版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、建設(shè)工程設(shè)計合同(二) Engineering Service Contract 血) (專業(yè)建設(shè)工程設(shè)計合同) (Professio nal Engin eeri ng Service Con tract For Con structi on Project) 工程名稱: Name of the project: 工程地點: Locati on of the project: 合同編號: (由設(shè)計人編填) Con tract No.: (Filled in by the Desig ner) 設(shè)計證書等級: Level of the desig n certificate: 發(fā) 包 人: E
2、mployer: 設(shè)計 人: Desig ner: 簽定日期: Date of con tract: 江蘇省建設(shè)廳監(jiān)制 江蘇省工商行政管理局 Supervised by: Jia ngsu Provin cial Departme nt of Con structi on Jiangsu Provincial Administration for Industry and Commerce 發(fā)包人: Employer: (Party A) 設(shè)計人: Desig ner: (Party B) 發(fā)包人委托設(shè)計人承擔工程設(shè)計,工程地點 為,經(jīng)雙方協(xié)商一致,簽訂本合同,共同執(zhí)行。 The Employ
3、er entrust the Designer to undertake the engineering design of * a nd the locati on for the project is within the pla nt of .After frie ndly con sultati on, the Parties hereby sig n this Con tract as follows 第一條本合同簽訂依據(jù)。 Article 1 Basis for the con clusi on of this Con tract 1.1中華人民共和國合同法、中華人民共和國建筑法、
4、建設(shè)工程勘察設(shè)計 市場管理規(guī)定。 1.1 The Con tract Law of the People s Republic of Chi na; The Con structi on Law of the People Republic of China; Regulations on the Administration of the Market for Survey and Desig n of Engin eeri ng Con structio n. 1.2國家及地方有關(guān)建設(shè)工程勘察設(shè)計管理法規(guī)和規(guī)章。 1.2 Nati onal and local rules and regu
5、lati ons on the adm ini strati on of the market for survey and desig n of engin eeri ng con structi on. 1.3建設(shè)工程批準文件。 1. 3 Approval docume nts of the engin eeri ng con struct ion 第二條 設(shè)計依據(jù)。 Article 2 Basis for desig n of the engin eeri ng con structi on 2.1發(fā)包人給設(shè)計人的委托書或設(shè)計中標文件 2.1 Letter of Authority or
6、 docume nts on letter of accepta nee provided by the Employer to the Desig ner. 2.2發(fā)包人提交的基礎(chǔ)資料 2.2 Basic materials submitted by the Employer. 2.3設(shè)計人采用的主要技術(shù)標準是: 國家及地方現(xiàn)行的技術(shù)標準和規(guī)范 2.3 The mai n tech no logical sta ndards adopted by the Desig ner are as follows: Curre nt n ati onal and local tech no logic
7、al sta ndards, rules and regulations. 第三條 合同文件的優(yōu)先次序 Article 3 Priority of the con tractual docume nts Current national and local technological standards, rules and regulations. 構(gòu)成本合同的文件可視為是能互相說明的,如果合同文件存在歧義或不一致,則 根據(jù)如下優(yōu)先次序來判斷: The several docume nts forming the Con tract are to be take n as mutually
8、expla natory of one another, but in case of ambiguities or discrepancies, the priority of the docume nts forming the con tract shall be as follows: 3.1合同書 3.1 The Con tract 3.2中標函(文件) 3.2 The Letter of Accepta nee (docume nts); 3.3發(fā)包人要求及委托書 3.3 Requireme nts of the Employer and letter of authority;
9、3.4投標書 3.4 The Ten der. 第四條 本合同項目的名稱、規(guī)模、階段、投資及設(shè)計內(nèi)容(根據(jù)行業(yè) 特點填寫)。 Article 4 Name, size, stagesnvestment and content of design (which may be filled in accordi ng to the characteristics of the in dustry). 名稱: Name: 規(guī)模: Size: 階段: Stage: 投資:約萬美元 Inv estme nt: Aboutdollars 設(shè)計內(nèi)容及工作范圍: Desig n content and wor
10、k scope 第五條發(fā)包人向設(shè)計人提交的有關(guān)資料、文件及時間。 Article 5 Materials and docume nts delivered by the Employer to the Desig ner and time for delivery of materials and docume nts 1. 上級部門的批復文件。(合同生效后) .Official reply docume nt by higher authority(after effective ness of con tract); 2. 設(shè)計開始前應提供有關(guān)技術(shù)規(guī)格資料。(合同生效后) 2. The E
11、mployer should supply related tech no logical specificatio n docume nts before start ing to desig n; 3. 主管部門對方案設(shè)計的審批意見。(施工圖開始前提供) 3. Official reply of the power supply department on consent of the power supply.(supply before con structi on draw ing) 第六條 設(shè)計人向發(fā)包人交付的設(shè)計文件、份數(shù)、地點及時間。 Article 6 Delivery of
12、 desig n docume nts by the Desig ner to the con tract issu ing party and copies, location and time for the delivery 第七條 費用。 Article 7 Charges 7. 1雙方商定,本合同的設(shè)計費為萬元。收費依據(jù)和計算方法按 國家和地方有關(guān)規(guī)定執(zhí)行,國家和地方?jīng)]有規(guī)定的,由雙方商定。 7.1 The Parties agree that charges for the desig n here un der shall be. The basis for charges an
13、d the method of computi ng shall be in accorda nee with releva nt n ati onal and local provisi ons. Where there are no releva nt n ati onal and local provisi on s, it shall be discussed and determ ined by the Parties. 7. 2如果上述費用為估算設(shè)計費,則雙方在初步設(shè)計審批后,按 批準的初步設(shè)計概算核算設(shè)計費。工程建設(shè)期間如遇概算調(diào)整, 則設(shè)計費也應作相應調(diào)整。 7.2 If th
14、e design charges mentioned above are appraised prices, both parties will compute desig n charges based on the approved rough estimate of prelim inary desig n after preliminary design approval. If there is rough estimate adjustment in period of engin eeri ng con structi on, the desig n price will be
15、adjusted accord in gly. 第八條 支付方式。 Article 8 Terms of payme nt 8.1本合同生效后三天內(nèi),發(fā)包人支付設(shè)計費總額的30%,計 萬元作為定金(合同結(jié)算時,定金抵作設(shè)計費)。 8.1 Withi n three days upon the effective ness of this con tract, the Employer shall pay the Desig ner 30% of con tract price n amely RMBYua n as the dow n payment.( The down payment sh
16、all be counted as the charges for design upon settleme nt of the con tract). 8.2設(shè)計人提交 方案 設(shè)計文件后三天內(nèi),發(fā)包人支付設(shè) 計費總額的20%, 計萬元;設(shè)計人提交 施工圖 設(shè)計文件后三天內(nèi),發(fā)包人 支付設(shè)計費總額的45%,計萬元;工程完工后,結(jié)清設(shè)計費, 不留尾款。 8.2 With in three days upon the submissi on of schematic desig n docume nts by the Desig ner, the Employer will pay 20% of
17、con tract price n amely RMBYua n. Within three days upon the submissi on of con struct ion draw ings by the Desig ner, the Employer will pay 45% of con tract price n amely RMB Yua n. After completi on of the project, the Employer will pay the rest RMB * *Yua n, without any rema in der. 8.3雙方委托銀行代付代收
18、有關(guān)費用。 8.3 The Parties shall en trust bank to collect and pay for releva nt charges. 第九條 雙方責任。 Article 9 Resp on sibilities of the Parties 9.1發(fā)包人責任 9.1 Resp on sibilities of the Employer 9. 1.1發(fā)包人按本合同第五條規(guī)定的內(nèi)容,在規(guī)定的時間內(nèi)向設(shè)計 人提交基礎(chǔ)資料及文件,并對其完整性、正確性及時限負責。發(fā)包 人不得要求設(shè)計人違反國家有關(guān)標準進行設(shè)計。 發(fā)包人提交上述資料及文件超過規(guī)定期限15天以內(nèi),設(shè)計人按
19、本合同第六條規(guī)定的交付設(shè)計文件時間順延;發(fā)包人交付上述資 料及文件超過規(guī)定期限15天以上時,設(shè)計人有權(quán)重新確定提交 設(shè)計文件的時間。 9. 1.1 The Em pl oye r shal l subm i t to Desi g ner basic materi al s and docu ment s wi th in specif i ed period as prov i ded in A rt i cl e 5 of thi s con t ract and sha 11 be resp on sibl e fo r the com pl et e ness, accuracy an
20、d t i me l i mi t of t he m at eri al s and d ocu m ent s. Th e E mpl oye r shal l not requi re the D esi gn er to con du ct design in v iol ation of relevant national st and ard s. In case there i s a delay o f l ess than 15 days ex ceedi ng t he specifi ed time limit fo r t he delivery o f the abo
21、ve materials and d ocu m ent s by the Employer, the time li mit for the Designer to deliver design docu ment s shall be ex tended acco rdi ngl y; in case there is a delay of more than 15 days exceedi ng the sp eci fi ed time limit fo r the delivery of the above material s and document s by the Emplo
22、yer, the Designer shall have the right to re-d et erm ine the time for delivery of the desi gn documents. 9.1.2 發(fā)包 人 變更 委 托 設(shè) 計 項 目 、 規(guī)模 、 條件 或 因 提 交的 資 料 錯 誤,或所提交資料作較大修改,或設(shè)計周期變化,以致造成設(shè)計 人 設(shè) 計返 工 或 工 作 量 加 大時 ,雙 方 除 另 行 協(xié)商 簽 訂 補 充 協(xié)議(或 另 訂 合 同 )、 重 新 明 確 有 關(guān) 條 款 外 , 發(fā) 包 人 應 按 設(shè) 計 人 所 耗 工 作 量向設(shè)計人支付返工費
23、。 在 未 簽訂 合 同 前 發(fā) 包 人 已同 意 ,設(shè) 計 人 為 發(fā)包 人所 做 的 各 項 設(shè)計 工作,發(fā)包人應支付相應設(shè)計費。 9.1.2 In case of the D esi gn er sr ewo rk on the design resulted fo r changes of the engi neering, size and cond itions of the design by the Empl oyer or mistakes of the materi al s submitted or major revi sion on the submitted mat
24、eri als, the Parties shall conclude supplementary agr eemen t separately (or conclude addi tional agreement) and redefi ne relevant term s and condi tions, and the Employer shoul d pay c harge s fo r r ewor k to the D esigner according to the workl oad. The Employer has agr eed befo re the conclusio
25、n of the co nt r act that it wi ll pay charge s of desi gn to the Desi gner for all the design works conducted by the Designe r. 9.1.3 在 合 同 履 行 期 間 ,發(fā) 包 人 要 求 終 止 或 解 除 合 同 ,設(shè) 計 人 未 開 始 設(shè) 計 工 作 的 ,不 退 還 發(fā) 包 人 已 付 的 定 金 ;已 開 始 設(shè) 計 工 作 的 ,發(fā) 包 人 應 根 據(jù) 設(shè) 計 人 已 進 行 的 實 際工 作 量,不 足 一 半 時 ,按該 階 段設(shè) 計 費 的一 半
26、 支 付 ;超 過 一半 時 ,按 該 階 段 設(shè)計 費的 全 部 支 付 。 9. 1.3 Duri ng the perfor mance of the cont ract , if the Empl oyer requires to terminate or cancel the cont ract before the D esi gn er starts the desi gn work, the Desi gn er wi ll not return the down payment already paid by the Empl oyer; if the D esi gn er
27、 has started the desi gn work, the Employer shall pay for the actual workl oad already done by the Designer. When the actual wo rkl oad of the design i s less than half of t he wo rk at the stage, t he Em ployer shall pay h alf o f t he paym ent f or t he design w ork at the stage. W hen t he actual
28、 workl oad of the d esi gn is more than half of the wor k at the st age, the Employer shall pay all the payment fo r the design work at t he stage. 9. 1.4 發(fā) 包 人 必 須 按 合 同 規(guī) 定 支 付 定 金 , 收 到 定 金 作 為 設(shè) 計 開 工 的 標 志 。未 收 到 定 金 ,設(shè) 計 人 有 權(quán) 推遲 設(shè)計 工 作 的 開 工時 間 ,且 交付 文件的時間順延。 9. 1.4 The Employer sho uld pay d
29、own paym ent as provi ded by the contract and receipt of down payment will be the symbol fo r the commencement of the design wo rk by the Designer. Th e Designer shall have the ri ght to pu t off t he com mencement date of t he design work if it has not received the down paym ent and the time for de
30、livery shall be extended accordi ngly. 9. 1.5 發(fā)包人應按本合同規(guī)定的金額和日期向設(shè)計人支付設(shè)計費 , 每逾期支付一天,應承擔支付金額千分之二的逾期違約金,且設(shè) 計人提交設(shè)計文件的時間順延。逾期超過 30 天以上時,設(shè)計人有 權(quán)暫停履行下階段工作 ,并書面通知發(fā)包人。發(fā)包人的上級或設(shè)計 審批部門對設(shè)計文件不審批或本合同項目停緩建 , 發(fā)包人均應 支付應付的設(shè)計費。 9.1.5 The Em pl oye r should pay charges for desi gn to the Designer at the amount and date pr
31、ovi ded in this Contract. For each day of overdue paym e nt, 2 %o of the overdue payme nt shall be paid as damages for overdue payment and the time for delivery by the Designer shall be extended accordi ngl y. Where the delay of payment has exceeded 30 d ays, the Designer shall have the right to sus
32、pend the perfo rmance of the work at the next stage and give written notice to the Employer. In case the hi gher authori ty or competent department of design approval would not approve the design docum ents or the engi neeri ng construction of thi s contract is suspended or stopped, the Employe r sh
33、oul d pay the payable charges for design. 9.1.6 發(fā)包人要求設(shè)計人比合同規(guī)定時間提前交付設(shè)計文件時 ,須 征得設(shè)計人同意,不得嚴重背離合理設(shè)計周期,且發(fā)包人應支付趕 工費。 9.1.6 If the Employe r requi res the Designer to deliver the design documents in advance, it should get the pri or consent of the Desi gner wi thout seri ous devi ation from the reasonabl e
34、design circl e, and the Empl oyer shall pay the crush cost. 9.1.7 發(fā)包人應為設(shè)計人派駐現(xiàn)場的工作人員提供工作、生活及 交通等方面的便利條件及必要的勞動保護裝備。 9.1.7 The Em ployer shoul d offe r conveniences in aspects of worki ng, livi ng and traffi c and necessary labor-protection equi pments. 9. 1.8 設(shè)計文件中選用的國家標準圖、部標準圖及地方標準圖由 發(fā)包人負責解決。 9.1.8 T
35、he Em ployer shall be responsible for the national standard drawi ng, m ini steri al standard dr awi ng and l ocal standard drawi ngs. 9.1.9 承擔本項目外國專家來設(shè)計人辦公室工作的接待費(包括 傳真、電話、復印、辦公等費用)。 9.1.9 The Empl oyer shall bear the expenses fo r receivi ng foreign expert in charge of the engi neeri ng to the Des
36、i gn er so ffi ce (includi ng ex penses on fax, telephone and offi ce affairs). 9. 2 設(shè)計人責任 9.2 Desig ner ssesp on sibilities 9. 2.1設(shè)計人應按國家規(guī)定和合同約定的技術(shù)規(guī)范、標準進行設(shè) 計,按本合同第六條規(guī)定的內(nèi)容、時間及份數(shù)向發(fā)包人交付設(shè)計文 件(出現(xiàn)9.1.1、9.1. 2、9. 1.4、9. 1.5規(guī)定有關(guān)交付設(shè)計文件順延 的情況除外)。并對提交的設(shè)計文件的質(zhì)量負責。 9. 2.1 The D esi g ner shoul d carry out desi g
37、 n work in accorda nee with t ech no logical rules and st a ndards pro vi ded in this con tra ct or the stat e, and del iver de si g n do cu me nts as the content, time and copi es specif i ed in Art i cl e 6 of thi s Cont ract (except fo r the ci rcu mst a nces prov ided in Art. 9. 1.1 , 9. 1.2, 9.
38、1.4, 9.1. 5 under whi ch the del i very of desig n docum e nts may be exte nded), and shal l b e re spo n si bl e for t he qu al i ty of the d esi g n do cum en ts. 9.2.2設(shè)計合理使用年限為主體結(jié)構(gòu)50年(磚混或框架結(jié)構(gòu))。 9. 2. 2 Th e d esi gn I ife of t he en gi neeri ng co nstruct i on s hal l be mai n st ru ct ure fi ft
39、y years. 9.2.3負責對外商的設(shè)計資料進行審查,負責該合同項目的設(shè)計聯(lián) 絡(luò)工作。 9. 2. 3 Th e De si g ner shal l be respo nsible for the sc rut i ny on the f orei g n inv est or ad esig n materi al and con tact on t h e desi g n of t he engi neeri ng. 9.2.4設(shè)計人對設(shè)計文件出現(xiàn)的遺漏或錯誤負責修改或補充。由 于設(shè)計人對設(shè)計錯誤造成工程質(zhì)量事故損失,設(shè)計人除負責采取 補救措施外,應免收損失部分的設(shè)計費,并根據(jù)損失
40、程度向發(fā)包 人支付賠償金,賠償金數(shù)額最多與受損部分的設(shè)計費相等. 9. 2.4 Th e Desi g ner shal l be respo nsible fo r the rev i si on or sup pl em e nt t o t he m i stakes or om issi on of t he d esi g n docu me nt s. If any engin eeri ng qual ity acci de nts happe n because of the Desi g ner sfaul t, the Desi g ner should be resp o
41、n si bl e fo r tak i ng remedi al measures as wel l as redu ce the desi gn ch arge s on the aff ected part of the de sig n work and com pe nsate the Em pl oye r accord ing to the degr ee of loss. The amount of the dam ages for compensation is no more than t he desi gn pri ce of t he actual l oss. 9.
42、2.5由于設(shè)計人原因,延誤了設(shè)計文件交付時間,每延誤一天,應 減收該項目應收設(shè)計費的千分之二。 9. 2. 5 If the del i ve ry of desig n docu me nts are del ayed fo r the Desi g ner sreaso n , each day over du e wi 11 resul ted in the redu cti on of 2 %o of t he desig n ch arge s for the engi n eer ing. 9.2.6合同生效后,設(shè)計人要求終止或解除合同,設(shè)計人應雙倍返還 發(fā)包人已支付的定金。 9.
43、 2. 6 A ft er t he cont ract ent ers i nto f orce, t he De sign er m ay r equi re term in at i on o r c ance 11 ati on of the co n t ract and t he D esig ne r should return the down paym ent i n doub le. 9.2.7設(shè)計人交付設(shè)計文件后,按規(guī)定參加有關(guān)上級的設(shè)計審查, 并根據(jù)審查結(jié)論負責不超出原定范圍的內(nèi)容做必要調(diào)查補充。設(shè) 計人按合同規(guī)定時限交付設(shè)計文件一年內(nèi)項目開始施工,負責向 發(fā)包人及施工
44、單位進行設(shè)計交底、處理有關(guān)設(shè)計問題和參加竣工 驗收。在一年內(nèi)項目尚未開始施工,設(shè)計人仍負責上述工作,可按 所需工作量向發(fā)包人適當收取咨詢服務費,收費額由雙方商定。 9.2.7 Up o n delivery of the desig n doc ume nts, the Desig ner shall participate in the in spect i on on the desi g n by the re l ev a nt hi gh er author ity as pro vi de and shal l be respo n si bl e for n ecessary a
45、dj ustm e nt and sup pl eme nt s t o the content wi th in the ori g i nal scop e of the desi g n acco rd i ng to the in spect i on con cl usi on. The Desi gner shal l st art the con stru ction wi thi n one ye ar upon d elivery of the desi g n docum e nt s wit hi n the speci f ied time limit and shal
46、 l be resp on si bl e fo r the tec h no logical d i scl os ure to the Employer and c on st ru cti on uni t, handl i ng wi th r el ev a nt mat ters on de sig n a nd part i ci pati on in t he accepta nee u pon co m pl et i o n o f t he e ngi n eeri ng con s t r uct ion. In case the engi n eeri ng con
47、s t r uct i on has not started with in one year, the Desi g ner shal l st i 11 be re spo nsible for the above wo rk an d m ay c ol lect reason abl e serv i ce fee fo r con sultancy from the Em pl oye r accord ing to the n eeded w ork l oad. The amount of t he servi ce fe e sh all be di scus sed an d
48、 de ter mined b y t he P arti es. 第十條 保密。 A rti cl e 1 0 Con fi de ntiality 雙方均應保護對方的知識產(chǎn)權(quán),未經(jīng)對方同意,任何一方均不得對 對方的資料及文件擅自修改、復制或向第三人轉(zhuǎn)讓或用于本合同 項目外的項目。如發(fā)生以上情況,泄密方承擔一切由此引起的后 果并承擔賠償責任。 Both P arties sh al l p rot ect each ot her si n tell ect ual p roper ty r i ght s. Without pri or consent, n ei ther part y s
49、hal l revi se, copy or tra nsfer to a third part y or use for t he p roj ect other tha n t he proj ect of thi s Contract any materi al s and document s of the other party. Under such ci rcum st a nces, the di scl os ing party shal l be respo nsible for al l the any con sequ e nee i t re sul t ed and
50、 sha 11 bear the rel ev a nt compe nsat i on 第十一條仲裁。 A rticl e 11 Arbi trati on 本建設(shè)工程設(shè)計合同發(fā)生爭議,發(fā)包人與設(shè)計人應及時協(xié)商解決 也可由當?shù)氐亟ㄔO(shè)行政主管部門調(diào)解,調(diào)解不成時,雙方當事人 同意由仲裁委員會仲裁。雙方當事人未在合同中約定仲裁 機構(gòu),當事人又未達成仲裁書面協(xié)議的,可向人民法院起訴。 If any disput es ar i ses in conn ect i on wi th thi s Engin eer ing Serv ice Con t ract, i t shal l be sett
51、l e by f ri endl y con sul tati on of t he Part ies, or b e subm itted t o t he com pet ent l ocal con st ru ct i on adm i n i st rat io n depart me nt fo r medi at i on. Where the di sput e can n o t be sett led by medi ati on, it shal l be subm itted to theAr bit rati on Com m ittee f or s ettleme
52、nt. Where t he Parti es h ave not agreed on the arbi trati on orga ni zati on in the Con t ra ct nor con cl ude ar bit rat i on agr eeme nt in w ri tte n form, the di spute wi 11 be bro ught to the Peopl esCour t. 第十二條 合 同生效及 其他 。 Article 12 Contract eff ective and miscellaneous 12.1 發(fā) 包 人要 求 設(shè)計 人 派
53、專 人 長期駐 施工 現(xiàn) 場進 行 配合 與 解決 有關(guān) 問題 時 ,雙 方應 另行簽定 技術(shù) 咨詢 服務合同 。 12.1 As per the requ est of the Employer fo r dispatch of personnel to stay on the Construc tion site so as to co or di nate and solve relevant issues, the individual technical co ns ul t ant serv ice contract shall be signed by both parties.
54、 12.2 設(shè)計 人為 本合 同項目的 服務 至施工安 裝結(jié) 束為 止。 12.2 Servi ce provi ded by the Designer f or the Proj ect in this Contract wi ll be concluded unt il the completion of con struction and i nstal lation. 12.3 本 工程 項 目中 ,設(shè)計人 不得指定 建筑材 料、設(shè) 備 的生 產(chǎn) 廠或 供貨商。發(fā)包人需要設(shè)計人配合建筑材料、設(shè)備的加工訂貨時, 所需費用由發(fā)包人承擔。 12.3 In the proj ects of t
55、he Contract, Designer shall not appoi nt m anu f act urers or Desi gners of construction mat er i al s and equi pments. Where there is a necessity that Designer shall cooperate wi th Employer in o rd eri ng the process of con struction materi als and equi pments, the relev ant fee shall be pai d by
56、Employer. 12.4 發(fā) 包人委托 設(shè)計人配合 引進項 目的 設(shè) 計任 務 ,從詢價、 對外 談判 、國 內(nèi)外 技術(shù)考察 直至 建成 投產(chǎn)的各 個階段 ,應 吸收 承擔有 關(guān)設(shè)計任務的設(shè)計人員參加。出國費用,除制服費外,其他費用 由發(fā)包人支付。 12.4 The Empl oyer ent r ust ed the Designer to cooperate with the engi neering work of import ed proj ect and design per sonn el undertaki ng relevant design assignment sha
57、ll be included in all st ages fr om enqui ry, business negot iation, domestic and overseas techni cal inspection until the produ ction period. The fee for overseas busi ness trip and ot her relevant fee wi ll be paid by Employer ex cept the fee for purchasing dress. 12.5 發(fā) 包人委托 設(shè)計人承擔 本合同 內(nèi)容 以 外的 工作服
58、務 ,另 行簽 訂協(xié)議并支付費用。 12.5 Additional agreement for any other servi ce, which Employer entrusts D esi gner to provi de, however, out of the scope of the Contract, shal l be signed and the paym ent shall be paid correspondingl y. 12.6 由 于 不可 抗 力因 素 致合 同 無法履 行時 , 雙方 應 及時 協(xié) 商解 決。 12.6 For any failure to pe
59、rform any term or condi tion of this Contract due to the force majeure, both parties shall, i n goo d f aith, attempt to settle amicably and by mutual agreement. 12.7本合同雙方簽字蓋章即生效,一式四 份,發(fā)包人 二 份,設(shè) 計人 二 份。 12.7 The Cont ract is effe ctive onee aft er bot h part ies stamped and sig ned. T here are total ly four co pi es of the Con t ract, Employer retai ns two cop ies, a nd D
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 臨時工作合作合同2024年版版
- 2025年全球及中國實驗室用大麻含量測試設(shè)備行業(yè)頭部企業(yè)市場占有率及排名調(diào)研報告
- 2025-2030全球氮化鎵藍色激光二極管行業(yè)調(diào)研及趨勢分析報告
- 2025-2030全球醫(yī)用高純度 PFA 管行業(yè)調(diào)研及趨勢分析報告
- 2025年全球及中國ZSM-5沸石原粉行業(yè)頭部企業(yè)市場占有率及排名調(diào)研報告
- 2025年全球及中國數(shù)字信號處理超聲波設(shè)備行業(yè)頭部企業(yè)市場占有率及排名調(diào)研報告
- 2025-2030全球商業(yè)揚聲器行業(yè)調(diào)研及趨勢分析報告
- 2025-2030全球分散固相萃取試劑盒行業(yè)調(diào)研及趨勢分析報告
- 二零二五年度家教服務+社會實踐體驗合同3篇
- 二零二五年度鋼結(jié)構(gòu)工程保險合同范本3篇
- 2024-2025學年八年級上學期1月期末物理試題(含答案)
- 2025年國新國際投資有限公司招聘筆試參考題庫含答案解析
- 制造車間用洗地機安全操作規(guī)程
- 2025河南省建筑安全員-A證考試題庫及答案
- 商場電氣設(shè)備維護勞務合同
- 油氣田智能優(yōu)化設(shè)計-洞察分析
- 陜西2020-2024年中考英語五年真題匯編學生版-專題09 閱讀七選五
- 磚混結(jié)構(gòu)基礎(chǔ)加固技術(shù)方案
- 助產(chǎn)專業(yè)的職業(yè)生涯規(guī)劃
- 新《國有企業(yè)管理人員處分條例》知識競賽考試題庫500題(含答案)
- 骨質(zhì)疏松護理
評論
0/150
提交評論