下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、 422 UNDERGROUND SPACE Vol. 24 Keywords settlement of pile base ; creep ; Mersi model Hierarchy2Fuzzy Comprehensive Judgment for Safety Evaluation of Metro Running Tunnel WANG Yan et al ( 301 Abstract An overall analysis of factors influencing the safety system of metro running tunnel was carried ou
2、t ; a Hier2 archy2structure Model is set up . The relative weigh of influencing factors to the evaluated objects are gained by analyz2 ing the model . Then , a multi2hierarchy comprehensive evaluation on whole safety system by fuzzy comprehensive judg2 ment was carried out and a reasonable safety ev
3、aluation method for metro running tunnel is set up . Keywords metro running tunnel ; hierarchy analysis ; fuzzy comprehensive judgment ; safety evaluation WANG Yu2lan et al ( 306 Abstract In this paper , based on the property of the underground civil defense projects in need of reinforcement during
4、wartime , the bearing capacity of the underground civil defense projects reinforced with pillars is analyzed by fi2 nite element program SAP93. The numerical results show that the pillars can improve the bearing capacity of the con2 struction and make the underground civil defense projects in confor
5、mity with the requirements for defense in wartime. Keywords underground civil defense project ; finite element program ; pillars added ; bearing capacity ; requirements for defense A Study on Bearing Performance of Reinforced Underground Civil Defense Projects J IANG Y ong et al ( 312 Abstract The m
6、ethods to determine the earth pressure and calculate lining structure of rock tunnel are studied , es2 pecially for uneven pressure tunnels , by which the tunnel lining can be dynamically analyzed during the construction stages. The construction parameters can be adjusted in time to achieve the best
7、 economic results. The recommended methods in regulations are used to determine the starting parameters ; the back2analysis is carried out adopting the sim2 Dynamic Analysis and Relevant Study on the Rock Tunnel with Uneven Pressure plex method of changeable tolerance for analysis of load and stratu
8、m parameters and the back2analysis parameters are used to analyze the internal force of the tunnel lining for guiding the determination of lining parameters. Keywords uneven pressure tunnel ; load2structure method ; back2analysis method Computer Method for Inner Damage Monitoring during Excavation o
9、f Underground Space WANG Hua2ning et al ( 315 Abstract Dynamic damage monitoring of cracked rock mass during construction is very important for the safety. The fitting function back2analysis method for damage field is established by using multi2variant distributed parameter ap2 proximation theory ,
10、which can be used to identify and monitor the evolution of adjacent rock damage. The distributed parameter system is described by multiplying several orthogonal functions. The form of damage function distribution is determined by the distributed parameters through back2analysis of the measured displ
11、acement . The accuracy of back2 analysis affected by different fitting function term number is studied as well . The time2varying back2analysis , step and final2work back2analysis are compared and analyzed. Keywords damage monitoring ; fitting function ; mapping A Simplified Method for Calculation of the Horizontal Coefficient of Sub 2grade Reaction with the Flat Dilatometer Test TANG Shi2dong et al ( 322 Abstract The horizontal coefficient of sub2grade reaction Kh can be obtained from the flat dilatometer test (DMT . However , there are many influencing factors for horizonta
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025至2030年中國紙帽數據監(jiān)測研究報告
- 2025至2030年中國寵物掛飾數據監(jiān)測研究報告
- 2025至2030年中國全自動飯柜數據監(jiān)測研究報告
- 2025至2030年中國PDA點菜系統(tǒng)數據監(jiān)測研究報告
- 2025至2031年中國谷物清理機行業(yè)投資前景及策略咨詢研究報告
- 2025年度電商直播內容制作合同4篇
- 2025年度出租車司機休息休假聘用合同4篇
- 二零二五年度存量房交易合同與物業(yè)管理交接服務協議4篇
- 二零二五年度美容院美容產品綠色生產合同3篇
- 2025年繆含離婚協議書及離婚后財產監(jiān)管協議4篇
- 2024-2025學年北京石景山區(qū)九年級初三(上)期末語文試卷(含答案)
- 第一章 整式的乘除 單元測試(含答案) 2024-2025學年北師大版數學七年級下冊
- 春節(jié)聯歡晚會節(jié)目單課件模板
- 中國高血壓防治指南(2024年修訂版)
- 糖尿病眼病患者血糖管理
- 抖音音樂推廣代運營合同樣本
- 教育促進會會長總結發(fā)言稿
- 北師大版(2024新版)七年級上冊數學第四章《基本平面圖形》測試卷(含答案解析)
- 心理調適教案調整心態(tài)積極應對挑戰(zhàn)
- 噴漆外包服務合同范本
- JT-T-390-1999突起路標行業(yè)標準
評論
0/150
提交評論