1、外文文獻(xiàn)翻譯(含:英文原文及中文譯文) 文獻(xiàn)出處: Nuclear Instruments & Methods in Physics Research, 2015, 3(2):281-294.英文原文Importance of construction organization designG BaeckerAbstractDuring the construction process of a construction project, the advantages and disadvantages of the construction organization scheme not o

2、nly directly affect the quality of the project, but also have an important impact on the duration and the safety of the personnel during the construction process. The construction organization is an important technical and economic document for the project construction and guidance of project constr

3、uction. Can adjust the contradiction of personnel, machinery, raw materials, environment, process, equipment, civil construction, installation, management, production, etc. in construction. It is necessary to supervise and control the construction organization design so as to ensure the project qual

4、ity with high quality, low cost, and less Energy consumption is completed.Key words: Project Management, Construction Organization, Program ImportanceConstruction organization design is the conception and specific arrangement of the entire construction process of the engineering construction project

5、. It is the core and soul of the construction organization management work. Its purpose is to make the project faster, better quality, and more efficient. Make the whole project get relatively optimal results in the construction.1. The reason for the importance of the design of construction organiza

6、tionThe construction project and its construction have three characteristics: fixed and fluidity, diversity and individuality, large body and long construction period. Therefore, the construction of each construction project must be carried out. This is because: The production of other general indus

7、trial products has its own fixed, long-term factory. The construction of the building is fluid, and it is impossible to establish such a factory. It is only when each construction project is constructed that a corresponding, temporary construction site preparation like the nature of the plant is emp

8、loyed. The unique features of construction and the characteristics of construction mobility determine that each construction project must select the appropriate equipment and labor organization. The selection of construction methods, the formulation of construction technology plans, and the organiza

9、tion of workforces and implements are collectively referred to as construction work capacity allocation. The characteristics of the construction cycle have determined that the supply of various labors, equipment and many materials and materials technologies will take a long time. This will result in

10、 the construction and design of materials and technologies that are compatible with the overall construction schedule. From this we can see that construction organization design is very important in project management.2. The importance of construction organization designAs a product, building produc

11、ts play an extremely important role in project management throughout the construction process. The construction organization of the engineering construction project has a close relationship with its engineering cost. The basic contents of the construction organization design include: project overvie

12、w and construction condition analysis, construction plan, construction process, construction schedule plan, and general plan of construction. There are also economic analysis and construction preparation work plans. Among them, the determination of the construction plan and construction process is m

13、ore important. For example, the selection of construction machinery, the selection of horizontal transportation methods, the construction methods of the earthwork, the construction methods of the main structure and the selection of the construction technology all directly affect the project budget.

14、The price changes. Under the premise of guaranteeing project quality and satisfying the owners use requirements and construction period requirements, optimizing the construction plan and construction process is an important measure and method to control investment and reduce construction project cos

15、t.2.1 The construction organization plan affects the quality of the project to a great extent. Therefore, a reasonable project organization plan is not only the basis for ensuring the successful completion of the project, but also the basis for project safety. The construction organization design is

16、 an important part of the construction engineering design documents. It is the main basis for preparing the project investment budget and the main reference for the preparation of bidding documents. Therefore, careful construction of the construction organization will have a very important role in d

17、etermining the project cost and reducing the investment in the project, which will help control the construction cost.2.2 The construction organization plan is an important means for scientific management of construction activities. It has the dual role of strategic deployment and tactical arrangeme

18、nts. It embodies the requirements for realizing the basic construction plan and design, provides the contents of the construction preparation work in each phase, and coordinates the mutual relations between each construction work area, each construction work type, and each voluntary work in the cons

19、truction process. The construction organization plan must be able to determine the basic combination of various factors of production based on the characteristics and requirements of the engineering product and the current and possible winning construction conditions. It is impossible to carry out a

20、ny production without effectively solving the problem.3. Index calculation and analysis of construction organization designAt present, what indicators should be established in the construction organization design are not uniform and the calculation method is not standardized. As it is a yardstick fo

21、r evaluating the overall effect of construction organization design and evaluation of implementation status, it is also the basis for examining the level and effect of production, operation and management of the unit (project department) that undertakes construction. We should pay attention to the f

22、ollowing suggestions.3. 1 indicator system. The index system should be set up to reflect the level reached by the construction organizations design goals and provide convenience for evaluation, assessment, and implementation.3. 2 Index calculations. (1) Construction preparation period. From the star

23、t of site preparation to the full time of formal project start-up. (2) Unit project duration. The construction period arranged by the unit construction schedule. (3) Labor imbalance coefficient. The ratio of the peak number of construction period to the average number of people. (4) Reduce the cost.

24、 Technical organization measures to lower the cost of price results. (5) Reduce the cost rate. The percentage of cost reduction in contracted costs. (6) The degree of construction mechanization. The ratio of the completion value of mechanical construction to the project contracting cost. (7) The deg

25、ree of factory construction. Prefabrication plant (quarry, quarry) The ratio of the completed production value to the engineering contracting cost. (8) Proportion of temporary engineering investment. The ratio of all temporary engineering investment and project contracting cost. (9) Proportion of te

26、mporary engineering expenses. All Temporary Project Cost Reducing Ratio of Charges and Engineering Contract Costs.3. 3 Indicators Analysis. Compared with the historical actual level of similar projects, the construction organization design index can evaluate the effect of the construction organizati

27、on design; The comparison of indicators of different construction organization design schemes can be used to optimize the program; The weighted values of previous indicators of the same type of previous projects can be analyzed, which can be used as the future The basis of bidding.4. Management of c

28、onstruction organization designWith the establishment of a socialist market economy, the competition in the construction market has become increasingly fierce, and the objective situation has become increasingly demanding for construction companies. Not only does it require higher requirements in te

29、rms of technical equipment, personnel quality, and construction organizers, but it also faces new challenges in engineering economic management. In the rigorous construction market situation, some construction companies did not actively take response measures and did not update or train employees pr

30、ofessional skills. The management level of science and technology is quite backward. In addition, it did not pay enough attention to the preparation of auditing construction organization design. Therefore, the following common situations will occur:4.1 There is no preparation of auditing before the

31、commencement of the construction of the organization design: do not engage in the layout of the construction plan, the material indiscriminately put. There are no guarantee measures for the shipment of earth moving in and out, mechanical equipment, unplanned labor demand, project quality, and safe c

32、onstruction. The phenomenon of wasting waste from workers is serious and the management level is low.4.2 Whether it is a professional to compile the construction organization design: In order to deal with the inspections of the superior department and supervision unit and Party A, the construction p

33、ersonnel shall design the construction organization design on behalf of the construction worker or the information officer. Because the data was not known about the current construction management but was recently arranged by the leadership, it had to be created and dealt with indiscriminately.4.3 T

34、he level of construction organization design is low: Some construction companies do not understand the importance of the construction organization in the construction process, write down the sub-item construction process, draw the floor plan, and the project schedule, and they think that it is the c

35、onstruction organization, designed.4.4 Technology Abandonment Economy: A considerable number of construction enterprise units are preparing the construction organization design. Only pay attention to the technical measures of each sub-project in the construction organization. The content of the econ

36、omic indicators of the sub-item was not taken into consideration, which caused continuous disputes during the settlement of the project and caused economic losses. Therefore, we must manage the construction organization design:(1) Implement dynamic managementDuring the construction process, it will

37、inevitably encounter unexpected problems, such as design changes, natural factors, etc. Changes in the construction process at each stage will result in the adjustment of on-site plans. Therefore, dynamic management must be carried out according to the changed site conditions. , Make necessary modif

38、ications, supplements, and optimizations to the inappropriate parts of the construction organization design to achieve the established construction goals.(2) Implement hierarchical managementThe implementation of project law construction, the separation of management and operation layers, and the gr

39、adual reduction of fixed workers will inevitably lead to the phenomenon of general contracting and subcontracting. The successful bidders have changed from direct management of the past to direct technical disclosure to indirect management and indirect technologies. As a result, management should be

40、 layered according to the design of the construction organization, and the technical authority, responsibilities and working procedures of the general contracting and subcontracting units, management and operation layers should be clearly defined.5 ConclusionDuring the construction of the project, t

41、he organization and design of the construction must be supervised and controlled to ensure the orderly construction of the project and prevent the construction organization from flowing into the form. Construction organization design is a powerful measure to ensure project quality, safety and progre

42、ss. Under certain resource conditions, the technical and economic benefits of the project can be achieved, and the purpose of win-win construction and economic benefits can be achieved.中文譯文施工組織設(shè)計的重要性G Baecker摘要建筑工程在施工過程中,施工組織方案的優(yōu)劣不僅直接影響工 程 的質(zhì)量,對工期及施工過程中的人員安全也有重要影響。施工組 織是項目建設(shè)和指導(dǎo)工程施工的重要技術(shù)經(jīng)濟文件。能調(diào)節(jié)施工中 人

43、員、機器、原料、環(huán)境、工藝、設(shè)備、土建、安裝、管理、生產(chǎn) 等矛盾,要對施工組織設(shè)計進(jìn)行監(jiān)督和控制,才能科學(xué)合理的保證 工程項目高質(zhì)量、低成本、少耗能的完成。關(guān)鍵詞:項目管理施工組織方案重要性施工組織設(shè)計就是對工程建設(shè)項目整個施工過程的構(gòu)思設(shè)想 和具體安排,是施工組織管理工作的核心和靈魂。其目的是使工程 速度快、質(zhì)量好、效益高。使整個工程在施工中獲得相對的最優(yōu)效果。1編制施工組織設(shè)計重要性的原因建筑工程及其施工具有固定性與流動性、多樣性與單件性、形體 龐大與施工周期長這三對特點。所以,每一建筑工程的施工都必須 進(jìn)行施工組織設(shè)計。這是因為:其它一般工業(yè)產(chǎn)品的生產(chǎn)都有著自 己固定的、長期適用的工廠。

44、而建筑施工具有流動性的特點,不可能 建立這樣的工廠,只能是當(dāng)每一個建筑工程施工時,建立一個相應(yīng)的、 臨時性的,如同工廠作用性質(zhì)的施工現(xiàn)場準(zhǔn)備,即工地。施工單件性特 點與施工流動性特點,決定了每一建筑工程施工都要選擇相應(yīng)的機 具和勞動力組織。選擇施工方法、擬定施工技術(shù)方案及其勞動力 組織和機具配置,統(tǒng)稱為施工作業(yè)能力配置。施工周期的特點,決定了 各種勞動力、機具和眾多材料物資技術(shù)的供應(yīng)時間也比較長,這就 產(chǎn)生了與施工總進(jìn)度計劃相適應(yīng)的物資技術(shù)的施工組織設(shè)計內(nèi)容。 由此可見,施工組織設(shè)計在項目管理中是相當(dāng)重要的。2施工組織設(shè)計方案的重要性建筑產(chǎn)品作為一種商品,在項目管理中工程質(zhì)量在整個施工過 程中

45、起著極其重要的作用。工程建設(shè)項目的施工組織設(shè)計與其工程 造價有著密切的關(guān)系。施工組織設(shè)計基本的內(nèi)容有:工程概況和施 工條件的分析、施工方案、施工工藝、施工進(jìn)度計劃、施工總平面 圖。還有經(jīng)濟分析和施工準(zhǔn)備工作計劃。其中,施工方案及施工工 藝的確定更為重要,如:施工機械的選擇、水平運輸方法的選擇、 土方的施工方法及主體結(jié)構(gòu)的施工方法和施工工藝的選擇等等,均 直接影響著工程預(yù)算價格的變化。在保證工程質(zhì)量和滿足業(yè)主使用 要求及工期要求的前提下,優(yōu)化施工方案及施工工藝是控制投資 和降低工程項目造價的重要措施和手段。2.1施工組織方案在很大程度上影響著工程質(zhì)量,因此合理的施 工組織方案不僅是確保工程順利完

46、成的基礎(chǔ),也是工程安全的依據(jù)。 施工組織設(shè)計是建筑工程設(shè)計文件的重要組成部分,是編制工程投 資概預(yù)算的主要依據(jù)和編制招投標(biāo)文件的主要參考依據(jù)。因此,認(rèn) 真做好施工組織設(shè)計,對于正確確定工程造價、降低工程投資,從而有 利控制工程造價將有十分重要的作用。2.2施工組織方案是對施工活動實行科學(xué)管理的重要手段,它具 有戰(zhàn)略部署和戰(zhàn)術(shù)安排的雙重作用。它體現(xiàn)了實現(xiàn)基本建設(shè)計劃和 設(shè)計的要求,提供了各階段的施工準(zhǔn)備工作內(nèi)容,協(xié)調(diào)施工過程中 各施 工工區(qū),各施工工種,各項自愿之間的相互關(guān)系。施工組織方案必 須能夠根據(jù)工程產(chǎn)品的特點和要求,根據(jù)現(xiàn)有的和可能爭取到的施 工條件,從實際出發(fā),決定各種生產(chǎn)要素的基本結(jié)合方式,不切實解 決問題,就不可能進(jìn)行任何生產(chǎn)。3施工組織設(shè)計的指標(biāo)

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論