已閱讀5頁,還剩6頁未讀, 繼續(xù)免費閱讀
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領
文檔簡介
陜西理工學院高等繼續(xù)教育畢業(yè)(設計) 建筑施工技術(shù)論文班級:16級土木工程1102班學號: 姓名:魏鵬剛建筑施工技術(shù)論文建筑施工技術(shù)探析【摘要】目前我國建筑技術(shù)的水平還比較低,建筑業(yè)作為傳統(tǒng)的勞務密集型產(chǎn)業(yè)和粗放型經(jīng)濟增長方式,沒有得到根本性的改變,在建筑工程領域如何加快科技成果轉(zhuǎn)化,不斷提高工程的科技含量,全面推進施工企業(yè)技術(shù)進步,促進建筑技術(shù)整體水平提高的唯一的途徑就是緊緊依靠科技進步,將科學的管理和大量技術(shù)上先進、質(zhì)量可靠的科技成果廣泛地應用到工程中去,應用到建筑業(yè)的各個領域。【關(guān)鍵詞】建筑;施工;技術(shù)隨著科學技術(shù)的飛速發(fā)展,在建筑行業(yè)中也有了日新月異的變化。當前的建筑市場競爭激烈,要想開拓市場站穩(wěn)腳跟,謀求更大的發(fā)展,就必須依靠科技創(chuàng)新來增強企業(yè)實力,保證施工的關(guān)鍵技術(shù)設備緊跟國際發(fā)展趨勢,與行業(yè)先進水平同步??吭黾涌萍己縼硖岣吖こ藤|(zhì)量,降低生產(chǎn)成本,創(chuàng)造最佳效益。1 建筑施工技術(shù)發(fā)展狀況隨著科技水平的不斷提供,建筑施工技術(shù)的水平也相應得到了相當成熟的提高,特別是近年來,施工工程中不斷出現(xiàn)的新技術(shù)和新工藝給傳統(tǒng)的施工技術(shù)帶來了較大的沖擊,這一系列新技術(shù)的出現(xiàn),不但解決了過去傳統(tǒng)施工技術(shù)無法實現(xiàn)的技術(shù)瓶頸,推廣和引導了新的施工設備和施工工藝的出現(xiàn),而且新的施工技術(shù)使得施工效率得到了空前的提高,一方面它降低了工程的成本、減少了工程的作業(yè)時間,另一方面更是增強了工程施工的安全可靠度,為整個施工項目的發(fā)展提供了一個更為廣闊的舞臺。目前建設部重點推廣的“建筑業(yè)十項新技”,包括深基坑支護技術(shù)、高強高性能混凝土技術(shù)、高效鋼筋和預應力混凝土技術(shù)、粗直徑鋼筋連接技術(shù)、新型模板和腳手架應用技術(shù)、建筑節(jié)能和新型墻體應用技術(shù)、新型建筑防水和塑料管應用技術(shù)、鋼結(jié)構(gòu)技術(shù)、大型構(gòu)件和設備的整體安裝技術(shù)、企業(yè)的計算機應用和管理技術(shù)。2 建筑施工新技術(shù)應用分析2.1 大體積混凝土施工對于大體積混凝土施工中,大體積混凝土施工過程中,由于混凝土中水泥的水化作用是放熱反應是相當復雜的。一旦產(chǎn)生的溫度應力超過混凝土所能承受的拉力極限值時,混凝土就會出現(xiàn)裂縫??刂苹炷翝仓K體因水泥水化熱引起的溫升、混凝土澆筑塊體的里外溫差及降溫速度,防止混凝土出現(xiàn)有害的溫度裂(包括混凝土收縮裂)是施工技術(shù)的關(guān)鍵問題。根據(jù)具體情況和溫度應力計算,確定是整澆或分段澆筑。然后根據(jù)確定的施工方案計算混凝土運輸工具、澆筑設備、搗實機械和勞動力數(shù)量。常用的澆筑方法是用混凝土泵澆筑或用塔式起重機澆筑。澆筑混凝土應合理分段分層進行,使混凝土沿高度均勻上升,澆筑應在室外氣溫較低時進行,混凝上澆筑溫度不宜超過。大體積混凝上分段澆筑完畢后,應在混凝上初凝之后終凝之前進行一次振搗或進行表面的抹壓,排除上表面的泌水,用木拍反復抹壓密實,消除最先出現(xiàn)的表面裂縫。在冬期施工的條件下,混凝土抹壓密實后應及時覆蓋塑料薄膜,再覆蓋保溫材料(巖棉被、革簾等)。非冬期施工條件時,可覆蓋塑料薄膜及保溫材料,也可在混凝土終凝后在其上表面四周筑堤,灌水20-30cm深,進行養(yǎng)護。并定期測定混凝土表面和內(nèi)部溫度。混凝土在潮濕環(huán)境中的養(yǎng)護時間,對采用硅酸鹽水泥、普通硅酸鹽水泥或礦渣硅酸鹽水泥拌制的混凝土,不得少于7d,對摻用緩凝型外加劑或有抗?jié)B要求的混凝土,不得少。2.2 防水施工技防水實際上就是在與水接觸的部位防滲漏、防有害裂縫的出現(xiàn)。我們應該遵循正確的設計原則。綜合治理、多道設防、剛?cè)峤Y(jié)合、防排并用、復合防水、全面設防、節(jié)點密封),合理選擇防水材料和施工工藝。對于屋面防水,本文提出了一種較為新型的施工技術(shù),即聚合物水泥基復合涂膜施工;這種施工技術(shù)首先做好板縫、節(jié)點和基層處理。塔樓屋面及裙樓屋面施工時涂膜應分遍涂布,先涂的涂料干燥成膜后方涂布后一遍涂料。鋪設方向互相垂直,最上面涂層厚度不小于1mm。涂膜防水層的收頭用防水涂料多遍涂刷,不得出現(xiàn)流淌和堆積現(xiàn)象。防水層反起墻面不少。對于外墻防水,宜采用加氣砼磚墻施工,即為防止抹灰層開裂空鼓,加氣砼砌塊墻體抹灰前先在兩種不同材料之間的界面掛鋼絲網(wǎng)。鋼絲網(wǎng)固定后再進行基面處理,20的108膠水,再摻以15的水泥配成漿體涂刷?;嫣幚砗笤龠M行抹灰層施工。砌筑時嚴禁使用干磚或含水飽和的磚。不得隨澆隨砌。水平灰縫厚度和豎向灰縫寬度控制102cm范圍,水平灰縫砂漿飽滿度80。一般分三次砌到頂,采用鋼筋砼過梁。在后續(xù)的防水層施工中,SKK水性超低污染氟涂料(二液防污型)在找平層上以十字交叉各刷一道,厚度3mm,施工完后應及時進行淋水養(yǎng)護。2.3 屋面施工。屋面施工主要環(huán)節(jié)應該屬于屋面的防水施工,通常采用傳統(tǒng)的防水卷材,包括瀝青防水卷材、高聚物改性瀝青防水卷材、合成高分子防水卷材三個系列。防水卷材的主導品種是高聚物改性瀝青防水卷材和高分子防水卷材。隨著社會的不斷進步發(fā)展,將會出現(xiàn)更多的新技術(shù)、新設備和新材料,要勇于創(chuàng)新,大膽應用,并結(jié)合現(xiàn)代化科學管理,在建設工程施工生產(chǎn)中不斷取得好成績。同時,為不斷推進建筑業(yè)技術(shù)進步,加大建筑業(yè)推廣先進適用新技術(shù)的力度,對建筑業(yè)新技術(shù)內(nèi)容也應加以調(diào)整和補充,不斷適應新的生產(chǎn)力發(fā)展要求,實現(xiàn)企業(yè)的可持續(xù)發(fā)展。2.4 鋼筋連接施工鋼筋連接施工中有需要規(guī)范的問題,比如機械連接、焊接接頭面積百分率應按受拉區(qū)不宜控制。如遇鋼筋數(shù)量單數(shù)時,百分率略超過些也是符合要求的。受壓區(qū)則不限制。綁扎接頭面積百分率控制:受拉鋼筋梁、板、墻類不宜大,當工程中確有必要增大接頭面積百分率時,梁受拉鋼筋不應大于50,其他構(gòu)件可根據(jù)實際情z粱中受拉鋼筋接頭面積百分率是一個底線,不應越過,其他構(gòu)件則可以放寬,但必須滿足搭接長度的要求。如般柱子鋼筋(特別是構(gòu)造柱),也可設置一個搭接頭,這將方便于施工。目前一種新型的鋼筋連接方式出現(xiàn)了,即直螺紋接頭連接;直螺紋接頭連接分別三種不同的形式。對于鋼筋直螺紋連接,在具體施工中標準接頭的連接時,首先把裝好連接套筒的一端鋼筋擰到被連接鋼筋,使套筒外露的絲扣不超1個完整扣,連接即告完成。加長絲頭型接頭:先將鎖緊螺母及標準套筒按順序全部擰在加長絲頭鋼筋一,將待接鋼筋的標準絲頭靠緊,再將套筒擰回到標準絲頭,并用板手擰緊,再將銷緊螺母與標準套筒擰緊鎖定,連接即告完成。對于接頭檢驗時,當接頭連接完成,由質(zhì)檢人員分批檢驗。按如下方式進行檢驗:目測接頭兩端外露螺紋長度相等,且不超過一個完整絲(加長螺紋除外),每300個接頭為一,每批抽驗一,要求鋼筋連接質(zhì)100合格。參考文獻1 周兆銀,周國恩,建筑工程施工實訓指導M.重慶:重慶大學出版社,20122 孟小鳴,施工組織與管理M.北京:中國電力出版社,20143 曲頤勝,建筑施工組織與管理M.北京:科學出版社,20074 姚剛主編.土木工程施工.北京:人民交通出版社,20135 何凱,建筑工程質(zhì)量管理,商品與質(zhì)量:建筑與發(fā)展- 20126 劉宗仁主編.土木工程施工.北京:高等教育出版社,2011.7 A. J. Thomson, et al.牛津?qū)嵱糜⒄Z語法.8常建立,曹智M.北京:北京理工大學出版社,2013 陜西理工學院Reliability of Frame and Shear Wall Structural Systems. I: Static LoadingAhmed GhobarahAbstract: An efficient and accurate algorithm is developed to evaluate the reliability of a steel frame and reinforced concrete shear wall structural system subjected to static loading. In a companion paper, the algorithm is extended to consider dynamic loading, including seismic loading. The concept integrates the finite-element method and the first-order reliability method, leading to a stochastic finite element-based approach. In the deterministic finite-element representation, the steel frame is represented by beam-column elements and the shear walls are represented by plate elements. The stiffness matrix for the combined system is then developed. The deterministic finite-element algorithm is verified using a commercially available computer program. The deterministic algorithm is then extended to consider the uncertainty in the random variables. The reliability of a steel frame with and without the presence of reinforced concrete shear walls is evaluated for the strength and serviceability performance functions. The results are verified using Monte Carlo simulations. The algorithm quantitatively confirms the beneficial effect of shear walls, particularly when the steel frame is weak in satisfying the serviceability requirement of lateral deflection. The algorithm can be used to estimate the reliability of any complicated structural system consisting of different structural elements and materials when subjected to static loading. The procedure will be useful in the performance-based design guidelines under development by the profession. Reliability Analysis of Frame with Shear WallsThe frame shown in Fig. 2 is reinforced with shear walls as shown in Fig. 1. The statistical properties of two additional variables related to the shear walls, Ec and , are given in Table 3. The building is assumed to contain five similar frames connected by rigid diaphragms at the floor levels. Only the center frame of the building is assumed to have shear walls. Although the physical thickness of the shear wall is 12.7cm,considering the presence of five similar frames and the rigid behavior of diaphragms, the effective thickness per frame is assumed to be 2.54 cm in this study. The combined system is subjected to the three static loads given in Table 3. After the tensile stress of each shear wall exceeds the prescribed tensile stress of concrete, the degradation of the shear wall stiffness is assumed to be reduced to 40% of the original stiffness. The probability of failure of the combined system is calculated using the proposed algorithm. For the strength limit state, the probability of failure of a column, represented by Node eg in Figs. 1 and 2, is estimated. For the serviceability limit state, the horizontal deflection at the top of the combined system (point a in Figs. 1 and 2) is evaluated. The results are summarized in Table 4. As before, 10,000 simulations are used for the strength limit state and 100,000 simulations are used for the serviceability limit state. For both the strength and serviceability limit states, the reliability indexes estimated by the proposed algorithm and the Monte Carlo simulation technique are similar. The results clearly indicate that the proposed algorithm can be used to estimate the probability of failure of a combined system consisting of frame and shear walls under static loading. The reliability of the column did not change significantly due to the presence of shear walls. However, the horizontal drift at the top of the frame reduced significantly and the probability of failure of the combined system in serviceability became almost zero. This is expected. For the combined system, the controlling limit state has changed from serviceability to strength. This simple example clearly demonstrates the beneficial effect of shear walls in carrying horizontal loads. It also demonstrates that the proposed algorithm can be used to estimate the reliability of a complicated structural system under static loading conditions, broadening the application potential of reliability methods.ConclusionsAn efficient and accurate algorithm is developed to evaluate the reliability of a steel frame and RC shear wall structural system. The steel frame is represented by beam-column elements and the shear walls are represented by plate elements. A stochastic finite element-based approach consisting of the reliability approach, the first-order reliability analysis procedure, and the finite-element method is proposed. The reliability of a frame with and without shear walls is evaluated for the strength and serviceability performance functions. The results are verified using the Monte Carlo simulation technique. The proposed stochastic finite-element-based algorithm is reasonable for evaluating the reliability of a combined system consisting of frame and shear walls for static loading. It gives similar results for both the strength and serviceability performance functions compared to the results from Monte Carlo Simulation. As expected, this study showed that the reliability of a frame for horizontal deflection could be significantly improved with the help of shear walls. The proposed algorithm to evaluate the reliability of a combined system consisting of steel frames and RC shear walls for static loading is very unique. It produces accurate and efficient results, and can be used in the future to evaluate the reliability of complicated structural systems. The proposed algorithm demonstrates how reliability methods can be applied to evaluate the risk of a real structural system capturing its realistic mechanical behavior. The procedure will be useful in the performance-based design guidelines under development by the profession.References1 Chaallal O, Nollet M-J, Perraton D. Shear strengthening of RC beams by externally bonded side CFRP strips. Journal of Composites for Construction, ASCE 1998;2(2):1113.2 Spadea G, Bencardino F, Swamy RN. Structural behaviour of composite RC beams with externally bonded CFRP. Journal of Composites for Construction, ASCE 1998;2(3):1327.3 Saadatmanesh H, Ehsani MR, Li MW. Strength and ductility of concrete columns externally reinforced with fibre composite straps. ACI Structural Journal 1994;91(4):43447.4 Saadatmanesh H, Ehsani MR, Jin L. Seismic strengthening of circular bridge pier models with fibre composites. ACI Structural Journal 1996;93(6):63947.靜荷載作用下框架剪力墻的可靠性作者:Ahmed Ghobarah摘要:一種新的精確有效的計算方法已經(jīng)被發(fā)現(xiàn)用來評價鋼筋混凝土框架剪力墻結(jié)構(gòu)在受到靜荷載作用時的可靠性。在一位同僚的論文中,這種方法已經(jīng)被用來計算包括地震在內(nèi)的動荷載。它將有限元和第一可靠性原則結(jié)合起來,產(chǎn)生了一種基于有限隨機的要素的方法。在這種確定性的有限元表示法中,鋼框架體系由梁柱結(jié)構(gòu)體系表現(xiàn)出而剪力墻結(jié)構(gòu)由板體系表現(xiàn)出來,組合在一起的體系的剛度矩陣就形成了。這種確定性的有限元方法可以用計算機程序來檢驗。它可以被延用于考慮隨機情況下的不確定因素。是否有剪力墻加固工事的鋼框架的可靠性被用來確定在結(jié)構(gòu)在發(fā)揮作用時的強度和適用性。這種方法在數(shù)字上體現(xiàn)出對剪力墻的正面效果,特別是在側(cè)向偏差令人滿意而框架性能很弱的時候。它可以用于對受靜荷載作用的任何材料和結(jié)構(gòu)形式的復雜結(jié)構(gòu)的可靠性的評估。職業(yè)一點來說,這種方法對于指導尚欠發(fā)展的設計工作是很有用的。關(guān)鍵詞:極限狀態(tài),模擬,剪力墻,靜荷載,鋼框架,有限元。緒論對各種由不同的體系和材料組成的復雜結(jié)構(gòu)的實際可靠性的分析是對我們專業(yè)人員的挑戰(zhàn)。在大部分情況下,對結(jié)構(gòu)的可靠性可由極限狀態(tài)和正常狀態(tài)(荷載和相關(guān)反力之間不確定的符合相關(guān)規(guī)范的一種函數(shù)關(guān)系)的暗示中得到結(jié)果。這種經(jīng)常會被用于獲取由不同材料組成的結(jié)構(gòu)體系發(fā)揮作用信息的方法就是有限元法。有限元就是一種普通應用于許多工程領域,適用于簡單和復雜結(jié)構(gòu)體系的強大分析工具。使用這種方法,對于復雜幾何結(jié)構(gòu)、各種非線性問題、不同的材料和傳力途徑的問題的分析將是直截了當?shù)摹5?,確定性(限制性)有限元不能分析可變結(jié)構(gòu)。因此不能被用作穩(wěn)定性分析。另一方面,可靠性方法不能真實地描述結(jié)構(gòu)。如果基本變量不能確定,那么用這種分析方法計算的結(jié)構(gòu)也是可靠的。如果在分析的每步中,通過基本量的變化將反應中的不確定性限制住,那么這種可靠性分析方法在當前還是能普遍使用的。為了獲得這兩種方法令人滿意的結(jié)果,必須要將它們結(jié)合起來,這樣就有了隨機有限元的產(chǎn)生。這種框架結(jié)構(gòu)的隨機有限元法則已經(jīng)經(jīng)過幾個研究人員的發(fā)展了。然而其主要缺點是不能有效地傳遞水平荷載(比如風荷載、地震荷載和海浪等)。他們是和結(jié)構(gòu)的柔韌性有關(guān)的。為了增強其側(cè)向剛度,支撐和剪力墻是必需的。Haldar和Gao試圖將支撐用于鋼框架中。他們在模型中使用了很多構(gòu)架。但是,他們沒有考慮嘗試使用在S隨機有限元的文章中提到的可以用二維平面描述的剪力墻。算例為了研究剪力墻系統(tǒng)對于結(jié)構(gòu)體系的整體可靠性所起到的作用,在本次研究中我們將以一個不帶剪力墻系統(tǒng)的框架結(jié)構(gòu)和一個帶剪力墻系統(tǒng)的框架結(jié)構(gòu)為研究對象,對比他們的實驗結(jié)果。在這兩種結(jié)構(gòu)上施加的荷載全部是靜力荷載。在評定這兩種帶剪力墻和不帶剪力墻的框架結(jié)構(gòu)體系的可靠性時都采用建議的計算方法。這種計算方法的精確度經(jīng)過了蒙特卡羅模擬法的驗證。無剪力墻框架的可靠性分析首先我們考慮一個雙跨雙層的框架,見圖2(圖2由圖1去掉剪力墻得來)。此框架采用A36級鋼。結(jié)構(gòu)的橫斷面規(guī)格和材料性質(zhì)等在結(jié)構(gòu)可靠性分析時所必須用到的結(jié)構(gòu)特征都統(tǒng)計在表3中。分別在框架結(jié)構(gòu)上施加恒載,活載和水平荷載。這些荷載的統(tǒng)計資料在表3中也已給出。在承載力極限狀態(tài)下的測試中,對于位于節(jié)點e的最接近臨界狀態(tài)的梁和位于節(jié)點c的最接近臨界狀態(tài)的柱的可靠性的評定使用在Eqs.(13)和(14)中建議的計算方法。在正常使用極限狀態(tài)下的測試中,對頂層在節(jié)點a處的水平位移和位于節(jié)點d處的橫梁跨中的豎向撓度需要檢查。在Eq.(12)中規(guī)定了對于框架結(jié)構(gòu)頂層的水平位移最多不能夠超過h/400, h是框架的高度。因此在本例子中drift limit等于1.83 cm。類似地,規(guī)定框架橫梁跨中的豎向撓度在未考慮折減的活載作用下最多不能超過l/360,l是橫梁的跨度。在本例子中,deflection limit就等于2.54 cm。在評定不同節(jié)點處的相應的可靠性指數(shù)和結(jié)構(gòu)破壞的可能性時考慮了在表3中列出的所有的隨機變量。在表4中列出了可靠性分析的結(jié)果。對于不帶剪力墻的框架結(jié)構(gòu)體系,框架梁的破壞的可能性為0.0039,這個數(shù)據(jù)是在做了一萬次模擬實驗后得出來的。而由于水平位移過大而導致的結(jié)構(gòu)破壞的可能性為零,考慮到超大型計算機的實際應用特點,為得出這個數(shù)據(jù)做了十萬次模擬實驗。通過蒙特卡羅模擬法得出的實驗結(jié)果列在表4中。當?shù)贸龅慕Y(jié)構(gòu)破壞機率比較大時,對于這兩種極限狀態(tài)的分析結(jié)果非常接近。然而,當?shù)贸龅慕Y(jié)構(gòu)破壞機率相對小時,兩種實驗結(jié)果的差別就比較明顯了,從結(jié)果中可以看出建議的計算方法可以應用于估計復雜結(jié)構(gòu)體系的可靠性。結(jié)構(gòu)框架中的橫梁和柱的可靠性指數(shù)一般都可以滿足結(jié)構(gòu)的承載力極限狀態(tài)。關(guān)于結(jié)構(gòu)橫梁的豎向撓度的可靠性也可以滿足結(jié)構(gòu)的承載力極限狀態(tài)。然而,框架結(jié)構(gòu)在水平荷載的作用下的彎曲程度相當嚴重??蚣芙Y(jié)構(gòu)的結(jié)構(gòu)破壞機率的主要因素就是由于節(jié)點a處的水平位移太大而引起的。因此,在這種情況下框架結(jié)構(gòu)就必須在水平方向做強化處理,否則是不可接受的,而此時對結(jié)構(gòu)起控制作用的極限狀態(tài)時正常使用極限狀態(tài)。表三:基本的隨機變量項目變量額定值額定系數(shù)變異系數(shù)分布注釋框架E(Mpa)2.00E+051.00.06對數(shù)常態(tài)Ab(cm2)113.61.00.05對數(shù)常態(tài)梁截面1860Ib(cm4)409571.00.05對數(shù)常態(tài)Zb(cm3)20151.00.05對數(shù)常態(tài)Ac(cm2)109.71.00.05對數(shù)常態(tài)柱截面1258Ic(cm4)197701.00.05對數(shù)常態(tài)Zc(cm3)1415.81.00.05對數(shù)常態(tài)Fy(Mpa)248.211.050.10對數(shù)常態(tài)剪力墻Ec(Mpa)2.14E+041.00.18對數(shù)常態(tài)Fc=20.68(Mpa)0.171.00.10對數(shù)常態(tài)荷載D(KN/m)29.21.00.10對數(shù)常態(tài)L(KN/m)17.521.00.25類型H(KN)125.530.780.37類型注:b梁,c柱。表四:有剪力墻框架和無剪力墻框架的實驗結(jié)果執(zhí)行標準位置SFEM蒙特卡羅模擬法PfPf無剪力墻的框架承載力標準節(jié)點cd2.6590.00390.0134節(jié)點eg2.2310.01290.0282正常使用標準節(jié)點a0.0600.47610.4740節(jié)點d5.3410.00.0有剪力墻的框架承載力標準節(jié)點eg3.1660.000760.00212正常使用標準節(jié)點a5.2900.00.0注:安全指數(shù),Pf結(jié)構(gòu)破壞幾率有剪力墻的結(jié)構(gòu)框架體系的可靠性分析將圖2中的框架結(jié)構(gòu)用剪力墻系統(tǒng)加強后就變成了圖1中的結(jié)構(gòu)體系。對于剪力墻系統(tǒng),我們要考慮兩種與剪力墻相關(guān)的附加變量,Ec和v,在表3中已經(jīng)給出這兩種變量的統(tǒng)計信息。我們假定本結(jié)構(gòu)是由五個在每一個樓層平面都采用剛接的相同的框架組成,并且只有本建筑中心的框架帶有剪力墻系統(tǒng)。雖然剪力墻的結(jié)構(gòu)層厚度設定為12.7cm,但是考慮到此結(jié)構(gòu)共包括五個相同的框架再加上每層樓板的剛性效應,因此本例中剪力墻最后分到每榀框架的實際有效厚度假定為2.54cm。在這個框剪聯(lián)合系統(tǒng)上將要施加三種靜力荷載,在表3中也已給出。在每個剪力墻上的橫向張拉應力超出了混凝土的規(guī)定抗拉強度之后,剪力墻系統(tǒng)的剛度就被削弱,減少到了初始剛度的40%。在計算此框剪聯(lián)合系統(tǒng)的結(jié)構(gòu)破壞可能性時采用了建議的計算方法。在承載力極限狀態(tài)下的測試中,需要測試的是框架柱的結(jié)構(gòu)破壞指數(shù),在本例中以圖1和圖2中節(jié)點e g為代表。在正常使用極限狀態(tài)下的測試中,需要測試此聯(lián)合系統(tǒng)的頂部(在圖1和圖2的節(jié)點a處)的水平位移所導致的結(jié)構(gòu)破壞指數(shù)。本次測試的結(jié)果記錄在表4中。同上文一樣,在承載力極限狀態(tài)下的測試中共做了一萬次實驗,在正常使用極限狀態(tài)下的測試中共做了十萬次實驗。對于這兩種極限狀態(tài)的測試,由建議的計算方法和通過蒙特卡羅模擬法得出的結(jié)構(gòu)的可靠性指數(shù)實驗結(jié)果基本相同。因此通過本次實驗結(jié)果可明顯得出如下結(jié)論:建議的計算方法可以應用于對框架剪力墻聯(lián)合結(jié)構(gòu)體系在靜力載荷作用下的結(jié)構(gòu)破壞可能性的分析當中。剪力墻系統(tǒng)的使用并沒有對框架柱的可靠性產(chǎn)生任何影響。然而,由于剪力墻的作用使得框架結(jié)構(gòu)頂部的水平位移顯著地減小了,從而使得這種聯(lián)合體系在正常使用極限狀態(tài)下的結(jié)構(gòu)破壞機率幾乎減小到零。這才是剪力墻系統(tǒng)的作用所在。對于這種聯(lián)合結(jié)構(gòu)體系,起控制作用的極限狀態(tài)從正常使用極限狀態(tài)變成了承載力極限狀態(tài)。這個簡單的例子清晰的證明了剪力墻系統(tǒng)在結(jié)構(gòu)承受水平荷載時是相當有益的。同時它也證明了建議的計算方法可以應用于在靜力載荷作用下的復雜結(jié)構(gòu)體系的結(jié)構(gòu)可靠性分析當中,從而擴展了結(jié)構(gòu)可靠性計算方法的選用范圍。總結(jié)
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年板材行業(yè)市場開拓與采購支持合同4篇
- 二零二四年石膏板市場分析采購合同書3篇
- 2025年度汽車智能網(wǎng)聯(lián)技術(shù)研發(fā)合同
- 二零二五年度白酒產(chǎn)業(yè)園區(qū)建設與管理合同2篇
- 二零二四年度運動員參賽賽事責任與免責合同范本3篇
- 2025年度機場工程承攬合同建設施工合同范本4篇
- CRP-Alb在內(nèi)分泌治療轉(zhuǎn)移性激素敏感性前列腺癌預后中的意義
- 2025年度出租車公司股權(quán)協(xié)議范本及車輛智能化改造合同3篇
- 2025年度存量房買賣與產(chǎn)權(quán)分割服務合同2篇
- 二零二五年度消防安全信息化平臺建設合同2篇
- 2024年安全教育培訓試題附完整答案(奪冠系列)
- 神農(nóng)架研學課程設計
- 文化資本與民族認同建構(gòu)-洞察分析
- 2025新譯林版英語七年級下單詞默寫表
- 【超星學習通】馬克思主義基本原理(南開大學)爾雅章節(jié)測試網(wǎng)課答案
- 《錫膏培訓教材》課件
- 斷絕父子關(guān)系協(xié)議書
- 福建省公路水運工程試驗檢測費用參考指標
- 2024年中國工業(yè)涂料行業(yè)發(fā)展現(xiàn)狀、市場前景、投資方向分析報告(智研咨詢發(fā)布)
- 自然科學基礎(小學教育專業(yè))全套教學課件
- 《工程勘察資質(zhì)分級標準和工程設計資質(zhì)分級標準》
評論
0/150
提交評論