




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、ansys分析出現(xiàn)問(wèn)題NO.0052some contact elements overlap with the other contact element which can cause over constraint.這是由于在同一實(shí)體上,即有綁定接觸(MPC)的定義,又有剛性區(qū)或遠(yuǎn)場(chǎng)載荷(MPC)的定義,操作中注意在定義剛性區(qū)或遠(yuǎn)場(chǎng)載荷時(shí)避免選擇不必要的DOF自由度,以消除過(guò)約束NO.0053Shape testing revealed that 450 of the 1500 new or modified elements violate shape warning limits.是
2、什么原因造成的呢?單元網(wǎng)格質(zhì)量不夠好盡量,用規(guī)則化網(wǎng)格,或者再較為細(xì)密一點(diǎn)NO.0054在用Area Fillet對(duì)兩空間曲面進(jìn)行倒角時(shí)出現(xiàn)以下錯(cuò)誤:Area 6 offset could not fully converge to offset distance 10. Maximum error between the two surfaces is 1% of offset distance.請(qǐng)問(wèn)這是什么錯(cuò)誤?怎么解決?其中一個(gè)是圓柱接管表面,一個(gè)是碟形封頭表面。ansys的布爾操作能力比較弱。如果一定要在ansys里面做的話,那么你試試看先對(duì)線進(jìn)行倒角,然后由倒角后的線形成 倒角的面。
3、建議最好用UG、PRO/E這類(lèi)軟件生成實(shí)體模型然后導(dǎo)入到ansysNO.0055There are 21 small equation solver pivot terms.;SOLID45 wedges are recommended only in regions of relatively lowstress gradients.第一個(gè)問(wèn)題我自己覺(jué)得是在建立contact時(shí)出現(xiàn)的錯(cuò)誤,但自己還沒(méi)有改正過(guò)來(lái);第二個(gè)也不知道是什么原因。還有一個(gè):initial penetration 4.4408910E-6 was detacted between contact element 5392
4、8 and target element 53616;也是建立接觸是出現(xiàn)的,也還沒(méi)有接近。第一個(gè)問(wèn)題:There are 21 small equation solver pivot terms.;不是建立接觸對(duì)的錯(cuò)誤,一般是單元形狀質(zhì)量太差(例如有i接近零度的銳角或者接近180度的鈍角)造成small equation solver pivot terms第二個(gè)問(wèn)題:SOLID45 wedges are recommended only in regions of relatively lowstress gradients.這只是一個(gè)警告,它告訴你:推薦SOLID45單元只用在應(yīng)力梯度較低
5、的區(qū)域。它只是告訴你注意這個(gè)問(wèn)題,如果應(yīng)力梯度較高,則可能計(jì)算結(jié)果不可信。NO.0056ansys向adams導(dǎo)的過(guò)程中,出現(xiàn)如下問(wèn)題There is not enough memory for the Sparse Matrix Solver to proceed.Please shut down other applications that may be running or increase the virtual memory on your system and return ANSYS.Memory currently allocated for the Sparse Matri
6、x Solver=50MB.Memory currently required for the Sparse Matrix Solver to continue=25MB可是我的內(nèi)存不小呀,512MB應(yīng)該夠了吧,我設(shè)的虛擬內(nèi)存4072MB,也應(yīng)該夠了吧。不清楚你ansys導(dǎo)入adams過(guò)程中怎么還需要使用Sparse Matrix Solver(稀疏矩陣求解器)。估計(jì)是scrach memery太低了,從ansys product launcher 進(jìn)入 設(shè)置內(nèi)存,total workspace和 dataspace的差就是scrach memery如我給的圖中所示,total workspa
7、ce 1150MBdataspace200MB,scrach memery 就是1150-200=950MBNO.0057error:element type 1 is PLANE42,which cant be used with the VMES command, meshing of volume 3 aborted.意思是:?jiǎn)卧?lèi)型1是PLANE42,不能使用劃分體網(wǎng)格的命令VMES,劃分體3中止。改進(jìn)辦法:1修改單元類(lèi)型為適合體網(wǎng)格的單元類(lèi)型。如solid,或shell 2不使用VMES命令,使用AMESHNO.0058error:keypoint 10 is referenced
8、by only one line. Improperly connected line set for AL command.意思是:關(guān)鍵點(diǎn)10只在一條線上。不適合使用AL命令連接線。AL命令是用線來(lái)定義面,而選擇兩條線可能只有兩個(gè)關(guān)鍵點(diǎn),因?yàn)殛P(guān)鍵點(diǎn)10不在線上,而定義面至少有三個(gè)點(diǎn)。改進(jìn)辦法:再選一條線NO.0059waring:constraint equation 212 does not have a unique slave dof.原因:邊界約束條件和約束方程在同一節(jié)點(diǎn)位置交疊解決方法:或者只加約束條件,或者只加約束方程N(yùn)O.0060node 8471 does not lie o
9、n or near the selected elements.The CEINTF operation produced no results for this node.單元裝配時(shí),中間操作/命令流步驟,添加了冗余的操作/命令。正確步驟為:1)XSEL/ESLX/CM,X-ELEM,ELEM; 2)XSEL/NSLX/CM,X-NODE,NODE; 3)CEINTF順序不亂,也不能有冗余命令。任何諸如CM,X-X,X,比如CM,A-No,AREA出現(xiàn)在步驟中,都會(huì)導(dǎo)致錯(cuò)誤。NO.00611.Constraint equation 212 does not have a unique sla
10、ve dof.和Constraint eqaution 171 has specified dof constraint at all node/dof 。constraint equation dleted。這一Warning常發(fā)生在邊界約束條件與約束方程相互交疊的節(jié)點(diǎn)位置。解決方法是不選邊界約束位置節(jié)點(diǎn),或不選約束方程位置節(jié)點(diǎn)。第一個(gè)warning發(fā)生當(dāng)節(jié)點(diǎn)位置對(duì)稱(chēng)邊界條件與約束方程向沖突時(shí)。第二個(gè)warning發(fā)生當(dāng)節(jié)點(diǎn)位置約束條件與約束方程相沖突時(shí)。2.Term 4 (node 5000 rotz) on CE number 3331 is not active on any elem
11、ent。This term is ignored。這一warning發(fā)生當(dāng)主節(jié)點(diǎn)坐標(biāo)系與從節(jié)點(diǎn)坐標(biāo)系不在同一個(gè)坐標(biāo)體系下時(shí)。例如主節(jié)點(diǎn)坐標(biāo)系為總體直角坐標(biāo)系,而從節(jié)點(diǎn)坐標(biāo)系為總體圓柱體坐標(biāo)系。解決方法,就是保證二者坐標(biāo)體系相一致。NO.0062模型中有圓柱和長(zhǎng)方體相切,所以相切的附近單元?jiǎng)澐值牟缓贸霈F(xiàn)警告,但是我這個(gè)也沒(méi)法倒角單元出現(xiàn)高度扭曲。解決方法一:尋求劃分比較好的網(wǎng)格質(zhì)量(最佳方法)??梢酝ㄟ^(guò)改變建模策略和網(wǎng)格劃分策略實(shí)現(xiàn)解決方法二:采用更多的載荷步,以及更多的載荷子步。NO.0063Term 1 (node 3525 ROTX) on CE number 4 is not activ
12、e on any elementThis CE is ignored.這是在一個(gè)實(shí)體模型上家彎矩后出現(xiàn)的警告,CE(約束方程)被忽略。原因:Term 1 (node 3525 ROTX) on CE number 4 is not active on any element就是說(shuō),節(jié)點(diǎn)3525的ROTX自由度不在任何單元中active,沒(méi)有哪個(gè)單元支持ROTX自由度。NO.0064把體用面分割的時(shí)候出現(xiàn)的錯(cuò)誤提示:Boolean operation failed.try adjusting the tolerance value on the BTOL commmand to some fra
13、ction of theminimum keypoint distance.Model Size (current problem)1.e+000,BTOL setting 1.00000e-005,minmum KPT distance 4.e-006先在要分割的地方設(shè)置一個(gè)工作平面,用布爾運(yùn)算“divided -volume by working plane”進(jìn)行分割的時(shí)候,出現(xiàn)上述錯(cuò)誤,主要愿意可能是設(shè)置的公差太小,當(dāng)時(shí)試了幾次都么有成功,最后干脆把體重新建立了一個(gè),又畫(huà)了一個(gè)很大的面,終于成功了NO.0065real contant set 1 undefined but refere
14、nced by element 70 . 實(shí)常數(shù)1沒(méi)有定義,但單元70還要參照它。total of thickness for layered elements may not epual zero.check real contstant table 1 層合單元的總厚度可能不等于零,檢查實(shí)常數(shù)表1這是我做層合板問(wèn)題時(shí)遇到的兩個(gè)錯(cuò)誤。NO.0066For item= LOC, the component ( 90-() is invalid.The NSEL command is ignored.這個(gè)錯(cuò)誤是在定義選取一定范圍節(jié)點(diǎn)時(shí)候遇到的。我后來(lái)進(jìn)行分析,查找錯(cuò)誤,發(fā)現(xiàn)是因?yàn)樵诰帉?xiě)命令流時(shí)候
15、,括號(hào)是用中文輸入法輸入,導(dǎo)致命令無(wú)法識(shí)別。同樣的類(lèi)似情況很多,大家在編寫(xiě)命令時(shí)候一定記住把輸入法切入英文模式,以避免以后不必要的麻煩!NO.0067對(duì)一個(gè)復(fù)雜型面的葉片劃分單元,采用自由劃分網(wǎng)格,出現(xiàn)如下警告和錯(cuò)誤,應(yīng)該怎么解決?* WARNING * CP = 55.703 TIME= 15:57:23Initial attempt to mesh area 13 was unsuccessful. Automaticallyattempting to correct and remesh. (5).* ERROR * CP = 393.641 TIME= 16:03:06Error me
16、shing area 13. Redefine number of divisions on boundary oradjust element size parameters.這個(gè)應(yīng)該是因?yàn)槟忝娣e13的形狀比較特殊,網(wǎng)格在這個(gè)面積劃分時(shí)候,質(zhì)量特別不好導(dǎo)致。試著將面積13再細(xì)化后,劃分網(wǎng)格NO.0068Error!Element type 1 is Solid95,which can not be used with the AMES command, meshing of area 2 aborted.剛開(kāi)始學(xué)習(xí)的人經(jīng)常出這種錯(cuò)誤,這是因?yàn)椴煌瑔卧?lèi)型對(duì)應(yīng)不同的劃分網(wǎng)格操作。上面的錯(cuò)誤是說(shuō)
17、單元類(lèi)型為Solid95(實(shí)體類(lèi)型),不能用AMES命令劃分面網(wǎng)格。NO.0069Meshing of volume 5 has been aborted because of a lack of memory. Closed down otherprocesses and/or choose a larger element size, then try the VMESH command again. Minimum additional memory required=853MB.說(shuō)你的內(nèi)存空間不夠,可能因?yàn)槟愕挠?jì)算單元太多,增加mesh尺寸,減少數(shù)量或者增加最小內(nèi)存設(shè)定(ansys10
18、中在customization preferences菜單存儲(chǔ)欄 可以修改)NO.0070Body load from line 61 is not transferred to unselected node 3122.是不是用SOLID65 單元比較好SOLID65是空間混凝土實(shí)體單元,用于模擬混凝土的受力。該單元可用于建立素混凝土模型,也可加筋建立鋼筋混凝土模型。該單元有8個(gè)節(jié)點(diǎn),每個(gè)節(jié)點(diǎn)又X、Y、Z 3個(gè)平動(dòng)自由度。NO.00711。當(dāng)定義了數(shù)組 *dim, a,20,1如果你是用下面的方法賦初值 a(1)=1,2,3,.20你會(huì)發(fā)現(xiàn)有些a 中的數(shù)值與你賦予的不符, 原來(lái) 這樣賦初值不
19、能超過(guò)10個(gè) a(1)=1,2,.,10a(11)=11,12,.20這種錯(cuò)誤沒(méi)有提示的。2。如果你用accat,等建立了面,線的連接后,如果復(fù)制,移動(dòng)這個(gè)集合模型,一定要在移動(dòng)之前刪除 鏈接的線,體NO.0072* WARNING *There are 1 small equation solver pivot terms.什么錯(cuò)誤啊,怎么解決?ansys,剛度矩陣主元太小, 可能是單元畸形,或者材料參數(shù)有問(wèn)題, 總之這個(gè)問(wèn)題你就不斷的換個(gè)方式建立模型,trial and error ,往往就解決了這個(gè)問(wèn)題NO.0073Shear modulus must be positive for m
20、aterial 1 in element 1.請(qǐng)問(wèn)這個(gè)錯(cuò)誤是什么意思?材料參數(shù)有問(wèn)題。使剪切模量為負(fù)。NO.0074* WARNING * CP = 8.922 TIME= 10:37:30Specified DOF constraint UY at unused node .* WARNING * SUPPRESSED MESSAGE CP = 8.984 TIME= 10:37:30Force load on unused node FY.加邊界的節(jié)點(diǎn)未包含在計(jì)算模型中NO.0075對(duì)一個(gè)復(fù)雜型面的葉片劃分單元,采用自由劃分網(wǎng)格,出現(xiàn)如下警告和錯(cuò)誤,應(yīng)該怎么解決?* WARNING * C
21、P = 55.703 TIME= 15:57:23Initial attempt to mesh area 13 was unsuccessful. Automaticallyattempting to correct and remesh. (5).* ERROR * CP = 393.641 TIME= 16:03:06Error meshing area 13. Redefine number of divisions on boundary oradjust element size parameters.“網(wǎng)格設(shè)置不合理,再細(xì)化一些。NO.0076Structure elements
22、 without mid nodes usually produce much more accurate results in quad or brick shape.這個(gè)是什么原因???使用了高階單元。不用理NO.0077* WARNING * CP = 1.391 TIME= 17:09:16Use of the -M switch is no longer recommended for normal ANSYS use.ANSYS now dynamically allocates memory as needed. Only use the -Mswitch if you are c
23、ertain that you need to do so.在做諧反應(yīng)時(shí)候遇到的發(fā)現(xiàn)是自己自定義ANSYS內(nèi)存容量使用,在計(jì)算時(shí)候elements數(shù)量過(guò)多不能使ANSYS自動(dòng)調(diào)節(jié)導(dǎo)致NO.0078* ERROR * CP = 16.859 TIME= 09:29:26Brick element 91 has an aspect ratio of 1.E+20, which exceeds the error limit of.不是警告是錯(cuò)誤!用APDL .是不是有一個(gè)volume的某方向的尺寸要遠(yuǎn)小于其他volumes的尺寸?比如上下兩個(gè)volume,上邊假設(shè)厚度 1mm,而下面厚度可能10E
24、-3或者很小這時(shí)候就會(huì)出現(xiàn)這種錯(cuò)誤。關(guān)于解決方法我建議對(duì)一個(gè)維度上很小的該部分,用低維單元,比如對(duì)三維問(wèn)題,其他用體單元,而對(duì)這個(gè)厚度很小的部分定義shell單元設(shè)定厚度NO.0079* ERROR * CP = 89.899 TIME= 17:03:44The value of UY at node 24320 is 3.E+28. It is greater thanthe current.這個(gè)應(yīng)該是約束不夠,Uy方向的位移過(guò)大,自查一下約束條件NO.0080ring model建立時(shí)候遇到的。請(qǐng)指教!Brick element 4731 has an aspect ratio of 10
25、00, which exceeds thewarning limit of 20.可能是有面網(wǎng)格NO.0081tetrahedron element 8120 has a jacobian ratio of 150.5,which exceeds the warning limit of30.Midside nodes,if any,may be poorly positioned.這個(gè)問(wèn)題是說(shuō)單元的什么比例出了問(wèn)題???要緊么?雅克比太大,最好改下NO.0082* ERROR * CP = 160.625 TIME= 08:49:22The value of UY at node 340 is
26、 4.E+19. It is greater than thecurrent limit of . This generally indicates rigid body motionas a result of an unconstrained model. Verify that your model isproperly constrained.上面這個(gè)ERROR前面有人貼出來(lái)過(guò),但是按照給出的方法,還是無(wú)法解決問(wèn)題?,F(xiàn)在可以肯定的是材料參數(shù)沒(méi)問(wèn)題,約束添加也沒(méi)問(wèn)題。我起初以為是網(wǎng)格劃分不夠細(xì)致,于是多次劃分,盡量細(xì)化。尤其因?yàn)槌鲥e(cuò)的節(jié)點(diǎn)總是位于一個(gè)面的邊緣(實(shí)體的最上邊那個(gè)面的邊緣)(
27、最下的那個(gè)面加的約束),就把這個(gè)面特意細(xì)化了下,但是這個(gè)問(wèn)題仍然存在。根據(jù)錯(cuò)誤的信息y方向上卻少約束,存在剛體位移,不知道你怎么確定你的約束沒(méi)有問(wèn)題的?你不妨找出node340約束住y方向的位移求解試試看NO.0083import .sat file into ansys . The system indicates that Line 170 on area 79 is not on the area within a tolerance. This area could have problems in future boolean operations.I oversee it.Then
28、 I want to make substract operation. It fails and indicates:The following entities do not support booleans.Use the SPLOT command to examine bad surfaces/areas Format for SPLOT is PLOT,NA1,NA2,NINC,MESHSIZE Volume Shell Area Loop Line 1 1 41 1 119 - - - - 120 - - 36 1 114 - - - - 117 - - 38 1 119 - -
29、 - - 101 - - 33 1 114 - - - - 90 - - 1 1 3line170不面area79內(nèi),所以如果要用line170來(lái)分隔area79就會(huì)出錯(cuò),增大一下布爾操作的容差值(tolerances),BTOL命令NO.0084The volume 1 is defined!其中同一個(gè)程序在運(yùn)行是:有時(shí)候1還會(huì)變成20!我是參數(shù)化編程,進(jìn)行靈敏度分析的時(shí)候出現(xiàn)的!這個(gè)我都不知道怎么解決了?。】赡苁怯捎趨?shù)化引起的錯(cuò)誤,每一個(gè)幾何(點(diǎn)、線、面)的編號(hào)是與建模及布爾操作命令的順序有關(guān)的,參數(shù)化編程時(shí),如果某一個(gè)參數(shù)的變化會(huì)引起所執(zhí)行命令順序的變化,就會(huì)出現(xiàn)重復(fù)定義的情況,不知道
30、是不是這個(gè)原因,僅供參考。NO.0085錯(cuò)誤提示的內(nèi)容是:The input volumes do not meet the conditions required for the VGLUoperation . No new entities were created . The VOVLAP operation is a possible alternative.VGLU是將兩個(gè)或多個(gè)體粘到一塊,體之間的交集應(yīng)該是面,幫助里的說(shuō)法,This operation is only valid if the intersections of the input volumes are areas
31、 along the boundaries of those volumes。你粘結(jié)glue的體可能有重疊,所以后面提示了一個(gè)VOVLAP命令,該命令是將兩個(gè)或多個(gè)體的重疊部分拿出來(lái)作為結(jié)果NO.0086Keypoint 2 belongs to line 4 and cannot be moved應(yīng)該是關(guān)鍵點(diǎn)2從屬于線段4,它不能被刪除NO.0087在三維計(jì)算時(shí),出現(xiàn)這樣的錯(cuò)誤:Zero volume in element ,調(diào)試半天,也沒(méi)弄明白是什么原因?在這個(gè)錯(cuò)誤應(yīng)當(dāng)是用了相同位置的結(jié)點(diǎn)建立了單元,用unmmrg,壓縮一下結(jié)點(diǎn)應(yīng)該可以解決問(wèn)題NO.0088Area 2286 is att
32、ached to 2 volume(s) and cannot be changed.怎么出現(xiàn)這個(gè)錯(cuò)誤?我檢查了幾遍模型,不知道為什么有這個(gè)錯(cuò)誤?意思是面2286從屬于2個(gè)體,它不能被刪除ansys規(guī)定:刪除圖元,只能從高級(jí)往低級(jí)刪!NO.0089節(jié)點(diǎn)連成單元出現(xiàn)的,好多次 不知道是啥子原因Wedge element 1 has an aspect ratio of 29.48,which exceeds thewarning limit of 20?單元的特征比值為29.48,有于警界限值20,說(shuō)明這個(gè)單元有奇異但同樣可以計(jì)算出結(jié)果如果 這樣的單元很少,應(yīng)該可以不用管它NO.0090Bool
33、ean operation failed.try adjusting the tolerance value on the BTOL commmand to some fraction of theminimum keypoint distance.Model Size (current problem) .做aglue時(shí)出現(xiàn)提示修改BTOL,后來(lái)認(rèn)真想了,查看了模型,發(fā)現(xiàn)兩個(gè)面并不是相交的,只是共了兩個(gè)點(diǎn),所以做aglue時(shí)就說(shuō)要改一下BTOL,因?yàn)榫嚯x距離超過(guò)了BTOL默認(rèn)的1e-5了問(wèn)題應(yīng)該也是模型并沒(méi)有真正的出現(xiàn)相交的公共部分。后來(lái)把面做更大就通過(guò)了,那是由于更大的面可以出現(xiàn)了完整的公
34、共邊界了。有點(diǎn)像咱們切瓜果,如果面太小,那會(huì)有一部分沒(méi)有切開(kāi)NO.0091想在已建體(定義為V)中挖四個(gè)孔(四個(gè)待挖成孔的體孔分別定義為VA,VB,VC,VD),將四個(gè)體定義為數(shù)組集,即:CMGRP,VV,VA,VB,VC,VD。后用VSBV,V,VV,SEPO,KEEP,命令減去四個(gè)孔,但是并沒(méi)發(fā)現(xiàn)k孔的存在,還出現(xiàn)一下警告:請(qǐng)教用命令流如何完成我的目的?一個(gè)體減多個(gè)體時(shí),建議還是用GUI操作產(chǎn)生的命令流因?yàn)閂SBV,1,ALL這樣一條命令本身有問(wèn)題,ALL就是全部,那1應(yīng)該在ALL里面,所以會(huì)出錯(cuò)。我覺(jué)得你遇到的這個(gè)錯(cuò)誤是否也是出在這里?雖然你用的CM組處理過(guò)。NO.0092我的默認(rèn)保存地
35、址怎么也改不了。一保存總是在C盤(pán)的C:Documents and SettingsAdministrator里,并且里面的NTUSER.DAT文件怎么也刪不掉,想剪切換個(gè)文件夾保存,也保存不了,怎么回事?在launcher里面修改后,最下面有一個(gè)run“按鈕,你點(diǎn)run運(yùn)行一次ANSYS,那你修改的東西就會(huì)保存了,我以前也沒(méi)有注意我屏幕顯示的這個(gè)問(wèn)題,在launcher里面最下面一行的run”等幾個(gè)按鈕已經(jīng)在電腦任務(wù)欄下面了,看不見(jiàn),呵呵。最后,你刪除那個(gè)文件做什么?如果按你說(shuō)的連剪切都不能做,可能是電腦設(shè)置問(wèn)題,不是ANSYS的問(wèn)題,除非你沒(méi)有關(guān)ANSYS就想剪切,那當(dāng)然不行,ANSYS正在
36、用那些文件,你怎么能剪切走呢,復(fù)制倒沒(méi)有問(wèn)題。NO.0093Meshing of volume 5 has been aborted because of a lack of memory. Closed down otherprocesses and/or choose a larger element size, then try the VMESH command again. Minimum additional memory required= .好像是說(shuō)單元過(guò)多了。你也沒(méi)有說(shuō)清楚,你是自由網(wǎng)格劃分嗎?可能精度太高了,產(chǎn)生的單元過(guò)多。VMESH劃分時(shí),精度不同,單元數(shù)量差別太大了,如
37、果是自由網(wǎng)格劃分,那么嘗試幾個(gè)SMRT等級(jí)看看。還有就是單元形狀不同,產(chǎn)生的網(wǎng)格質(zhì)量也差別很大,我前幾天才重新劃了一次網(wǎng)格,印象很深。shape,0,3d和shape,1,3d就是劃分體時(shí)控制單元形狀的NO.0094Structure elements without mid nodes usually produce much more accurate results in quad or brick shape.我覺(jué)得這是一個(gè)建議性的提示,它是說(shuō)不帶中間結(jié)點(diǎn)的結(jié)構(gòu)單元可以產(chǎn)生更精確的結(jié)果,可以不用理會(huì)。NO.0095求解時(shí)的警告,算出來(lái)感覺(jué)不對(duì),用solid45單元加在實(shí)體邊線上面計(jì)算時(shí)
38、的警告,請(qǐng)問(wèn)如何解決?謝謝* WARNING * CP = 191.250 TIME= 16:49:39Selected areas attached to line 154 are not meshed. Surface load PRESon this line is not transferred. Loads will be transferred to meshedareas attached to this line.提示的意思是沒(méi)有劃分與線154相關(guān)的面網(wǎng)格你先選擇線154:lsel,s,154,然后選擇與154一塊的面,asll,再選擇相關(guān)單元esla,看看有沒(méi)有選擇到單元,如
39、果是0個(gè)單元,那是你沒(méi)有劃分相關(guān)的面。沒(méi)有劃分單元,那你施加在上面的PRES沒(méi)有單元可以轉(zhuǎn)上去。NO.00961. Nodes I and J of element 101 ( COMBIN39 ) are not coincident.2. The variable viewer requires a NUMVAR of 200. The calculator will notbe available. To use the caclulator please export your data to afile; then choose the Clear Time-History Data
40、 button; and thenimport your data from the file.這兩個(gè)都是警告。對(duì)結(jié)果有影響么?也遇到了你的第一個(gè)警告,不知道你可解決了。我在前處理的時(shí)候出現(xiàn)了,沒(méi)鳥(niǎo)它,然后進(jìn)行模態(tài)分析,又出現(xiàn)了,又沒(méi)鳥(niǎo)它,再進(jìn)行時(shí)程分析,在時(shí)間歷程后處理的時(shí)候,發(fā)現(xiàn)計(jì)算的結(jié)果與我預(yù)期的比較吻合。雖然如此,但心里總有疙瘩!首先這個(gè)警告是說(shuō)COMBIN40和14單元的兩個(gè)節(jié)點(diǎn)與單元不匹配。我用的是11.0版本。做的是層間隔震時(shí)程分析。先建底層柱,然后是二層柱及以上,隔震支座在一層柱頂位置,隔震層的兩個(gè)節(jié)點(diǎn)直接和一層柱頂及二層柱底的關(guān)鍵點(diǎn)共用,這樣考慮是隔震層與主體結(jié)構(gòu)兩種單元在豎
41、向連接的整體性,然后約束隔震層所有節(jié)點(diǎn)的所有轉(zhuǎn)動(dòng)自由度,最后allsel,all nummrg,all numcmp,all,之后就出現(xiàn)了如上的警告。初步分析:14和40號(hào)單元在定義時(shí)et,3,combin14,3, /et,4,combin40,1, /et,5,combin40,2,關(guān)鍵選項(xiàng)都選擇為一維單元,而我又約束了節(jié)點(diǎn)三個(gè)方向的轉(zhuǎn)動(dòng)自由度,這樣的話,節(jié)點(diǎn)與單元便不匹配了,不知道這樣閉門(mén)造車(chē)可能說(shuō)得過(guò)去,有時(shí)間我搞個(gè)小模型檢驗(yàn)一下NO.0097.There are 21 small equation solver pivot terms.第一個(gè)問(wèn)題:說(shuō)明結(jié)構(gòu)剛度矩陣出現(xiàn)小主元。如果矩陣
42、D 的所有主元都是正的,這時(shí)結(jié)構(gòu)的切線剛度矩陣正定,結(jié)構(gòu)處于穩(wěn)定狀態(tài);如果矩陣D 的主元有小于0 的,則切線剛度矩陣非正定,結(jié)構(gòu)處于不穩(wěn)定狀態(tài)。如果出現(xiàn)的小主元不多,說(shuō)明可能是達(dá)到某個(gè)臨界點(diǎn),以后還可以繼續(xù)求下去;如果出現(xiàn)的小主元很多,而且越來(lái)越多,說(shuō)明這個(gè)結(jié)構(gòu)即將破壞,比如出現(xiàn)大面積的塑性區(qū),形成多個(gè)塑性鉸等。當(dāng)|D |=0時(shí),矩陣D 為奇異矩陣,非線性方程會(huì)產(chǎn)生奇異解,奇異解出現(xiàn)于可能產(chǎn)生不定解或非唯一解的分析中,求解方程的主元為負(fù)或零會(huì)產(chǎn)生這樣的奇異解。有些情況下,盡管遇到主元為負(fù)或零,仍需繼續(xù)進(jìn)行分析(特別是一些非線性分析中)。(since a negative or zero piv
43、ot value can occur for a valid analysis.)下述條件會(huì)引起求解過(guò)程出現(xiàn)奇異性:(The following conditions may cause singularities in the solution process: )?約束條件不足?模型中有非線性單元:如間隙元、滑動(dòng)元、鉸鏈元、纜束員等。結(jié)構(gòu)的一部分可能已經(jīng)塌陷或分散了?材料特性為負(fù):如在瞬態(tài)熱分析中規(guī)定的密度或溫度?連接點(diǎn)無(wú)約束,單元排列可能會(huì)引起奇異性。例如:兩個(gè)水平梁?jiǎn)卧谶B接點(diǎn)的垂直方向存在無(wú)約束自由度,在線性分析中,將會(huì)忽略加在該連接點(diǎn)的垂直載荷。另外,考慮一個(gè)與梁?jiǎn)卧蚬軉卧怪毕?/p>
44、連的無(wú)板面內(nèi)的旋轉(zhuǎn)剛度的殼單元,在連接點(diǎn)處不存在板面內(nèi)的旋轉(zhuǎn)剛度。在線性分析中,將會(huì)忽略加在該點(diǎn)處的板面內(nèi)力矩。?屈曲。當(dāng)應(yīng)力剛化效果為負(fù)(壓縮)時(shí),結(jié)構(gòu)受載后變?nèi)?。若結(jié)構(gòu)變?nèi)醯絼偠葴p小到零或?yàn)樨?fù)值,就會(huì)出現(xiàn)奇異解,且結(jié)構(gòu)已經(jīng)屈曲。會(huì)打印出“主元值為負(fù)”的消息。?零剛度矩陣(在行或列上)。如果剛度的確為零,線性或非線性分析都會(huì)忽略所加的載荷。NO.0098NO.0003、 Coefficient ratio exceeds 1.0e8 - Check results.這個(gè)大概是跟收斂有關(guān),但是我找不到具體的原因。好像這個(gè)coefficient是指剛度系數(shù),大多發(fā)生在接觸定義不當(dāng)和接觸間隙過(guò)大倒
45、置,我作的一個(gè)模型,其中有一個(gè)彈簧combin39, 當(dāng)定義兩節(jié)點(diǎn)不當(dāng)?shù)怪脧椈刹怀闪r(shí)就會(huì)出現(xiàn)這個(gè)warning,當(dāng)調(diào)節(jié)好后,這個(gè)warning就會(huì)消失NO.0099在三維計(jì)算時(shí),出現(xiàn)這樣的錯(cuò)誤:Zero volume in element ,調(diào)試半天,也沒(méi)弄明白是什么原因,大家?guī)蛶兔Γ∧P蜕系某叽绮顒e太大,所以劃分單元時(shí)出現(xiàn)了一些非常小的單元,或者是提示中的體積單元。我遇到過(guò)這個(gè)問(wèn)題,想辦法先把體切割一下再劃分,不行只能修改前面的建模了。我的當(dāng)時(shí)是由于前面建模時(shí)沒(méi)有注意,出現(xiàn)了一段非常短的線,劃分網(wǎng)格時(shí)就在那段非常小的線附近出現(xiàn)這樣的問(wèn)題,有時(shí)單元設(shè)置不好的話甚至不能劃分網(wǎng)格。NO.0010
46、0在計(jì)算時(shí)遇到Nagative or zero pivot;pivot value=0.e+.000.不知什么原因,且計(jì)算直接退出來(lái)了!出現(xiàn)主元,矩陣沒(méi)法求解,所以退出了NO.00101Memory available for solver = 522.38 MB Memory required for in-core = 6435.80 MB Optimal memory required for out-of-core = 758.20 MB Minim .你用的稀疏矩陣求解器,是直接求解器,很耗資源,速度也不是很好,一般適用于10000自由度的問(wèn)題求解。可以考慮用迭代求解器中的PCG或者
47、JCG求解器。用命令EQSLV可以換求解器NO.00102* WARNING * CP = 10.156 TIME= 19:17:20Cumulative iteration 2 may have been solved using different model orboundary condition data than currently stored. POST1 results may beerroneous unless you RESUME from a Jobname.DB file for this substep.我試過(guò)了,你可能當(dāng)時(shí)ansys同時(shí)打開(kāi)了兩個(gè)db文件,或者你
48、打開(kāi)的db文件的文件名與你剛剛打開(kāi)ansys時(shí)工作目錄下定義的文件名不同NO.00103模態(tài)分析:主要單元是solid95單元,共11萬(wàn)個(gè)單元。 模態(tài)分析時(shí),中途中斷,跳出錯(cuò)誤提示:* ERROR * CP = 1739.797 TIME= 16:31:41Eigenvalue extraction failed due to a file access error. Possiblyinsufficient disk space.磁盤(pán)空間不夠!NO.00104在用VSBA,ALL,6命令時(shí)出現(xiàn)錯(cuò)誤:Topological degeneracy detected for VSBA comman
49、d Try modifying geometry slightly or loosening the tolerance(BTOL command),If BTOL is relaxed,be sure to change the tolerance back to the default after operation。相減后產(chǎn)生退化單元,可能是面沒(méi)有選擇好,可以設(shè)置boolen 公差(使用BTOL命令),如果公差已經(jīng)很松弛了,在操作后恢復(fù)默認(rèn)。ansys錯(cuò)誤集2009-10-25 16:401 把體用面分割的時(shí)候出現(xiàn)的錯(cuò)誤提示:Boolean operation failed.try ad
50、justing the tolerance value on the BTOL commmand to some fraction of theminimum keypoint distance.Model Size (current problem)1.e+000,BTOL setting 1.00000e-005,minmum KPT distance 4.e-006先在要分割的地方設(shè)置一個(gè)工作平面,用布爾運(yùn)算“divided -volume by working plane”進(jìn)行分割的時(shí)候,出現(xiàn)上述錯(cuò)誤,主要愿意可能是設(shè)置的公差太小,當(dāng)時(shí)試了幾次都么有成功,最后干脆把體重新建立了一個(gè),又
51、畫(huà)了一個(gè)很大的面,終于成功了。2.一個(gè)常見(jiàn)的代表性錯(cuò)誤!原來(lái)我的虛擬內(nèi)存設(shè)置為“無(wú)分頁(yè)文件”,現(xiàn)在改為“系統(tǒng)管理”,就不在出現(xiàn)計(jì)算內(nèi)存不夠的情況了。Error!Element type 1 is Solid95,which can not be used with the AMES command, meshing of area 2 aborted.剛開(kāi)始學(xué)習(xí)的人經(jīng)常出這種錯(cuò)誤,這是因?yàn)椴煌瑔卧?lèi)型對(duì)應(yīng)不同的劃分網(wǎng)格操作。上面的錯(cuò)誤是說(shuō)單元類(lèi)型為Solid95(實(shí)體類(lèi)型),不能用AMES命令劃分面網(wǎng)格。3 Meshing of volume 5 has been aborted becaus
52、e of a lack of memory. Closed down other processes and/or choose a larger element size, then try the VMESH command again. Minimum additional memory required=853MB(by kitty_zoe )說(shuō)你的內(nèi)存空間不夠,可能因?yàn)槟愕挠?jì)算單元太多,增加mesh尺寸,減少數(shù)量或者增加最小內(nèi)存設(shè)定(ansys10中在customization preferences菜單存儲(chǔ)欄 可以修改)你劃分的網(wǎng)格太細(xì)了,內(nèi)存不足。建議將模型劃分為幾個(gè)部分,分部分進(jìn)行劃分,可以減少內(nèi)存使用,試一下!4.The input volumes do not meet the conditions required for the VGLU operation . No new entities were created . The VOVLAP operation is a possible alternativeVGL
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 文化用品租賃業(yè)務(wù)成本控制考核試卷
- 化工產(chǎn)品批發(fā)商市場(chǎng)營(yíng)銷(xiāo)策略評(píng)估與優(yōu)化考核試卷
- 酵素浴培訓(xùn)課件
- 蔬菜大棚出售合同范本
- 環(huán)衛(wèi)運(yùn)營(yíng)合同范本
- 培訓(xùn)課件經(jīng)典案例
- 小學(xué)生講紀(jì)律課件
- 房屋修繕賠償合同范本
- 湖南省招投標(biāo)培訓(xùn)課件
- 成都高新技術(shù)產(chǎn)業(yè)投資協(xié)議
- 2024年度委托創(chuàng)作合同:原創(chuàng)美術(shù)作品設(shè)計(jì)與委托制作3篇
- 建設(shè)工程招標(biāo)代理合同(GF-2005-0215)(標(biāo)準(zhǔn)版)
- 剪映專(zhuān)業(yè)版教學(xué)課件
- 膽結(jié)石并急性膽囊炎護(hù)理查房
- 公司新建電源及大用戶并網(wǎng)管理辦法
- 《hpv與宮頸癌》課件
- 2024年世界職業(yè)院校技能大賽“智能網(wǎng)聯(lián)汽車(chē)技術(shù)組”參考試題庫(kù)(含答案)
- 新材料在管道施工中的應(yīng)用方案
- 2024中華人民共和國(guó)文物保護(hù)法詳細(xì)解讀課件
- 滑膜炎課件教學(xué)課件
- 輕質(zhì)白油供應(yīng)安全協(xié)議書(shū)(2篇)
評(píng)論
0/150
提交評(píng)論