法與接縫相似。每層粘固粉應(yīng)寬于前一層25mm。完全干燥后用砂紙輕輕打磨。Thedecorationworkcouldbedonedirectlyonthegypsumboardwhenthejointtreatmentfinished.接縫解決完畢之后可以直接在石膏板表面進(jìn)行裝飾。QualityRequirement質(zhì)量規(guī)定Finishedgypsumboardwallshouldbeplane,vertical,neatandwithoutanydeformation.完畢后石膏板表面應(yīng)表面平整、立面垂直、無翹曲、觀感干凈。Thegapsoftheboardsshouldbeevenandsmooth.在板與板之間接縫抹灰處應(yīng)寬窄一致、平直光滑。Thelightsteeljoistmustbestrong,planeandstraight,withsufficientbearingcapacity.輕鋼龍骨架必要結(jié)實平直,并有足夠承載能力。Section2.0MetalCeilingTile第二節(jié)金屬板吊頂施工方案2.1ConstructionPreparation施工準(zhǔn)備Drawingreviewandconstructionplanworkingout;MakesitemeasurementandmakelayoutofmainjoistandinstallationschemeaccordingtothesiitesituationaswellasmakearrangementforAir-conditioningventilationopening,manhole,andlightingopening.Workoutworksequence,detaildrawingandperformrealtechnicalrequirement&intentionexplanation.審核圖紙進(jìn)行實地丈量,并按實際狀況,制定施工方案:繪制主龍骨走向及布置圖,制定空調(diào)排風(fēng)孔、檢查孔、照明孔安裝方案,制定施工順序及節(jié)點詳圖,進(jìn)行技術(shù)交底。Contactandcoordinatewithrelativetradeteamatthelocationofceilingfittingandpre-installhangersorembeddedpartsduringmainstructureconstructionandconferwithlighting,HVACtradeteamontheworkingprocedurearrangement.在進(jìn)行吊頂部位,與關(guān)于工種聯(lián)系配合,在主體構(gòu)造施工時,預(yù)留吊桿或埋件,與照明、通風(fēng)專業(yè)協(xié)商好工序插入時間。Constructionequipmentshouldbereadyforconstructioncompletely.Mainconstructionmachineincludes:profilecuttingmachine,pistoldrill,impactdrill,level,anglesquare,powderlinebag,screwdriver,linemakingstylusandetc.施工機(jī)具準(zhǔn)備齊全并可用于施工,重要施工機(jī)具備:型材切割機(jī)、手槍鉆、沖擊電鉆、水平尺、角尺、粉線袋、螺絲刀、劃線鐵筆等。Basepreparation:Clearbarrierontheroofandallaround.Fixingpointforlightingsandetc.mustbemakewellaccordingtodesignrequirement.Inspectcircuitofinstalledduct,fireworkandelectric.Andcheckifpressuretest,externalinsulationandpreservationhavebeenperformed,afterwhichceilingsysteminstallationcanbestarted.基層解決:清除頂棚及周邊障礙物,對燈飾等承重固定支點,應(yīng)按設(shè)計規(guī)定做好。檢查已安裝好通風(fēng)、消防、電器線路,并檢查與否做完打壓實驗或外層保溫、防腐等工作。這些工作完畢后方可進(jìn)行吊頂安裝工作。2.2ConstructionProcess施工工藝Layoutofstudandframe-→hangerrodfixing→levelingstudandmetalfameinstallation→metalceilingtileinstallation→trimtheedge龍骨布置彈線→固定吊桿→安裝調(diào)平龍骨→安裝金屬板吊頂板→條邊封口Setting-outandmarking:Settingoutistomarkelevationlineandjoistlayout.Normallytheelevationlinecanbemarkedtothewallandcolumnwherethealuminumangleshallbefixedto.Thealuminumangleactsassealingtotheceilingedgeandtrimthemargintobecompleteandflat,whichcanbepeggedbycementnailorpoweractuatedsettingdevice.Iftheceilingelevationsaredifferent,thenthepositionforchangemustbemarkedtotheslab.Ifthepanelsizeisbiggersquare,justfixlierneribonthebackofthepanel.Iftherigidityisgoodenough,deformingwillnothappenthoughthespacingbetweenjoistisbigger,whichisnotapplicableforthethinnerstrippanel.Thusthespacingbetweenjoistsisnotbiggerthan1.2mnormally,andthespacingofhangerpointistobe1m.劃線:放線重要是彈標(biāo)高線和劃出龍骨布置線,標(biāo)高線普通彈到墻面或柱面,然后將角呂固定在墻或柱面上。角鋁作用是天棚邊沿部位封口,使之邊角部位更加完整與順直,角鋁多用高墻水泥釘固定,也可用射釘固定,如果天棚有不同標(biāo)高,那么應(yīng)將變截面位置彈到樓板上。龍骨布置,如果是將板塊較大方塊,在板背加肢,剛度較好,盡管龍骨間距較大,也不會發(fā)生變形。對于很薄板條,是不適當(dāng),因此,這種狀況龍骨間距普通不適當(dāng)超過1.2米,吊點控制在1米左右。Hangerfixing;thisincludesfixingwithstructure,selectionofsection,connection&fixingbetweenhanger,joistandstructure.Expansionboltisfixedonthehangerspotwithimpactdrillandthenweldedwiththehanger.Thequalityforhangermountingshouldbeaccordwiththeregulationofexistingnationalcode.Thedesignelevationlinecanbedrewonthewallaroundclearlyandaccurately.Forthehangerspotspacingofmainjoist,recommendtousesystemsolution,risingofarctobeinthemiddle,whichcanbenotlessthan1/200oftheroomspan.Thepositionandelevationofthemainjoistshouldbeadjustedtimelywhenitisinstalled.Thedistancebetweenthehangerandtheendofmainjoistcannotbeexcess300mm.Otherwise,additionalhangersshouldbeincreasedtopreventmainjoistsagging.Whenthehangerconflictswiththeequipment,thestructureofhangershouldberegulatedor,toensurethequalityofceiling.Thehangershouldbestraightandabletobearweight.Whenitisnecessaryforthebuilt-inhangertobelonger,itshouldbelapweldedwellwithfullandevenweldingjoint.Accordingtotherequirementofpanelarrangement,preparespecialjoistforaluminumpanelandconnectedtotheedgeanglewithconnector,whichisfixedonwallaround.Adjustpositionandlevelofjoistcomprehensively.Connectorsshouldbestaggeredjoint.Toleranceforthestaggeredjoint0ffull-lengthjoistcannotexcess11mm.Afteradjustment,allhangingandconnectingpartsshouldbetightened.固定吊桿:吊桿施工重要涉及與構(gòu)造固定、斷面選取、吊桿與龍骨連接、與構(gòu)造固定辦法采用在吊點位置,用沖擊鉆打膨脹螺栓,然后將膨脹螺栓同吊桿焊接。安裝吊頂龍骨基體質(zhì)量,應(yīng)符合關(guān)于現(xiàn)行國標(biāo)規(guī)定。更具吊頂設(shè)計標(biāo)高在四周墻上彈線,彈線應(yīng)清晰,位置精確。主龍骨吊點間距應(yīng)按設(shè)計推薦系列選取,中間某些應(yīng)起拱,金屬龍骨起拱高度應(yīng)不不大于房間短向跨度1/200,主龍骨按裝后應(yīng)及時校正其位置和標(biāo)高。吊桿據(jù)主龍骨端部距離不超過300mm,否則應(yīng)增設(shè)吊桿,以免朱龍骨下墜,當(dāng)?shù)鯒U與設(shè)備相遇時應(yīng)調(diào)節(jié)吊頂構(gòu)造或政社吊桿,以保證吊頂質(zhì)量。吊桿應(yīng)通直并有足夠承載能力,當(dāng)預(yù)埋吊桿與接長時必要搭接焊牢,焊縫均勻飽滿,依照板材布置需要,準(zhǔn)備鋁板專用龍骨,用連接件將其連接在邊龍骨應(yīng)按設(shè)計規(guī)定彈線,固定在四周墻上。全面校正龍骨位置及水平度,連接件應(yīng)錯位安裝,通長龍骨連接處對接錯位偏差不得超過1mm。校正后應(yīng)將龍骨所有吊掛件、連接件擰夾緊,檢查安裝好吊頂骨架,應(yīng)牢固可靠。Coordinationforlighting,vent,manholeandmechanicalwork:Forlightaluminumpanelceiling,suspendingsystemforlightingorventareseparatefromthatofceiling.Sprinkler,smokesensor,airopeningandetcshouldbelinkedupwithceilinginosculate.Atthejunctionofmanholeorventwithwallorcolumn,sealingtrimshouldbemadewelltothepanelwithoutexposedstubble,normallybyusingsamecoloraluminumangle.Being2sidedsealingformanhole,2piecesanglesbacktobackshallbefixedwithrivetandframedasperthesizeofperformedhole.關(guān)于燈飾、通風(fēng)口、檢查口、機(jī)電設(shè)施同天棚配合問題:燈飾或風(fēng)口篦子懸吊系統(tǒng)與天棚選調(diào)系統(tǒng)對于輕質(zhì)鋁合金板天棚應(yīng)當(dāng)分開,噴淋、煙感、風(fēng)口等設(shè)備與天棚表面銜接要得體、安裝吻合。在檢查孔、通風(fēng)口、與墻面或柱面交接部位,板條要做好封口解決,不得露白茬,普通慣用辦法是用相似色彩角鋁封口。在檢查孔部位,因牽涉到兩面收口,因此用兩根角鋁背靠背,拉鉚釘固定,然后按預(yù)留口尺寸圍成框框。Alloweddeviationandtestingmeathod容許偏差和檢測辦法Item項目Alloweddeviate容許偏差(mm)Testingmethod檢查辦法Surfacesmoothness表面平整度2Inspectingwith2mlevelscaleandFeelergauge用2m靠尺和塞尺檢查BelineofJoint接縫直線度1.5Pull5mline,lessthan5mpullathroughlongline,checkwiththeSteelRuler拉5m線,局限性5m接通線,用鋼尺檢查Seamheightdifference接縫高低差1Inspectwiththesteelruleandthefeelergauge用鋼尺和塞尺檢查Section3.0SuspendingPlasterboardCeiling第三節(jié)輕鋼龍骨石膏板吊頂施工方案3.1WorkConditions作業(yè)條件Forin-situconcreteslab,usedia.10mmsteelrodhangerandexpansionbolt,spacingdependondesignrequirement.Whenthereisnotrequirementforspacing,hangersspacingnormallyis900-1200mmaccordingtojoistarrangement.在現(xiàn)澆混凝土樓板中,用10膨脹螺栓鋼筋吊桿,間距按設(shè)計規(guī)定,設(shè)計無規(guī)定期按大龍骨排列位置,鋼筋吊桿普通間距為900-1200mm。3.2Installation吊頂龍骨安裝Marking:Accordingtothefloorelevationline,measurethedesignceilingheightverticallyandupwardwithrulerandmarklineofceilinglevelonwallaroundandjoistlayout.彈線:依照樓層標(biāo)高水平線,用尺豎向量至頂棚設(shè)計標(biāo)高,沿墻四周彈頂棚標(biāo)高水平線,并沿頂棚標(biāo)高水平線,在墻上劃好龍骨分文獻(xiàn)位置線。8mmdiameterhangerwillbeused.10mmexpansionboltwillbefixedtothestructure吊桿用直徑為8毫米,10膨脹螺栓打眼固定到構(gòu)造上,與長度適當(dāng)?shù)鯒U連接。Definethepointofhangeraccordingtothedetailandcheckthespacingwhichis900-1200mm.Drilla10mmholewithimpactingdrilleratthepointofhangerandfixedthe8mmexpansionboltwithhangerweldedtogetherthere.Theholedepthcannotexcess60mm依照大樣圖擬定吊點位置彈線,并復(fù)檢吊點間距,吊點間距為900至1200毫米。在吊點處可用沖擊鉆將吊點相應(yīng)樓板底面打10毫米孔洞,將安裝有吊桿8毫米膨脹螺栓固定于吊點處,打孔深度不能超過60mm。Themainjoistshallbeconnectedwithhangerswithhookandtightenedbyscrew.Whenthemainjoistshouldbeconnectedtobelonger,connectingrodwillbeusedforlapjoint.Leveladjustmentwillbedoneaftermainjoistmounting,andtheheightofcamberisnotlessthan2%ofroomspan. 安裝主龍骨時,應(yīng)將主龍骨用吊掛件連接在吊桿上,打緊螺絲卡牢.主龍骨接長可用接桿體邊接。主龍骨安裝后進(jìn)行調(diào)平,并應(yīng)考慮頂棚起拱高度不少于房間短向跨度2%。Sub-joistwillbefixedunderthemainjoistwithhanger,whichtoppartwillbeputonmainjoistandcclipinsertinthemainjoist.副龍骨用吊件固定在主龍骨下面,吊件上端搭在主龍骨上c型腿鉗子插入大龍骨中。中龍骨間距按板材尺寸決定,間距≤600mm。Transversestrutwhichmeetandsub-joistatrightangleshallbefittedatthesplicejointoffinishpanel.Transversestrutwillbeconnectedwithsub-joistwithsub-joistconnectors.Transversestrutcanbeinterceptedfromsub-joist.Wheninstallthem,theunderpartofthemmustbeflatsothatthefinishpanelcanbeplaced.橫撐龍骨與副骨垂直,裝在罩面板拼接處,橫撐龍骨與副龍骨連接,采用副龍骨連接件,再安裝演變一行龍骨。橫撐龍骨可用副龍骨截取,安裝時橫撐龍骨應(yīng)與副龍骨底面平順,以便安裝罩面板。3.3.PlasterboardPlacing:安裝罩面板Beforeinstalltheplasterboard,checkthemountedjoistframeandplasterboardifuptomustard.Andthentostart.Forthisproject,12mmgypsumplasterboardwillbeused.Plasterboardwillbefixedwithjoistbyscrews.Undertheinstalledandcheckedjoistframe,considerthesizeoftheplasterboardwith5mmclearanceandsnappiecebypiece.Thenstartmountingthefirstplasterboardfromthemiddlepartofceilingasthebenchmarkandproceedworkintwosidesseparately.Screwspacingforfixingtheplasterboardis150mmandtheheadwillburiedintheplasterboard0.5mm.罩面板安裝前要對已安裝完龍骨和罩面板材進(jìn)行檢查,符合規(guī)定后方進(jìn)行罩面板安裝,本工程先用12mm紙面石膏板。罩面板與輕鋼骨架固定方式為,自攻螺釘式固法:在已裝好并經(jīng)驗收輕鋼骨架下面,按罩面板規(guī)格,拉開間縫,石膏板間縫隙為5mm,進(jìn)行分塊彈線,從頂棚中間順副龍骨方向開始先裝一塊罩面板,做為基準(zhǔn),然后向兩側(cè)伸延分行安裝,固定罩面板自攻螺釘間距為150mm,螺絲頭埋入板面0.5mm。Section4.0AcousticFibrousBoardCeiling第四節(jié)礦棉板吊頂施工方案4.1CeilingBoardInstallationProcedure吊頂安裝順序Definingheight→roommeasurement→mainjoistsize38installationaccordingtothesizeoftheroom→built-infittings&hangerfixing→mainrunnerandsub-joistmounting→electricalcablewiringforlightings→fiberousboardplacing定出標(biāo)高→測量房間尺寸→依照房間尺寸拉上38主骨吊作線→固定件安裝和吊件系→安裝主次龍骨→安裝電線燈具→安裝礦棉板。Todefinetheheightofceilingaccordingtoceilingdesignandmarkthehorizontallinesoastoinstalltrimangle.Normally,Thenailclearanceislessthan400mm.依照吊頂設(shè)計定出標(biāo)高并彈出水平線安裝邊角,普通可用鋼釘間距不不不大于400mm。Theclearancebetweenmainjoistandsub-joistshallbeworkedoutaccordingtothedimensionoftheroomandthesizeofceilingboard.Thehorizontallinewillbeinfixedonthehangerfittingof38mainjoist.Andtheclearancebetweenthemainstudwillbe1000-1200.依照房間尺寸和用礦棉板大小分出主骨和付骨間距,在38主骨吊件位置上掛水平線,主骨間距在1000mm-4.2SuspensionSystemInstallationProcedure懸吊系統(tǒng)安裝順序Accordingtotheeachsettinglocation,thebuilt-infittingwillbefixedtotheroofwithφ6mmexpansionbolt.依照逐個放線位置,把固定件安裝在頂面上,可用φ6mm膨脹螺栓把固定件安裝上。Theφ6mmsteelbarrodwillbeweldedwithbuilt-infitting,underwhichisthehanginghookof38mainjoist.Andlevelingwiththehorizontalline.用φ6mm鋼筋吊桿與固定件焊接上,吊桿下端安裝38主骨吊掛,底面與水平線平齊。Install38mainjoistandsub-joistinturnandadjusttobelevel.Thehangershouldbeanti-rustandthemainjoistandsubjoistshouldbestaggeredforthejoint.把38主骨和次骨依次安裝上并調(diào)平,吊桿應(yīng)作防銹解決,主骨、次骨按接頭要錯開。Cablewiringaccordingthelocationofthelightings:Thelightingsmustbefixedtightlyandnotplacedonthesub-joistbuttotheroof.依照燈具位置線路:燈具安裝好固定住,注意燈具不要安裝在次龍骨上,要與原頂面固定。Finallytheacousticfibrousceilingboardwillbeplaced安裝礦棉板吸音板。Section5.0WallRenderingandEmulsionPainting第五節(jié)墻面刮膩子、刷乳膠漆施工方案5.1MaterialSelection材料選用Adaptthepaintaccordingtotherequirementofclientandspecificationofdesign涂料選用應(yīng)依照設(shè)計規(guī)范或業(yè)重規(guī)定進(jìn)行選取。5.2PreparationBeforeWork施工前準(zhǔn)備工作Tocheckifthesurfaceoffinishedwallflatanduptostandardofacception檢查墻面制成品與否平整,能否達(dá)到驗收原則。Sitecleaningmustbedonebeforepaintingforcreatingagoodconstructioncondition涂料施工前,必要做好現(xiàn)場清理工作,創(chuàng)造一種良好施工環(huán)境。Maketherealconstruction&safetyintentionexplanationtositesupervisor,formanandworkers.由工長對班長和職工進(jìn)行施工技術(shù)和安全等方面施工交底。5.3ConstructionProcess施工流程Basepreparation→Plastering→paintingwithrollerbrushorsprayer表面解決→批膩子→刷(噴)面漆.KeyControlPointofConstruction施工要點a) Surfacepreparation表面解決Removeashandscumawayfromthepaintedwallorceilingsurface.Anyoilstainonthatshouldbeclearedbyreagentorwaterandcleanoffdustwithbrushafteritdry.先將裝修表面上灰塊、浮渣等雜物用開刀鏟除,如表面有油污,應(yīng)用清洗劑和清水洗凈,干燥后再用棕刷將表面灰塵清掃干凈。b) Plastering滿刮膩子Tofillthejoint,roughedpoint,comb,holesanddeformedplaceofplasterboardwithcaulkinggessoandputtyandstickedwithspecialpapertape.用嵌縫膏與膩子膏將石膏板縫及墻面麻面、蜂窩、洞眼、殘缺處彌補(bǔ)好,石膏板縫用專用紙帶粘貼。Plasterputty2timesfully.滿刮兩遍膩子。第一遍應(yīng)用膠皮刮板滿刮,規(guī)定刮抹平整、均勻、光滑,密實平整,線腳及邊楞整潔為度。盡量刮薄,不得漏刮,接頭不得留槎。待第一遍膩子干透后,用粗砂紙打磨平整,磨后用棕掃帚清掃干凈。第二遍膩子滿刮辦法同第一遍,但刮抹方向同第一遍相垂直。然后用細(xì)砂紙打磨平整、光滑為止。5.4WorkingProcedureofPainting涂料粉刷操作工藝Confirmthemodelandmaterialofpaint,whichshallbeappliedontheareainlinewithdesignrequirement.Priortoinstallation,givedetailedtechnicalrequirementtotheworkersandavoidwrongpainting.墻面、頂棚刷涂前,按設(shè)計規(guī)定擬定各施工區(qū)域刷涂材料品種。因而,施工中嚴(yán)格按圖進(jìn)行,防止將涂料錯刷。Itisnecessarytoremovedirty,oil,dustfromthesurfaceofthewallpriortopaintingthewall,andcheckifanyfixingscrewsarehigherthansurface.石膏板墻面施涂前,應(yīng)清除墻體基層表面上灰塵、污垢,并檢查所有固定石膏板螺絲與否高出墻表面。Beforeinstallingpaintonthegypsumboardwallforthefirsttime,mixthepainttothefull,andtheninstallthepaintonthewalluptodown.Don’tpatchtheputtyuntilthefirstlayerofpaintsdry.第一次刷涂底層涂料時,將涂料充分?jǐn)嚢?,按先上后下順序涂刷,干燥后補(bǔ)膩子。Forthesecondlayerofunder-coatpaint,theconstructionrequirementisassameasthefirstlayerofunder-coatlayer.Don’trubthewallboardwithfinesandpaperuntilthepaintlayerisdry.底層涂料涂刷第二遍時,施工規(guī)定同第一遍,待其干燥后,用細(xì)砂紙磨光,清掃干凈。Don’tstarttheworkofinstallingcoatpaintuntilotherworksintheroomhavecompleted.Paintingworkshouldbedonecontinuouslyandquickly,fromonesidetotheother,uptodown.面層涂料涂刷時,需等室內(nèi)其他工作基本做完后進(jìn)行。涂刷應(yīng)持續(xù)迅速操作,涂刷從一端開始,逐漸向另一端,要上下順?biāo)⒒ハ噙B接,避免浮現(xiàn)干燥后接頭。Noleakagesurfaceanddropdownonthewallsurface,thefinishedwallsurfaceshouldbesmooth,even,noclearbrushtrace.罩面涂料不得有漏涂和流墜現(xiàn)象,施工完畢涂料表面要光亮光滑,均勻一致,顏色一致,無明顯刷紋。Whenconductingspraycoating,usestheNo.spraygun,thespraycoatingpressuretransfersto0.3N/mm2--0.3N/mm2,thespraynozzleandthefinishform900degreeangle,thedistancecontrolledin40cm-50cm噴涂時,采用1號噴槍,噴涂壓力調(diào)至0.3N/mm2--0.3N/mm2,噴嘴與飾面成900角,距離控制在40cm—50cm為宜,噴出涂料成霧狀。噴涂要均勻,不可漏噴、過厚,普通以噴涂二遍為宜。Inordertoavoidthedustfromdefilingthecoatsurface,cleaningworkintheroomshallnotbestarteduntilthecoatpainthasdriedcompletely.Duringprecedingthepaintwork,someprotectivemeasuresshallbeperformedtothefloor,doorandwindows,glassesandsoon.罩面涂料干燥前,室內(nèi)不得清掃地面,防止塵土沾污墻面。涂料施工時,要對周邊做好保護(hù),不得污染地面、門窗、玻璃等。5.5QualityInspection&AcceptanceStandard質(zhì)量檢查驗收原則Allthespecificationofpaintingincludingbrand,class,rating,color,performancemustaspertherequirementsofthechosensamples,andthepaintmusthaveitsownqualitycertificateandusagemanual.所有涂料、膩子品種、級別、顏色、性能等必要符合選定樣品規(guī)定,并必要有出廠合格證和使用闡明書;Thepaintshallhavetheeventhickness,consistentcolor.Anypeel-off,neglectofpaintingshallbenotallowed.涂刷涂膜厚度應(yīng)均勻、顏色一致,禁止掉粉、起皮、漏刷和咬底。5.6FinishedWorkProtection成品保護(hù)Beforethewallpaintingisdried,thefloorcan’tbecleanedforfearthatthedirtwouldblemishthewallpaint.Afterfinishthepaint,thewallsurfacemustbeproperlyprotected,theremustbenodamageornotouch.Whenpainting,thefinishedproductslikefloor,doorandwindows,glassmustn’tbeblemished.涂料墻面未干前室內(nèi)不得清掃地面,以免粉塵玷污墻面。涂料墻面竣工后要妥善保護(hù),不得磕碰損壞。涂刷墻面時,不得污染地面、門窗、玻璃等已竣工程。Section6.0StainlessSteel第六節(jié)不銹鋼金屬安裝施工方案6.1MaterialSelection材料選用Ensurethatitssurfacehassufficientrigidity.保證其表面有足夠鋼度。Protectivemembraneforstainlesssteelcouldnotbetearedupduringtheprocessingandinstallationreally不銹鋼保護(hù)膜在加工和安裝其間不能撕掉。6.2WorkProcess施工流程Settingout→testingmounting→weldingandinstalling→finishedproductprotection放線→試安裝→焊接安裝→成品保護(hù)Sequenceofwork施工順序a) Completestheconnectionjointandbendconnectionsamplefirstaswellasthesampleapproval先做好接口與轉(zhuǎn)彎接口樣品,樣品經(jīng)承認(rèn)b) Settingout:Beforeinstallment,verticalandhorizontalaxialandcontrollinemustbedeterminedfirstandvalidatetheactualprocessingdimension.Confirmifthedimension,specificationisconsistentwithdesignbeforeinstallingthepillasothattoguaranteedtheinstallationsmoothly.放線:安裝前一定要先定出縱橫軸線、垂直線、控制線,并驗證明際加工尺寸。安裝柱子前必要確認(rèn)其尺寸、規(guī)格與設(shè)計與否相符,保證安裝順利。c)Testinstallation:Conductatestinstallationbeforeformalinstallation,ifdimensionsdonotmatch,thesteelpartsshouldbesenttofactorytoredoorrepair.Adhesiveshouldbeappliedevenly,pressedtightlyfromtheinsidetocommissure,Arrangetheglueandairexhaust,sothatplatecanbecloselybondedwiththebottomplate,extrusionoftheglueshouldbeimmediatelywipewithoutgluemarks.試安裝:安裝時要先進(jìn)行試安裝,如有尺寸不吻合,應(yīng)送工廠返工或修理。安裝時抹膠要均勻,由里向縫口順序壓緊,排膠排氣,使板材與底板貼緊,擠出膠液要及時擦凈,不能留有膠痕。d)Installation:Glueapplyingshouldbeevenwheninstalling,pressedtightlyfromtheinsidetocommissure,Arrangetheglueandairexhaust,sothatplatecanbecloselybondedwiththebottomplate,extrusionoftheglueshouldbeimmediatelywipewithoutgluemarks.Colorargonweldingshallbeadaptedandjointweldingshouldbesolid,leavenojointtraceuponrubdownandpolishing.Bendjointwhichcannotbepolisheddoesnotneedtobewelded,butthejointmustbeingoodcondition.安裝:安裝時抹膠要均勻,由里向縫口順序壓緊,排膠排氣,使板材與底板貼緊,擠出膠液要及時擦凈,不能留有膠痕。焊接采用彩氬焊接,接口處焊接要牢固,磨平拋光后看不出接口。無法拋光轉(zhuǎn)彎接口不用焊接,但其接口必要相稱吻合。6.3ProtectionofFinishedProduct成品保護(hù)Protectionmustbedoneafterworkcompletionparticulartopreventahardobjectimpact,fallingdownorbenddamageandotherabnormalphenomena.竣工后一定要做好保護(hù)解決,特別要防止硬物撞擊,脫落或彎頭損壞等異?,F(xiàn)象。Section7.0StainlessSteelHandrail第七節(jié)不銹鋼欄桿施工方案7.1MaterialSelection材料選用AdaptSS304stainlesssteelpipeaccordingtospecificationinbiddingdocuments.按照招標(biāo)文獻(xiàn)規(guī)定,采用304不銹鋼管。7.2WorkProcess施工流程Theinstallationofhandrailandsubstratetreatmentshallasperthefollowingrules:欄桿安裝、基層解決應(yīng)符合下列規(guī)定:a)Theelevation,locationandquantitiesoftheembeddedcomponentsshallasperthedesign&installationrequirements.Theembeddedcomponentsshouldbecorrosive-resistanttreated.Iftheembeddedcomponentsarenotinaccordancewiththerequirements,theeffectivemeasuresshallbetaken.Addorreducethecomponents.預(yù)埋件設(shè)計標(biāo)高、位置、數(shù)量須符合設(shè)計及安裝規(guī)定,并經(jīng)防腐防銹解決。埋件不符規(guī)定期,應(yīng)及時采用有效辦法,增補(bǔ)埋件。b)Thepositionofinstallingthehandrailpostswherethereisnolooseconcretesubstrate,what’smore,theinstallationelevationmustbeasperthedesignrequirements.Theunevennessofthesurfacemustbechoppedandrepairedflat.Theconcaveplaceandroughsubstratelikehoneycombshallberepairedbyhighstrengthconcreteinsteadofcementmortar.Afterthis,thehandrailcanbeinstalled.安裝樓梯欄桿立桿部位,基層混凝土不得有酥松現(xiàn)象,并且安裝標(biāo)高應(yīng)符合設(shè)計規(guī)定,凹凸不平處必要剔除或修補(bǔ)平整,過凹處及基層蜂窩麻面嚴(yán)重處,不得用水泥砂漿修補(bǔ),應(yīng)用高強(qiáng)混凝土進(jìn)行修補(bǔ),并待有一定強(qiáng)度后,方可進(jìn)行欄桿安裝。c)Markthepositionandcentrallineofthehandrailpostsasperdesignandinstallationrequirements按設(shè)計及安裝規(guī)定對的彈出欄桿立桿安裝間距位置和中心線。Keypointsfortheinstallationofthestainlesssteelhandrails不銹鋼樓梯欄桿、扶手安裝操作要點:a)Theinstallationofhandrailpostshallbeproceededasperrequirementsandinupwardorderoftheinkline.Thepostslocatedonbothsidesoftheplatformatthefirststeps.Therearetwoinstallationmethods,weldingandfixingbyscrews.欄桿立桿安裝應(yīng)按規(guī)定及施工墨線從起步處向上順序進(jìn)行。樓梯起步處平臺兩端立桿應(yīng)先安裝,安裝分焊接和螺栓固定兩種辦法。b)Whenwelding,theweldingrodmustbethesamekindofmaterialasthemothermaterial.Wheninstalling,thepostshallbetemporarilyfixedbypartlyweldingwiththeembeddedcomponents.Afteradjustingtheelevationvertically,thepostshallbefixedfirmlybytotalwelding.焊接施工時,其焊條應(yīng)與母材材質(zhì)相似,安裝時將立桿與埋件點焊暫時固定,經(jīng)標(biāo)高、垂直校正后,施焊牢固。c)Whenemployingscrews,theopeningattheendofthemetalplateofthepostshallbeprocessedintooblongholeforfearifthelocationoftheexpansionscrewsisinappropriate,theholeshallbeusedforminoradjust.Duringconstruction,inthepositionofinstallingthepost,wheretheexpansionboltshallbedrilledintobyelectricaldrill,thepostshallbeconnectedandpartlyfixed.Ifthereisanydifferencewheninstallingthepost,themetalpadshallbeemployedtoadjust.Afteradjusttheelevationvertically,fixedthescrewcapstight.采用螺栓連接時,立桿底部金屬板上孔眼應(yīng)加工成腰圓形孔,以備膨脹螺栓位置不符,安裝時可作微小調(diào)節(jié)。施工時,在安裝立桿基層部位,用電鉆鉆孔打入膨脹螺栓后,連接立桿并稍作固定,安裝標(biāo)高有誤差時用金屬薄墊片調(diào)節(jié),經(jīng)垂直、標(biāo)高校正后固緊螺帽。d)Afterthepostsonbothsidesareinstalled,installtherestpostsbypullingageneralstraightline.Thepostmustbeinstalledtightly.Afterweldingandconnectingbyscrews,alltheconcernedpartsofpointsshallbecorrosivefreeandrustfreetreated,andnotexposed,andatthesametimethedecorationcoveringshallbeinstalledattheends.兩端立桿安裝完畢后,拉通線用同樣辦法安裝別的立桿。立桿安裝必要牢固,不得松動。立桿焊接以及螺栓連接部位,除不銹鋼外,在安裝完后,均應(yīng)進(jìn)行防腐防銹解決,并且不得外露,應(yīng)在根部安裝裝飾罩或蓋。e)Wheninlayingthefenceboardwithorganicglass,thefenceboardshallbeinstalledafterthepost.Thefenceboardmustbetightlyinstalled,thevertical,thelevelandtheinclinationmustbeasperthedesignrequirements.Wheninstalling,thefenceshallbesetintothechannelonthebothsidesoftheposts.Thejointsbetweenthechannelandthefenceboardsshallbesealedbysilicone.Whenweldingthehandrails,thefenceboardshallbecoveredandprotectedbyfireproofasbestosclothtoavoidtheweldingsplashtodamagethefenceboard.鑲配有機(jī)玻璃、玻璃等欄板,其欄板應(yīng)在立桿完畢后安裝。安裝必要牢固,且垂直、水平及斜度應(yīng)符合設(shè)計規(guī)定。安裝時,將欄板鑲嵌于兩側(cè)立桿槽內(nèi),槽與欄板兩側(cè)縫隙應(yīng)用硬質(zhì)橡膠條塊嵌填牢固,待扶手安裝完畢后,用密封膠嵌實。扶手焊接安裝時,欄板應(yīng)用防火石棉布等遮蓋防護(hù),以免焊接火花飛濺損壞欄板。f)Therailshallbeinstalledbywelding(thespecialdimensionexcluded).Theweldingrodshallhavethesamematerialasthemothermaterial.Theinstallationshallst
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 浙江安防職業(yè)技術(shù)學(xué)院《中學(xué)語文課程教學(xué)論》2023-2024學(xué)年第一學(xué)期期末試卷
- 數(shù)獨(dú)答案生成器-20220303010135
- 數(shù)字教學(xué)實踐報告
- 經(jīng)典搞笑語錄集錦
- 部編版2024-2025學(xué)年六年級上語文寒假作業(yè)(七)(有答案)
- 浙江省杭州市拱墅區(qū)源清中學(xué)2024-2025學(xué)年高一(上)期中物理試卷(含答案)
- 2025屆吉林省前郭爾羅斯蒙古族自治縣第五高級中學(xué)高三上學(xué)期第五次考試歷史試題(綱要上下 選擇性必修三冊)(含答案解析)
- 《色達(dá)佛學(xué)院全景》課件
- 伊春職業(yè)學(xué)院《臺詞與表演》2023-2024學(xué)年第一學(xué)期期末試卷
- 二零二五年度城市綜合體土石方運(yùn)輸及配套設(shè)施合同3篇
- 2025年河南鶴壁市政務(wù)服務(wù)和大數(shù)據(jù)管理局招聘12345市長熱線人員10人高頻重點提升(共500題)附帶答案詳解
- 建設(shè)項目安全設(shè)施施工監(jiān)理情況報告
- 春節(jié)期間安全施工措施
- 2025年大唐集團(tuán)招聘筆試參考題庫含答案解析
- 建筑工地春節(jié)期間安全保障措施
- 路面彎沉溫度修正系數(shù)
- TLFSA 003-2020 危害分析與關(guān)鍵控制點(HACCP)體系調(diào)味面制品生產(chǎn)企業(yè)要求
- LY/T 2244.3-2014自然保護(hù)區(qū)保護(hù)成效評估技術(shù)導(dǎo)則第3部分:景觀保護(hù)
- 紀(jì)律教育月批評與自我批評五篇
- GB/T 26480-2011閥門的檢驗和試驗
- GB/T 13342-2007船用往復(fù)式液壓缸通用技術(shù)條件
評論
0/150
提交評論