1、頂管法施工方案(英文版)頂管法施工方案(英文版)頂管法施工方案(英文版)V:1.0精細(xì)整理,僅供參考 頂管法施工方案(英文版)日期:20 xx年X月 Method Statement for Pipe JackingConstruction of PitsThe jacking pit with a dimension of 6mx5 clear opening with depth of 250mm below invert level of the steel pipe.The floor will be leveled by 100mm thick concrete blinding f
2、ixing tow I beams in the center of the pit for fixing jacking frame.Installation of Jacking FrameAfter the construction of drive, the jacking rig will be lowered into the pit and adjust to the control line and level. The rig will be used on this contract consist of two number of hydraulic cylinders
3、with a capacity of 150 ton each to give a total jacking force of 300 tons. The rig will have guided rails, pushing plate and base plate to hydraulic power back with control unit. The hydraulic system will run through a diesel engine installed the top of the pit.The rig will installed to the correct
4、line and level and check by the consultant in respect to level and alignment.Thrust WallConstructing a concrete block behind the base plate of the rig to a dimension of will be provided to take and distribute the jacking load.Pipe Jacking OperationA steel shield is used at the front of the pipe to a
5、ccommodate the miner and to allow for steering of the pipe jack. The soil within the shield is manually excavated and loaded into a wheel skip for transport to the pit bottom. The miner does not dig outside the shield (both in front and radically) and the front, or cutting edge, of the shield is alw
6、ays kept buried in the face, so stability is maintained. The shield is thus used to trim the excavation to the size of the pipe thus minimizing the potential for settlement of the ground above the pipe jack.In the pit bottom, the skip is hoisted to the surface, emptied and returned to the used to lo
7、osen it prior to digging. The exact diameter of shield will be selected to suit the pushing pipes.As excavation continues, the shield is jacking forward using two hydraulic jacks thrusting from the back wall. When the shield is buried, the jacks are retracted and the first sleeve pipe lowered on to
8、the rails. This in then pushed up to the shield and excavation can then continue.When the sleeve pipe is pushed home, the hydraulic jacks are retracted and the services (lighting& ventilation) disconnected. The next sleeve pipe is lowered on to the rails and the services reconnected and the cycle re
9、peated until the shield is pushed into the receiving pit and the pipeline pushed into final position.Maintaining Line and LevelIn order to maintain the correct line and level, a graduated target plate is located within the shield. The site engineer notes the position of the visible sport on the targ
10、et, this initial position is used as reference value to locate the relative position of the shield at all times during the drive. At each push, the site engineer monitors the position reference value with the help of level instrument and theodalite, thus giving a shield position (high or low, right
11、or left) relative to the design position. Based on this information, the operator manipulates a correct course.Extending or retracting a combination of steering rams causing the front of the shield to articulate in the required direction carries out the steering. As the pipe follows the shield, the
12、correct line and level will be maintained. At all times, the amount steering applied is kept to minimum.Fixing Carrier PipesAfter completion of the pipe jacking , we check the line and level for the steel pipe and we take the exact line and level for the carrier pipe with the help of survey instrume
13、nts.A 3 steel angle bar fixed by welding in the correct bottom level of the carrier pipe, then 3mm thick flat bar half moon claps will fixed through wielding in the correct line after that we put neoprene rubber 3mm thick in the clamp to avoid the scratches of the carrier pipes.Then we start laying
14、the carrier pipe one by one and fix the clamps through nuts and bolts. After fixing the nuts and bolts we make angle support in between the top of the clamp and top of the pipe. Then we fix the other pipe in the same manner. The same procedure will continues up to the requirement.GroutingUpon comple
15、tion of pipe jacking we make 4 2 holes like ventilation in every meter, it helps the concrete fill the gap between the steel pipe and ground. Then we fixed six inch grouting pipe vertically one meter height in the top of the pipe both end jacking and receiving. One side will keep ventilation and the
16、 other side for connection and the concrete pump.After that we lay the carrier pipe in the correct line and level then check with the consultant and make the test required from the consultant then we close the both end between steel and carrier pipe by m/s plate welding or masonry, the gap between steel sleeve and ground in the both end we c
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 云南工程職業(yè)學(xué)院《重金屬冶金學(xué)》2023-2024學(xué)年第二學(xué)期期末試卷
- 新疆應(yīng)用職業(yè)技術(shù)學(xué)院《外國戲劇史》2023-2024學(xué)年第二學(xué)期期末試卷
- 2025屆河南省駐馬店市驛城區(qū)高三上學(xué)期一模歷史試卷
- 黑龍江職業(yè)學(xué)院《勞動(dòng)定額學(xué)》2023-2024學(xué)年第二學(xué)期期末試卷
- 2024-2025學(xué)年浙江省部分重點(diǎn)高中高二上學(xué)期12月月考?xì)v史試卷
- 九江學(xué)院《文具設(shè)計(jì)》2023-2024學(xué)年第二學(xué)期期末試卷
- 青海師范大學(xué)《汽車電子電氣A》2023-2024學(xué)年第二學(xué)期期末試卷
- 煙臺(tái)理工學(xué)院《中國古代文學(xué)作品》2023-2024學(xué)年第二學(xué)期期末試卷
- 南陽農(nóng)業(yè)職業(yè)學(xué)院《就業(yè)與創(chuàng)業(yè)教育》2023-2024學(xué)年第二學(xué)期期末試卷
- 桂林信息工程職業(yè)學(xué)院《生物質(zhì)能源概論》2023-2024學(xué)年第二學(xué)期期末試卷
- 血液科護(hù)士的惡性腫瘤護(hù)理
- 畜禽廢棄物資源化利用講稿課件
- 土地糾紛調(diào)解簡單協(xié)議書
- 服裝倉庫管理制度及流程
- 《餐飲渠道開發(fā)方案》課件
- 架子工安全教育培訓(xùn)試題(附答案)
- 一中師德考核評(píng)估制度
- 春節(jié)習(xí)俗中的傳統(tǒng)茶文化與茶藝
- 醫(yī)療文書病歷書寫規(guī)范培訓(xùn)教學(xué)課件
- 分布式網(wǎng)絡(luò)處理方案
- CNAS-CL02-A001:2023 醫(yī)學(xué)實(shí)驗(yàn)室質(zhì)量和能力認(rèn)可準(zhǔn)則的應(yīng)用要求
評(píng)論
0/150
提交評(píng)論