On the project management and construction management of the construction progress of quality management(項(xiàng)目管理和施工管理的質(zhì)量管理的施工進(jìn)度)_第1頁
On the project management and construction management of the construction progress of quality management(項(xiàng)目管理和施工管理的質(zhì)量管理的施工進(jìn)度)_第2頁
On the project management and construction management of the construction progress of quality management(項(xiàng)目管理和施工管理的質(zhì)量管理的施工進(jìn)度)_第3頁
On the project management and construction management of the construction progress of quality management(項(xiàng)目管理和施工管理的質(zhì)量管理的施工進(jìn)度)_第4頁
On the project management and construction management of the construction progress of quality management(項(xiàng)目管理和施工管理的質(zhì)量管理的施工進(jìn)度)_第5頁
已閱讀5頁,還剩1頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、 On the project management and construction management of the construction progress of quality management Abstract The main factors affect the progress of the project and construction quality management is analyzed in detail, for reference. Paper Keywords: project management, construction schedule m

2、anagement, construction quality control for factors that affect the progress of the project, usually including human factors, technical factors, material and equipment factors, mechanical factors, foundation factors, financial factors, climatic factors, environmental factors, etc. common main factor

3、s are the following: Building construction impacts 1.1 engineering resources availability in order to complete a construction project need to configure the associated bulk construction materials, devices and equipment, and human resources. First, the allocation of human capital if insufficient or un

4、balanced, will certainly affect the progress of the construction work issues. Again, if the supply of raw materials can not meet the demand for wood-based construction-related projects, such that raw materials can not be successful turnaround, resulting in the construction process had been forced to

5、 simultaneously segmented construction, waste of time, affecting the progress of the project Finally, if the configuration excessive construction tools, not only a waste of resources, but also to the construction site blocked, seriously affecting the work. 1.2 Technical factors for each project tech

6、nical requirements are not identical, so before beginning a construction project, to conduct a comprehensive assessment of the projects technical aspects, in order to appear to be made in advance of the technical problems measures to ensure the normal construction schedule. However, in a specific pr

7、oject, the general construction companies will not spend human and financial resources for technical assessment of the difficulty, because they thought it was unnecessary expense. However, when the real construction, the construction side often because of technical problems which led to the construc

8、tion of some items can not be normal, the loss of personnel costs resulting downtime sometimes far greater than the required pre-construction costs to assess the technical difficulty. 2 specific measures to strengthen the management of project construction progress management of pre-construction 2.1

9、 Construction Schedule Management (1) set up the project management team and improve the management level of progress before the start of construction, since the formation to have a higher management level and technical level project management team. Team project manager for the core of leadership,

10、step by step the progress targets duties, their duties, so that each part of the project, progress management of each stage are specifically responsible. And through strict scientific assessment mechanism and incentive mechanism, and fully mobilize the enthusiasm of the project management team membe

11、rs work to ensure the smooth implementation schedule, the project objectives are achieved. Construction Engineering Paper (2) strict examination blueprint to strengthen contract management First, rigorous examination of design drawings, design drawings to ensure the rationality, feasibility, accurac

12、y and clarity. On this basis, to organize construction workers familiar with the design drawings, so that the characteristics of engineering, design intent, technical requirements, and other processes generally pretty good idea to ensure that the specific construction meet the design requirements, r

13、educing rework due to design changes or misunderstanding caused by drawing . Second, to ensure the authority, fairness, clarity, rationality and feasibility of the contract. Avoid disputes after the start, resulting in the temporary suspension, delay the construction period. 3 Project Management Con

14、struction Quality Management Project Management Construction Quality Control should be a comprehensive control process of the whole process, factors affecting project management construction quality there are many, can be artificial, machinery, materials, methods, and the environment various aspects

15、 of construction quality control. The project department should take effective measures for effective control of these projects, to ensure construction quality. Construction managers and operations personnel, the Ministry of construction projects should be ideological and professional qualities, phy

16、sical fitness and other aspects into account, overall construction quality control in order to achieve their goals. During the construction process should also be appropriate choice of machinery and equipment, the establishment of various machinery and equipment management system. Construction Proje

17、ct Department should do the inspection and acceptance of the control to ensure correct and reasonable use of these items. Project Department should adopt guidance, supervision, inspection, to establish a good technical environment, management of the environment and the working environment for the re

18、alization of quality objectives provide good conditions for strengthening the construction quality management to contribute. 4 Conclusion In summary, project management is the management of a complex of factors, the impact of the lot. Therefore, we need to actively deal with the construction process, emerging issues, and strictly control the construction progress, improve construction quality, reduce construction costs and e

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論