1、精選優(yōu)質文檔-傾情為你奉上帶式輸送機安裝工藝指導書工藝名稱Process name工藝要求Process request公差Tolerance 質量問題Quality Question解決辦法Solution 地基Foundation按照帶式輸送機的安裝尺寸,核實安裝基礎是否符合要求,測量安裝基礎是否在同一水平面上(指橫向)According to the installation size of the belt conveyor,Verify installation base is in line with the requirements,Whether measuring insta
2、llation based on the same horizontal plane(Refers to the horizontal) 水平面公差1/1000Level of tolerance 1/1000 地基水平Foundation Level可用墊片調整到水平為止Available shim adjustment at the level帶式輸送機安裝中心線The center line of the belt conveyor installation按總裝圖的安裝尺寸要求,將其尺寸復制到地基上,劃完線后,再由工程質檢進行檢驗確認According to the requireme
3、nts of assembly diagram of installation dimension,Its size is copied to the foundation,After draw the line,Confirmed by the test engineering quality inspection again 滾筒及托輥軸線對輸送機機架中心線的垂直度2/1000,兩相鄰托輥對角線3mmPulley and roller line to the center line of the conveyor frame vertical degree 2/1000,Two adjac
4、ent rollers diagonal 3mm 先將頭尾架劃好中心,再用軟線彈出帶式輸送機的中心線,根據中心線兩側分畫中間架及支腳線Center head tail rack row first,Pop up the center line of belt conveyor with a soft line again,According to the center line on both sides of the picture frame and the leg line 頭尾架Head and tail frame在經檢驗合格后的安裝中心線上,進行頭尾架的安裝所用工具千墜、水平尺、差
5、尺,主要測量頭、尾架、滾筒座是否在同一水平面上(要求1/1000),爾后測出滾筒軸線對輸送機中心線的垂直度(要求2/1000)In the inspection qualified after the installation of the center line,The head and tail rack installation tools used for thousand pendant, spirit level, ruler, mainly measuring head and tail frame, pulley is in the same horizontal plane(
6、request 1/1000),Then measure the verticality of cylinder axis of the center line of the conveyor(request 2/1000) 水平公差1/1000垂直公差2/1000The level of tolerance1/1000The vertical tolerance2/1000地基不平,頭尾架變形The foundation uneven,Head to tail frame deformation地基不平可用墊片進行調整;機架變形可調整機架(1) the foundation uneven g
7、asket available to adjust(2)the frame deformation adjustable frame 支腿landing leg首先檢測支腿是否變形,方法是測量兩立柱的對角線,觀測兩立柱是否在同一平面上,確認無質量問題后,按地腳線進行安裝,安裝后確保支腿兩側立柱的直線度在任意25m長度內,公差為5mm,輸送機長度100m,直線度10mm100-300m,直線度30mm以內The first Detecting whether the leg transformation,Methods are the two pillar of diagonal measure
8、ment,If observed two columns on the same plane,After confirmed with no quality problem,According to the anchor line installation,After installation to ensure that the leg on either side of the column the straightness in arbitrary length of 25 m,tolerance of 5 mm,Conveyor length 100 m or less,straigh
9、tness 10mm100-300m,Straightness of 30 mm 對角線4,在任意25m直線度5mm100m直線度10mm,100-300m直線度30mm以內Diagonal 4,In any 25 m straightness 5 mm or less 100 m straightness is 10 mm, > 100-300 - m straightness within 30 mm 地基不平,支腿變形The foundation uneven,Head to tail frame deformation 用墊片調整地腳;修正支腿或變換 (1) with the g
10、asket to adjust the anchor(2) correction of leg or change 中間架Middle Frame 按圖確定好下料點位置,首先安裝與其對應的中間架,爾后按中間架排號進行安裝,邊安裝邊測量孔的對角線4mm,安裝完后必須經質檢人員簽字合格后方可進行下一步工序According to the figure fine blanking point location is determined,First installation and its corresponding to the middle of the frame,Then according
11、 to the numeral middle frame for installation,Install while measuring hole diagonal 4 mm or less,After the installation must be done by the quality inspection personnel qualified rear can carries on the next working procedure 兩側中間架水平度2/1000,安裝托輥橫梁孔的對角線公差4mmOn both sides of the middle 2/1000 levelnes
12、s,Install idler beam hole diagonal tolerance of 4 mm or less 兩中間架不在同一水平面上,對角線超差Two the middle frame is not in the same horizontal plane, diagonal error應認真調整、測量,注:這是對輸送機跑偏與否起到關鍵性的工藝Should be carefully adjusted, measurementNote:This is key technology in terms of conveyor running deviation or not滾筒pull
13、ey頭尾滾筒的安裝要求轉動靈活,垂直度要符合2/1000的公差要求The request of installation about head and return pulley is flexible rotation水平度1/1000Levelness1/1000垂直度2/1000Vertical 2/1000滾筒轉動不靈活;Pulleys rotation is not flexible垂直度超差Vertical beyond tolerance滾筒兩側瓦合用墊片進行調整到轉動靈活為止;Adjust both sides of pulleys tile combination washe
14、r to flexible rotation檢查劃線是否有誤,Check the dash whether have mistake用調整螺栓進行調整be adjusted by adjusting the screw托輥橫梁及托輥convey frame and roller認真查閱總裝配圖,注意緩沖托輥、前傾橫梁及過渡橫梁、調心托輥橫梁的安裝位置(兩邊的調心托輥先不上)Carefully review the general assembly drawing,Notice the installation location of impact rollers, forward beams
15、and excessive beam,spherical roller beams(spherical rollers both side cant install firstly) 輸送帶Conveyor belt輸送帶安裝前必須嚴格檢查轉動件轉動是否靈活可靠,確認無問題后,可安裝輸送帶,輸送帶的吊裝嚴禁用帶銳角的工具或鋼絲繩直接接觸帶來吊運,可用80mm直徑的圓管等穿入帶心進行吊裝,輸送帶接頭貼接采用硫化貼接,需專業(yè)技術人員完成Conveyor must be strictly checked before installation to confirm turning whether f
16、lexible and reliable.Installation conveyors after confirmed.Transporting conveyor belts use With sharp tools or direct contact with wire rope is forbidden.Lifting can use penetration with a heart tube (pipe diameter80mm).Connector of conveyor belt use then paste sulfide by professional workers. 帶邊撕裂
17、Band edge tear吊裝工具不對,更換工具Lifting tools is wrong,change tools跑偏開關、拉繩開關Deviation switch,Rope switch輸送帶安裝完畢后,在試運行前必須安裝好跑偏開關及拉繩開關,否則禁止試車運行After installing conveyor belts ,and Before commissioning,deviation switch and rope switch must be installed successful.or commissioning is forbidden 驅動裝置Drive means驅
18、動裝置安裝時與傳動滾筒對接,其兩聯軸器的標志一定對齊(此件為柱銷聯軸器)安裝同心度0.7mm,安裝完后按設備要求加足潤滑油Install buff drive and drive pulley,the log of two couplings must alignment.(This piece is pin coupling)Installation concentricity0.7mm,Add Lubricating oil as equipment request after installation.同心度0.7mmConcentricity0.7mm轉動時顫動或兩相鄰的軸承發(fā)熱Rot
19、ation fibrillation or two adjacent bearings heating重新調整驅動裝置位置,上下不同心可在驅動架下墊片,解決前后不同心,可移動驅動裝置解決,以達到理想效果為止Re-adjust the position of drive means .Driving under the gasket in the frame while Down different heart,Mobile drive unit to slave Before and after different heart.The aim is to achieve the desired
20、 effectPloughunloader犁式卸料器在下料口處安裝犁式卸料器,安裝后要進行調整,膠板探出刮板10-15mm,刮板要與輸送帶調至無間隙為止,在試運行前,把犁頭抬起以減小開車阻力Install plough unloader at feed opening,after installing, adjust it. rubber board is longer than scraper,about 10-15mm. Scraper and conveyor belt should be adjusted with no gap,before commissioning,lift th
21、e pough to reduce driving resistance. 試運行Commissioning運行前準備工作:preparation before operating 一、檢查驅動裝置各潤滑處所注入的潤滑油牌號、數量是否符合要求;Check the driving device lubrication point,the injected oil grade and quantity to meet the requirements. 二、檢查液力偶合器中注入的介質(油式水)質量、數量是否與傳動功率相匹配(應加入介質量占總容積的75-80%);二、Check injected o
22、peration medium(oiled water) of fluid coupling quality,quantity,whether match the transmission power(should be added to the total volume of operation medium quality 75%-80%)三、檢查制動器閘瓦與制動輪間隙是否符合1.5-3mm的要求;三、Check the brake shoe and brake wheel gap,whether meets the requirements of 1.5-3mm.四、檢查減速器輸入軸的轉
23、向,逆止器的轉向是否符合要求;點動試車四、Check the the steering of the gearbox input shaft,steering of inverted valve,meets the requirements. cold startup.五、檢查跑偏開關、拉繩開關是否安裝完畢;五Check the deviation switch and cord switch are installed.六、用手轉動各傳動部分的機械是否靈活,有無卡住的現象;六Rotate the mechanical part of the transmisison is flexible,
24、with or without stuck phenomenom.七、檢查基礎及各部件螺栓是否緊固,工地焊接的焊縫有無漏焊等;七、Check the basis and every bolts are fastening,weld is welding seamless,etc.八、檢查電氣信號、電氣控制保護、絕緣等是否符合電氣說明書的要求,點動電機,確認電機旋轉方向;八、Check the electrical signal,electrical control protection,electrical insulation, whether meet the demands of ele
25、ctrical manual,move the motor,check the motor rotation direction. 啟動電機后減速機不轉動; After starting the motor,reducer doesnt rotate.整機無法啟動; the conveyor cant be operated.啟動后聯軸器振動,軸承位發(fā)熱升溫超過40°C(含環(huán)境溫度)coupling vibration starts,bearing position heating temperature rising over 40 degrees.(including ambie
26、nt temperature) 液力偶合器是否加夠了介質數量,Fluid coupling add enough quantity of operation medium 有逆止器的帶式輸送機是否轉向不對,check the belt conveyor with inverted valve is turning right. 如聯軸器振動或軸承位發(fā)熱,應重新調整聯軸器的同心度或軸承是否缺油。 If the coupling vibration or bearing position is high temperature,re-adjust the concentricity of the
27、coupling or bearing is lack of oil.空載運行中的觀察內容及設備調整The observed and equipment adjust during no load operation試運行中,要仔細觀察各部分的運轉情況,發(fā)現問題及時調整:During test run,you should scrutinize the service behavior of every part,find the problem and adjust it.一、觀察各運轉部件有無相蹭的現象,特別是輸送帶點動,觀察輸送帶是否跑偏,跑偏要及時處理,防止損傷輸送帶;Observe
28、whether one part rub the other part,or off tracking,if off tracking appear,must dispose in time to protect the conveyor belt from broken.二、輸送帶的跑偏超過帶寬的5%應進行調整,調整好后將調心托輥安裝上;If the off tracking degree more than 5% of belt width should adjust,after adjust finishing,install the aligning roller.三、檢查設備各運轉部
29、件,有無異常聲音及異常振動;Check each part of the equipment,whether have abnormal noise or abnormal vibration.四、檢查減速機、液力偶合器、潤滑油、軸承等處溫升情況是否正常,是否有漏油現象;Check the temperature rise of reducer,fluid coupling,lube and bearing whether oil leak.五、制動器、各種限位開關保護裝置的動作是否靈敏可靠;Check brake and all limit switch,whether it is sensitive.六、拉緊裝置運行是否良好,有無卡死現象;Tension device running well,whether locking or no
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 【世界銀行】創(chuàng)新金融工具及其在管轄REDD發(fā)展中的作用
- 商業(yè)設計師考試的關鍵機制與試題答案總結
- 廣告設計師考試中的設計原則試題及答案
- 中考英語試題及答案陜西
- 助理廣告師考試高效學習方式試題及答案
- 2024年紡織設計師職業(yè)素質試題及答案
- 研究紡織品的質量與標準體系試題及答案
- 心境障礙試題及答案解析
- 思維導圖紡織品設計師證書考試試題及答案
- 關注紡織工程師證書考試分類知識試題及答案
- 高考語文120個重點文言實詞
- 江蘇省糧食集團招聘筆試題庫2024
- 2024年深圳市彩田學校初中部小升初入學分班考試數學模擬試卷附答案解析
- 2024年安徽安慶市交通控股集團有限公司招聘筆試沖刺題(帶答案解析)
- 《沙龍培訓》課件
- 充電樁四方協(xié)議書范本
- 中考英語情景交際和看圖寫話
- 知道智慧網課《科學社會主義概論》章節(jié)測試答案
- 事故調查分析課件
- 《養(yǎng)老護理員》-課件:自然災害的應對處理知識
- 勞務外包服務方案(技術方案)
評論
0/150
提交評論