1、道康寧(張家港)有限公司19萬噸/年有機(jī)硅聚硅氧烷項(xiàng)目(二期)Dow Corning 190kt/a Siloxane Project in Zhangjiagang (phase 2)(Team A區(qū)Part A& C鋼結(jié)構(gòu)安裝工程)(steel structure installation engineering for Part A& C of Team A area)臨時(shí)用電方案Temporary Electricity Supply Plan編制Author: 審核Verifier: 批準(zhǔn)Approver: 上海寶冶建設(shè)有限公司Shanghai Baoye Const

2、ruction Corp.Ltd一、 編制說明道康寧有機(jī)硅聚硅二期鋼結(jié)構(gòu)工程Team A區(qū)鋼結(jié)構(gòu)工程基本上全部為高強(qiáng)螺栓連接,現(xiàn)場(chǎng)臨時(shí)用電主要是用于極小量的焊接及打磨、飲水機(jī)等少量用電設(shè)施,計(jì)劃用電總功率約26KW。一級(jí)電箱不用配備(已與業(yè)主聯(lián)系用博格豪森路與12區(qū)之間的配電箱編號(hào)為63)。配備一個(gè)二級(jí)電箱,多個(gè)移動(dòng)式小配電箱(主要是用于砂輪機(jī))。具體電箱布置及電纜走向見電箱布置及電纜走向圖。Team A steel structure in Dow Corning Siloxane Project Phase 2 is mainly connected with high strength

3、bolt. In allusion to all construction use of power operated tools, welding machine, rotary sander, the planning for total power is about 26KW. It should not fit out the main electrical distribution container (it will use the distribution container which located between Bogehaoshen road and area 12,t

4、hat the number is 63)。It should fit out the secondary panel and many mobile distribution panels (mainly for rotary sander). Arrangement of distribution container and routing of cable meet the following schematic plan.二、電源配置走向示意圖:低壓配電的操作順序如下,送電順序:業(yè)主提供的一級(jí)電源箱寶冶二級(jí)電源箱開關(guān)箱;停電順序相反。The electrical sequence: t

5、he main distribution containerSBCs distribution container switch box;三、電纜、電箱的配置所有電箱、電纜均以“三相五線制,三級(jí)配電二級(jí)保護(hù),一機(jī)、一閘、一漏、一箱”的原則進(jìn)行配置。All distribution boxes and cables should apply three-phase five-wire system, with three class power distribution and two-step earth-fault protection. One machine can only conne

6、cts to one switch, one leakage protection equipment and one distribution container. 四、安全用電措施 security electricity supply measure1)、電工必須經(jīng)專業(yè)技術(shù)培訓(xùn)合格后方可進(jìn)入現(xiàn)場(chǎng)進(jìn)行施工。電工必須持有操作證上崗作業(yè),嚴(yán)禁無證上崗作業(yè)。Electrician should take part in the training and be approved by the owner and engineering should have the certificate to

7、work.2)、所有進(jìn)現(xiàn)場(chǎng)的配電箱、配電線、電纜、用電設(shè)備,必須預(yù)先經(jīng)過檢驗(yàn)、測(cè)設(shè),合格后方可使用。不得采用殘缺、破損等不合格產(chǎn)品。All approach distribution, wire, cable and electricity supply equipment should pass the inspection and test. It should not allow use the sub-quality products.3)、用電系統(tǒng)必須按規(guī)范規(guī)定設(shè)置短路、漏電保護(hù)。 The electricity supply system should accord with th

8、e specification to set up the cutting-out and protection for leakage.4)、配電裝置必須設(shè)端正、牢固,不得拖地放置;周圍不得有雜物、雜草;進(jìn)線端必須做固定連接,不得用插座、插頭做活動(dòng)連接;進(jìn)出線上嚴(yán)禁搭、掛、壓其它雜物。The distribution device should set up the correctitude and firm, it should not lay-aside on the ground; the round of the distribution device should not have

9、 the natural grass and sundries; it should firm lead-in end, it should not move the connection with the plug and attachment plug. The sundries should not allow hung and press on the wire.5)、移動(dòng)式配電裝置及用電設(shè)備遷移位置時(shí),必須先將其前一級(jí)電源隔離開關(guān)分閘斷電,嚴(yán)禁帶電搬運(yùn)。When portable-type distribution device and the electricity supply

10、equipment move the location, it should switch off. 6)、用電設(shè)備嚴(yán)禁濺水、浸水,已經(jīng)濺水或浸水的用電設(shè)備必須停電處理,未斷電時(shí),嚴(yán)禁徒手觸摸和打撈。Splashing water and water strictly prohibited on the equipment, the equipment which already has the splashing water and water should switch off the power to deal with the water. Touch and fishing stri

11、ctly prohibited when the power is on.7)、建立技術(shù)交底制度及相應(yīng)的檔案,通過技術(shù)交底提高各類人員安全用電意識(shí)和水平。建立電氣巡查、維修、拆除制度。It should establish the system for technique hand-over and relative fire to improve the consciousness of electricity supply. It should establish the system for go on a tour, maintain and dismantle.8)、動(dòng)火或動(dòng)電焊前應(yīng)

12、對(duì)周圍環(huán)境進(jìn)行檢查,如發(fā)現(xiàn)有易燃、易爆或電纜、光纜等敏感性物質(zhì)應(yīng)進(jìn)行有效保護(hù)方可進(jìn)行。It should be checked the surrounding environment before weld. It found the explosive, cable, fiber optic cable, ect. It should be protected to work.9)、,電焊專業(yè)人員進(jìn)入作業(yè)現(xiàn)場(chǎng),作業(yè)人員一定要穿戴好防護(hù)用品并應(yīng)戴好防護(hù)鏡或防護(hù)面罩。When entry in the site, the worker should wear the protection goo

13、ds, the welder should wear the protective glasses and protective mask.10)、焊機(jī)接地要良好,防止觸電事故發(fā)生The welder earth in good condition, it should prevent the accident for electroshock.11)、焊接完后及時(shí)關(guān)閉焊機(jī),將焊鉗放在絕緣物品上或懸掛起來,不得與構(gòu)件接觸。It should switch off the weld machine; the welding tongs should put on the insulator or

14、 hang on. Dont touch the member.12)、作業(yè)區(qū)內(nèi)必須配有可撲滅電器火災(zāi)的滅火器,作業(yè)區(qū)不得有易燃、易爆物品,防止火災(zāi)等發(fā)生。It should equip with annihilator, it should not have the tinder to prevent the fire.13)、施工場(chǎng)地注意文明施工,安全通道暢通,電焊線堆放整齊,保證施工現(xiàn)場(chǎng)的整潔。It should attend the civilization construction. The members and construction material should pile regular. It should clean the rubbish and keep the orderliness on site.14)配電箱、開關(guān)箱要合理設(shè)置,避免不良環(huán)境因素?fù)p害和引發(fā)電氣火災(zāi),其裝設(shè)位置應(yīng)避開污染介質(zhì)、外來固體撞擊、強(qiáng)烈振動(dòng)、高溫、潮濕、水濺,以及易燃易爆物The configuration of distribution box and switch box should be suitable. Avoid damage and fire

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論