




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
TheRequestforProposal
ofHooverDam
Name:
NO.:
Statementofwork
Withthemainfunctionofplanstobuildthedaminfloodcontrolandirrigationwatersupply,powergenerationandothercomprehensiveeffect,thearchitectureisaconcretewith2.6millionm3ofconcretearchdam.Thedamis221.3mhigh,crestlength379.2m,thetop13.7mwide,dambottomwidth201.2m.
Thesizeofthehydropowerstation:
Hydroelectricpowerislocatedbehindthedam,withtherightfactoryinstalled8businessunits,ontheleftbankworkshopinstallationwithninebusinessunits,inadditiontounit2setsforprivateuse.Installedcapacityof2.08millionkw,generating4billionkw-h.Fourintaketowerbuiltinfrontofthedaminthereservoir,fourdiameteris9.14m,thetotaldeliveryand19diameteris3.99mofpressuresteelpipeareinstalledinonbothsidesofthetunnel.
Onbothsidesoftheriverbeddamfoundationandabutmentmainlycomposedoflava,rockhard,inadditiontoveryshallowtabledepartment(m)onlyweatheringisflabby,jointfissuredevelopment,rockmassintegrity,highrangewithoutamajordiscontinuityindamfoundation,damupstreamordownstreamoutsidethefoundationpithasafault,270mapart.1000~1100ftelevationinbankslopeisrelativelyslow,mainlylithologyrelativelypoor,weakweatheringresistance,breccia.But,whetherlavaorbreccia,theuniaxialcompressivestrengthofthewetaverageismorethan100mpa.Thedeepestriverbedcover38m.Seismicintensity8°~9°.
Thehooverdam’sbedrockishardandesiteandbreccia.Itsriverbedisnarrowandsteeponbothsides.Lowwaterleveltothedepthofthebedrockis33~40m,lowof42.4m,widthoflowwaterlevelofthewateris88-113m.
Table1:data
Cost
5billiondollar
Humancost
≤10
Thedamheight
221.4meters
Thedamlength
379.2m
Damthickness
200mthick
Concretequantity
3.33millioncubicmeters
Capacity
2080megawatts
2.Requirements
2.1Thedamwhichwillbeconstructedneedtoachievethefollowingpurposes:
Canbeirrigatedfarmland.
Forthousandsofyears’eachspringandearlysummer,theColoradoRiverduetothelargesnowmeltrunoffimport,resultinginriversfloodedinlow-lyingareasandpubliclifeandpropertysufferedseriouslosses.Butinthelatesummerandearlyautumn,riversdriedupagainlikeatrickle,whichcannotirrigatethefarmland.Inordertoensurenotsufferingfloodandstablewatersupplyalltheyearround,mustcontrolthetroubledriver.ThetobebuiltdamneedtomakesurethattherearemillionsofacresoflandintheUnitedStates,Mexico,about500000acresoflandunderirrigation,forlocaleconomicdevelopmentandprovidestrongguarantee.
(2)Cansupplywater.
ThedamcanofferresidentialandcommercialwatersupplyinLasVegas,LosAngeles,SanDiego,phoenixandothersouth-westofthetown'saswellastheArizona,NevadaandCaliforniaIndiancommunityresidentsandbusiness.
(3)Toprovidepower.
Toprovidethestateswithelectricity,suchasNevada,ArizonaandCalifornia,andannualoutputneedtoachieve4billionkw-hfor1.5millionresidents.
(4)Becomealeisureentertainmentplaces.
Seekprofitscanbeobtainedfromtheaspectsoftourism.Inadditiontotheutilitiessuchaselectricity,watersupply,makethedamrealizeitsornamentalvalueasmuchaspossible.
2.2Thebidder'squalificationshallmeetthefollowingconditions:
1)Levelofqualificationofconstruction:Waterconservancyandhydropowerengineeringconstructiongeneralcontractinglevel2andlevel2above;
2)Constructionexperience:theenterprisehasdonesimilarprojectperformancebeforeJanuary,projectmanagerortechnicaldirectorhasdonesimilarprojectperformancebefore.
3)Keypersonnel:
Projectmanager:morethansecondaryandsecondarywaterconservancyproject;
Technicaldirector:waterconservancyengineerandabove.
2.3Theunitcannotserveasabidderbelongstooneofthefollowingsituations:
1)Inthisprojectorthiscontractprojectpreparationstagehasbeenasalegalperson,orthiscontract’semployerhasbeenhiredforthiscontract’sdesignandconsultingservices;
2)Havebeenemployedasthesupervisorofthiscontract.
3.Deliverables
Biddersshallbestipulatedinthetenderdocumentscontentandformatofthecompilationandsubmitthebiddocuments,biddocumentsshouldincludequalificationdocuments,businessbid.
3.1Qualificationdocuments
Enterprisebusinesslicense,qualificationcertificate,safetyproductionlicense,investmentprojectteampersonnelqualificationcertificate,3kindsofstaffperformance,enterprisesimilarprojects,theprojectmanager,ortechnicalperformance,headofthesimilarprojects
3.2Thebusinessbid
(1)Characteristicvalueofthebiddocuments
(2)Bidproposal
(3)Bidsummarysheet.
(4)Pricedbillofquantities;
(5)Temporaryengineeringquotationsheet;
(6)Othercostquotationsheet;
(7)Biddingtheauxiliarymaterialsunitpriceanalysistable,materialbudgetpricesummarytable,unitpriceanalysistable,themainmaterialofconcreteandtheformulationsofcementmortarwithscale,etc.
4.ItemsSuppliedbyUs
Wewillprovidethecontractorswithdetailedinformationaboutthedam’scurrentstatus,aswellasstatisticalinformationregardingitssurroundings.
5.ApprovalsRequired
Beforetheimplementationoftheprojectconstructionwork,thecontractormustobtaintheapprovalofthefinaldesign.
6.TypeofContract
Duetotheobjectivefactorssuchaslarge-scaleconstructionofthedam,longconstructionperiod,thecontractisemployedinadjustablepricecontractform.
7.DueDate
ContractormustsubmitarequestforproposaltousbeforeMarch1st,
8.TimeTable
WehopetoelectacontractorbeforeApril1st.Thedurationoftheprojectissixyears,fromMay1st,toMay1st,.AlldeliverablesmustbeprovidedpriortoMay1st,tothecompany.
9.PaymentTerms
Thisprojectadoptstheprogresspayment
(1)thecompletedquantity50%,to40%ofthecontractprice;
(2)completethequantityof90%,to70%ofthecontractprice;
(3)afterthecompletionacceptance,thepaidtosettleat95%,5%asqualityretention,tobepaidaftertheexpirationofoneyearqualityassurance.
10.ProposalContents
Theapplicationmustincludethefollowingcontents:
A.Approach
Thecontractorsneedtoclarifythattheyhaveaclearunderstandingoftheexpectationsoftherequestforproposalwhichisonbehalfofthecontractor.Furthermore,describetheimplementationoftheprojectindetail,andforeachtaskcontractorsshouldillustratehowtocompletethetasksindetail.
B.Deliverables
Thecontractorsshouldprovidethedescriptionofeachdeliverablewhichshouldincludethenecessarydata.
C.Schedule
Intheformofabarchartornetworkdiagram,showingthetimetableforthedetailedtaskstobeperformedweekly,soastocompletetheprojectwithinthetimelimitrequirements.
D.Experience
Describethesimilarprojectthatrecentlyexecuted.
E.Staffing
Liststhespecificnamesoftheofficerswhowillbeassignedtotheworkoftheprojectandadetailedresumeisrequiredifheorshehasexperien
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 科技助力下的現(xiàn)代食品展臺(tái)設(shè)計(jì)新趨勢(shì)
- 科技創(chuàng)新與經(jīng)濟(jì)發(fā)展結(jié)合的大氣污染治理新路徑
- 科技產(chǎn)品生產(chǎn)線上的效率提升策略
- 推動(dòng)學(xué)校生物學(xué)科發(fā)展計(jì)劃
- 社交媒體界面設(shè)計(jì)對(duì)用戶體驗(yàn)的影響
- 電力工程與智能化建筑
- 外貿(mào)購(gòu)銷(xiāo)合同范本
- 生涯規(guī)劃與咨詢計(jì)劃
- 木材的健康和環(huán)境友好性考核試卷
- 2024-2025學(xué)年高中地理課時(shí)分層作業(yè)12中國(guó)區(qū)域生態(tài)環(huán)境問(wèn)題及其防治途徑含解析新人教版選修6
- GB/T 44865-2024物聯(lián)網(wǎng)基于物聯(lián)網(wǎng)和傳感網(wǎng)技術(shù)的動(dòng)產(chǎn)監(jiān)管集成平臺(tái)系統(tǒng)要求
- 燃?xì)夤究?jī)效考核管理制度
- 高中生物課程標(biāo)準(zhǔn)(人教版)
- 第三章-自然語(yǔ)言的處理(共152張課件)
- 2023版初中語(yǔ)文新課程標(biāo)準(zhǔn)
- 2024至2030年中國(guó)蜜柚行業(yè)市場(chǎng)發(fā)展現(xiàn)狀及潛力分析研究報(bào)告
- 高達(dá)模型市場(chǎng)需求與消費(fèi)特點(diǎn)分析
- 人音版音樂(lè)一年級(jí)上冊(cè)第3課《國(guó)旗國(guó)旗真美麗》說(shuō)課稿
- GB/T 44255-2024土方機(jī)械純電動(dòng)液壓挖掘機(jī)能量消耗量試驗(yàn)方法
- DL∕T 1785-2017 電力設(shè)備X射線數(shù)字成像檢測(cè)技術(shù)導(dǎo)則
- 山東財(cái)經(jīng)大學(xué)《大學(xué)英語(yǔ)》2022-2023學(xué)年期末試卷
評(píng)論
0/150
提交評(píng)論