1、國(guó)際工程項(xiàng)目施工分包合同(中英文)CONTRACT OF SUBPROJECT EXECUTION本合同系中譯英翻譯:云軍Translated from Chinese to English by Mr. Chang Yunejune.簽署日期:Date ofSignature :總包商: General Contractor分包商: Subcontractor電氣機(jī)械承包公司(以下簡(jiǎn)稱總包商),和工程施工公司(以下簡(jiǎn)稱分包 商),于訂立本分包合同。鑒于總包商已同利比亞國(guó)大型電氣項(xiàng)目管理局(以下簡(jiǎn)稱業(yè)主),就電氣機(jī)械承包工程項(xiàng)目的設(shè)計(jì),運(yùn)輸和施工簽訂了合同;鑒于分包商愿按該合同實(shí)施土建和安裝工
2、程而報(bào)了價(jià);鑒于總包商已接受分包商的報(bào)價(jià),并依據(jù)分包商所附的報(bào)價(jià)表,現(xiàn)雙方達(dá) 成協(xié)議如下:This con tract is made and en tered into on , between Electrical Mach ine Con tract ing Compa ny (here in after referred to as gen eral con tractor) and Engin eeri ng Compa ny (here in after referred to as subco ntractor).WHEREAge neral con tractor has co
3、n cluded con tract, with Libya n Nati onal Authority of Large Electrical Project (here in after referred to as employer ), of the design, transportationand execution of the contractedproject of electrical machine installation;WHEREAS subc on tractor is willi ng to execute the project of civil engin
4、eeri ng and in stallati on and made quotati on there on;WHEREAS gen eral con tractor has accepted subc on tractor' s quotati on;NOWHEREFORiarties hereto, as per subc on tractor ' s quotati on, hereby cove nant and agree as follows:(一) 下列文件應(yīng)是本分包協(xié)議的組成部分:Follow ing docume nts is the in tegral p
5、arts of this subc on tract ing con tract.1 電氣、機(jī)械及技術(shù)操作的合同通用條款(1980年第一版);Gen eral Provisi ons on Electrical / Mach ine and Tech ni cal Operati on(First versio n 1980);2.合同的特殊條款;Particular Provisio ns of Con tract;3 電氣機(jī)械工程項(xiàng)目的技術(shù)規(guī);Tech ni cal Norms of Project of Electrical / Mach ine;4.工作圍和技術(shù)要求; Contents
6、 and Tech ni cal Requireme nts for Project;5 .土建和安裝工程分包合同的報(bào)價(jià)表。Quotati on for Subc on tract of Civil Engin eeri ng and In stallati on.(二)工作圍 Project Contents本建設(shè)電氣機(jī)械工程項(xiàng)目位于利比亞國(guó)境,業(yè)主的技術(shù)規(guī)定如圖所示。分 包商的工作圍包括如下容:The project of Electrical Machine which technical requirements as shown in drawings, is located in
7、the territory of Republic of Libya. The Working contents of subcontractor include the following:1提供所有工程的監(jiān)督人員,熟練和非熟練工人,提供運(yùn)輸、測(cè)繪工具 及設(shè)備,挖掘及鉆孔機(jī)械,吊車,以承擔(dān)塔架安裝和導(dǎo)線掛垂和拉直等工作。Dispatching the personnel, for all projects, of supervision, skilled and unskilled workers, providing transportation, mapping tools / equi
8、pment, machines of digging & drilling and crane, which for the purpose of the executions of tower i nstallation, electrical line's hanging /straightening, and so on.2 .提供混凝土材料、水泥、砂、石子、灰漿材料、鋼筋,并運(yùn)送到工地Provision of and transportation of concrete materials, cement, sand, gravel, mortar materials
9、and steel bar.3 .為所有工人及管理人員提供住宿、膳食、供水、衛(wèi)生設(shè)備、交通費(fèi)用 和社會(huì)保險(xiǎn)。Provision of, for all workers and administrators, accommodation, meals, water, sanitation, transport costs and social insurance.4.運(yùn)送由總包商提供的庫(kù)房中的塔架、導(dǎo)線、絕緣材料、五金構(gòu)件、接 地材料,包括從總包商庫(kù)房到施工現(xiàn)場(chǎng)的運(yùn)輸,并負(fù)責(zé)卸車和保管。Transportation, from warehouse, provided by general con
10、tractor, of tower, electrical line, hardware components, grounding materials, which including the responsibilities of transportation from general contractor 's warehouse to Work site in addition to unloading and storage thereof.5 .分包商應(yīng)按總包商提供的縱斷面圖和測(cè)繪圖確定塔架的位置。凡是已 由總包商定出的塔架位置,分包商應(yīng)測(cè)量檢驗(yàn),以保證塔架的位置和線位方向
11、 符合合同技術(shù)規(guī)的要求,并在取得總包商批準(zhǔn)后,應(yīng)對(duì)測(cè)繪圖作相應(yīng)的更改或 修正。Subcontractor should, as per the profile view and mapping diagram, provided by general contractor, determine the location of tower on which, general contractor has terminated, subcontractor should makemeasure and inspection so as to ensure tower ' s locatio
12、n and orientation conform the technical requirements hereof, and should, be subject to approval of general contractor, process corresponding alteration or amendment thereof.(三)符合技術(shù)規(guī)要求 Conformity With Requirements of Technical Norms分包商應(yīng)熟悉技術(shù)規(guī),應(yīng)按照業(yè)主的要求和合同規(guī)定,承擔(dān)屬于分包工程 圍的與分包商有關(guān)的全部責(zé)任。Subcontractor should,
13、be familiar with the technical norms and as per employer 's requirements and contract 's stipulation, assume all responsibilities which within subcontract 's works and relevant tosubcontractor.(四)勞工 Labor分包商應(yīng): Subcontractor should1.提供足夠數(shù)量的工人,以滿足總包商工程師在工程進(jìn)度方面的要求。Send a sufficient of numbe
14、r of workers to meet the necessity of project progress schedule by engineer of general contractor.2 .支付雇員工資并自費(fèi)為其雇員提供保險(xiǎn),為其雇員提供住宿及膳食。Make payment, at its own expenses, of wages / salary and insurance for its employers, and provide employers with accommodation and meals.五) 遵守法律 Comply with Laws分包商應(yīng)對(duì)下列事
15、項(xiàng)承擔(dān)法律責(zé)任:Subcontractor should assume legal liability for following items1遵守利比亞國(guó)關(guān)于所得稅的規(guī)定。如果其雇員中有人對(duì)雇主給他們的 報(bào)酬不付個(gè)人所得稅,分包商也應(yīng)對(duì)此負(fù)責(zé)。Comply with the provisions of income tax in Libya laws, if any employer fail to pay such tax against the payment of remuneration which paid by employer, subcontractor shall bear
16、 responsibility therewith.2 分包商應(yīng)服從所有適用于本分包工程圍的利比亞國(guó)的法律、地方法及 規(guī)定。Subcontractor should obey all laws, local regulations and rules, which apply to this sub-project, of Libya.(六)與業(yè)主的關(guān)系 Relationship with Employer除總包商的工程師授權(quán)外,分包商任何時(shí)候均不能與業(yè)主接觸或談判。Subcontractor should not, at any time, take contact to and negot
17、iation with employer except with the authorization of general contractor' sengineer.(七)維修保證期 Warranty Period 分包商將從頒發(fā)驗(yàn)收證書之日起12個(gè)月所分包施工的工程的質(zhì)量保修責(zé)任。Subcontractor shall, within 12 months on and from the date of Acceptance certificate issued, take the liability of quality warranty for its subcontractin
18、g project.八)保險(xiǎn) Insurance1.工程保險(xiǎn):總包商應(yīng)按合同一般條款的規(guī)定,自費(fèi)對(duì)永久和臨時(shí)性工 程、施工機(jī)械及設(shè)備進(jìn)行保險(xiǎn),這應(yīng)包括分包工程在。Project Insurance: General contractor should, as per the stipulations of general provisions hereof, at its own expense, effect the insurance, which include sub-contract, covering the permanent and temporary works, const
19、ruction machinery / equipment.2 .第三方保險(xiǎn):包括分包商在的第三方保險(xiǎn),將由總包商承擔(dān),而分包 商不付任何費(fèi)用。分包商應(yīng)自費(fèi)負(fù)責(zé)其工人的保險(xiǎn),包括與分包工程有關(guān)的各 種性質(zhì)的索賠。Insurance for the third party: The third party insurance which include subcontractor shall be effected by general contractor, for which no expense on subcontractor. Provided that subcontractor s
20、hould at its own expense effect the insurance for its workers, include the claims of various kinds which relevant to subcontracted project.(九)工具及設(shè)備 Tool and Equipment該分包工程施工和維修所需的全部工具,包括拉力設(shè)備、撥具、緊裝置、 操作線、傳動(dòng)滑車等、分包商應(yīng)自費(fèi)提供。分包商應(yīng)遵守利比亞國(guó)有關(guān)各種工具、設(shè)備、機(jī)械及運(yùn)輸工具方面的所有 法律和海關(guān)規(guī)定,并支付由此產(chǎn)生的全部費(fèi)用。一俟該分包工程竣工,分包商 就應(yīng)負(fù)責(zé)把上述全部設(shè)備和工具
21、撤出利比亞國(guó)。Subcontractor should, at its ownexpense, provide any and all tools which necessary for execution and maintenance of project including pulling device, dial tool, tensioning device, operating line, driving pulley, and other tools.Subcontractor should comply with all laws and customs regulations
22、 inLibya on a variety of tools, equipments, machinery and transport vehicle and pay all expense which arising thererom. Subcontractor should, upon the completion of subcontracted works, withdraw all equipments and tools referred above out of Libyan country.(十)總包商材料的交付 Delivery of Ge neral Con tracto
23、r ' s Materials總包商應(yīng)負(fù)責(zé)交付工程施工所需材料,包括塔架、塔架附件、導(dǎo)線、絕緣 裝置、絕緣體及導(dǎo)線配件、接地棒及接地線等。分包商應(yīng)在總包商的倉(cāng)庫(kù)提取 材料,將材料 裝車,運(yùn)送到施工現(xiàn)場(chǎng)并卸車,費(fèi)用自行承擔(dān)。按工程進(jìn)度計(jì)劃, 對(duì)分包商各項(xiàng)工作所需要的材料,總包商至少要在該項(xiàng)工作開始前一周為分包 商備妥。如果總包商 未能按上述要求把材料交付給分包商,總包商應(yīng)準(zhǔn)許分包商相應(yīng)的延長(zhǎng)期。Gen eral con tractor should be resp on sible for the delivery of con struct ion materials n eeded
24、for executi on, which in clude tower a nd its accessories, electrical li ne, in sulat ing device, in sulators, wire accessories, grounding rods and grounding lin es, and so on.Subc on tractor should on its own expe nse, obta in from gen eral con tractor ' s warehouse, and load and tran sport the
25、 materials to work site and unioading. With respect to the materials which necessary to the various works of subc on tractor, gen eral con tractor should, as per project schedule, complete material preparati on for subc on tractor within one week prior to the comme nceme nt of work, provided that if
26、 gen eral con tractor fail to do so, corresp onding exte nsion of work period shall be allowed to subc on tractor.(一)分包工程量與分包總價(jià)Subcontracted Quantity and Total Cost在該分包工程價(jià)格表中所列的工程量?jī)H是估算數(shù)量,如果增減圍在土_% 之,則單價(jià)不作任何變化。如果增減圍超過(guò)土_%,應(yīng)按總包合同一般條款中第條規(guī)定辦理。The qua ntity specified in Subproject Price List is only estim
27、ate, if,in crease or decrease range with in± _%, no adjustme nt shall be ma deto unit price.Provide that if in crease or decrease range bey ond ± _%, shall process as per Article in commercial con diti on of Gen eral Con tract.本工程項(xiàng)目的分包總價(jià)是在分包商給總包商的報(bào)價(jià)中予以確定的,而分包商的 報(bào)價(jià)及報(bào)價(jià)條件已被總包商接受,且是本分包合同的組成部分。
28、Subject total cost has been affirmedin subcontractor ' s quotation togeneral contractor, and the quotation and conditions thereof have been accepted by general contractor and constitute the part hereof.(十二)總包商的監(jiān)督 Supervision of General Contractor.總包商將指定一位或幾位工程師監(jiān)督該項(xiàng)分包工程的施工,分包商的人員 應(yīng)對(duì)現(xiàn)場(chǎng)監(jiān)督承擔(dān)協(xié)助義務(wù)。One
29、or more than one engineers whoare appointed by general contractor shall makesupervision and inspection on the execution of subproject and the staff of subproject should assumethe assistance liability for site supervision.(十三)許可證和執(zhí)照 Permission and License總包商應(yīng)幫助分包商獲得分包商雇員所需的入境簽證、居住證和勞動(dòng)證、 該分包工程所需的施工材料和
30、設(shè)備進(jìn)口許可證,以及生活用房。辦理這些函件 所花的費(fèi)用以及由此產(chǎn)生的一切開支均應(yīng)由分包商承擔(dān)。General contractor should assist subcontractor available for entry visas, Permissions of residence and work, which are necessary for subcontractor 's employees, in addition to the import permission of materials / equipments needed by subject, as wel
31、l as living house. All cost and expense arising therefrom shall be for subcontractor'saccount.(十四)竣工及違約延誤 Completion and Delay due to Breach根據(jù)雙方同意的施工日程表,在分包商能及時(shí)得到材料的條件下,分包商 應(yīng)按下列規(guī)定日期完成各分項(xiàng)工程的施工。(各分項(xiàng)工程的竣工日期略)如果由于分包商的錯(cuò)誤或疏忽,未能按上述日期完成該分包工程,分包商 同意每延誤一天,就向總包商支付拖延分項(xiàng)工程的分包合同價(jià)的,作為罰 金或違約罰款金,罰金或違約罰款金最高限額不得超過(guò)分
32、包合同總價(jià)的。Subcontractor should, subject to Execution Schedule which agreed by parties hereto, at the circumstances under which subcontractor isavailable to theprovision of materials in time, make completion of theexecuti ons of each sub-project as the follow ing stipulated date.(十五)進(jìn)度報(bào)告 Progress Report
33、分包商應(yīng)按總包商同意的格式,呈送每周和每月的進(jìn)度報(bào)表Subc on tractor should, as per the format which agreed by general con tractor prese nt weekly and mon thly progress report.(十六)廠商證明書和試驗(yàn)報(bào)告Manufacturer ' s Certificate and TestReport分包商應(yīng)呈送用于該分包工程的水泥、鋼筋、砂、礫石以及任何其他材料 的廠商證明及試驗(yàn)報(bào)告,并取得總包商對(duì)此批準(zhǔn)?;炷猎噳K的報(bào)告單應(yīng)同地 基工程付款申請(qǐng)單一起呈送。所有試驗(yàn)及試驗(yàn)報(bào)告
34、書應(yīng)符合有關(guān)標(biāo)準(zhǔn)規(guī)的要求。Subc on tractor should provide gen eral con tractor with manu facturer' scertificate and test report of ceme nt, re inforcing steel bar, sand,gravel and any other materials which shall be used in subproject and with the permissi on of gen eral con tractor. Report of con crete block
35、should be sent together with Application of payment for foundation project. All test and report thereof should conform to the requireme nt of releva nt sta ndard or norm.(十七)支付條款 Payme nt總包商應(yīng)按如下規(guī)定向分包商付款:Gen eral con tractor should as per followi ng provisi on make payme nt to subc on tractor:1 預(yù)付款,其
36、金額為分包合同價(jià)總額的_%,自分包商提交由銀行開具 的等值銀行預(yù)付款保函之日起15天,付給分包商;保函有效期為個(gè)月。Adva nee payme nt, which equal to % of subc on tract ' s total value shall be paid to subc on tractor withi n 15 days on and from issue of BankGuara ntee, by subc on tractor, for Adva nee Payme nt which has equal valve with the samevalue
37、of advanee payment. The validity period of Guarantee shall be months.2 每月完成的并經(jīng)業(yè)主驗(yàn)收的工程的占分包合同價(jià)的In accordance with monthly completion which have been accepted by employer, the payment shall be of subcontract total cost.3 分段工程占分包合同價(jià)的_%;憑暫時(shí)驗(yàn)收證書。Payment of subsection shall account of subcontract cost agai
38、nsttemporary acceptance certificate.4分包價(jià)的_%;憑最終驗(yàn)收證書支付。按總包合同規(guī)定,只有工程經(jīng) 業(yè)主在四周驗(yàn)收后,自收到分包商發(fā)票之日起五周,才能付給分包商。% of total subcontract cost shall, against Certificate of FinalAcceptance , be made payment. In accordance with the provisions of general contract the payment can not be madeunless and until within fiv
39、e weeks in which employer make acceptance and within four weeks in which receipt of subcontractor' s invoices.(十八)驗(yàn)收工程 Acceptance工程竣工后,分包商應(yīng)通知總包商驗(yàn)收,總包商自接到驗(yàn)收通知3 個(gè)工作日組織驗(yàn)收,并辦理驗(yàn)收、移交手續(xù)。如總包商在規(guī)定時(shí)間未能組織驗(yàn)收,需 及時(shí)通知分包商,另行確定驗(yàn)收日期。Upon completion of project, Subcontractor should inform General contractor to proc
40、ess completion acceptance; General contractor shall arrange inspection and acceptance within 3 working days after receiving the notification, and shall handle the inspection and hand-over processes. In the event of General contractor could NOT arrange the inspection and acceptance within the require
41、d period, General contractor should inform Subcontractor and reschedule the date for acceptance on a timely manner.分包商在向總包商提交竣工驗(yàn)收申請(qǐng)的同時(shí),應(yīng)提交相關(guān)的竣工資料和竣 工圖。Subc on tractor shall submit releva nt as-built submittals and as-built drawing whensubmitting the request for completion acceptanee to General con t
42、ractor.竣工驗(yàn)收后,分包商必須在7天,完成場(chǎng)地清退工作,并向總包商做好各 項(xiàng)交接工作包括文件、設(shè)備和工具等。After the completi on accepta nee, Subc on tractor must fin ish the vacation of the project site within 7 days and complete all hand-over processes in clud ing docume nts, equipme nt, and ute nsils(十九)履約保函 Guara ntee for Performa nee在分包合同簽訂后15
43、天,分包商應(yīng)根據(jù)所附的保函格式,提交一份銀行 開具的無(wú)條件履約保函,額度相當(dāng)于分包合同價(jià)的,有效期為個(gè)月,自 本分包合同簽訂之日起。Subc on tractor should, with in 15 days on and after sig nature of subproject as per the guara ntee format, submit an Uncon diti onal Perform Guara ntee by a bank, of which the amount shall be equal to % of subject con tract total cos
44、t and validity is mon ths on and after the date of sig nature of this con tract.(二十)文件和圖紙 Docume nts and Draw ings在收到最終付款之時(shí),分包商應(yīng)向總包商退還所有總包商向其提供的文件、 圖紙和技術(shù)規(guī)。由總包商提供的任何文件分包商都不能用于除本協(xié)議目的以外 的其他任何目的;同時(shí)分包商亦不能泄露由總包商或業(yè)主所提供的文件中的任 何資料。但是涉及本協(xié)議目的的除外。Subc on tractor should, upon receipt of final payme nt, retur n a
45、ll docume nts, draw ings and tech ni cal no rms, which provided by gen eral con tractor. Any docume nt from gen eral con tractor can not be used by subc on tractor to any other purpose bey ond the executi on hereof, and subc on tractor shall in no case disclose any in formati on in the docume nts provided by gen eral con tractor or employer, except for the purpose hereof.(二十一)總包商
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 纖維加工過(guò)程中的節(jié)能減排考核試卷
- 琥珀蜜蠟拍賣考核試卷
- 礦物學(xué)及巖石學(xué)考核試卷
- 糕點(diǎn)行業(yè)產(chǎn)品質(zhì)量評(píng)價(jià)與監(jiān)督考核試卷
- 臨清市2024-2025學(xué)年五年級(jí)數(shù)學(xué)第二學(xué)期期末綜合測(cè)試模擬試題含答案
- 珠海三中高一下學(xué)期期中考試?yán)砜粕镌囶}
- 吉林司法警官職業(yè)學(xué)院《紀(jì)錄片創(chuàng)作與拍攝》2023-2024學(xué)年第一學(xué)期期末試卷
- 山東蒙陰縣2024-2025學(xué)年中考化學(xué)試題倒計(jì)時(shí)模擬卷(2)含解析
- 遼寧省普蘭店市第一中學(xué)2025年高三下學(xué)期模擬測(cè)試(三)語(yǔ)文試題含解析
- 眉山職業(yè)技術(shù)學(xué)院《兒童舞蹈創(chuàng)編(實(shí)驗(yàn))》2023-2024學(xué)年第二學(xué)期期末試卷
- 數(shù)學(xué)三角形的高、中線、角平分線教案2024-2025學(xué)年北師大版(2024)七年級(jí)數(shù)學(xué)下冊(cè)
- 《關(guān)于強(qiáng)化危險(xiǎn)化學(xué)品“一件事”全鏈條安全管理的措施》學(xué)習(xí)解讀
- 三農(nóng)項(xiàng)目申請(qǐng)操作流程指南
- 組織行為學(xué)(對(duì)外經(jīng)濟(jì)貿(mào)易大學(xué))知到課后答案智慧樹章節(jié)測(cè)試答案2025年春對(duì)外經(jīng)濟(jì)貿(mào)易大學(xué)
- 貼太陽(yáng)膜知識(shí)培訓(xùn)課件
- 面粉廠粉塵防爆培訓(xùn)課件
- 【2025新教材】教科版一年級(jí)科學(xué)下冊(cè)全冊(cè)教案【含反思】
- 2025年由民政局策劃的離婚協(xié)議官方文本模板
- 高血壓科普健康宣教課件
- 第16課《有為有不為 》課件-2024-2025學(xué)年統(tǒng)編版語(yǔ)文七年級(jí)下冊(cè)
- 班級(jí)安全員信息員培訓(xùn)
評(píng)論
0/150
提交評(píng)論