1、集控室、電子間盤柜電纜接線 質(zhì)量控制工序卡TERMINATION FOR CCR AND EER QUALITY CONTROL PROCESS CARD序號NO操作要領(lǐng)與方法Operation main points質(zhì)量標準或要求Quality standard控制點Control point控制點計 劃Control point plan控制點負責人superintendentWHRS01控制電纜在接線之前,具體負責的技術(shù)人員一定要對圖紙進行仔細的審核,審核工作內(nèi)容包括:相關(guān)的控制原理圖、廠家資料和接線施工圖。Before termination, technician should ch

2、eck the drawing carefully, include schematic diagram,producer data and termination drawing通過認真審核圖紙來確保接線圖紙的正確性。Make sure the drawing is correct. W02準備好接線圖紙,負責接線的技術(shù)人員對接線人員進行詳細的安全、技術(shù)交底,并培訓考試合格,做好全程交底培訓記錄。Prepare termination drawing, technician should tell the workers safety, technical disclosure, and t

3、hey should pass the exam. Make a record.交底不清、考試不合格,嚴禁上崗。You can not work if technical disclosure is not clearly or you fail exam.W03人員分工,實施“專人、專柜、掛牌”接線法,接線人員備好所需的施工工具及勞動防護用品。Divide the work by “specially-assigned person, specially-assigned panel, sign”, termination person should prepare tools and sa

4、fety equip.專人:受過培訓,且考試合格的某位施工人員;專柜:指定的某盤、某臺或某柜;掛牌:專為跟蹤、控制接線工藝質(zhì)量而設計的接線標識牌。specially-assigned person: constructor who pass by training and exam.specially-assigned panel: specified panel, stage or cabinet.Sign: a sign for termination quality control.W04電纜接線前在盤柜的門背后右上方貼上接線工藝卡,在工藝卡上用黑色記號筆填寫:接線圖紙審核人的姓名和聯(lián)系

5、電話,接線人的姓名、班組、聯(lián)系電話以及接線人所接的電纜編號,做到接線圖紙審核和接線施工責任落實到具體的人,并具有可追溯性。Before termination, paste a operation card on the panel, the card should be wrote on the name and phone number who checked the drawing, the termination staffs name, phone number, and all the cable tag. Make sure specific person that in cha

6、rge termination work.對接線圖紙的正確性、接線施工的正確率和工藝必須制定獎懲措施來控制。We control the drawing correction, termination correction and quality by reward and punishmentW05接線人員首先根據(jù)接線圖紙查找核對電纜數(shù)量、規(guī)格型號、編號。電纜核對不清時,做好記錄,并及時向技術(shù)人員匯報進行查對。Termination person first check cable quantity, type, tag. If not clearly, make a record and

7、report to technician timely.電纜未核對好時,嚴禁整理電纜。You cant banding cable before check one by one.R06電纜核對無誤后,根據(jù)盤內(nèi)端子排位置和電纜在主橋架上的位置進行電纜排列、整理。電纜整理時,需與周圍盤柜接線人員協(xié)商好,避免電纜在主通道上交叉。Arrange the cable according to the terminal location and the cable location in the cable tray. consult with other person avoid cable and

8、cable crossing.電纜標識要清晰完整,不得與其它電纜混淆。Cable should be marked clearly and intact, dont mix up with other cable.H071. 電纜整理時,首先由主橋架最上一層開始向分橋架上引出,待上一層整理完畢,再逐層整理;Cable arrangement, the first by the main frame the first layer began to points on the bridge derivations, for one layer after finishing, then up s

9、tep by step;2. 使用塑料扎帶綁扎時,每兩根電纜用一根扎帶,最多一根扎帶綁扎三根電纜。使用綁線時,要整齊一致,松緊適度;Cable dressing with plastic tie,one tie for two cable ,one tie at most for three cables, when ,when using cable string should be neat;3. 帶有鋼帶的電纜,要在分支架上統(tǒng)一的位置剝除鋼帶,并用自粘帶纏繞35圈,鋼帶要處理光滑、整齊。Cable with steel string should be opened and cut at

10、 branch cable tray, using self-adhesion 35loops,steel string should be rubbed smoothly1. 電纜夾層的電纜整理時一律從主橋架下方引出,電纜嚴禁交叉凸起,電纜排列整齊、弧度一致、美觀。Mezzanine cable arrangement are the main frame when from beneath the derivation, it is strictly prohibited to cable cross convex, cable in order, radian consistent, b

11、eautiful.2. 電纜綁扎固定間距每隔一道橫撐綁扎一道。Cable dressing fixed gap should use string every same distance.3.嚴禁使用破損的綁線和扎帶。Strictly prohibit using damaged tie and stringW08當盤內(nèi)電纜較多時,電纜固定可采用分層方式,第一層固定在柜體支架上,下一層固定在第一層的電纜上,以此類推。when there are too much cable in the panel , cable fixed can adopt hierarchical way, the f

12、irst layer fixed in the cabinets support, a layer of fixed on the first floor of the cables, by parity of reasoning要求接近端子的電纜布置在內(nèi)側(cè),接較遠端子的電纜布置在外側(cè)Requirements of the cable decorate in close to terminal inside, by far the cable on the terminal layoutW09電纜整理到盤底座下,根據(jù)接線端子位置,再分批分區(qū)進行整理。同一類型的盤綁扎位置及方式必須一致。如發(fā)現(xiàn)有

13、問題時,及時向技術(shù)人員匯報。接線人員不得隨意確定整理方式。Cable dressing under the base, according to the terminal blocks position, and partial partition for finishing. The same type of plate assembling position and way shall be consistent. If have problems, termination workers should report to engineer termination workers shal

14、l not be arbitrarily determined to change the way.嚴格按照制定好的整理方式施工。 Strictly according to make good the order way constructionW10盤柜(臺)的電纜在制作終端頭前一定要將電纜完全整理后加以固定,方可制作電纜頭。Cables terminal head fabricated will be fixed after dressing cable completly, can make cable head.電纜頭以上線芯完全散開、拉直,注意不要損傷線芯和屏蔽線(層)。Cable

15、 heads above wire core completely away, pull straight, be careful not to damage wire core and shielding wireH111. 電纜皮剝除時,應剝一根整理一根,不得同時將多個電纜標牌解下,以免混淆。Open cable should one by one that dont must not at the same time to open cable sign for avoiding mix up2. 電纜剝皮位置由技術(shù)人員現(xiàn)場統(tǒng)一規(guī)定,接線人員不得隨意確定。Cable opened loc

16、ation should be told by engineer. electricians dont open cable by themselves without engineer agreed.3. 電纜剝皮時,施工人員應仔細謹慎,用力適當,不得傷及芯線絕緣層。Cable is opened carefully without hurting core4. 電纜皮剝除完后,要進行修理,使其高度一致,再將電纜芯線散開,逐根拉直,用力要適當,以免拉斷芯線。The cable skin after opening to adjust , make its height consistent,

17、 by root made straight, and the strength should be proper, in order to avoid the damage core wires5. 電纜做頭時,先將塑料帶對折,然后在電纜根部順時針繞至與電纜同徑,微呈喇叭狀,再用塑料粘膠帶纏繞1圈,然后用與電纜粗細配套的黑色熱縮管縮緊。A cable, first the plastic with folded in half, and then in the cable clockwise around to the root and cable with diameter, micro

18、is bell shape, then use plastic adhesive tape winding 1 lap, and then use the form a complete set with the cable degree black heat shrinkable tube tighten.6. 電纜頭制作完,逐個將其固定,然后用線繩把臨時電纜牌掛好,線繩長度要適合,以便更換正式的電纜牌。Cable head after fabrication, one by one fixed, then use the temporary cable card even hang up,

19、 even length should fit, to replace official cable card.1.剝除位置要合理一致,高度適合。Open cable location to reasonable consistent, height should appropriate2.電纜刀切痕適度一般為皮厚度的3/4。Cable knife cut mark moderate and the thickness of the skin is commonly 3/43.電纜頭包扎要松緊適度,高度一致,整齊美觀、固定牢固。 Cable head wrap reasonable to mo

20、derate, height consistent, tidy and beautiful, fixed firmly.4.電纜頭制作時要避免出現(xiàn)蜂腰或者鼓腰現(xiàn)象。Cable head to avoid making over surface phenomenon.5.所有熱縮管長度一致,切割整齊。熱縮管的高度與塑料帶平齊。All heat shrinkable tube length is consistent, cut and neat. Heat shrinkable tube of height and plastic belt leveled6.電纜頭固定要牢固,排列整齊。Cable

21、 head should fixed tightly and neatly7.電纜頭以上線芯完全散開、拉直,注意不要損傷線芯和屏蔽線(層)。Cable heads above wire core completely away, pull straight, be careful not to damage wire core and shielding wireH121.芯線根據(jù)電纜排列,成束綁扎,可先用綁線臨時綁扎,待整束完成后更換扎帶綁扎。綁扎間距一致,粗細合適,過度自然美觀。 According to the cable core wires arrangement, into a b

22、unch of binding, and can use first tied with string temporary binding, and for the bundle of finish after the replacement firm with locally. Binding spacing consistent, degree of appropriate, excessive natural beauty2.線束拐彎處要平滑、成型整齊美觀。Cable bunch turning to smooth, molding tidy and beautiful3.有線槽的盤柜,

23、線束先進線槽。但無論盤柜有無線槽,芯線都須從線束背部引出,抽芯線時,相互間應保持平行,并留有余度,抽線位置線束無外觀交叉。線束不宜過粗或者過細。同一盤內(nèi)有多個芯線束時,應合理分配。Cable trough plates channel, put in the channel. But whatever plate channel with a wireless slot, core wires must be drawn back from the wire, every core wires, should keep each other parallel, and remain more

24、degrees, every line position without appearance cross wiring harness. Harness should not be too thick or carefully. The same disc have fixed core wires beam, should be reasonable distribution1. 線束綁扎間距一致。Wire bundle dressing consistent neat, beautiful, well-balanced.2.抽線整齊、美觀、勻稱、悅目。down-lead cable cl

25、ean, beautiful, symmetry, and pleasing to the eye2. 3.線束直徑一般不大于50mm。Cable bunch diameter are rarely more than 50 mmW131.對線必須按照規(guī)定的順序進行。同類盤可分為主動盤和被動盤,即先接一方為主動盤,后接一方為被動盤,被動盤必須找主動盤對線,主動盤要積極配合對方對線。According to the regulation of line must be of the order. Similar plate can be divided into the active panel

26、 and the passive panel, the first termination panel is active panel, followed one of the parties is a passive panel, passive panel must find active panel to check cable, active plate should actively cooperate with each other to the line2.對線一般采用通燈法進行,工作前應檢查確定使用通燈是一對,約定好接地端(或某根芯線),閃亮次數(shù),用對講機聯(lián)系,校好線后及時套好

27、端子頭。Usually, lamp test is used to check wire. Before check wire, confirm the times of flare and wire of earthling. Use walky-talky to check wire if necessary. Put on mark in time after check was finished.3. 對線時,每根導線必須處于開路狀態(tài),不允許導線間連通或者短路。4. During wire checking, all the wires must be in a condition o

28、f open-loop, no happening of termination between wire and short circuit.1. 通訊工具配備齊全,電池電量充足。通訊工具保證語言清晰。Communication tools equipped, the battery power is enough. Communication tool to keep clear language2.電纜對線時需確認正確后,方可進行下一根。Cable checking make sure that the correct then checking another cableW141.根據(jù)

29、端子排位置將芯線抽出,留足長度后多余部分剪掉,用剝線鉗剝?nèi)ソ^緣,剝線時不應損傷芯線。According to drawing, fetch wire out to correlative module and Cut redundant wire. Decorticate wire insulation layer with wire stripper, and not to damage copper core. 2.導線彎曲后套上號頭,號頭字符的閱讀方向要與其對應的二次線的號頭方向一致。接至端子內(nèi),用螺絲刀擰緊,且每個端子一般不超過兩根芯線。After bending wire, put

30、on ferrule and connect it to terminal and make it fastened by screwdriver. There are no more than two wires in every terminal.3.接線時必須認真,仔細核對,避免整理錯位,導致芯線交叉混亂,接線正確、牢固。3. When the termination must be serious, check carefully and avoid finishing dislocation, suitable to cross chaos, its correctness, fir

31、m.4.備用芯線應留足夠長度,備用芯應套電纜編號字頭,固定美觀牢固。The length of spare wire is enough, The mark of spare wire is beautiful and in order.5.電纜芯線要避免有接頭,若必須時,應焊接并處理好絕緣,做好記錄。5.Cable core to avoid the joint, if needed, should be welding and deal with the good insulation, make record.6.接線螺栓、墊片齊全,接線片壓接緊固。芯線與端子接觸良好,不得有松動現(xiàn)象。B

32、olt and washer are all ready. Connections between wire contact and terminal are all right.7. 電纜線芯從線束引至端子排要做到保持平行、間距相等、均勻排列并彎成一個半圓弧,半圓弧要統(tǒng)一使用模具彎制。進入端子排線芯的直線段長度統(tǒng)一成60mm,回彎半徑取15mm,端子排外部裸露的線芯嚴格控制在1mm以下;如端子排離線槽距離較近,可統(tǒng)一采用“S”形彎曲后接入端子,“S”形彎曲圓弧大小須一致。From wire cable core leads to terminal row to do keep paralle

33、l, equal spacing, uniform arrangement and bend like a half arc, half arc to unified use mould. Into the terminal of straight section length united into 60 mm, half arc radius 15 mm, terminal line of the external bare wire control in 1 mm the following; Such as terminal row near the slot, can user th

34、e "S" shape after bending access terminal, "S" shape bending arc size should be consistent.8.備用線芯的長度以能達到盤內(nèi)最遠處接線端子為準,并用扎線扎緊固定好,銅芯不得外露,(以每根電纜的備用芯為一組,做好標記,以便備用)。The length of the spare wire should be reach the farthest terminal, and firm line tied fixed good, copper-core can not app

35、ear, (in every cable core is a set of spare, do mark, in order to set aside).9.總屏蔽層及對絞屏蔽層均應接地。電纜接地采用單端接地,在盤側(cè)接地將引出的黃綠雙色屏蔽線平均分成3道,按花狀進行編織,線芯采用接線鼻子壓接方式,裸露線芯穿出壓接區(qū)前端1mm處,不得將絕緣層壓住,壓接好的線鼻子外不得出現(xiàn)松散的線芯。最后統(tǒng)一整理接到盤內(nèi)接地銅排上。Total shielding layer and wring shielding layer should are connected to ground. Cable ground

36、ing the single end grounding, on the disk side of yellow green grounding will lead to double color shielding wire average into three way, according to take shape to weave, wire core crimping the nose wiring way, bare wire core wear a crimping area 1 mm in front, may not live insulating layer pressur

37、e, pressure meet good line the nose will appear loose wire core. Finally unified arrangement received them onto a grounding copper platoon.10.電纜接線完畢,應清理盤、臺、柜內(nèi),使之清潔,線槽蓋板完整,然后更換正式的電纜牌,線繩長度要適合。Cable wiring finished, must clean dish, Taiwan, ark inside, make clean, slot cover complete, then replace offi

38、cial cable CARDS, even length should be suitable for.1. 導線彎曲方向、彎曲弧度一致美觀。Wire bending direction, curve radian consistent and beautiful.2. 電纜接線時,接線片壓接緊固,排線整齊美觀。芯線表面無氧化層、傷痕。When cable wiring, wiring crimping tighten, line tidy and beautiful.3. 接線正確率必須保證達到100%。The accuracy of wiring must be 100%4. 電纜芯線與

39、端子接觸良好,接線正確牢固。Connections between wire contact and terminal are all right.5. 電纜芯線號頭要求正確、清晰、不褪色。Cable ferrule correct , clearly, not faded.6. 正式的電纜 牌的線繩長度要統(tǒng)一,一般為牌子掛好垂下50mm左右,線繩使用1.5mm白色尼龍繩。The length of formal cable tag strings to unify, generally hanging around 50 mm, use 1.5 mm white nylon cord.7.如

40、設備廠家特殊要求接地,按產(chǎn)品說明書執(zhí)行;無特殊要求時,按照設計圖紙施工,屏蔽層接地應可靠,接地線無間斷、損傷。If the equipment manufacturer special requirements for grounding, according to the product instruction execution; No special requirements, according to the design drawing construction, shielding layer should be reliable grounding, no interrupted

41、, damage.WW見證點W Witness point H停工待檢點 H Shutdown to behave R記錄點R Record point S連續(xù)監(jiān)控點S Continuous employ編寫人Write people: Wang yujing 審核人Audit people: 批準人Approval:工程師ENGINEER:張占超 ZHANG ZHANCHAO電話Phone call: 9909959523質(zhì)量控制點簽證單Quality control points visa list 項目名稱Project name電纜接線Cable termination機組Unit工序

42、卡名稱Process card name集控室、電子間盤柜電纜接線CCR cable wiring專業(yè)Professional熱工I&C控制點名稱Control point name電纜接線準備Ready to cable termination性質(zhì)Properties W H R S監(jiān)督檢查內(nèi)容Supervision and check the content評價Evaluation簽字/日期Signature/date圖紙審核正確性Drawing review correctness施工人員交底及培訓情況Construction personnel training and wor

43、k勞動力組織及分工Labor organization and the division of labor現(xiàn)場滿足施工條件Meet the construction site conditions該控制點已實施監(jiān)督,允許進入下道工序。The control points already implementation surveillance, allow into the next working procedure.責任人/日期Responsible persons/date: 專業(yè)QC/日期Professional QC/date:注:該表中的責任人指質(zhì)量控制工序卡中控制點的責任人Note

44、: this table of the persons responsible quality control working procedure in the card to the person responsible for the control points質(zhì)量控制點簽證單Quality control points visa list項目名稱Project name電纜接線Cable wiring機組Unit工序卡名稱Process card name集控室、電子間盤柜電纜接線CCR cable termination專業(yè)Professional熱工I&C控制點名稱Cont

45、rol point name電纜整理Cable dressing性質(zhì)Properties W H R S監(jiān)督檢查內(nèi)容Supervision and check the content評價Evaluation簽字/日期Signature/date電纜數(shù)量、規(guī)格型號、編號是否齊全。Cable number, specification, Numbers are complete or not.電纜標識要清晰完整。Cable logo to clearly and complete.電纜排列整齊、弧度一致、美觀,綁扎一致、固定牢固。Cable in order, radian consistent,

46、 beautiful, binding agreement, fixed firmly.該控制點已實施監(jiān)督,允許進入下道工序。The control points already implementation surveillance, allow into the next working procedure.責任人/日期Responsible persons/date: 專業(yè)QC/日期Professional QC/date:注:該表中的責任人指質(zhì)量控制工序卡中控制點的責任人Note: this table of the persons responsible quality contro

47、l working procedure in the card to the person responsible for the control points質(zhì)量控制點簽證單Quality control points visa list項目名稱Project name電纜接線Cable wiring機組Unit工序卡名稱Process card name集控室、電子間盤柜電纜接線CCR cable wiring專業(yè)Professional熱工I&C控制點名稱Control point name電纜頭制作Cable head making性質(zhì)Properties W H R S監(jiān)督檢

48、查內(nèi)容Supervision and check the content評價Evaluation簽字/日期Signature/date電纜皮剝除位置要合理一致,高度適合。The detailed place about decorticating is same and appropriate.電纜頭包扎要松緊適度,高度一致,整齊美觀、固定牢固。Enswathement elasticity of terminal must be moderate; length is alike, arrangement must be orderly and beautiful and fixing is

49、 firm.所有熱縮管長度一致,切割整齊。熱縮管的高度與塑料帶平齊。The length of all the firing shrinkage tubes is alike. The height of firing shrinkage tube is the same as plastic tape.電纜頭固定要牢固,排列整齊。The end of cable must be fixed hard and in order.該控制點已實施監(jiān)督,允許進入下道工序。The control points already implementation surveillance, allow int

50、o the next working procedure.責任人/日期Responsible persons/date: 專業(yè)QC/日期Professional QC/date:注:該表中的責任人指質(zhì)量控制工序卡中控制點的責任人Note: this table of the persons responsible quality control working procedure in the card to the person responsible for the control points質(zhì)量控制點簽證單Quality control points visa list項目名稱Proj

51、ect name電纜接線Cable wiring機組Unit工序卡名稱Process card name集控室、電子間盤柜電纜接線CCR cable wiring專業(yè)Professional熱工I&C控制點名稱Control point name電纜接線Cable termination性質(zhì)Properties W H R S監(jiān)督檢查內(nèi)容Supervision and check the content評價Evaluation簽字/日期Signature/date線束綁扎間距一致,線束直徑一般不大于50mm,導線一律從線束的背部出線,抽線整齊、美觀、勻稱、悅目。The binding

52、distance of wiring harness is same. The diameter of wiring harness is no more than 50mm. Wire must be fetched out from the back of wiring harness. Outlet wire is in order, beautiful, shapely.芯線表面無氧化層、傷痕。No scar and oxidation happens to wire.電纜芯線與端子接觸良好,接線正確牢固。Connection is right and hard.電纜芯線號頭正確、清晰

53、、不褪色。Wire mark is right, clear and fadeless.正式的電纜牌的線繩長度要統(tǒng)一,一般為牌子掛好垂下50mm左右,線繩使用1.5mm白色尼龍繩。The line is white nylon line, whose dia. is 1.5mm. The length of line is 150mm.屏蔽層接地可靠,接地線無間斷、損傷,符合設計及設備廠家的要求The grounding of shield layer is reliable and shield layer has no joint and scar. It should be according to the design and manufacturers requirement.該控制點已實施監(jiān)督,允許進入下道工序。The control points already implementation

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論