1、Material Transportation Safety _Offshore Back Loading Sep. 2013Attendee Requirement: COPC Service Supervisor, Warehouse Man, Material Man; COPC Crane Operator, Rigger, Signalman; COPC Drilling Supervisor; COSL Sr. Toolpusher, HSE, Material Man; Others who may involve in material back loading.Verific

2、ation Requirement:The sign-on sheets of both hitches shall be approved by facility OIMs and the scan saved at facility S drive.BackgroundBackground_ Near Miss of overloading basketOn Aug.5, offloading of Shengfeng #2 was stopped when harbor personnelsuspected the basket was overweight. (12t gross) P

3、ersonnel suspected there Were too many 4-1/2” tubing in the basket and unloaded it, one bundle at a time. (Same way it was back loaded to the SF #2 offshore) Calculated total weight was 24.8t gross. Logistics immediately reported condition to offshore for investigation.Cause Analysis: Poor planning

4、and communication. Poor hazard awareness. Did not follow manifesting procedure.Corrective Action: Share near miss in whole field through September 8th, 2013. SWL of basket must be confirmed by lifting crew when back loading pieces. Facility materials man must calculate and record total weight of bas

5、ket when back loading pieces to insure no over weight condition exists.Background_ Near Miss of overloading basketAug 16_NM_WHPE_Drilling:Around 12:00PM, 3 bundles of tubing (60 joints) was back-loaded into the long basket on Guoshun-18, a reluctant acceptance by the vessel happened at last. Current

6、 Requirements:Background_ Non-compliance of backload cargo from offshore6DRK (15#),from WHP-D by JH8008,Aug.9, 2013 The safety bar is unlocked.Background_ Non-compliance of backload cargo from offshore7FAIRNESS (FTJ-B-01),from WHP-E ,by JH8008, Aug.9 2013 Oily waste put in the basket without spill p

7、rotection; Oily waste put in white trash bag.Background_ Non-compliance of backload cargo from offshore8T-POWER (TP-C-03),from WHP-B,by JH8008, Aug.9, 2013 No fastening for the rollers and small tubes Background_ Non-compliance of backload cargo from offshore20130805ZYH264HAL HESWHP-AOne shackle has

8、 no safety pin and one safety pin was not put right.9Background_ Non-compliance of backload cargo from offshore20130805SF2#COPC&MITBWHP-BOneswimmingpoolbasketoverload(136jointtbginthebasket,thisbasketSWL12T,136jointtbgtotal24.8t)10Background_ Non-compliance of backload cargo from offshoreJutal c

9、age to Hua Teng from WHPA on Aug.28,2013 The wire sling is too short for rigging to crane.Requirements of COPC HSE MS Procedure Material HandlingCOPC HSE MS Procedure Material Handling4.5 Offshore Material Handling & Back Loading 4.5.1 Line supervisionEnsure that the following requirements are p

10、erformed before any material is back-loaded for transportation back to shore or to other facilities: Ensure all lifting equipment is in good condition according to HSE MS Level II procedure of Rigging and Lifting. Making sure the load is centralized and secured. Baskets are not overfilled or overloa

11、ded, Ensure that all materials loaded into the containers are properly placed and they will not collapse or fall out when open the container doors. The tarpaulin should be in place to secure materials before closing the container doors if collapse or fall out risk foreseeable when loading. Record th

12、e cargos weight from cranes weight scale and indicate it on SAP cargo manifest.COPC HSE MS Procedure Material Handling When hazardous materials are returned to shore, make sure that the cargo is properly labeled and that the containers of hazardous materials are not leaking. “HEAVY LIFT” tags are ap

13、plied to the sling ring of equipment or material weight over Heavy Lift criterion. Ensure oily trash is proper handled with anti-pollution equipment and no leakage or spill; Boat captain has the right to reject any cargo if there is any potential risk on secondary containment. To ensure industrial w

14、aste, food waste, living waste, general waste is segregated and proper packed before back loading. Ensure separation of company material and contractor material Proper length of tag line is attached to the lift. COPC HSE MS Procedure Material Handling4.5.2 Material man/COSL material man Organize the

15、 offloading and loading of equipment / material for its facility and: Check manifest for weights of containers /baskets to decide which line to be used to lift with. Advise crane operator as to which lifts are to be made and their order. Offload cargo in a place where unloading can be done safely. S

16、ufficiently communicate with the supply boat captain. Receive and distribute equipment / material to the appropriate owner.Prepare shipping manifests to onshore or other offshore facilities for the Offshore Support Boat Coordinator and make sure the indications and instructions for the back loaded o

17、r forwarded material are clear for handling.Verify that all containers/baskets have identifying numbers painted on the top and sides of the container. Reminder based on recent walkthroughPerform pre-lift check efficientlyCrushing of wire sling: shall be destroyed and scrapped if the diameter is less than 70% of original size.Perform pre-lift check efficientlyThimble deformation:Crack, excessive deformation and corrosion ar

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論