




版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
摘要AbstractThisgraduationdesignprojectisaBeijinguniversityofscienceandtechnologyofthetotherequestofthedesignmission,inaddition,thebuildinganditssurroundings,usage
Andtheprojectdesignaccordingtotherelateddesignnormconfirmthestructuralformof
2.Thestructuredesignisbasedonpreliminaryarchitecturedesign,toselecttheright
structuretype,precedestructurearrangementandsizesofstructurecomponentstocalculate.
Whenthedirectionsoftheframesisdetermined,firstlytheweightofeachflooris
calculated.Thenthevibratecycleiscalculatedbyutilizingthepeak-displacementmethod,then
makingtheamountofthehorizontalloadforce(seismicload,windload)canbegotbywayof
thebottom-shearforcemethod.Theforcecanbeassignedaccordingtotheshearingstiffnessof
theframesofthedifferentaxis.Thentheinternalforce(bendingmoment,shearingforceand
axialforce)inthestructureunderthehorizontalloadscanbeeasilycalculated.Afterthe
determinationoftheinternalforceunderthedeadandliveloads,thecombinationofinternal
forcecanbemadebyusingtheExcelsoftware,whosepurposeistofindoneorseveralsetsof
KeyWords:framestructure;loadcomputation;internalloadcomputation ;internalloadcombination;anti-seismicdesign;PKPM目錄 第一章緒論第二章結構計算書第三章梁、柱截面尺寸估算,h,H1.27.83.314410 1.27.84.6514410 第四章框架計算簡圖及梁柱線剛度,Ibh,icEIbh
bh
令i 1.438,0.819,i
2525第五章荷載計算合計:合計:合計:合計:0.56kNm3kNm2.5kNm3.32.12
7.80.5
7.80.5
1.899的窗。1.0010.0221kNm 0.420kNm1.0010.36kNm0.360kNm合計: 縱墻在計算單元內(nèi)相當于高度為
7.80.5
面磚外墻面 1.6510.0221kNm 0.693kNm1.82.1
2.70.5
合計:2.70.5
合計:合計:房間 2.5kN/m走廊 荷載呈梯形分布,短邊支承梁上荷載呈三角形分布;B~C軸間梁上板的板傳至梁上的三角形荷載等效為均布荷載q;梯形荷載等效為均布荷載
122.7686.6 2.7687.8
2+2+ 222.7686.6 2.7687.82+ 2+ 22.7687.82+ 22.7686.6 2.7687.8
2+ 22.7686.6 2.7687.8
22+ 20.084 0.250.53104.216.1 z2 7.816.1 z3 11.416.1 z4 1516.1 1.3風荷載標準值 表5.1風荷載標準值
F(KN)2i
cc 2(0.5i icc 2i 1.4380.819
2i
icc 2(4.6812.667)
0.5i
2i
icc 表5.8風荷載作用下框架側移計算D △uim 1/550(滿足)G墻813.082659.0041472.086kNG柱851.764.73.61112.020kNQ q S q S屋面處:GE1 屋面處:GE1 表5.9假想頂點側移
DT1T T1TF = =0.16?.85?(G1G2G G 按照公式FF F F
hii 和EKijiji表5.11各層剛重比和剪重比iiii ji
jijiDh
由表5.7.3可見,各層的剛重比ii重比EKijiji第六章內(nèi)力計算表6.1水平地震荷載匯總表表6.2一榀框水平地震荷載第七章內(nèi)力組合梁荷載統(tǒng)計表7.1梁上荷載表7.5屋面橫向框架梁內(nèi)力組合
表7.6四層橫向框架梁內(nèi)力組合
表7.7三層橫向框架梁內(nèi)力組合
表7.8二層橫向框架梁內(nèi)力組合
fbh hh /2 cff s0.039
Syh0
62.59010 0.9803006150.188121 1 0.8947Syh<0.7f則A表8.3梁AB(CD)斜截面受剪承載力配筋表8.4梁BC斜截面受剪承載力配筋續(xù)表8.5框架柱的正截面配筋計算表8.6框架柱的斜截面配筋計算1
ftbh8.3.1設計資料8.3.2荷載設計值
8.3.3內(nèi)力計算表8.7雙向板(樓面)彎矩計算/l
0ymx0m
(0.01096.170.02912.28)(0.03705.520.08341.63)
(0.00725.520.02361.63)m0.2m
()
()
2.7 mm
-0.07418.442.7 -4.5590.05698.442.72
-3.501kN穖
0.0797 7.413.92
-8-0.0571 7.143.92
-6.201表8.8雙向板(屋面)彎矩計算0
mxmy
(0.03273.212.7(0.01093.210.02910.33)2.7(0.03703.210.08340.33)
3.9(0.00723.210.02360.33)
3.9m0.2m
()
()
座 m
2.72m
-0.05695.7782.72 第九章基礎設計9.2.1荷載計算0.99.2.2確定基礎底面積圖9.2基礎圖19.30.617.2(1.40.6
G PGdf226201.42.9m。偏心距eG
0.0285 P0,滿足要求。G P P 2.42.9P60.0285
19.30.617.2(1.40.6
dmG Pdf226201.4dm(d 0.5)偏心距eG
0.018 1442.29266.56 P0,滿足要求。G 1442.29266.56P P 2.83.4P60.018
P16.5319.20.6P P60.0285PP60.02852400mm,acbc btbbbbt2h5002560 1620mmb btb5001620h600mm800mmhptbmh0l a bb h)b(h0) FlP 2ahptbmh02.90.5P P (PmaxP184.096(207.166184.096) Psmax
P22.9P (la(2bb)P115153.915 PPsmax
P smin(bb(2la)P(560-10)113圖9.5B柱基礎祥圖2.83.4
P P60.012PP60.012圖9.6B柱基礎底面受力圖2800mm,acbc btbbbbt2h5002560 1620mmb btb50016
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 學校物業(yè)管理委托合同書
- 景點特色介紹與評分表
- 個人購房擔保借款合同式幾份
- 三農(nóng)綠色產(chǎn)業(yè)扶貧計劃指導書
- 工程項目部承包合同
- 2025年包頭鐵道職業(yè)技術學院單招職業(yè)適應性考試題庫標準卷
- 房地產(chǎn)戶外廣告合同
- 2025年十堰年貨運從業(yè)資格證考試題庫
- 冷庫冷藏車租賃合同
- 2025年鞍山職業(yè)技術學院單招職業(yè)傾向性考試題庫a4版
- 2025年安徽水利水電職業(yè)技術學院單招職業(yè)適應性測試題庫(含答案)
- 山東省青島市市北區(qū)2024-2025學年七年級上學期期末考試英語試題(含答案+解析)
- 餐飲及食品安全管理制度
- 湖北省襄陽市襄州區(qū)2024-2025學年九年級上學期期末語文試題(含答案)
- 2025年安徽電氣工程職業(yè)技術學院單招職業(yè)技能測試題庫及答案1套
- 2025年房屋交易代持策劃協(xié)議書
- 課題申報參考:“四新”建設背景下教育創(chuàng)新與課程數(shù)字化實踐研究
- 2025年煙臺汽車工程職業(yè)學院高職單招職業(yè)適應性測試近5年??及鎱⒖碱}庫含答案解析
- 2025年江蘇農(nóng)牧科技職業(yè)學院高職單招職業(yè)技能測試近5年??及鎱⒖碱}庫含答案解析
- 2024年長沙衛(wèi)生職業(yè)學院高職單招職業(yè)技能測驗歷年參考題庫(頻考版)含答案解析
- 2024年度國網(wǎng)營銷安全(用電檢查)安全準入客觀題備考試題庫(附答案)
評論
0/150
提交評論