已閱讀5頁,還剩16頁未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, the County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of貴陽市東站路道路工程第1合同段貴陽市東站路道路工程第1合同段地下通道箱涵滿堂支架施工方案編制: 日期: 年 月 日復(fù)核: 日期: 年 月 日審核: 日期: 年 月 日審批: 日期: 年 月 日中鐵隧道集團(tuán)有限公司貴陽市東站路道路工程第1合同段項(xiàng)目經(jīng)理部二一二年七月二十八日目錄一、編制依據(jù)- 2 -二、工程概況- 2 -三、施工方案設(shè)計(jì)- 2 -1、構(gòu)配件種類、規(guī)格- 2 -2、滿堂支架方案設(shè)計(jì)- 2 -2.1 支架整體要求- 2 -2.2 滿堂支架設(shè)計(jì)- 2 -2.3 架體結(jié)構(gòu)計(jì)算圖(平、立、剖)- 3 -2.4 模板結(jié)構(gòu)及支撐體系- 4 -2.5 模板頂端節(jié)點(diǎn)構(gòu)造圖- 4 -3、涵洞及滿堂支架施工工藝- 4 -3.1測量放線- 4 -3.2支架搭設(shè)- 5 -3.3模板制作與安裝- 6 -3.4鋼筋加工與安裝- 6 -3.5混凝土澆筑與振搗- 7 -3.6 施工機(jī)械、材料用量表及供應(yīng)計(jì)劃- 8 -4、架體搭設(shè)、使用和拆除方法- 8 -4.1施工準(zhǔn)備- 8 -4.2腳手架搭設(shè)- 8 -4.3腳手架使用- 9 -4.4腳手架拆除- 9 -四、架體結(jié)構(gòu)計(jì)算- 9 -1、荷載計(jì)算- 9 -2、最不利位置強(qiáng)度檢算- 11 -2.1立桿強(qiáng)度及穩(wěn)定性檢算- 11 -2.2結(jié)構(gòu)受力計(jì)算圖- 14 -五、施工安全技術(shù)措施- 15 -1、確保材料合格- 15 -2、按照設(shè)計(jì)方案搭設(shè)- 15 -3、加強(qiáng)施工過程監(jiān)控- 16 -4、規(guī)范拆除支架施工- 16 -六、施工應(yīng)急預(yù)案- 17 -1、編制目的- 17 -2、應(yīng)急預(yù)案適用范圍- 17 -3、應(yīng)急救援組織機(jī)構(gòu)及職責(zé)- 17 -4、應(yīng)急救援實(shí)施程序- 18 -5、加強(qiáng)預(yù)防準(zhǔn)備工作- 19 -地下通道箱涵滿堂支架施工方案一、編制依據(jù)貴陽市東站路第1合同段地下通道施工圖設(shè)計(jì)公路橋涵施工技術(shù)規(guī)范(JTG F50-2011)建筑施工碗扣式腳手架安全技術(shù)規(guī)范(JGJ 166-2008)建筑施工模板安全技術(shù)規(guī)范(JGJ 162-2008)建筑結(jié)構(gòu)荷載規(guī)范(GB50009-2001)二、工程概況地下通道中心里程與東站路交叉于MK3+300里程,通道位于路基填方區(qū)域,通道與路線交角70,長度為66米。通道凈高4.5米,凈寬7m,涵身厚度為70cm,為C40鋼筋混凝土結(jié)構(gòu)。單向縱坡為0.75%,單向橫坡為1.5%,路面低側(cè)設(shè)置蓋板邊溝。根據(jù)箱涵施工工藝要求并結(jié)合施工現(xiàn)場實(shí)際,擬采用縱向分段、豎向分次施工,箱涵頂板及腹板內(nèi)模采用碗扣式滿堂支架支撐、外模采用對拉桿與斜撐組合支撐。三、施工方案設(shè)計(jì)1、構(gòu)配件種類、規(guī)格碗扣式鋼管48mm3.5:內(nèi)徑41mm外徑48mm、壁厚3.5mm。立桿的型號:LG-120、長1200mm;LG-180、長1800mm; LG-240、長2400mm。橫桿的型號:HG-30、長300mm;HG-60、長600mm;HG-90、長900mm;HG-120、長1200mm;HG-150、長1500mm;HG-180、長1800mm。斜桿的型號:XG-0912、長1500mm;XG-1518、長2340mm;XG-1818、長2550mm。2、滿堂支架方案設(shè)計(jì)2.1 支架整體要求支架結(jié)構(gòu)必須有足夠的強(qiáng)度、剛度、穩(wěn)定性。支架在承重后期彈性和塑性變形應(yīng)控制在15mm以內(nèi)。地基承載(壓)力滿足支架設(shè)計(jì)后驗(yàn)算要求。2.2 滿堂支架設(shè)計(jì)滿堂支架基底為涵洞鋼筋混凝土基礎(chǔ),滿足要求。立桿按0.90.9m進(jìn)行布置,即橫向間距0.9m,縱向間距0.9m、0.9m,步距為1.2m;支架最大高度為5米。涵洞橫向每4排立桿搭設(shè)一排橫向剪刀撐,沿掃地桿上搭設(shè)一排水平剪刀撐。支架高度通過可調(diào)托座調(diào)節(jié),頂托頂部距立桿頂部的懸空距離不大于15cm。碗扣式鋼管的內(nèi)徑41mm外徑48mm、壁厚3.5mm。立桿搭設(shè)時將其接長縫錯開,第一層立桿用長1.8 m和3.0 m的立桿錯開布置,往上至頂層再用1.8 m和3.0 m兩種長度找平,最后用頂托調(diào)整坡度。2.3 架體結(jié)構(gòu)計(jì)算圖(平、立、剖)支架布置橫向剖面圖支架布置平面圖支架布置縱向立面圖2.4 模板結(jié)構(gòu)及支撐體系模板結(jié)構(gòu)是否合適將直接影響涵洞的外觀,側(cè)板外模均采用定型鋼模板,頂板底模采用竹膠板。沿涵洞縱向采用100100mm方木,間距0.6米;橫向在縱向方木上置于42mm的鋼管,鋼管中到中間距為0.3米,凈距0.26米。在釘面板時,每塊面板應(yīng)從一端趕向另一端,以保證面板表面平整,竹膠板拼縫處且45斜面拼接。2.5 模板頂端節(jié)點(diǎn)構(gòu)造圖模板頂端節(jié)點(diǎn)構(gòu)造圖3、涵洞及滿堂支架施工工藝涵洞施工工藝如下圖所示。3.1測量放線 (1)確定支架搭設(shè)范圍。(2)按照設(shè)計(jì)方案準(zhǔn)確找出立桿位置及搭設(shè)高度。(3)確定模板安裝位置。測量放線支架搭設(shè)立底模標(biāo)高復(fù)核混凝土拌合綁扎鋼筋、立側(cè)模拆模、養(yǎng)護(hù)拆除支架、清理場地取試件砼澆筑混凝土運(yùn)輸3.2支架搭設(shè)支架系統(tǒng)由下而上依次為:支撐架底托基礎(chǔ)、48碗扣腳手支架、頂托、分配梁和底模等組成。(1)測量放出涵洞中心點(diǎn),首先拉線定出支架的縱軸線,然后在軸線上按設(shè)計(jì)間距分出每排立桿位置。(2)分塊安裝枕木,因支墊的枕木其新舊程度不一,故在鋪設(shè)時注意將枕木的大面朝向頂?shù)撞课恢?,以保證枕木與底部接觸緊密穩(wěn)定。(3)安裝底托,底托支撐鋼板與枕木間平整接觸,充分受力。底托調(diào)節(jié)螺桿擰緊無松動,以保證底托受力均勻。(4)用48碗扣腳手管搭設(shè)腳手架立桿,立桿按90cm90cm間距進(jìn)行布置;立桿布置時,縱橫方向均拉線進(jìn)行,保證立桿位置及分布間距均勻一致。(5)鋼管支架設(shè)置縱橫向橫聯(lián),橫聯(lián)層距按120cm布置,在橫、縱方向支架之間設(shè)置斜桿支撐,斜聯(lián)按360cm間距布置。(6)將支架由一側(cè)向另一側(cè)依次搭設(shè),以保證在每段都能根據(jù)凈空高度合理調(diào)節(jié)支架高度。(7)每段支架間用3m長的短鋼管按1.8m間距梅花型連接,以保證整個支架連接成一整體,加強(qiáng)支架的穩(wěn)定性。(8)頂托在立桿搭設(shè)完成后安裝。每一段支架頂托的高度均由測量按設(shè)計(jì)值放出起止控制斷面,并拉線將其余頂托調(diào)節(jié)到位。頂托調(diào)節(jié)螺桿要豎直受力,頂托“U”型槽口向同一個方向。(9)按照位置測量放線模板控制線,并按照要求鋪設(shè)枕木及模板。3.3模板制作與安裝涵洞側(cè)墻模板采用鋼模板、頂板底模采用厚18mm的竹膠板。底模安裝:在鋼管支架的頂縱向鋼管上,架縱向鋼管分布梁,在其之上橫向鋪設(shè)方楞木。楞木接頭相互交錯布置,楞木間距為30cm,縱向鋼管、方楞木之間用木楔調(diào)整以保證底模線形。底模竹膠板直接鋪釘在方楞上竹膠板,拼縫剛好位于方楞木中間,拼縫間夾貼雙面棉膠,拼縫表面用石臘密封。側(cè)模安裝:對涵洞的平面位置進(jìn)行放樣,在基礎(chǔ)上標(biāo)出側(cè)模邊線和鋼筋布置的位置。側(cè)模用鋼模板組合,每隔30cm立方木、背桿木,豎向背桿木直接置于支架橫向方楞木上,并用木楔楔牢。所有排水孔的預(yù)埋管按設(shè)計(jì)圖紙固定到位,預(yù)埋件的預(yù)埋無遺漏且安裝牢固,位置準(zhǔn)確。3.4鋼筋加工與安裝1)鋼筋進(jìn)場及檢驗(yàn)鋼筋必須按不同種類、等級、牌號、規(guī)格及生產(chǎn)廠家分批驗(yàn)收、分別堆放,不得混雜,且應(yīng)立標(biāo)牌以示識別。鋼筋在運(yùn)輸、儲存過程中,應(yīng)避免銹蝕和污染,并堆置在鋼筋棚內(nèi)。在鋼筋進(jìn)場后,要求提供附有生產(chǎn)廠家對該批鋼筋生產(chǎn)的合格證書,標(biāo)示批號和出廠檢驗(yàn)的有關(guān)力學(xué)性能試驗(yàn)資料。2)鋼筋制作、綁扎涵洞鋼筋按設(shè)計(jì)圖紙?jiān)阡摻罴庸づ飪?nèi)進(jìn)行加工;縱向通長鋼筋采用焊接,焊接接頭應(yīng)符合鋼筋焊接及驗(yàn)收規(guī)程的要求。焊接接頭不設(shè)于最大壓力處,并使接頭交錯排列,受拉區(qū)同一焊接接頭范圍內(nèi)接頭鋼筋的面積不得超過該截面鋼筋總面積的50%。鋼筋布置按設(shè)計(jì)圖紙,依次綁扎側(cè)板鋼筋及頂板鋼筋。為保證鋼筋保護(hù)層的厚度,在鋼筋與模板間設(shè)置三角砂漿墊塊,墊塊用預(yù)埋的鐵絲與鋼筋扎牢,并互相錯開布置。3.5混凝土澆筑與振搗混凝土澆筑前應(yīng)對支架、模板和預(yù)埋件進(jìn)行認(rèn)真檢查,清除模板內(nèi)的雜物,并用清水對模板進(jìn)行認(rèn)真沖洗。為防止混凝土本身的收縮及施工時間較長,混凝土中應(yīng)摻入緩凝劑。澆筑過程中底板后肋板用插入式振搗器振搗,混凝土搗固密實(shí)。砼澆注前,必須再次對支架體系的安全性進(jìn)行全面檢查,經(jīng)自檢和監(jiān)理檢查確認(rèn)后,方可進(jìn)行澆筑。混凝土澆筑方案充分考慮工地拌和站的攪拌時間、運(yùn)輸距離和泵送速度?;炷翝仓诉x擇溫度不超過32、無雨的天氣進(jìn)行,如該段時間內(nèi)溫度較高,則需通過調(diào)整配合比降低水化熱并加強(qiáng)砼的養(yǎng)護(hù)作業(yè)。箱涵混凝土一次澆筑11m長,分三批前后平行作業(yè),混凝土澆筑順序?yàn)橄扔芍胁繚仓?cè)壁,然后按照分批分層對稱澆筑側(cè)板混凝土,最后澆筑頂板混凝土。混凝土澆筑應(yīng)按順序、一定的厚度和方向分層進(jìn)行,分層厚度為30cm,必須注意在下層混凝土初凝或重塑前澆筑完上層混凝土。上下層同時澆筑時,上層與下層前后澆筑距離應(yīng)保持1.5m以上。振搗采用插入式振動棒,移動間距不應(yīng)超過振動棒作用半徑的1.5倍,并與側(cè)模保持510cm的距離。振搗時插入下層混凝土510cm,每一處振完后應(yīng)徐徐提出振動棒。振搗時避免振動棒模板,鋼筋等,對每一振動部位必須振到該部位混凝土密實(shí)為止,即混凝土停止下沉,不再冒氣泡,表面呈現(xiàn)平坦、泛漿。在澆筑過程中應(yīng)安排各工種檢查鋼筋、支架及模板的變化,遇到情況及時處理。在混凝土澆筑完成后,應(yīng)在初凝后盡快保養(yǎng),采用麻袋或其他物品覆蓋混凝土表面,灑水養(yǎng)護(hù),混凝土灑水養(yǎng)護(hù)的時間為10天,每次灑水以保持混凝土表面經(jīng)常處于濕潤狀態(tài)為度。用于控制拆模、落架的混凝土強(qiáng)度試壓塊放置在涵洞內(nèi),與之同條件進(jìn)行養(yǎng)生。在養(yǎng)護(hù)期內(nèi),嚴(yán)禁利用涵洞頂面作為施工場地或堆放原材料?;炷翝仓^程中采取綜合安全措施,主要包括:混凝土澆筑前,對腳手架、連接件和基礎(chǔ)進(jìn)行全面、系統(tǒng)的檢查,對不符合要求的進(jìn)行及時整改。澆筑時派專人負(fù)責(zé)檢查澆筑段的支架變化,有異常情況時立即通知施工員、安全員及現(xiàn)場負(fù)責(zé)人,視情況提出整改措施并立即予以實(shí)施。混凝土的澆筑部位、澆筑速度嚴(yán)格按照施工方案進(jìn)行控制,特別需控制好汽車臂加泵混凝土的輸出速度、高度等。施工過程中出現(xiàn)異常險情時,按照應(yīng)急預(yù)案進(jìn)行緊急處置。3.6 施工機(jī)械、材料用量表及供應(yīng)計(jì)劃為保證施工進(jìn)度及安全,機(jī)械選擇性能好、滿足施工要求的機(jī)械,材料按照設(shè)計(jì)量進(jìn)行采購和準(zhǔn)備。機(jī)械及材料計(jì)劃表項(xiàng)次名稱規(guī)格型號單位數(shù)量備注1砼運(yùn)輸車10m3輛4備用1輛2載重汽車8t輛1模板、材料轉(zhuǎn)運(yùn)3電焊機(jī)BX1-500臺4鋼筋加工、模板加固等4鋼筋切斷機(jī)臺1鋼筋加工5鋼筋彎曲機(jī)臺1鋼筋加工6全站儀徠卡902臺1平面位置控制7精密水準(zhǔn)儀臺1標(biāo)高控制8C40混凝土商混方13009鋼筋HRB335T28310腳手架483.5mmT10滿堂支架11模板方204、架體搭設(shè)、使用和拆除方法4.1施工準(zhǔn)備腳手架搭設(shè)前工程技術(shù)負(fù)責(zé)人按腳手架施工設(shè)計(jì)或?qū)m?xiàng)方案的要求對搭設(shè)和使用人員進(jìn)行技術(shù)交底。對進(jìn)入現(xiàn)場的腳手架構(gòu)配件,進(jìn)行質(zhì)量復(fù)檢。構(gòu)配件按品種、規(guī)格分類放置在堆料區(qū)內(nèi)或碼放在專用架上,清點(diǎn)好數(shù)量備用。腳手架堆放場地排水暢通,不得有積水。4.2腳手架搭設(shè)腳手架搭設(shè)的要求:底層水平框架的縱向直線度應(yīng)L/200;橫桿間水平度應(yīng)L/400。腳手架全高的垂直度應(yīng)小于L/500;最大允許偏差應(yīng)小于100mm。腳手架的搭設(shè)應(yīng)分階段進(jìn)行,搭設(shè)后經(jīng)檢查驗(yàn)收后方可正式投入使用。腳手架搭設(shè)到頂時,應(yīng)組織技術(shù)、安全、施工人員對整個架體結(jié)構(gòu)進(jìn)行全面的檢查和驗(yàn)收,及時解決存在的結(jié)構(gòu)缺陷。4.3腳手架使用使用過程中,不得隨意破壞支架結(jié)構(gòu),如確需更改,則需通過監(jiān)理工程師和設(shè)計(jì)單位同意。支架荷載堆放符合要求,不得超載超范圍堆放。按照施工方案正確施工,正常使用支架結(jié)構(gòu)。施工過程中,加強(qiáng)對支架結(jié)構(gòu)的檢查,并注意對缺陷部分進(jìn)行及時修復(fù)。4.4腳手架拆除當(dāng)頂板混凝土強(qiáng)度達(dá)到設(shè)計(jì)強(qiáng)度85%以上,并得到監(jiān)理指示后,方可進(jìn)行支架卸落。先進(jìn)行跨中部位的模板體系的松動和拆除,然后將兩端的模板進(jìn)行松動拆除,最后從上至下依次進(jìn)行拆除作業(yè)。卸架時尤其要注意施工作業(yè)的安全。(1)支架拆除前應(yīng)由單位工程負(fù)責(zé)人召集有關(guān)人員對架子工程進(jìn)行全面檢查與簽證確認(rèn),建筑物施工完畢,且不需要使用時,腳手架方可拆除。(2)拆除腳手架應(yīng)設(shè)置警戒,張掛醒目的警戒標(biāo)志,禁止非操作人員通行和地面施工人員能行,并有專人負(fù)責(zé)警戒。(3)長立桿、斜桿的拆除應(yīng)由二人配合進(jìn)行,不宜單獨(dú)作業(yè),下班時應(yīng)檢查是否牢固,必要時應(yīng)加設(shè)臨時固定支撐,防止意外。(4)拆除外架前應(yīng)將通道口上的存留材料雜物清除,按自上而下先裝后拆,后裝先拆的順序。(5)支架拆除順序?yàn)椋喊踩W(wǎng)防護(hù)欄桿剪刀撐腳手片大橫桿小橫桿立桿,自上而下拆除,一步一清,不得采用踏步式拆除,不準(zhǔn)上、下同時作業(yè)。(6)如遇強(qiáng)風(fēng)、大雨等氣候,不能進(jìn)行外架拆除。(7)拆卸的鋼管與扣件應(yīng)分類堆放,嚴(yán)禁高空拋擲。(8)吊下的鋼管與扣件運(yùn)到地面時應(yīng)及時按品種規(guī)格堆放整齊。四、架體結(jié)構(gòu)計(jì)算1、荷載計(jì)算根據(jù)支架布置方案,采用滿堂支架,對其剛度、強(qiáng)度、穩(wěn)定性必須進(jìn)行檢算。鋼管的內(nèi)徑41mm外徑48mm、壁厚3.5mm。截面積轉(zhuǎn)動慣量回轉(zhuǎn)半徑截面模量鋼材彈性系數(shù)鋼材容許應(yīng)力 ,按照鋼管滿堂支架預(yù)壓技術(shù)規(guī)程中關(guān)于舊鋼管抗壓強(qiáng)度設(shè)計(jì)值的規(guī)定需要乘以折減系數(shù)0.85,故驗(yàn)算時按照170MPa的容許應(yīng)力進(jìn)行核算。1、支架結(jié)構(gòu)驗(yàn)算荷載計(jì)算及荷載的組合:A、鋼筋混凝土自重:W砼= 0.726=18.2KN/m2(鋼筋混凝土梁重量按26kN/m3計(jì)算)B、支架模板重 模板重量:(竹膠板重量按24.99kN/m3計(jì)算)主次楞重量:主楞方木:(方木重量按8.33KN/m3計(jì)算)次楞鋼管: 支架重量:根據(jù)現(xiàn)場情況,按立桿高度進(jìn)行檢算。W立桿=91253.84=2070kg。W橫桿=(7412+4911)3.84=2810 kg。W撐桿=(744+722)3.84=537.6 kg。W =(2.07 +2.81+0.54)10/117=0.7KN/m2。C、人員及機(jī)器重W =1KN/ m2 (JGJ166-2008 建筑施工碗扣式腳手架安全技術(shù)規(guī)范)D、振搗砼時產(chǎn)生的荷載 W =2KN/ m2 ( JGJ166-2008 建筑施工碗扣式腳手架安全技術(shù)規(guī)范) E、傾倒混凝土?xí)r沖擊產(chǎn)生的荷載W =3KN/ m2 (采用汽車泵取值3.0KN/m2)F、風(fēng)荷載按照建筑施工碗扣式腳手架安全技術(shù)規(guī)范,風(fēng)荷載Wk=0.7uzusWo其中uz為風(fēng)壓高度變化系數(shù),按照建筑結(jié)構(gòu)荷載規(guī)范取值為1;us為風(fēng)荷載體型系數(shù),按照建筑結(jié)構(gòu)荷載規(guī)范取值為0.8;Wo為基本風(fēng)壓,按照貴陽市市郊離地高度5m處50年一遇值為0.3 KN/m2。風(fēng)荷載Wk=0.710.83=1.68 KN/m2由風(fēng)荷載產(chǎn)生立桿彎矩值: 式中: 風(fēng)荷載產(chǎn)生的彎矩; 風(fēng)荷載標(biāo)準(zhǔn)值(); 立桿的縱距; 立桿的計(jì)算長度;Mw=1.40.61.221.68/10=0.2 KNm2、最不利位置強(qiáng)度檢算 2.1立桿強(qiáng)度及穩(wěn)定性檢算 立桿荷載組合N=1.2(18.2+0.4+0.59+0.7)+0.91.4(1+2+3+1.68)=33.5 KN/m2按照立桿最不利位置0.90.9m間距布置,單枝立桿荷載N=33.50.81=27.2KN(1) 立桿壓彎強(qiáng)度驗(yàn)算立桿壓彎強(qiáng)度計(jì)算公式:式中: 有效彎矩系數(shù),采用1.0; 截面塑性發(fā)展系數(shù),鋼管截面為1.15; 立桿的截面模量; 歐拉臨界力;(2)立桿穩(wěn)定驗(yàn)算結(jié)論:立桿滿足強(qiáng)度及穩(wěn)定性要求。(3)橫向鋼管(次楞)強(qiáng)度和剛度驗(yàn)算次楞荷載組合N=1.2(27.2+0.4)+0.91.4(1+2+3+1.68)=42.8KN/m2按照次楞最不利位置0.3m間距布置,單根次楞荷載q=42.80.3=12.8KN/mA、橫向鋼管抗彎強(qiáng)度驗(yàn)算截面抵抗矩;彎矩;驗(yàn)算公式式中: 鋼管設(shè)計(jì)抗彎強(qiáng)度為205MPa,考慮壁厚損耗按照85%折減為174 MPa。故次楞抗彎強(qiáng)度滿足設(shè)計(jì)要求。B、橫向鋼管剛度驗(yàn)算故橫向鋼管滿足強(qiáng)度和剛度要求。(4)縱向方木(主楞)強(qiáng)度和剛度驗(yàn)算主楞荷載組合N=1.2(27.2+0.4+0.12)+0.91.4(1+2+3+1.68)=43.04KN/m2按照主楞最不利位置0.6m間距布置,單根主楞荷載q=43.040.6=25.8KN/m支架中采用100100mm縱向方木,驗(yàn)算時按連續(xù)梁計(jì)算,縱向方木間距60cm布置。A、縱向方木強(qiáng)度驗(yàn)算式中: 方木截面抵抗矩; 方木所受彎矩;方木的力學(xué)性能指標(biāo)按A3類木材并按濕材乘0.9的折減系數(shù)取值,則故主楞方木強(qiáng)度要求。B、縱向方木剛度驗(yàn)算式中:方木彈性模量按照0.9系數(shù)折減,即結(jié)論:主楞方木滿足強(qiáng)度和剛度要求。(5)側(cè)模強(qiáng)度和剛度驗(yàn)算側(cè)模采用鋼模板,對拉桿連接模板兩側(cè)以平衡混凝土澆筑時產(chǎn)生的側(cè)壓力,并增加方木斜支撐保證模板穩(wěn)定性?;炷羵?cè)壓力計(jì)算:其中:F-混凝土澆筑最大側(cè)壓力(KN/ m2) V-混凝土澆筑速度(m/h),取2m/h t-混凝土入模溫度(),取30 1-混凝土外加劑修正系數(shù),添加混凝土外加劑時取1.2 2-坍落度影響修正系數(shù),坍落度為110-150mm時取1.15計(jì)算得F=12.88 KN/ m2為防止混凝土脹?;蜃冃?,核算時考慮最不利條件即未將對拉桿受力納入。按照側(cè)模外支撐豎向3根方木支撐,縱向間距0.8m布置,則每平方布置3根支撐,每根支撐受軸力為N=(12.8850.8/3)0.717=12.3KN抗壓強(qiáng)度M=12.3103/0.10.1=1.23MPa,故滿足設(shè)計(jì)要求。2.2結(jié)構(gòu)受力計(jì)算圖 2.2.1滿堂支架搭設(shè)計(jì)算圖 立桿受力分析圖2.2.2受力單元內(nèi)力計(jì)算圖 1)、將橫梁、墊木受力簡化為受均布荷載的簡支梁進(jìn)行受力分析橫桿(梁)受均布荷載受力圖橫桿(梁)受均布荷載剪力圖橫桿(梁)受均布荷載彎矩圖2)、將立桿受力簡化為受集中荷載的兩端鉸支結(jié)構(gòu)進(jìn)行受力分析立桿(梁)受集中荷載平衡圖五、施工安全技術(shù)措施1、確保材料合格(1)搭設(shè)腳手架全部采用48mm,壁厚3.5mm的鋼管。(2)鋼管表面平直光滑,無裂縫、結(jié)疤、分層、錯位、硬彎、毛剌、壓痕和深的劃痕。(3)鋼管上嚴(yán)禁打孔,鋼管在便用前先涂刷防銹漆。(4)材質(zhì)必須符合規(guī)范規(guī)定。 新扣件具有生產(chǎn)許可證,法定檢測單位的測試報告和產(chǎn)品質(zhì)量合格證。對扣件質(zhì)量有懷疑時,按現(xiàn)行國家規(guī)定標(biāo)準(zhǔn)抽樣檢測。對不合格品禁止使用。 舊扣件使用前,先進(jìn)行質(zhì)量檢查,有裂縫、變形的嚴(yán)禁使用,出現(xiàn)滑絲的螺拴進(jìn)行更換處理。 新、舊扣件均進(jìn)行防銹處理。(5)腳手片用毛竹腳手片,無發(fā)霉、腐蝕。2、按照設(shè)計(jì)方案搭設(shè)(1)滿堂支架搭設(shè)一般順序是:里立桿外立桿小橫桿大橫桿掃地桿腳手片防護(hù)欄桿和踢腳桿安全網(wǎng)。(2)腳手架必須配合施工進(jìn)度搭設(shè),一次搭設(shè)高度不宜過大并隨時增加臨時支撐,保證搭設(shè)過程中和穩(wěn)定性。(3)腳手架搭設(shè)中累計(jì)誤差超過允許偏差,難經(jīng)糾正,每搭完一步腳手架后,按規(guī)定校步距、縱距、橫距、立桿的垂直度。(4)豎立桿時應(yīng)由兩人配合操作。大、小橫桿與立桿連接時,也必須兩人配合。(5)當(dāng)有六級及六級以上大風(fēng)和霧、雨時,應(yīng)停止腳手搭設(shè)作業(yè)。雨后上架作業(yè)應(yīng)注意防滑,并采取防滑措施。(6)腳手架搭設(shè)后組織分段驗(yàn)收,辦理驗(yàn)收手續(xù)。驗(yàn)收表中應(yīng)寫明驗(yàn)收的部位,內(nèi)容量化,驗(yàn)收人員履行驗(yàn)收簽字手續(xù)。驗(yàn)收不合格時,應(yīng)在整改完畢后重新填寫驗(yàn)收表。腳手架驗(yàn)收合格并掛合格牌后方可使用。3、加強(qiáng)施工過程監(jiān)控(1)勞保用品正確佩戴,做好施工周邊區(qū)域安全防護(hù)和警戒。(2)經(jīng)常性檢查連接件是否有松動脫落、基礎(chǔ)是否有開裂沉降等情況,遇變化時及時采取應(yīng)對措施進(jìn)行處理。(3)檢查架體幾何不變性的斜桿、十字撐等設(shè)置是否完善;立桿底座與基礎(chǔ)面的接觸有無松動或懸空情況;立桿上碗扣是否可靠鎖緊;立桿連接銷是否安裝、斜桿扣接點(diǎn)是否符合要求、扣件擰緊程度等。(4)在混凝土澆筑過程中,應(yīng)有專人負(fù)責(zé)查看腳手架變化情況。(5)作業(yè)層上的施工荷載應(yīng)符合設(shè)計(jì)要求,不得超載,不得在腳手架上集中堆放模板、鋼筋等物料。 (6) 大模板不得直接墩放在腳手架上。 (7)遇6級及以上大風(fēng)、雨、大霧天氣時應(yīng)停止腳手架的搭設(shè)與拆除作業(yè)。(8)腳手架使用期間,嚴(yán)禁擅自拆除架體結(jié)構(gòu)桿件,如需拆除必須報請技術(shù)主管同意,確定補(bǔ)救措施后放可實(shí)施。(9)嚴(yán)禁在腳手架基礎(chǔ)及鄰近處進(jìn)行挖掘作業(yè)。(10)加強(qiáng)施工用電、小型機(jī)具等使用的安全管理工作。4、規(guī)范拆除支架施工(1)架體拆除時應(yīng)按施工方案設(shè)計(jì)的拆除順序進(jìn)行,即先跨中后邊跨、從上至下依次進(jìn)行。(2)拆除前應(yīng)全面檢查腳手架的連接、支撐體系等是否符合構(gòu)造要求,經(jīng)按技術(shù)管理程序批準(zhǔn)后方可實(shí)施拆除作業(yè)。(3)腳手架拆除前現(xiàn)場工程技術(shù)人員應(yīng)對在崗操作工人進(jìn)行有針對性的安全技術(shù)交底。(4)腳手架拆除時必須劃出安全區(qū),設(shè)置警戒標(biāo)志,派專人看管。(5)拆除前應(yīng)清理腳手架上的器具及多余的材料和雜物。(6)拆除作業(yè)應(yīng)從頂層開始,逐層向下進(jìn)行,嚴(yán)禁上下層同時拆除。(7)拆卸的鋼管與扣件應(yīng)分類堆放,嚴(yán)禁高空拋擲。(8)吊下的鋼管與扣件運(yùn)到地面時應(yīng)及時按品種規(guī)格堆放整齊。六、施工應(yīng)急預(yù)案1、編制目的為了加強(qiáng)施工安全工作,保護(hù)施工人員生命財產(chǎn)的安全,實(shí)行“安全第一,預(yù)防為主”的安全管理方針,同時為了更好的在出現(xiàn)事故情況下快速實(shí)施救援以將險情及時控制并最大程度降低事故帶來的損失,特制訂本應(yīng)急預(yù)案。2、應(yīng)急預(yù)案適用范圍 涵洞混凝土澆筑過程中,支架及模板出現(xiàn)失穩(wěn)、坍塌等危及施工作業(yè)人員安全的情況。3、應(yīng)急救援組織機(jī)構(gòu)及職責(zé)項(xiàng)目經(jīng)理部成立支架坍塌應(yīng)急救援工作組,工作組按照職能劃分,下設(shè)搶險組、綜合協(xié)調(diào)組、后勤保障組、善后處理。應(yīng)急救援工作組組長:項(xiàng)目經(jīng)理副組長:黨工委書記、項(xiàng)目生產(chǎn)副經(jīng)理、項(xiàng)目總工、安全總監(jiān)組 員:機(jī)電總工、工程部長、安檢部長、設(shè)物部長、辦公室主任、分隊(duì)隊(duì)長。應(yīng)急救援工作小組職責(zé):1)工作組組長職責(zé):負(fù)責(zé)施工方案的審批和監(jiān)督相關(guān)部門落實(shí),發(fā)生事故時啟動應(yīng)急預(yù)案并領(lǐng)導(dǎo)組織各小組實(shí)施應(yīng)急救援和事故處理。2)應(yīng)急救援工作組辦公室設(shè)在項(xiàng)目安檢部,辦公室主任由安檢部長兼任,負(fù)責(zé)項(xiàng)目應(yīng)急救援指揮領(lǐng)導(dǎo)小組日常工作。其職責(zé)是:按照國家有關(guān)法律法規(guī)要求,認(rèn)真組織落實(shí)應(yīng)急預(yù)防和應(yīng)急計(jì)劃各項(xiàng)措施,在應(yīng)急啟動后,嚴(yán)格按照預(yù)案要求組織、協(xié)調(diào)搶險救援工作,確?,F(xiàn)場治安、醫(yī)療救援和通訊暢通,調(diào)集搶險救援相關(guān)資料,上報搶險救援進(jìn)展情況及事故調(diào)查資料準(zhǔn)備。3)應(yīng)急搶險小組:小組組長由項(xiàng)目生產(chǎn)副經(jīng)理擔(dān)任,組員由項(xiàng)目總工、機(jī)電總工、安全總監(jiān)、工程部長、設(shè)物部長、分隊(duì)隊(duì)長等組成。其職責(zé)是:勘察現(xiàn)場,提出搶險救援技術(shù)方案并實(shí)施,協(xié)調(diào)有關(guān)部門的搶險行動,及時向應(yīng)急救援領(lǐng)導(dǎo)小組報告搶險進(jìn)展情況。4)綜合協(xié)調(diào)小組:小組組長由項(xiàng)目黨工委書記擔(dān)任,組員由安檢部長和工程部、設(shè)物部有關(guān)人員組成。其職責(zé)是:負(fù)責(zé)現(xiàn)場應(yīng)急搶險所需人員、車輛、物資、設(shè)備的組織、安排、協(xié)調(diào)工作,協(xié)助負(fù)有法定職責(zé)的部門對事故事件的調(diào)查取證工作,協(xié)助相關(guān)人員進(jìn)行對外信息公布工作。5)后勤保障小組:小組組長由工區(qū)書記擔(dān)任,組員由辦公室主任和相關(guān)施工分隊(duì)人員組成。負(fù)責(zé)搶險救援及事故事件調(diào)查工作人員生活保障、食宿安排等后勤服務(wù),提供必要的辦公用品和交通、通訊工具、器材,負(fù)責(zé)突發(fā)事故事件的現(xiàn)場治安保衛(wèi)工作,杜絕一切與事故事件無關(guān)的人員、車輛進(jìn)入現(xiàn)場。6)善后處理小組:小組組長由工區(qū)書記擔(dān)任,組員由辦公室、醫(yī)護(hù)人員、安檢部相關(guān)人員及相關(guān)分隊(duì)人員組成。其職責(zé)是:對事故或險情傷亡人員實(shí)施救治、處置、安撫工作,保障隊(duì)伍穩(wěn)定。4、應(yīng)急救援實(shí)施程序1)應(yīng)急預(yù)案啟動及上報混凝土澆筑過程中,模板支架出現(xiàn)坍塌時,由現(xiàn)場安全員向應(yīng)急救援工作組組長即項(xiàng)目經(jīng)理匯報,由項(xiàng)目經(jīng)理負(fù)責(zé)啟動應(yīng)急預(yù)案。同時項(xiàng)目經(jīng)理在事故事件發(fā)生后30分鐘內(nèi)向公司應(yīng)急救援領(lǐng)導(dǎo)小組辦公室報告,根據(jù)事故級別在1小時內(nèi)向相關(guān)上級單位和政府部門報告。2)應(yīng)急救援過程在啟動應(yīng)急救援預(yù)案后,應(yīng)急搶險小組立即到達(dá)現(xiàn)場,對事件基本情況做出評估分析并形成處置方案。按照處置方案,派遣搶險小組實(shí)施現(xiàn)場處理。主要內(nèi)容包括查明事故原因、查清有無人員受傷及救治、采取措施防止支架坍塌進(jìn)一步擴(kuò)展、支架及施工恢復(fù)方案。綜合協(xié)調(diào)小組同時進(jìn)駐現(xiàn)場,負(fù)責(zé)搶險物資、設(shè)備的調(diào)配。并將現(xiàn)場進(jìn)行安全封閉,嚴(yán)禁一切無關(guān)人員、車輛和物品進(jìn)入救援區(qū)域,維持事件現(xiàn)場的治安和交通秩序。負(fù)責(zé)聯(lián)絡(luò)相關(guān)政府安全監(jiān)督管理部門進(jìn)駐現(xiàn)場,并配合好其行使權(quán)利的工作。小組組長負(fù)責(zé)將救援過程、進(jìn)展、損失程度及其它相關(guān)事宜及時、準(zhǔn)確的對外發(fā)布。后勤保障小組負(fù)責(zé)做好搶險救援及事故事件調(diào)查工作人員生活保障、食宿安排等服務(wù)工作,按照救援需求提供必要相應(yīng)的服務(wù),協(xié)調(diào)好現(xiàn)場治安保衛(wèi)工作。善后處理小組負(fù)責(zé)受傷人員的現(xiàn)場緊急救治和安全轉(zhuǎn)移,必要時需求當(dāng)?shù)蒯t(yī)院救護(hù)。穩(wěn)定相關(guān)人員的情緒,做好安撫工作。3)應(yīng)急救援終止當(dāng)事故現(xiàn)場處理完成,人員和財產(chǎn)得到最大限度的保護(hù)后,在得到上級單位同意后,由項(xiàng)目經(jīng)理宣布應(yīng)急救援行動終止。4)后期處理救援結(jié)束后,及時做好人員安撫、撫恤等工作。成立事故調(diào)查組,及時開展事件調(diào)查和現(xiàn)場取證、事故分析,作出事故結(jié)論,提出處理意見并實(shí)施處理,向相關(guān)上級單位和部門匯報事故調(diào)查處理經(jīng)過。5、加強(qiáng)預(yù)防準(zhǔn)備工作1)針對應(yīng)急預(yù)案加強(qiáng)宣傳,并組織開展對全員進(jìn)行應(yīng)急預(yù)案專項(xiàng)培訓(xùn),提高安全生產(chǎn)意識和出現(xiàn)突發(fā)情況時相關(guān)個人明確職責(zé)分工、應(yīng)急程序,提高應(yīng)對突發(fā)事件的預(yù)防、處理能力。2)可根據(jù)項(xiàng)目生產(chǎn)實(shí)際情況,組織應(yīng)急救援預(yù)案的演練。3)在施工現(xiàn)場旁設(shè)立救援物資儲備室,專人保管相關(guān)救援物資。4)混凝土施工過程中,做好支架及模板的監(jiān)測觀察工作,按照安全專項(xiàng)方案實(shí)施安全管理工作。 中鐵隧道集團(tuán)有限公司 貴陽市東站路道路工程第1合同段項(xiàng)目經(jīng)理部 二一二年七月二十八日為了促進(jìn)本公司各項(xiàng)經(jīng)營活動由事后管理向事前管理方式的轉(zhuǎn)變,強(qiáng)化生產(chǎn)經(jīng)營全過程控制,提高資金使用的計(jì)劃性,特制定本管理辦法,以增加公司資金運(yùn)行的透明度,降低各項(xiàng)成本,使有限的資金發(fā)揮最大的效能。treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation three years action plans, requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project Trinity environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and imp
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 年度光伏組件背板產(chǎn)業(yè)分析報告
- 二零二五版共享辦公空間租賃管理合同2篇
- 2024-2025學(xué)年新教材高中歷史第八單元中華民族的抗日戰(zhàn)爭和人民解放戰(zhàn)爭第23課從局部抗戰(zhàn)到全面抗戰(zhàn)學(xué)案新人教版必修中外歷史綱要上
- 2024-2025學(xué)年高中政治專題三信守合同與違約2訂立合同有學(xué)問訓(xùn)練含解析新人教版選修5
- 2024-2025學(xué)年新教材高中英語UNIT1TEENAGELIFESectionⅡDiscoveringUsefulStructures課時作業(yè)含解析新人教版必修第一冊
- 2025年度臨時勞動合同范本(區(qū)塊鏈技術(shù)應(yīng)用)4篇
- 2025年度城市綠化工程合同及后期養(yǎng)護(hù)服務(wù)3篇
- 2024租賃合同(辦公設(shè)備)
- 2025年度智慧城市建設(shè)戰(zhàn)略合作合同范本3篇
- 2025年度監(jiān)獄門衛(wèi)安全責(zé)任書3篇
- 巖土工程勘察課件0巖土工程勘察
- 《腎上腺腫瘤》課件
- 2024-2030年中國典當(dāng)行業(yè)發(fā)展前景預(yù)測及融資策略分析報告
- 《乘用車越野性能主觀評價方法》
- 幼師個人成長發(fā)展規(guī)劃
- 2024-2025學(xué)年北師大版高二上學(xué)期期末英語試題及解答參考
- 動物醫(yī)學(xué)類專業(yè)生涯發(fā)展展示
- 批發(fā)面包采購合同范本
- 乘風(fēng)化麟 蛇我其誰 2025XX集團(tuán)年終總結(jié)暨頒獎盛典
- 2024年大數(shù)據(jù)分析公司與中國政府合作協(xié)議
- 一年級數(shù)學(xué)(上)計(jì)算題專項(xiàng)練習(xí)匯編
評論
0/150
提交評論