




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、Electric power system dispatch automation1.Feature of electric power system v Electrical energy can not be stored up massively vTransit process rapidlyvStructure complex and hugeThe five utilities of national grid in ChinaNortheast Grid;North China Grid;Central China Grid;Northwest Grid;South Grid.N
2、ortheast Grid, North China Grid, East China Grid, Central China Grid, Northwest Grid, South Grid have been formed a national network.1. Different resource in different places can complete each other and improve the economic operation.2. Use of time difference in different places can reduce the gap b
3、etween peak and trough,reduce the total installed capacity.3. Reduce backup capacity, under the malfunction they can complementary to each other, improve the system reliability.The advantage of the modern electric power systerm 4.The loads in every region are compensated to make sure frequency and v
4、oltage stable. 5.Convenient to install huge assembling unit, improve the efficient of the electric power system.1. Easily occur a chain of large scale malfunctions, hard to analyze the safety ,stability problem prominent, and a higher demand for dispatch. 2. How to coordinate between the various sub
5、systems, between the hydroelectricity and coal-fired power , how to consider global and local interests, is a problem of challenge. The disadvantage of the modern electric power systerm2. Power system operating requirementsSafety Ensure continuity of supply, satisfy customer demand for electricityQu
6、ality Ensure power quality (voltage, frequency, waveform)Economy Improve power system economics Environmentally) Reduce the adverse impact on the environment Qualified power QualityGood economic CharacteristicsEnsure safe and reliable power supplyThe basic running of the power system Requirements3.
7、Power system componentsPower system consists of generation, transmission, transformation, distribution, electrical equipment componentsPrime motorHeat load Power sectionElectric generatorBoosting transformerCircuitStep-down transformerThe power grid Power SystemsElectrical power systemPower UserElec
8、trical equipment(3) Secondary system:In the power system on primary monitoring equipment, relay protection devices, remote communication devices and other components and auxiliary systems. This is an information system, also known as the secondary system.(1) Primary system:Power system is an energy
9、system, also called primary system.(2) Primary equipment:Electrical equipment of primary system (5)Power system:It is an integral part of the secondary system, generally refers to the electrical equipment and system of automatic monitoring control and scheduling.(4)Secondary equipment:The devices in
10、 the secondary system is called secondary equipment (or device)4.Classification of power system automation Electric power system dispatch automation Power plant automation Substation automationGeneration and transmission automated SchedulingDistribution automationThermal power plant automationHydrop
11、ower plant automationDividedby runningmanagement area Frequency and active power of electric power system automation control Power system voltage and reactive power automatic control Automatic control of power system security Power system circuit breaker automatic controlDivided by the angle of the
12、automatic control5. Power system scheduling tasks1)Electricity load forecasting 2)Formulate the generating, operation mode and operation plan3)For security monitoring and security analysis 4)Command operations and dealing with incidents Electric power system dispatch automation task 6.Power system scheduling objectives (1)Ensure safe levels of system operation; (2)Ensure quality of power supply (frequency and voltage of system); (3)Ensure system running economy; (4)Guarantee effective recovery measures after an accident; Explanation:(1)The first three s
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度夫妻婚內(nèi)財產(chǎn)約定及家庭財務(wù)狀況監(jiān)測協(xié)議
- 2025年度白酒年份酒產(chǎn)區(qū)深度開發(fā)與合作合同
- 二零二五年度新能源企業(yè)代理招聘人才合同
- 二零二五年度獨(dú)立董事聘用合同(科技創(chuàng)新企業(yè))
- 二零二五年度全面數(shù)字化企業(yè)整體資產(chǎn)轉(zhuǎn)讓合同
- 二零二五年度解除勞動合同關(guān)系及經(jīng)濟(jì)補(bǔ)償計算協(xié)議
- 2025年度道路養(yǎng)護(hù)勞務(wù)承包合同(智能化管理)
- 二零二五年度挖機(jī)運(yùn)輸與設(shè)備回收合同
- 浙江國企招聘2024中國郵政速遞物流股份有限公司舟山市普陀區(qū)分公司招聘筆試參考題庫附帶答案詳解
- 2025陜西煤業(yè)新型能源科技股份有限公司招聘(31人)筆試參考題庫附帶答案詳解
- 全國大學(xué)生英語競賽輔導(dǎo)課件教學(xué)培訓(xùn)課件
- 2024年四川省成都市青羊區(qū)中考數(shù)學(xué)二診試卷(含答案)
- 2024年保安員考試題庫【典型題】
- Unit 2 Lets celebrate Developing ideas-Writing a letter to express 課件【知識精講+拓展訓(xùn)練】高中英語外研版(2019)必修第二冊
- 2024年湖南有色金屬職業(yè)技術(shù)學(xué)院單招職業(yè)技能測試題庫完美版含答案解析
- 2024年江蘇衛(wèi)生健康職業(yè)學(xué)院單招職業(yè)適應(yīng)性測試題庫及答案解析0
- 《中國陶瓷史》課件-3-陶與瓷
- 數(shù)學(xué)教育的國際比較與交流
- 2023年4月自考00160審計學(xué)試題及答案含解析
- 案卷評查培訓(xùn)課件模板
- 醫(yī)院死亡證明培訓(xùn)課件
評論
0/150
提交評論