版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、 VxRail 超融合平臺安裝部署手冊TopicVxRail Gen 2 Appliance Installation ProceduresSelectionsSelect your activity: Install A New VxRail Gen 2 Single Appliance Cluster (All Other Gen 2 VxRail Appliances)Are you connecting to an external vCenter?: NoSelect the SysLog Option: NoneSelect Top of Rack Switch topology:
2、 Single Top of Rack SwitchIs this a Dark Site? i.e. Customer does NOT allow call-home!: YES - This is a Dark-Site! Customer does NOT allow call-home!Include Appendix?: Do Not include any AppendiciesService Provider: EMC目 錄 TOC o 1-6 h z u HYPERLINK l _Toc505596403 Preliminary Activity Tasks PAGEREF
3、_Toc505596403 h 3 HYPERLINK l _Toc505596404 Read, understand, and perform these tasks PAGEREF _Toc505596404 h 3 HYPERLINK l _Toc505596405 Service Provider, Project Information and Customer Contact form PAGEREF _Toc505596405 h 4 HYPERLINK l _Toc505596406 VxRail Single Appliance Installation Procedure
4、 PAGEREF _Toc505596406 h 4 HYPERLINK l _Toc505596407 Overview: PAGEREF _Toc505596407 h 4 HYPERLINK l _Toc505596408 Pre-installation preparation PAGEREF _Toc505596408 h 4 HYPERLINK l _Toc505596409 VxRail hardware installation overview PAGEREF _Toc505596409 h 5 HYPERLINK l _Toc505596410 VxRail model a
5、nd software release cluster requirements PAGEREF _Toc505596410 h 5 HYPERLINK l _Toc505596411 Site requirements PAGEREF _Toc505596411 h 5 HYPERLINK l _Toc505596412 Task1:Unpacking the VxRail appliance PAGEREF _Toc505596412 h 5 HYPERLINK l _Toc505596413 Task2:Installing the appliance in a cabinet PAGE
6、REF _Toc505596413 h 7 HYPERLINK l _Toc505596414 Task3:Connecting cables to the VxRail appliance PAGEREF _Toc505596414 h 14 HYPERLINK l _Toc505596415 Task4:Connecting to a single TOR switch PAGEREF _Toc505596415 h 15 HYPERLINK l _Toc505596416 Task5:Before powering on VxRail PAGEREF _Toc505596416 h 16
7、 HYPERLINK l _Toc505596417 Task6:Powering on the appliance PAGEREF _Toc505596417 h 16 HYPERLINK l _Toc505596418 Using the VxRail BMC interface PAGEREF _Toc505596418 h 17 HYPERLINK l _Toc505596419 Before you begin PAGEREF _Toc505596419 h 17 HYPERLINK l _Toc505596420 About the VxRail BMC interface PAG
8、EREF _Toc505596420 h 18 HYPERLINK l _Toc505596421 Task7:Accessing BIOS from a local console PAGEREF _Toc505596421 h 18 HYPERLINK l _Toc505596422 Task8:Identifying the BMC LAN Port configuration in BIOS PAGEREF _Toc505596422 h 19 HYPERLINK l _Toc505596423 Task9:Identifying the BMC DHCP address PAGERE
9、F _Toc505596423 h 20 HYPERLINK l _Toc505596424 Task10:Configuring the BMC LAN Static IP Address PAGEREF _Toc505596424 h 21 HYPERLINK l _Toc505596425 Task11:Accessing the BMC Web console PAGEREF _Toc505596425 h 22 HYPERLINK l _Toc505596426 Task12:Using the BMC Web console to launch the remote console
10、 PAGEREF _Toc505596426 h 23 HYPERLINK l _Toc505596427 Task13:Using the BMC Web console to control server power PAGEREF _Toc505596427 h 25 HYPERLINK l _Toc505596428 Configuring VxRail for the First time PAGEREF _Toc505596428 h 26 HYPERLINK l _Toc505596429 Task14:Configuring VxRail for the first time
11、PAGEREF _Toc505596429 h 26 HYPERLINK l _Toc505596430 Task15:Installing the bezel PAGEREF _Toc505596430 h 37 HYPERLINK l _Toc505596431 How to Change the IB Status for VSPEX BLUE/VxRail PAGEREF _Toc505596431 h 38 HYPERLINK l _Toc505596432 Task16:Connect to the Salesforce site PAGEREF _Toc505596432 h 3
12、8 HYPERLINK l _Toc505596433 Task17:Under Case details complete the fields. PAGEREF _Toc505596433 h 39Preliminary Activity TasksThis section may contain tasks that you must perform before going to the customer site. Make sure these tasks are complete before performing the procedure.Read, understand,
13、and perform these tasks REF _Ref347961420 r h Table1 lists tasks, cautions, warnings, notes, knowledgebase (KB) solutions, and Top 10 Service Topics that you need to be aware of before performing this activity. Read, understand, and when necessary perform any tasks contained in this table and any ta
14、sks contained in any associated knowledgebase solution. List of cautions, warnings, notes, KB solutions, and Top 10 Service Topics for this activity HYPERLINK /docs/DOC-56305 o /docs/DOC-56305 VxRail: Dial-home event code: MYSTIC100001 - ESX Server Inaccessible458749 HYPERLINK /docs/DOC-56303 o /doc
15、s/DOC-56303 VxRail: How to properly apply the License file for the VSPEX BLUE / VxRail appliance303859 HYPERLINK /docs/DOC-56301 o /docs/DOC-56301 VxRail: Dial-home event code: MYSTIC020002 - Hardware health changed - disk status462945 HYPERLINK /docs/DOC-56306 o /docs/DOC-56306 VxRail: Prerequisite
16、 for successful ESRS deployment on VxRail Appliance334581 HYPERLINK /docs/DOC-56307 o /docs/DOC-56307 VxRail: Dial-home event code: MYSTIC024003 - Hardware health changed - node status (System Status LED amber blinking)462954 HYPERLINK /docs/DOC-56311 o /docs/DOC-56311 How to reset the BMC478938 HYP
17、ERLINK /docs/DOC-56280 o /docs/DOC-56280 VxRail: How to collect all VxRail log bundles for EMC Support333684 HYPERLINK /kb/488019 o View KB article 488019: The following EMC Knowledgebase solution applies to this activity:VxRail: VxRail 3.5 validation fails at external VC hostname, particullary on t
18、op-level domain HYPERLINK /kb/486959 o View KB article 486959: The following EMC Knowledgebase solution applies to this activity:VxRail: How to replace certificate in vCenter for VxRail appliance HYPERLINK /kb/486263 o View KB article 486263: The following EMC Knowledgebase solution applies to this
19、activity:VxRail: Performance degradation on VxRail 3.5 hybrid configurationService_Provider_Project_Cust_info.docService Provider, Project Information and Customer Contact formThis form is automatically populated based on the information that is provided in the VxRail Procedure Generator questionnai
20、re prior to generating the procedure. This information is collected and used for reference purposes when referring back to this procedure at a later date and time.Section 1:Service Provider InformationWhat is your name:What is your email address:Section 2:EMC Project InformationEMC CSI SR#:EMC Proje
21、ct/PAS ID (or Partner Company Name):Section 3:Customer Account InformationCustomer Site Name:Customer Contact Name:Customer Site Street Address:Customer Site City:Customer Site State/Country:VxRail_Gen2_Installation_Overview_Single_Appliance_FINAL.docVxRail Single Appliance Installation ProcedureOve
22、rview:This procedure only covers the physical hardware installation of a single VxRail Appliance. Out of scope for this procedure is adding an additional appliance to an already configured cluster. Additionally, this procedure does not cover any of the network configuration tasks necessary to result
23、 in a successful VxRail implementation. It is the customers responsibility to make certain that the network requirements have been met for the VxRail Appliance prior to the provisioning of VxRail.Pre-installation preparationIt is critical to an efficient, successful installation to completely captur
24、e and confirm all network elements, IP, ToR Switch details, VLAN information as described in the Pre-Installation Checklist.Perform the following:Download the most recent version of the Pre-Installation Checklist and thoroughly review it. The checklist is available via the SolVe Desktop for VxRail.C
25、ollaboratively work with designated customer contacts to confirm all the necessary pre-requisites have been met per the checklist prior to going on site to perform the physical installation.Collaboratively work with designated customer contacts to capture and record the configuration and network ele
26、ments described in the checklist prior to going on site to perform the physical installation.Ensure the IP pool size is sufficient for the number of appliances in the cluster. Refer to individual switch vendor documentation as described in the Pre-Installation Checklist for the individual configurat
27、ion and confirmation techniques for customer relevant network elements.Pay special attention to confirmation of customer network topology, differences in ToR switch models including firmware and licenses within the planned target cluster.The As-Built Configuration deliverable is automatically genera
28、ted by completing the checklist and can be printed for reference on site. Use it for reference during VxRail configuration.VxRail hardware installation overviewThe procedure details the key steps necessary to install VxRail hardware and prepare it for implementation.These steps include but are not l
29、imited to:Unpacking the applianceMounting the VxRail Appliance into the customer provided rack(If applicable) mounting the ToR Switches into the customer provided rackCabling ToR switches to VxRail appliance nodesConnecting to the customer networkPowering on VxRail applianceConfirm network readiness
30、 before performing an installation. Failure to have a properly configured Top of Rack switch will result in VxRail provisioning failure.VxRail model and software release cluster requirementsWhile new appliances are automatically discovered on addition to a cluster, the appliances being added must ma
31、tch the model and release level of the cluster in place. Adding a VxRail appliance with a newer software release DOES NOT automatically update other appliances in a cluster.Site requirementsThere are no restrictions on the location of the server in the cabinet. Allow at least 36 inches of service cl
32、earance in front of and behind the cabinet. Power distribution must support the number of outlets required for the servers and the server power rating listed on the Device Rating label on the chassis. For additional information, refer to the preparation/planning guides for your specific site and cab
33、inet.Ensure you have the following available before installing the VxRail appliance:Two people to lift the VxRail appliance.Philips screwdriver.Laptop or PC with Internet access to register for EMC Online Support, and with local network access to configure the VxRail system (Refer to the Pre-install
34、ation Site Checklist)A cable to connect the laptop or PC to the top-of-rack switch. This may require a media converter depending on the type of ToR switch and the type of connectors on the appliance (SFP+ or RJ45).Two 110 VAC circuits (VxRail 60 only) or two 220 VAC circuits (all other Gen 2 VxRail
35、Appliances).VxRail_Gen2_Installation_Rack_Single_Appliance_FINAL.docUnpacking the VxRail applianceWhen unpacking the appliance, preserve all the packaging materials in case you need to ship the appliance in the future.The appliance is heavy and should be removed from the package by two people. To av
36、oid personal injury and/or damage to the appliance, do not attempt to lift the appliance without a mechanical lift and help from another person.Inspect the package for damage. If the package (or any of the packaging material) is damaged, contact your shipper.Using a utility knife, carefully open the
37、 shipping box.Remove the contents of the package as illustrated in the following table.Removing package contents1. Accessory box2. Cardboard shipping material3. Top cushion4. VxRail appliance5. Bottom cushion and cardboard boxVerify that your package includes the following items:VxRail applianceRack
38、 mount kitPower cordsFront bezel and bezel keyFour red CAT6 Ethernet cablesVerify that the customer also has the following items:Eight blue CAT6 Ethernet cables (for appliances with RJ45 NICs only)Eight SFP TwinAx cables (for appliances with SFP/SFP+ NICs only)Installing the appliance in a cabinetTo
39、 install the server in a cabinet, you must perform the tasks below in the order listed.Review the warnings and recommendations section.Verify the contents of the mounting kit.Adjust the rail assemblies for the cabinet channel holes.Remove the inner rails from the rail assemblies.Attach the inner rai
40、ls to the server.Install the slide rails in the cabinet.Install the server on the slide rails in the cabinet.Connect cables to the server.Install the bezel on the server.The cabinet in which you will install the server must have a full earth ground to provide reliable grounding. Additionally, the ca
41、binet should have its own switchable power distribution. We suggest that you use a cabinet that has dual power distribution units, one on each side.We recommend that you use cabinet anti-tip devices, especially if you are installing or removing a server in the upper half of the cabinet when the lowe
42、r half is empty.Verify that the server mounting kit includes the parts listed in the following table.Mounting kit partsComponentUse2 universal rail assemblies (consists of slide rails for connection to the cabinet and inner rails for connection to server) Attach back to front on either side between
43、cabinet channelsFour Phillips pan-head 8-32 x 0.35 in screws Stabilize the server and rail mounting2U bezel (application specific)Covers front of server in cabinetYou need a # 2 Phillips-head screwdriver to complete the installation of the rails and server.Adjust the rail assemblies for the cabinet
44、channel holes.The rail assemblies ship with round alignment posts at the end of the rails for cabinet channels (NEMA rails) with round holes. If your cabinet has channels with square holes, switch the rail alignment posts to square posts.Remove the screw that secures the alignment post assembly.Push
45、 the plastic tab on the alignment post assembly up or down, depending on the rail end, and hold the tab in.Rotate the alignment post assembly either clockwise to switch from round posts to square posts or counter clockwise to switch from square posts to round posts until the assembly clicks into pla
46、ce.Secure the alignment post assembly in place with the screw that you removed.The screw goes in the hole opposite the hole from which you removed it.Switching from round rail alignment posts to square alignment postsRemove the inner rails from the rail assemblies.Slide the inner rail out from the s
47、lide rail as far as possible.On the inner rail, slide the blue disconnect tab forward to release the inner rail from the slide rail.Slide the inner rail completely out of the slide rail.Removing the inner rail from the slide railAttach the inner rails to the server.With the flat side of the inner ra
48、il facing the side of the server, align the large end of the rail notches of the inner rail with the connection studs on the server and push the inner rail onto the connection studs.Slide the inner rail forward along the server until the studs fit securely into the small end of the rail notches.An a
49、udible click indicates that the rail is secure.Attaching an inner rail to the serverInstall the slide rails in the cabinet.The universal rail assemblies for this server support cabinets in which the front and rear mounting channels are 24 inches to 34 inches apart. Each assembly contains a right and
50、 a left slide rail.Select the 2U (3.5 in) of cabinet space for the server.Location for the rails in the 2U space for the serverFrom the front of the cabinet, align rail alignment posts with the rear channel holes for the selected cabinet space for the server, and insert the alignment posts securely
51、into the holes.An audible click indicates that the connection is secure.Inserting rail alignment posts into rear channel holesSecure the rail to the rear channel with a small stabilizer screw.Installing stabilizer screwsInstall the server on the rails in the cabinetThe enclosure is heavy and should
52、be installed into or removed from a rack by two people. To avoid personal injury and/or damage to the equipment, do not attempt to lift and install the enclosure into a rack without a mechanical lift and/or help from another person.On each slide rail, bring the ball bearing retainer assembly fully t
53、o the front, so it rides onto the security knob.From the front of the cabinet, align the inner rails attached to the server, with the white plastic guide block on the front inside of each slide rail.Aligning the inner rail with white plastic guide blockWhen installing the server in the cabinet, do n
54、ot pick the server up by its power/control modules and do not push on its power/control modules. These modules are on either side of the front of the server.From the front of the cabinet, align the inner rails, attached to the server, with the white plastic guide block on the front inside of each sl
55、ide rail.Slide the server into the cabinet so the inner rail extends over the plastic guide blocks and the first part of the ball bearing retainer assemblies.Once the inner rails properly engage with the ball bearing retainer assemblies, push the server into the cabinet until the slide rails engage
56、and lock.An audible click indicates that the slide rails are engaged and locked.On the outside of each rail assembly, slide the blue disconnect tab forward to unlock the server, and push the server completely into the cabinet.Inserting the server in the cabinetTo further secure the rail assembly and
57、 server in the cabinet, insert and tighten a small stabilizer screw directly behind each bezel latch Installing the stabilizer screwsVxRail_Gen2_Installation_Cable_Single_Appliance_FINAL.docConnecting cables to the VxRail applianceRefer to the VxRail Pre-installation Site Checklist as needed for the
58、 customer environment specifics. Do not power on the VxRail appliance until after you have confirmed the ToR switch configuration is complete.Plug the power cords into the power supplies and connect these cords to AC power sources.Attach the I/O cables as appropriate:Connect the VxRail appliance to
59、a single ToR switchConnecting to a single TOR switchIf you are using a single top-of-rack (TOR) switch, make the network connections as shown.Each of the four nodes in a VxRail appliance has two network ports.Single ToR Switch with SFP+ network connectionsSingle ToR Switch with RJ45 network connecti
60、onsConnect each port on a node to the configured ports on the TOR switch.Work with the customer and refer to the VxRail Pre-installation Site Checklist as needed for the port assignments on the ToR Switch. Plugging into any available port does not guarantee network connectivity.SFP+ Twinax 10GbE Net
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 國畫畫室課程設計
- 無人智能化酒店課程設計
- 人工智能輔助智能廣告投放策略優(yōu)化服務合同
- 2024年智能道路設施安裝精修合同模板3篇
- 2024版房屋拆遷安置補償與后續(xù)開發(fā)承包合同模板3篇
- 2024年度房地產無底薪業(yè)務員傭金支付與銷售支持合同3篇
- 外來運輸車輛安全環(huán)保管理合同(32篇)
- 2024版分公司全產業(yè)鏈合作開發(fā)合同3篇
- 2024年智能穿戴設備OEM代加工及研發(fā)支持合同2篇
- 2024年度虛擬現實營銷解決方案合同2篇
- 創(chuàng)新思維與創(chuàng)業(yè)實驗-東南大學中國大學mooc課后章節(jié)答案期末考試題庫2023年
- 電網檢修工程預算定額
- 六年級上冊英語說課稿-Unit6 There are four seasons in a year Lesson 35-36|人教(精通)
- 大班語言故事吉吉和磨磨
- 裝配式建筑混凝土結構施工技術PPT完整全套教學課件
- 筆試考試:HSK筆試(二級)真題模擬匯編(共499題)
- 愛、金錢和孩子:育兒經濟學
- 小學音樂-拍皮球教學設計學情分析教材分析課后反思
- 年廣東省檔案工作人員崗位培訓班試題
- 【2022年】山東省臨沂市特種設備作業(yè)煙花爆竹從業(yè)人員模擬考試(含答案)
- 零基礎的住宅和城市設計智慧樹知到答案章節(jié)測試2023年同濟大學
評論
0/150
提交評論