




全文預(yù)覽已結(jié)束
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
The Software Process 1. During which phase of the software project management life cycle should testing occur? A. integration B. validation C. implementation D. maintenance E. testing occurs during each phase. 2. Why should each phase be fully documented before the next phase begins? A. The pressures to deliver the product on time are such that postponed documentation may never be delivered. B. The individual responsible for an early phase may not be available by the time that the documentation needs to be produced. C. A product is constantly changing during development. Until the changes are documented, modifications will be difficult to achieve. D. The question is incorrect. Documentation should be left under the product is finalised and is a specialised subject best left to expert technical writers. E. Postponed documentation may never be delivered, the individual responsible may have left later in the project and the fact that the product is constantly changing are all reasons why each phase should be fully documented before the next phase begins. 3. At which stage of the products life cycle should documentation be produced? A. testing, as it is only here that the technical writers can see what has been built and document it. B. maintenance, as this is the first phase when it is required in order to fix faults or make enhancements. C. specification, as it is needed to produce test cases for acceptance testing. D. at no stage, the use of modern techniques such as extreme testing obviates the need for any documentation E. throughout the project F. documentation phase 4. The individual or organisation who wants a product to be developed is known as the: A. developer B. user C. contractor D. initiator E. client 5. The members of the organisation responsible for building that product are known as the: A. developers B. users C. contractors D. initiators E. clients 6. One method of getting around the problem of the developers and clients visualising a piece of software and its functionality is to build a rapid prototype. What may be omitted from the prototype? A. its user interface B. requirements details C. functionality D. any of these may be omitted from the prototype E. file updating or error handling 7. The name of the organisation responsible for ensuring that the product delivered is what the client ordered is the: A. development team B. test team C. documentation department D. end-user group E. software quality assurance group 8. Which of the following items should not be included in the software project management plan? A. the techniques and case tools to be used B. detailed schedules, budgets and resource allocations C. the life cycle model to be used D. the organisational structure of the development organisation, project responsibilities, managerial objectives and priorities E. all of these aspects should be included 9. If a specification statement is to be testable then it one of the properties it must have is: A. tenacity B. probity C. longevity D. verifiability E. traceability 10. A fault to look for during testing of the products design is: A. logic fault B. interface fault C. lack of exception handling D. non-conformance to specifications E. all of theses are examples of faults to look for during testing of the products design. 11. Why is it necessary to carry out acceptance testing? A. The test group may not be competent enough. B. To receive the final payment for the completed product. C. Over 50% of the faults are found at the acceptance test phase. D. It is not until this stage of the testing that the system as a whole (hardware and software) is exercised. E. The users may use a combination of functions and data that are not anticipated by the developers. 12. The final form of testing COTS software is _ testing. A. unit B. integration C. alpha D. module E. beta 13. More time and money is spent in the _ phase than any other phase. A. requirements B. specification C. implementation D. integration E. maintenance 14. In the maintenance phase the product must be tested against previous test cases. This is known as _ testing. A. unit B. integration C. regression D. module E. beta 15. According to Brooks No Silver Bullet 1986, which aspect of software production is inherently difficult? A. complexity B. conformity C. changeability D. invisibility E. all of these 16. A major problem with the essence of software is that it is invisible and unvisual (Brooks, 1986). Visualisations such as flowcharts and data flow diagrams are extremely useful and powerful ways of visualising certain aspects of the product. What is the problem with the use of such diagrams?A. There is no standard agreed notation for each of the diagrams. B. Programming is an art and not an engineering science. Thus only an abstract diagram can capture the models semantics and such diagrams are subject to personal interpretation. C. Software is three-dimensional and only a few specialised systems can depict three-dimensional diagrams. D. Visualisations are not an effective means of communicating with clients and other software engineers. E. Such diagrams cannot embody every aspect of the product, nor is there a way of determining what is missing from any one visual representation of the product. 17. According to Brooks (1986) which approach is capable of achieving an order of magnitude improvement in software development p
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025-2030年中國ATO漿液行業(yè)市場現(xiàn)狀供需分析及投資評估規(guī)劃分析研究報(bào)告
- 2025-2030壓濾機(jī)專用泵行業(yè)市場現(xiàn)狀供需分析及重點(diǎn)企業(yè)投資評估規(guī)劃分析研究報(bào)告
- 水資源高效利用研究-洞察闡釋
- 雙親委派模型在動(dòng)態(tài)系統(tǒng)中的博弈演化研究-洞察闡釋
- 文化遺產(chǎn)數(shù)字化保護(hù)與利用的前沿探索-洞察闡釋
- 2025至2030中國防寒氈行業(yè)發(fā)展趨勢與投資戰(zhàn)略研究報(bào)告
- 2025至2030中國銀杏剝殼機(jī)行業(yè)營銷模式投資戰(zhàn)略研究報(bào)告
- 2025至2030中國航空食品行業(yè)消費(fèi)狀況及盈利研究報(bào)告
- 物流自動(dòng)化技術(shù)應(yīng)用-洞察闡釋
- 機(jī)器人在新興市場中的因果效應(yīng)與政策影響研究-洞察闡釋
- 醫(yī)院“互聯(lián)網(wǎng)+護(hù)理服務(wù)”制度
- 頂管施工危險(xiǎn)源辨識及風(fēng)險(xiǎn)評價(jià)表
- 江蘇省揚(yáng)州市2025屆高三第二次模擬考試生物試卷含解析
- 11SG534 帶水平段鋼斜梯(45°)
- 20232024遼寧大連市西崗區(qū)招聘社區(qū)工作者24人筆試歷年典型考題及考點(diǎn)剖析附帶答案詳解
- 涂裝工考試:中級涂裝工考點(diǎn)(三)
- 醫(yī)院重癥監(jiān)護(hù)室感染監(jiān)控指南
- 2024年高中英語衡水體書法練字字帖
- 融資融券實(shí)務(wù)
- 人教版二年級下冊口算題天天練1000道可打印帶答案
- 2022北京東城六年級畢業(yè)考英語試題含答案
評論
0/150
提交評論