版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、旬麟xl-06【2012】6號(hào) 簽發(fā)人:張勇關(guān)于旬麟xl-06合同段二灰砂礫底基層分項(xiàng)工程開工的申請報(bào)告旬麟二級(jí)公路jl-1駐地辦:我項(xiàng)目部經(jīng)過全面準(zhǔn)備,機(jī)械、人員、材料等已到場,滿足底基層分項(xiàng)工程開工條件,特此上報(bào)貴辦,請批準(zhǔn)開工。附件:1.施工放樣報(bào)驗(yàn)單、工程質(zhì)量責(zé)任卡、現(xiàn)場管理人員表、現(xiàn)場施工人員表、進(jìn)場機(jī)械表、進(jìn)場材料表、施工方案。 (此頁無正文) 二一二年七月二日主題詞: 底基層 開工 申請抄 送: 旬麟二級(jí)公路指揮部辦公室旬麟二級(jí)公路xl-06合同段項(xiàng)目經(jīng)理部 2012年7月2日 共3份旬麟二級(jí)公路分 項(xiàng) 工 程 開 工 報(bào) 告(編號(hào) 034 )合 同 段:k35+585k37+2
2、95.447開工項(xiàng)目:路面工程里程樁號(hào):k35+585k37+295.447項(xiàng)目經(jīng)理部(蓋章):申報(bào)日期: 年 月 日目 錄序號(hào)內(nèi) 容頁 數(shù)1分項(xiàng)工程開工申請批復(fù)單2分項(xiàng)工程開工申報(bào)表3施工放樣報(bào)檢單4分項(xiàng)工程數(shù)量批復(fù)表(附測量及計(jì)算資料)5施工進(jìn)度計(jì)劃(施工組織設(shè)計(jì))6土地占有及臨建工程情況(文字表述)7測量控制樁點(diǎn)成果表(按統(tǒng)一用表)8分項(xiàng)工程質(zhì)量責(zé)任卡9分項(xiàng)工程現(xiàn)場管理人員表10分項(xiàng)工程現(xiàn)場施工人員表11分項(xiàng)工程進(jìn)場機(jī)械設(shè)備表12分項(xiàng)工程進(jìn)場材料表13原材料報(bào)審表(按統(tǒng)一用表)14標(biāo)準(zhǔn)試驗(yàn)審批表(按統(tǒng)一用表)旬麟二級(jí)公路分項(xiàng)工程開工申請批復(fù)單施工單位:陜西方圓建工集團(tuán)有限公司 合同段:x
3、l-06監(jiān)理單位:陜西順通監(jiān)理公司 編 號(hào):034開工項(xiàng)目:路面工程(二灰砂礫底基層)樁號(hào):k35+585 k37+295.447建議開工:2012年7月12日計(jì)劃完工:2012年7月27日此項(xiàng)工程負(fù)責(zé)人:張勇 附件:施工放樣報(bào)驗(yàn)單,工程質(zhì)量責(zé)任卡,現(xiàn)場管理人員表,現(xiàn)場施工人員表,進(jìn)場機(jī)械表,進(jìn)場材料表,施工工藝,安全交底。承包人: 年 月 日監(jiān)理員意見:簽名: 年 月 日監(jiān)理工程師意見: 簽名: 年 月 日旬麟二級(jí)公路分項(xiàng)工程開工申報(bào)表施工單位:陜西方圓建工集團(tuán)有限公司 合同段:xl-06監(jiān)理單位:陜西順通監(jiān)理公司 編 號(hào):034編號(hào)034分項(xiàng)工程名稱路面工程樁號(hào)k35+585 k37+29
4、5.447擬定開工日期2012.7.15計(jì)劃工期15天完工日期2012.7.31材料情況材料準(zhǔn)備充足 滿足開工條件機(jī)械設(shè)備情 況配備齊全 滿足開工條件人員情況負(fù)責(zé)人姓 名何時(shí)畢業(yè)于何院校、何專業(yè)與投標(biāo)書人員是否一致備 注施工負(fù)責(zé)人周黨輝土木工程不一致技術(shù)負(fù)責(zé)人陳建民工民建不一致自檢負(fù)責(zé)人呂龍土木工程不一致測量負(fù)責(zé)人馮銳強(qiáng)土木工程不一致試驗(yàn)負(fù)責(zé)人李白瑜路橋不一致安全負(fù)責(zé)人孫都孝工民建不一致現(xiàn)場試驗(yàn)設(shè)備情況齊全測量設(shè)備情況齊全場地準(zhǔn)備情況滿足施工要求附 件/項(xiàng)目經(jīng)理(簽字): 年 月 日旬麟二級(jí)公路施工放樣報(bào)驗(yàn)單施工單位:陜西方圓建工集團(tuán)有限公司 合同段:xl-06監(jiān)理單位: 陜西順通監(jiān)理公司 編
5、 號(hào):034致(監(jiān)理工程師)朱立鋒:根據(jù)合同要求,已完成k35+585k37+295.447路面工程(二灰砂礫底基層)施工放樣工作,清單如下,請予查驗(yàn)。 承包人: 年 月 日樁號(hào)或位置工程或部位名稱放樣內(nèi)容備注k35+585k37+295.447路面工程中線及邊線附件:測量及放樣資料監(jiān)理員意見: 簽名: 年 月 日監(jiān)理工程師結(jié)論:簽名: 年 月 日旬麟二級(jí)公路分項(xiàng)工程數(shù)量批復(fù)表施工單位:陜西方圓建工集團(tuán)有限公司 合同段:xl-06監(jiān)理單位:陜西順通監(jiān)理公司 編 號(hào):034工程名程路面工程樁號(hào)k35+585k37+295.447支付編號(hào)項(xiàng)目名稱單位設(shè)計(jì)數(shù)量申報(bào)數(shù)量批復(fù)數(shù)量305-1-a二灰砂礫3
6、41703417034170項(xiàng)目經(jīng)理: 年 月 日監(jiān)理工程師: 年 月 日監(jiān)理員: 年 月 日指揮部辦公室負(fù)責(zé)人: 年 月 日二灰砂礫底基層施工組織設(shè)計(jì)一、 工程概況旬邑底廟至彬縣韓家公路改建工程起于旬邑底廟鎮(zhèn),途徑彬縣永樂鎮(zhèn)、義門鎮(zhèn)、城關(guān)鎮(zhèn)、車家莊鄉(xiāng)、韓家鄉(xiāng),終點(diǎn)位于彬縣與麟游交界的北灣村,與麟游縣河西至崔木公路相接。沿線直接串聯(lián)了8個(gè)鄉(xiāng)鎮(zhèn),是彬縣近1/3人口出行的最主要通道,同時(shí)也是彬縣往來旬邑、麟游縣的重要縣級(jí)道路。我公司承建的第六合同段位于涇河彬縣 城區(qū)段二期防洪工程段河堤路。本合同段起點(diǎn)樁號(hào)為:k35+585k37+295.447及k35+626.535、k37+295.447兩處平
7、交被交線,路線全長2.04km。二、 底基層工程量本合同段底基層部位:k35+585k37+295.447及k35+626.535、k37+295.447兩處平交被交線,采用石灰粉煤灰穩(wěn)定砂礫做底基層,混合料7天無側(cè)限抗壓強(qiáng)度達(dá)到0.6mpa。厚度為20cm石灰粉煤灰穩(wěn)定砂礫底基層:34170 m2。計(jì)劃開工日期2012年7月15日,計(jì)劃完工日期2012年7月31日。三、 實(shí)施性施工計(jì)劃1)2012年7月15日2012年7月20日歷時(shí)5天完成(k36+660k37+260);2)2012年7月21日2012年7月24日歷時(shí)4天完成(k37+260k0+057.885);3)2012年7月25日
8、2012年7月27日歷時(shí)30天完成(k36+060k36+660);4)2012年7月28日2012年7月31日歷時(shí)5天完成(k36+060k35+626.535(注:k35+626.535同時(shí)為ko+000)、ko+000k0+070);四、 勞、材、機(jī)的配置計(jì)劃二灰砂礫底基層施工項(xiàng)目部計(jì)劃配置管理人員4人,工程技術(shù)人員3名,輔助人員2名,機(jī)械操作手4名,運(yùn)輸車輛司機(jī)8名,施工作業(yè)隊(duì)4個(gè),施工人員2名。機(jī)械:450型廠拌設(shè)備一套、攤鋪機(jī)一臺(tái)、自卸機(jī)6輛、壓路機(jī)3臺(tái)、裝載機(jī)2臺(tái)、灑水機(jī)2輛。石灰:850 m3、粉煤灰:1600m3 、砂礫:7000m3;五、各種材料的落實(shí)情況(1)材料配合比為
9、:(重量比)石灰:粉煤灰:砂礫=5:15:80,(2)壓實(shí)度不小于97%。7d 齡期的無側(cè)限抗壓強(qiáng)度不小于0.6mpa。(3)二灰砂礫中集料最大粒徑不超過37.5mm,壓碎值不大于35%,并應(yīng)符合下列級(jí)配要求:二灰砂礫底基層的集料級(jí)配表結(jié)構(gòu)層通過下列篩孔(方孔篩mm)的質(zhì)量百分率(%)37.531.5199.54.752.361.180.60.075底基層10085100658950723555254517351027015五、質(zhì)量控制1、質(zhì)量保證體系.我們深刻明白“沒有進(jìn)度的質(zhì)量是零質(zhì)量,沒有質(zhì)量的進(jìn)度是零進(jìn)度”。首先合格的原材料是保證工程質(zhì)量的關(guān)鍵,我項(xiàng)目部根據(jù)成立的以項(xiàng)目經(jīng)理為工程質(zhì)量第
10、一責(zé)任人的質(zhì)量組織機(jī)構(gòu)和以項(xiàng)目總工負(fù)責(zé)的質(zhì)檢、試驗(yàn)、測量、三位一體的質(zhì)量保證體系,施工班組落實(shí)三檢制、實(shí)行質(zhì)檢工程師一票否決制,項(xiàng)目部經(jīng)過多方考察,按照工程指揮部及駐地辦的要求選擇了多家合格供應(yīng)商,實(shí)行原材料招標(biāo)采購,對原材料嚴(yán)把質(zhì)量關(guān)。1-1、施工時(shí)發(fā)現(xiàn)圖紙中的問題應(yīng)及時(shí)與有關(guān)部門取得聯(lián)系 ,予以糾正后,方可進(jìn)行施工; 1-2、嚴(yán)格落實(shí)測量“雙檢制”、復(fù)核簽認(rèn)制,基坑開挖前未經(jīng)檢查、復(fù)測不得進(jìn)行施工;1-3、嚴(yán)格執(zhí)行施工前的技術(shù)交底制度,施工時(shí)技術(shù)人員必須全過程旁站,做好技術(shù)指導(dǎo)工作,并認(rèn)真填寫施工記錄和各種檢查資料;1-4、在施工過程中現(xiàn)場要輪流值班,出現(xiàn)問題不能解決時(shí)要及時(shí)與有關(guān)人員聯(lián)系
11、?,F(xiàn)場試驗(yàn)人員要經(jīng)常檢查砂漿及混凝土配合比各種材料用量,以保證砌筑工程的順利進(jìn)行,并按要求制作試塊。2、安全生產(chǎn)保證體系為了保證安全施工我項(xiàng)目部成立了以項(xiàng)目經(jīng)理為首,以現(xiàn)場安全員、項(xiàng)目技術(shù)負(fù)責(zé)人及施工班組長為成員的項(xiàng)目安全領(lǐng)導(dǎo)小組,成立了安全生產(chǎn)專門機(jī)構(gòu),負(fù)責(zé)從開工到竣工全過程的安全生產(chǎn)工作。進(jìn)場以來項(xiàng)目部建立健全了安全管理制度,嚴(yán)格落實(shí)安全生產(chǎn)責(zé)任,建立了安全獎(jiǎng)罰制度,同時(shí)在現(xiàn)場設(shè)立了警示標(biāo)牌、安全標(biāo)語的標(biāo)示標(biāo)志。入場以來項(xiàng)目部對各施工隊(duì)開展了進(jìn)場教育,對新工人進(jìn)行崗前安全教育,教育結(jié)合工程實(shí)際情況,杜絕“假、大、空”等條款式內(nèi)容,做到實(shí)事求是。另外項(xiàng)目部要求安全員對施工人員進(jìn)行班前教育。嚴(yán)
12、格按照班前活動(dòng)制度堅(jiān)持班前教育。結(jié)合工程的實(shí)際進(jìn)度,按照施工的不同階段(基礎(chǔ)施工、主體施工),結(jié)合當(dāng)日施工內(nèi)容、天氣等情況進(jìn)行。由當(dāng)日安全值班人員根據(jù)輪流值班制度監(jiān)督各班組長落實(shí),并認(rèn)真填寫班組活動(dòng)記錄,保證天天講安全,時(shí)時(shí)刻刻有安全。再次,根據(jù)季節(jié)的變化項(xiàng)目部組織施工人員進(jìn)行換季教育。主要針對雨天、寒冷大風(fēng)季節(jié)施工的特點(diǎn)進(jìn)行,并將教育內(nèi)容記錄在教育登記卡上。此外,項(xiàng)目部根據(jù)目前情況制訂了以下措施以保證安全施工的順利進(jìn)行spacing of 100mm. c, line line line nearby. d, spare wire unified terminal strip termina
13、l (terminal strip at the top of the vertical, horizontal terminal strip from the harness to terminal pai end at the beginning), length to ensure as far as terminal and set aside. after e, form a wire harness, cable, line. when the line should be in the core wire for better identification and marking
14、 on the cards will be prepared in advance, alternate core core content for the cable numbering. f, finish line, according to the corresponding terminal locations, wire one by one from the bunch out, pulling line, should be kept parallel to each other and more. core dark as possible, determined in ac
15、cordance with specific conditions, it is required that: neat, beautiful, shapely, pleasing to the eye. 7.6.2 wiring technology, out of the core wire according to terminal position, cut off the excess, with wire stripping pliers or electrician knife stripped of insulation, so that connection. strippi
16、ng should not damage the copper core. b, core wire on the oxide and chip-insulated electricians knife scrape. c, core processing has been completed, thread round long nose pliers in a clockwise direction. circle with the screw in the direction of spin in the same direction, circle should be appropri
17、ate, it is best to slightly larger than the screws, bent round the circle and the length of root and appropriate so set screw is screwed on tight. d, when on the crimp-type terminals when wiring, threads do not have to bend. insulating part should be careful not to press it into a terminal, and make
18、 the loop doesnt make sense and to prevent bad head crimping, fell down, causing an open circuit. after wiring, may be tried. e, crimping terminal crimping, wire and terminal contact is good, solid, not subject to mechanical strain, and ensure the insulation level. f, cables, such as when there is a
19、 bare copper ground wire, bare copper wire with a plastic pipe should be set. g, when wiring wiring must be in radians. h, terminal screws二灰砂礫底基層施工進(jìn)度計(jì)劃表 月份 工程項(xiàng)目7月8月1214161820222527293124681012二灰砂礫底基層k36+660k37+260k37+260k0+057.885k36+060k36+660k36+060k35+626.535編制:馮西玲 復(fù)核:陳建民 審核:張勇旬麟二級(jí)公路分項(xiàng)工程質(zhì)量責(zé)任卡施工單位
20、:陜西方圓建工集團(tuán)有限公司 合同段:xl-06監(jiān)理單位:陜西順通監(jiān)理有限公司 編 號(hào):034項(xiàng)目名稱路面工程開工及擬計(jì)劃完成日期2012年 7 月15日至 2012年 7月31 日第 一責(zé)任人項(xiàng)目總負(fù)責(zé)人簽 名貼照片處身份證號(hào)直 接責(zé)任人技 術(shù)負(fù)責(zé)人簽 名貼照片處身份證號(hào)現(xiàn)場技術(shù)負(fù)責(zé)人專 業(yè)工程師簽 名貼照片處身份證號(hào)現(xiàn)場管理負(fù)責(zé)人施 工負(fù)責(zé)人簽 名貼照片處身份證號(hào)駐地辦監(jiān)理工程師簽 名貼照片處身份證號(hào)駐地建設(shè)組組 長簽 名貼照片處身份證號(hào)旬麟二級(jí)公路分項(xiàng)工程現(xiàn)場管理人員表施工單位:陜西方圓建工集團(tuán)有限公司 合同段:xl-06監(jiān)理單位:陜西順通監(jiān)理公司 編 號(hào):034工程名稱路面工程樁 號(hào)k3
21、5+585k37+295.447序號(hào)姓名性別年齡職稱學(xué)歷專業(yè)擬擔(dān)任職務(wù)備注1裴潤民男56建造師??仆聊竟こ躺a(chǎn)副經(jīng)理2孟向陽男32工程師專科土木工程現(xiàn)場技術(shù)負(fù)責(zé)人3呂龍男28助理工程師高中土木工程現(xiàn)場技術(shù)負(fù)責(zé)人4馮銳強(qiáng)男25助理工程師中專土木工程測量負(fù)責(zé)人項(xiàng)目經(jīng)理: 年 月 日監(jiān)理員: 年 月 日監(jiān)理工程師: 年 月 日旬麟二級(jí)公路分項(xiàng)工程現(xiàn)場施工人員表施工單位:陜西方圓建工集團(tuán)有限公司 合同段:xl-06監(jiān)理單位:陜西順通監(jiān)理公司 編 號(hào):034工程名稱路面工程樁 號(hào)k35+585k37+295.447熟練工人工種級(jí)別人數(shù)上崗證號(hào)碼模板工/6/測量員/2/配合整平/4/普工/6/普通工人人
22、數(shù)基本工人12人民 工6人項(xiàng)目經(jīng)理: 年 月 日監(jiān)理員: 年 月 日監(jiān)理工程師: 年 月 日旬麟二級(jí)公路分項(xiàng)工程進(jìn)場機(jī)械設(shè)備表施工單位:陜西方圓建工集團(tuán)有限公司 合同段:xl-06監(jiān)理單位:陜西順通監(jiān)理公司 編 號(hào):034工程名稱路面工程樁 號(hào)k35+585k37+295.447序號(hào)機(jī)械或設(shè)備名稱規(guī)格型號(hào)數(shù)量制造時(shí)間及生產(chǎn)廠家使用年限及狀況進(jìn)場日期1廠拌設(shè)備45012012.7.102自卸車20t62012.7.103攤鋪機(jī)ltu201 2012.7.104壓路機(jī)15t32012.7.105裝載機(jī)20t22012.7.106灑水車10-8t22012.7.10項(xiàng)目經(jīng)理: 年 月 日監(jiān)理員: 年
23、 月 日監(jiān)理工程師: 年 月 日旬麟二級(jí)公路分項(xiàng)工程進(jìn)場材料表施工單位:陜西方圓建工集團(tuán)有限公司 合同段:xl-06監(jiān)理單位:陜西順通監(jiān)理公司 編 號(hào):034工程名稱路面工程樁 號(hào)k35+585-k37+295.447試驗(yàn)單位西安公路研究院公路工程試驗(yàn)檢測中心序號(hào)材料名稱及規(guī)格進(jìn)場日期進(jìn)場數(shù)量檢驗(yàn)日期報(bào)告編號(hào)檢驗(yàn)結(jié)果1石灰/2012.7.5sxgsjcbg-tg2011-018-1合格2粉煤灰/2012.7.5sxgsjcbg-tg2011-018-1合格3二灰砂礫/2012.7.5sxgsjcbg-tg2011-018-1合格自檢意見簽名: 年 月 日項(xiàng)目經(jīng)理: 年 月 日監(jiān)理員: 年 月 日監(jiān)理工程師: 年 月 日旬麟二級(jí)公路首件工程認(rèn)可證書施工單位:陜西方圓建工集團(tuán)有限公司 合同段:xl-06監(jiān)理單位:陜西順通監(jiān)理公司 編 號(hào):034單位工程名稱路面工程里程樁號(hào)k35+585k37+295.447分部工程名稱路面工程里程樁號(hào)k35+585k37+295.447分項(xiàng)工程名稱底基層里程樁號(hào)k35+585k37+2
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年學(xué)校語文教師工作計(jì)劃例文(三篇)
- 2024年小學(xué)安全教育計(jì)劃范例(二篇)
- 2024年土建工程師崗位的工作職責(zé)說明例文(七篇)
- 2024年學(xué)校公務(wù)用車管理制度模版(三篇)
- 2024年小學(xué)教研活動(dòng)總結(jié)標(biāo)準(zhǔn)范本(二篇)
- 2024年小學(xué)圖書借閱制度模版(五篇)
- 2024年固定資產(chǎn)借款合同范本(二篇)
- 2024年單位年終工作總結(jié)(四篇)
- 2024年安全生產(chǎn)工作總結(jié)簡單版(四篇)
- 2024年工程預(yù)算員工作職責(zé)(四篇)
- 配網(wǎng)工程管理流程及注意事項(xiàng)
- 電動(dòng)車證明模板
- 美標(biāo)鋼材理論重量整理(槽鋼、角鋼、H型鋼-W型鋼、T型鋼)
- 管樁打樁規(guī)范及要求
- 光纖傳感器的八大優(yōu)點(diǎn)和分布式光纖傳感器的六大特點(diǎn)
- 機(jī)關(guān)工作人員考勤表Excel模板
- 日照市重點(diǎn)支柱產(chǎn)業(yè)情況
- 學(xué)生課堂表現(xiàn)評(píng)價(jià)量表(共8頁)
- 未就業(yè)證明模板村委會(huì)
- 《2021國標(biāo)暖通圖集資料》14K117-3 錐形風(fēng)帽
- 公司固定動(dòng)火區(qū)標(biāo)識(shí)牌---副本
評(píng)論
0/150
提交評(píng)論